Permission for Retention of the extensions to the front, rear and side of the existing dwelling, (2) Permission for the decommissioning of the existing septic tanks, (3) permission for the installation of a secondary treatment system and soil polishing filter and all associated site works.Decision record indexed
Permission for retention for the part demolition of the attached single storey flat roofed extension and car port previously permitted under Planning Registration No. 14/55010, permission for demolition of the remainder of the attached single storey extension, the construction of a part 2 storey and part single storey extension to be constructed off the eastern gable of the existing dwellinghouse, the construction of a 1st floor extension on the northern elevation and a detached garden store, minor alterations to existing elevations and all ancillary site works.Decision record indexed
The development consists of: 1) Permission for retention of the existing dwelling as constructed (change of design from that granted under PD 35, PD 982 & PD 1337). 2) Permission for retention of the existing detached domestic garage as constructed. 3) Permission for retention of the alterations to the boundary at the rear of the dwelling. 4) Permission for decommissioning of the existing septic tank and percolation area to the rear of the property and replacing it with a package pump system and rising main to connect to the public sewer on Navigation Road.Decision record indexed
Twigfield House (Protected Structure, RPS No 47) Navigation Road Annabella Mallow, Co Cork
Alterations and extensions to existing dwelling house namely, (a) ground and first floor extensions to side and rear (b) single storey carport to side (c) single storey storage building to side.Decision record indexed
Permission to construct an extension to an existing dwelling and alterations to existing elevations as well as associated site works.Decision record indexed
Permission for the construction of a new Biomass Plant for the generation of steam as part of the decarbonisation road map for the business. The development will consist of the construction of a single storey woodchip boiler building (840m2) with a height of 16.292m above ground level and a maximum stack height of 27.292m above ground level, the construction of an extension to the existing pipe bridge, new internal access road and yard to facilitate vehicle movements and associated site works. The application relates to an establishment which has an Industrial Emissions Licence, Ref.No. P0403-03. A Natura Impact Statement (NIS) will accompany the application.Decision record indexed
Annabella, West End & Park Road (N72), Mallow, Co. Cork.
Permission for development at this site of approximately 0.0352 hectares located at the permitted pharmacy and office units (totalling 317.3 sq.m gross floor space) of the newly constructed Lidl licensed discount foodstore (granted permission under Cork County Council Planning Reg. Ref. No.: 20/05063). The proposed development consists of the change of use of the constructed pharmacy unit (173.8 sq.m) to shop as defined by Article 5(1) of the Planning and Development Regulations 2001(as amended); the change of use of the constructed office unit (139.7 sq.m) to shop as defined by Article 5(1) of the Planning and Development Regulations 2001 (as amended); and associated signage (totalling 6.12 sq.m).Decision record indexed
(A) Demolish existing single storey annex (B) Refurbish existing dwelling (C) Construct a two storey extension to existing dwelling (D) Construct a new storage shed and (E) All ancillary site works.Decision record indexed
West End & Park Road Annabella, Castlelands Mallow Co.Cork
Alterations to Co-op store and café permitted, not yet constructed, under application register reference 20/4925, which will comprise: 1) the construction of a first floor internal mezzanine to the Co-op store to accommodate a staff area (offices, staff canteen and welfare facilities); 2) the construction of a first floor bulk store mezzanine to accommodate an additional bulk storage area; 3) all ancillary works including internal stairs and a lift; and 4) the construction of a ground floor extension to the café and associated extended external canopyDecision record indexed
West End Road and Park Road (N72) Annabella Mallow Co. Cork
Development comprising the construction of a new Licenced Discount Foodstore with ancillary infrastructure and associated site development works (all totalling 2,254.4 sq m Gross Floor Area and ranging in height equivalent from 1 to 2 storeys), at a site of approximately 1.476 hectares. The construction of the proposed Licenced Discount Foodstore (2,215 sq m gross floor area) comprises of: A retail sales area with ancillary off-licence use and bakery (total Net Retail Sales Area of 1,420 sq m), entrance pod, public facilities (incl. lobby and toilets), staff facilities (incl. lobbies, operations office, meeting room, canteen, locker room, showers and toilets), storage (incl. cold storage), IT room, plant room, and delivery area; Rooftop photovoltaic solar panel array extending to a maximum of 907.5 sqm; Corporate signage consisting of 4 no. building mounted corporate internally illuminated signs, 1 no. free standing internally illuminated flagpole sign at the site entrance