Retain the ridge height of dwelling house and also storage space created in attic. Retain one additional velux window in rear slope of roof.Decision record indexed
Construct a dwelling house, waste water treatment system, percolation area, new bored well, new splayed entrance and associated site workDecision record indexed
Renovate and extend existing cottage, remove evergreen trees, connect to existing services on-site and all associated site worksDecision record indexed
To construct, operate and decommission a photovoltaic solar farm over an area of 2 hectares comprising of photovoltaic panels on ground mounted frames, a switch room building, Perimeter fencing, hardcore access tracks with underground ducting routes, landscaping, new site entrance and access road to solar farm and existing sawmill facility, surface water drainage with underground attenuation tank, revision of existing site boundaries along with all associated ancillary development works. A Natura Impact Statement (NIS) has been submitted with this application.Decision record indexed
1) Demolish the existing attached garage to the west of the existing dwelling, 2) Construct a storey and a half style extension to the west of the existing dwelling, 3) Alter the South, East and North elevations including all associated site works.Decision record indexed
Construct a dwelling house, domestic garage, septic tank & percolation area, new entrance and all associated and necessary site worksDecision record indexed
Alter design of dwelling house, to alter site boundaries and to change location of dwelling house and domestic garage on site from that which was granted planning permission with 21/899 and all associated and necessary site worksDecision record indexed
Construct extension to existing livestock shed to accommodate the following: 2 no. robot milking units; slatted tank capacity 523 cu m; cubicles, calving/separating area; compressor room, store room; install cubicles and dairy area in existing shed; widen existing entrance by 8.0 m to the southwest side of existing entrance and all associated site worksDecision record indexed
Construct proposed dwelling house, domestic garage, septic tank treatment system, percolation area, new site entrance and all associated site works.Decision record indexed
New dwelling house, domestic garage, treatment system & percolation area, new bored well, new site entrance and associated site worksDecision record indexed
Construct extension & alter dwelling to include extension, new garage & stables, demolish existing shed & all associated site worksDecision record indexed
Modify the north-east and north-west elevations of the existing dwelling, the change of use of the existing garage to accommodate a living room and gym with the addition of a new A-type roof, a single-storey rear extension linking the main dwelling to the converted garage, and all associated site worksDecision record indexed
Extension to dwelling house, conversion of attic to sleeping accommodation with four velux windows fitted in roof, construction of domestic garage/ store, garden shed and carportDecision record indexed
Townlands of Bigbog Coolnabacky Esker Money Lower and Loughteeog, Stradbally, Co. Laois.
Amend the solar farm permitted under Laois County Council Reg. Ref. 17/532 and consists of a revised solar PV panel arrangement and maximum height of panels up to 3.2 metres; a reconfigured internal access route network; reduced number of MV transformers; provision of string inverters; revised CCTV arrangement; a spare parts storage container; weather stations; monitoring house; toilet facilities; and all other ancillary works associated with the development above and below ground including security fencing and gates, cabling, landscaping and drainage works. It is sought to increase the maximum export capacity of the solar farm to 80 MW and to increase the operational life of the solar farm from 30 to 40 years from the date of commissioning. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.Decision record indexed
A c. 1.82 Ha site at Summerhill, Portlaoise, Co. Laois
Provide 36 No. 4-bed, 2 No. storey houses.The development will also include: the continuation of the Link Road permitted in Phases 1A & 1B, as proposed to be amended as part of the Phase 2 application and extended as part of the Phase 2 & 3 applications; car parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; lighting; and all associated site and development works above and below ground.Decision record indexed
Construct new dwelling house and garage, new site entrance, new treatment system with polishing filter and all associated site worksGrounds not yet categorised
Construct new dwelling house and garage, new site entrance, new treatment system with polishing filter and all associated site worksGrounds not yet categorised
(1) change of use of an existing creche building (177 sq.m) at site 6B (approved under planning file 14-335) to a single storey house; (2) replace a single storey creche building (177 sq.m) at site plot 56 (approved under planning file 17-396) with 2 no. semi-detached houses (Type B) on site plots 56 and 56ADecision record indexed
A c. 4.15 Ha site at Summerhill, Portlaoise, Co. Laois
Construct a creche (c. 961 sq m) and 74 No. residential dwellings comprising 64 No. 4-bed houses and 4 No. 1-bed and 6 No. 2-bed sheltered housing units. The proposed development will be 1 No. and 2 No. storeys in height. The development will also include: minor amendments to the landscape and boundary treatment to the south of the Phase 1A site to provide car parking and access to the proposed creche; the continuation of the Link Road permitted in Phases 1A & 1B, as proposed to be amended and extended as part of the Phase 2 application; car parking; cycle parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; lighting; and all associated site and development works above and below ground.Decision record indexed
Construct a single storey domestic dwelling house, domestic garage, wastewater treatment system and percolation area along with new site entrance and boundary treatmentsDecision record indexed