from Park Road, and 1 no. free standing externally illuminated poster display boards; 1 no. covered trolley bay structure (39.4 sq m Gross Floor Area); Surface car park providing a total of 127 no. car parking spaces (4 no. disabled, 12 no. parent and child, 12 no. EV charging spaces and 101 no. regular) and 14 no. motorcycle parking spaces and 16 no. bicycle parking spaces; Primary vehicular and pedestrian access to the proposed Licenced Discount Foodstore will be provided via an existing site entrance (serving the Dairygold Co-Op Superstore) onto Park Road (N72), which is to be enhanced as part of the proposed development; Pedestrian access will be provided via a new plaza area along the northern boundary of the site with West End Road; and Boundary treatments, hard and soft landscaping, services (including 2 no. below ground attenuation tank) and all other ancillary and associated site development works above and below ground level. This Planning Application will be accompanied by a Natura Impact Statement.Decision record indexed
O'Mahony's Centra Spa Glen, Spaglen Td. Mallow Co.Cork
Permission for retention of (1) an existing refuse shed (25.3 sqm), (2) Electric vehicle charge point cabinet, (3) above ground 1600 litre LPG tank with associated works. Permission is also sought for (1) an AD BLUE fuel pump cabinet and ancillary 5000 litre above ground AD BLUE tank, (2) the construction of 2.5m high hit and miss fencing to screen existing 2 no. sheds and refuse shed and (3) the removal of condition no.3 attached to planning ref no. 20/4178, which called for the removal of the two sheds, (29 sqm) containing plant associated with the car wash operations on the expiration of the period of 3 no. years beginning on date of the grant of this permission, to allow for the 2 no. sheds to remain on site.Decision record indexed
Development on a site which will consist of the demolition of part of the existing Co-Op store, and associated garden centre, agri store, and delivery yard, and the provision of an expanded Co-Op store, and associated part-covered garden centre, agri store and delivery yard; the refurbishment of Annabella Villas (Protected Structure Reg Nos. 70-71) (Unit 1) to provide a restaurant use at lower ground floor and ground floor, to include the sale of hot food for consumption off the premises, and offices on the first floor and second floor; repair works to the Coach Houses (Protected structure Reg No. 72); 7no. new units (Units 2-8) suitable for convenience retail/comparison retail/retail warehousing/restaurant/café use, with retail use to include the sale of alcohol for consumption off the premises, and restaurant/café use to include the sale of hot food for consumption off the premises. A glazed connection, for restaurant use, is proposed between the lower ground floor of Annabella Villas (Protected Structure Reg Nos. 70-71) (Unit 1) and Unit 2. The proposed development also provides for the demolition of part of the boundary wall fronting West End; public realm works on West End; car parking; cycle parking; signage; waste management areas; ESB substation; rooftop plant, including solar panels; and all site development, infrastructural and landscaping works, including modifications to the existing access off Park Road, and improved/new pedestrian connections on West End and Park Road. The northern part of the site is located within an Architectural Conservation Area (ACA-1). An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the application. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.Decision record indexed
West End And Park Road, Annabella, Mallow, Co.Cork
Permission for Development on a site which will consist of the demolition of part of the existing Co-Op store, and associated garden centre, agri store, and delivery yard, and the provision of an expanded Co-Op store, and associated part-covered garden centre, agri store and delivery yard; the refurbishment of Annabella Villas (Protected Structure Reg Nos. 70-71) (Unit 1) to provide a restaurant use at lower ground floor and ground floor, to include the sale of hot food for consumption off the premises, and offices on the first floor and second floor; repair works to the Coach Houses (Protected structure Reg No. 72); 7no. new units (Units 2-8) suitable for convenience retail/comparison retail/retail warehousing/restaurant/café use, with retail use to include the sale of alcohol for consumption off the premises, and restaurant/café use to include the sale of hot food for consumption off the premises. A glazed connection, for restaurant use, is proposed between the lower ground floor of Annabella Villas (Protected Structure Reg Nos. 70-71) (Unit 1) and Unit 2. The proposed development also provides for the demolition of part of the boundary wall fronting West End; public realm works on West End; car parking; cycle parking; signage; waste management areas; ESB substation; rooftop plant, including solar panels; and all site development, infrastructural and landscaping works, including modifications to the existing access off Park Road, and improved/new pedestrian connections on West End and Park Road. The northern part of the site is located within an Architectural Conservation Area (ACA-1). An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the application. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. Extension of Duration to Permission granted under Planning Ref. No. 20/4925Decision record indexed
Co-Op Store West End and Park Road Annabella Mallow, Co. Cork
Permission for the construction of an ancillary bulk storage building and all associated site development works (change of elevational treatment of the southern and western elevations of the ancillary bulk storage building previously permitted under application register reference 20/4925) on a site to the south of, and attached to, the Co-Op store at West End and Park Road, Annabella, Mallow, Co. Cork.Decision record indexed
Pine Cottage, Navigation Road, Killetra, Mallow, Co. Cork, P51CA2R
Permission for extension and alteration to the existing dwelling house as follows: partial demolition of the 1st floor bedrooms pitched roof and construction of 1st floor extension, construction of ground floor new entrance, lobby and stepped approach, 1st floor master bedroom suite and home office, construction of covered area/overhang and raised patio/planter to front of house, conversion of existing side garage into home studio and storage, and addition of roof lights internal renovations throughout, installation of drain and associated soakpit at site entrance. Installation of surface water soakpit, wastewater treatment system, sand polishing module etc. Excavations, construction of new steps and raised landscaped areas to rear and all associated site works, services and landscapingDecision record indexed
The existing staff car park at Dairygold's Nutritional Campus and 5, 6 and 7 West End, Annabella Mallow, Co. Cork
The construction of a new 215mm solid block boundary wall with piers, of between 2.0-2.4m in height, plastered and capped, and new footpath, between the existing staff car park at Dairygold’s Nutritional Campus and 5 West End. The proposed development will also consist of the reinstatement of the original vehicular access via the archway between 6-7 West End (existing pedestrian/cyclist access, and existing gates to be retained); the blocking up of the existing northern pedestrian access from the existing car park (to match the existing boundary wall); and all ancillary works, including: the removal of existing internal bollards; the removal of the existing guardrail on West End; and the replacement of existing concrete footpath along West End; as well as all site development, drainage and landscaping works. There are no works proposed to the existing buildings at 5,6 and 7 West End (Protected Structures Reg. Nos. 100,101, and 102). The application relates to an establishment which has an Industrial Emissions License (P0403-03).Decision record indexed
Alteration/modification of the previously permitted (Ref: 21/6805) internal alterations, refurbishment and change of use of the apartment and office building (Protected Structures Reg. No’s 100,101 & 102). The proposed amendments include: (1) Provision of 2 No. additional residential units (1 bed split level) in lieu of the previously permitted management office at basement and ground floor levels (15 No. residential units in total); (2) Amending Unit 04 at ground floor to a 1 bed unit; (3) Provision of new staircase from the ground to basement in No. 5 West End; (4) Internal wall insulation proposed to external walls of basement level; (5) Internal alterations to third floor and provision of 2 No. roof AOVs; (6) Provision of 4 No. additional resident car parking spaces in lieu of the previously permitted staff parking.Grounds not yet categorised
Proposed internal alterations, refurbishment and partial change of use (1082sqm) from office to residential of No’s 5, 6 and 7 West End, Mallow, Co. Cork (Protected Structures Reg, No’s 100, 101 and 102) to provide 13 no. apartments (2 no. studio, 6 no. 1-bed and 5 no. 2-bed) an ancillary split-level management office and ancillary storage areas. External proposals include a new bicycle/refuse store, minor amendments to the existing car park and all associated site works. No alteration to the existing external elevations are proposed.Decision record indexed
(1) Retention of 1 no. fuel pump including ancillary signage, (2) retention of 1 no. electric vehicle charge point including ancillary signage and (3) permission to relocate said 1 no. electric vehicle charge point including ancillary signage.Decision record indexed
(1) Extend the existing hard standing area, (2) construct 1 no. rollover car wash and 1 no. jet car wash, (3) install 2 no. sheds (29 Sqm) containing plant associated with the car wash operations, (4) provide 3 no. additional car parking spaces, (5) provide new boundary treatments to northern and eastern site boundaries, (6) install new light pole and (7) carry out all associated site works.Decision record indexed
Permission to (1) install rooftop photovoltaic solar panel arrays consisting of approximately 364 Sqm of solar panels and associated fall arrest system fixed to the Western and Eastern roof slopes of existing main building and (2) carry out elevational changes to the front (Southern) façade of the existing main building. All of these works are proposed at O'Mahonys CentraDecision record indexed
The Mallow South Town Centre Development, (under construction), bounded by West End & Park Road, Annabella, Mallow, Co. Cork.