Construct a single storey extension to the rear, alterations to the existing house layout, including the demolition of the existing sunroom and garden shed and all associated site worksDecision record indexed
Construct a dwelling house, domestic garage, waste water treatment system, percolation area, new splayed entrance and associated site worksDecision record indexed
Retain realigned gateway, hard standing and farm access laneway to the east side of dwelling together with all associated site development worksDecision record indexed
A c. 3.85 Ha site at Summerhill, Portlaoise, Co. Laois
Construct 92 No. residential dwellings comprising 86 No. 4-bed houses and 6 No. 2-bed sheltered housing units. The proposed development will be 1 No. and 2 No. storeys in height. The development will also include: minor amendments to the Link Road permitted as part of Phases 1A & 1B and its continuation through the Phase 2 site; minor amendments to the landscape and boundary treatment to the south of the Phase 1A site; car parking; cycle parking; public open space; drainage connections; boundary treatments; hard and soft landscaping; pumping station; lighting; and all associated site and development works above and below ground.Decision record indexed
Bigbog Coolnabacky Esker, Money Lower Loughteeog, Stradbally Co Laois
Amend planning permission Reg. Ref. 17532 to consist of: Replacement of permitted Distribution Network Operator (DNO) 110kV substation and all associated infrastructure (Glass Reinforced Polyester (GRP) Cabinet, monitoring house, storage shed, auxiliary transformer and WC) with an Air Insulation Switchgear (AIS) 110kV substation comprising a single-storey control building (c. 6.28m height and c. 133.7sqm) within a palisade-fenced compound (c. 2.6m height and c. 1,779.8sq.m) and all associated electrical infrastructure and apparatus, and realignment of permitted solar arrays. The proposed development will consist of: Construction of a new vehicular entrance and access track connecting to permitted internal vehicular tracks; Construction of an underground cable (c. 160m length) to provide a tail fed connection to the permitted 400kV Coolnabacky substation (An Bord Pleanála Case Ref. PL11.VA0015); and, All ancillary site development works, including lighting, drainage, temporary construction compound and on-site parking to serve the operational and maintenance needs of the substation. A Natura Impact Statement (NIS) will be submitted to the planning authority with the application.Decision record indexed
Construct two storey and part three storey 1000 pupil secondary school to include general classrooms, specialist classrooms, a general-purpose hall, PE hall, offices, staff room, library, sanitary facilities and ancillary spaces. The development also includes the provision of: • New site entrance from O’Dowling roundabout on the Portlaoise South Orbital Route – R94 - Leading to new car and bus set down/ drop off area with 49 No. carparking spaces and with pedestrian & cycle route to the proposed school. • New site entrance from the adjoining Timahoe / Well Road (R426), access road with cycle and foot paths, bicycle spaces and 92 No. car parking space. • Provision of new footpath on the Timahoe / Well Road (R426), connecting to the existing. • Proposed new Hockey pitch with associated fencing, shelter dugouts and 8 no. flood lighting standards. • 6 no. ball courts, landscaped gardens and external social space. • Provision of a heat pump and gas storage areas, external stores and bin storage area. • Provision for all landscaping, boundary treatments, associated drainage, attenuation and other site services with all related site development and ancillary works. • A Natura Impact Statement (NIS) will be submitted to the planning authority with the application and the NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the office of the relevant planning authority.Decision record indexed
Retain single storey room as constructed to the side of dwelling house, permission to retain granite quoin stones to said house and all associated site worksDecision record indexed
A c. 2.14 Ha site at Summerhill Portlaoise Co. Laois. The site is generally bound to the north by the Portlaoise Southern Circular Road to the east by Holy Family School Road and to the west and south by undeveloped agricultural lands., Portlaoise,
Permission for development at this c. 2.14 Ha site at Summerhill, Portlaoise, Co. Laois. The site is generally bound to the north by the Portlaoise Southern Circular Road, to the east by Holy Family School Road, and to the west and south by undeveloped agricultural lands. Works are also proposed at O’Devoy (O’Deevy) roundabout comprising active travel infrastructure improvements to include the introduction of new shared pedestrian / cycle areas on the southern side of the Southern Circular Road and Aghnaharna Drive and improved pedestrian and cycle crossing facilities across the site access arm of this junction. Wastewater will be pumped via a rising main to discharge into the existing 450mm public wastewater sewer to the north-east at the O’Kelly roundabout. Potable water supply will be provided through a new connection to the existing 400mm public watermain on Aghnaharna Drive. The development site area, roadworks, and water and drainage works will provide a total application site area of c. 2.37 Ha. The development will consist of the provision of 45 No. residential dwellings comprising: 1 No. detached dwelling (three-storey 5-bed); 2 No. semi-detached corner dwellings (two-storey 4-bed); 18 No. semi-detached dwellings (two-storey 4-bed); 20 No. edge house t-shape dwellings (two-storey 4-bed); and 4 No. semi-dwellings (two-storey 3-bed). The development will also include: a new Link Road through the site, providing vehicular entrance/exit via O’Devoy (O’Deevy) roundabout; ancillary car parking spaces; public open space; boundary treatments; hard and soft landscaping; sub-station; pumping station; lighting; and all associated site and development works above and below ground.Decision record indexed