Permission for the construction of a single storey retail warehouse (unit 3) to the immediate east of retail unit 2 permitted under application reference 20/4925; roller shutter door to the rear elevation; signage; rooftop plant; extension to the delivery yard area permitted under application register reference 20/4925; and all associated site development and drainage works on a site that forms part of the Mallow South Town Centre Development (under construction). The proposed development will modify condition no. 2, which omitted the proposed retail units 3 and 4, attached to application reference 20/4925. The proposed modified condition no. 2, will exclude the omission of retail unit no. 3. A Natura Impact Statement (NIS) will be submitted to the planning authority with the application.Decision record indexed
Construction of a replacement septic tank and raised percolation area to replace existing septic tank and soakpit to serve their existing dwelling Knockrua.Decision record indexed
The construction of a residential development of 96 no. dwelling units and all associated site development works. The proposed development consists of the construction of 24 no. 4-bed semi-detached houses, 30 no. 3-bed semi-detached houses, 16 no. 3-bed townhouses, 14 no. 2-bedtownhouses and 6 no. 2-bed duplex units, 4 no. 2-bed apartment units and 2 no. 1-bed apartments units contained in 3 no. 3 storey apartment blocks. Vehicular access to the proposed development will be via the existing entrance from the L-1207. The proposed development also includes open space, landscaping, bicycle parking facilities, bin stores, public lighting and all ancillary site development works. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the application. The NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the offices of the planning authority.Decision record indexed
The construction of a residential development of 95 no. dwelling units and all associated site development works. The proposed development consists of the construction of 32 no. 4-bed semi-detached houses, 36 no. 3-bed semi-detached houses, 8 no. 3-bed townhouses, 7 no. 2-bed townhouses and 6 no. 2-bed duplex units, 4 no. 2-bed apartment units and 2 no. 1-bed apartment units contained in 3 no. 3 storey apartment blocks. Vehicular access to the proposed development will be via the existing entrance from the L-1207 and provision will be made for a pedestrian link with the River Valley housing estate (as previously permitted under Cork County Council Planning Reference 045426). The proposed development also includes open space, landscaping, bicycle parking facilities, bin stores, public lighting and all ancillary site development works. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with this application.Grounds not yet categorised
Permission for a package wastewater treatment plant, percolation area and associated pipework and to decommission the existing septic tank and soakpit.Decision record indexed
Permission for the construction of 28 no. dwelling houses at The Old Course, Spaglen, Mallow, Co. Cork. The application is for a change of plan to part of development containing units 43-58 and 65-76 previously permitted under Plg. Reg No. 22/4676. The changes include: A) Estate road serving the south-eastern portion of the development moved north and road levels updated due to site topography constraints. B) Updated FFL’s for houses 43-46 and 69-76, C) Updated FFL’s, house positioning and elevational treatments for houses 47-58. D) Alterations to rear garden dimensions for houses 47-58 and 65-76 to accommodate new proposed estate road position. The Car parking allocation, landscaping, boundary treatments, and all ancillary site development works remain as per previously permitted Plg. Reg No.22/4676.Decision record indexed
Permission for change of use of ground floor in existing 3 storey building from commercial use to domestic use as 3 storey dwelling house and all associated site works.Decision record indexed
15 and 16 West End Thomas Davis Street Mallow Co. Cork
Permission for renovations, alterations and change of use of derelict building previously used as office to restaurant use with staff facilities, office and events room on first floor and permission for the demolition of existing extensions to rear and construction of new extension to same.Decision record indexed
Scoil Íosagáin Infant School Spa Glen Mallow Co.Cork
Permission for construction of a two storey extension for the delivery of Special Needs Education on grounds of the existing Scoil Iosagain Infant school, construction of a single storey extension for circulation link to connect the new accommodation to the existing school, permission for new external play area, sensory garden and all associated site works.Decision record indexed
The construction of a residential development of 44 no. dwelling units and all associated site development works. The proposed development consists of the demolition / removal of existing foundations for incomplete dwellings permitted under Cork County Council planning reference 045426 (as amended by planning references 055906 and 064071) and the construction of 8 no. 4 bed semi-detached houses, 24 no. 3-bed semi-detached houses, 6 no. 3-bed townhouses and 6 no. 2-bed townhouses. Vehicular access to the proposed development will be via the existing entrance from the L-1207. The proposed development also includes open space, landscaping, public lighting and all ancillary site development works. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the application.Grounds not yet categorised
To demolish existing dwelling house and adjoining outhouses, and construction of replacement dwelling house with adjoining storage shed and all associated site works.Decision record indexed
Permission to demolish existing dwelling house and adjoining outhouses, and construction of replacement dwelling house with adjoining storage shed and all associated site works as previously permitted under planning ref no. 21/4222, except that the location of the dwelling house and storage shed have been amended within the site.Decision record indexed
Alterations to existing front garden surface. Demolition of half of the front garden wall and gate pier to accommodate car parking area. Dishing footpath and entrance and all associate work.Decision record indexed
The demolition of existing structures and construction of a residential development of 22 no. apartment and duplex units in 3 no. blocks. Block 1 is 2 no. storeys and comprises 4 no. two bed units. Block 2 is part-1 to part-3 no. storeys and contains 6 no. one bed units, 6 no two bed units and 4 no. three bed units. Block 3 is 2 no. storeys comprising 2 no. one bed units. The development will also include boundary treatments, hard and soft landscaping, car parking, cycle parking, bin storage and all ancillary site development works. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the application. The NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the offices of the planning authority.Decision record indexed
The demolition of existing structures and the construction of a residential development of 28 no. apartments and all ancillary site works. The proposed development will consist of 4 no. apartment buildings as follows; Blocks 1 & 2 (4 no. 1-bedroom apartments over 2 storeys); Block 3 (6 no. 1-bedroom apartments and 12 no. 2-bedroom apartments over 3 storeys); Block 4 (2 no. 1-bedroom apartments over 2 storeys). Ancillary site works to include provision of bin store and bicycle stands. Access to the proposed development will be from Emmet Street and Humes Lane.Grounds not yet categorised
Retention of modifications to the existing nursing home including alterations to the permitted site layout plan, changes to the permitted design and all ancillary site development works. 1. The changes in design consist of: (a) a ground floor boiler room extension with rooftop plant, (b) 2 no. first floor extensions, and (c) elevations changes including (i) modifications to the permitted entrance including a lift core and roof lights, (ii) changes to windows and doors at lower ground floor level, (iii) changes to the eastern and southern elevations. 2. Alterations to the permitted site layout include: 1 no. gas tank cage, 1 no. ESB kiosk, 1 no. water tank, 1 no. underground fire water tank, 1 no. boiler house, 1 no. plant building/store, 1 no. shed.Decision record indexed
The Patrician Academy/An Acadamh Paitríoch Fair Street/Sráid an Aonaigh Mallow/Mala Co. Cork/Co. Chorcaí
The development will consist of a part single-storey, part three-storey extension (c. 3,307 m2) to the existing school building (Protected Structure) to replace the previous 2-storey extension to the north-east of the application site which was destroyed by fire damage. The proposed extension will connect to the eastern elevation of the Protected Structure at the ground and first floor levels and will accommodate 11 no. classrooms and ancillary teacher and pupil facilities and a 2 no. classroom SNU unit with ancillary teacher and pupil facilities. The development will include the demolition of (i) the existing two-storey link building/entrance lobby (c. 111 m2) connected to the eastern elevation of the Protected Structure; (ii) the existing detached, single-storey building (c. 97 m2) adjacent to the eastern elevation of the Protected Structure; (iii) the existing part single-storey, part 2-storey wood work building (c. 377 m2) adjacent to the south-western site boundary; and (iv) a single storey storage building (c. 72 m2) adjacent to the north-eastern site boundary. The development will also include the removal of 7 no. existing pre-fabricated structures (c. 906 m2) generally located to west of the Protected Structure and within the central/southern portion of the site. The proposed development will also include 1 no. single storage building (c. 90 m2) adjacent to the north-eastern site boundary; the demolition of the existing entrance gate and boundary wall at the eastern site boundary at Fair Street and its replacement with a new set back entrance gate and boundary treatment including school signage; the widening of the existing vehicular entrance to the site at the southern site boundary, including reinstatement works to the existing boundary wall and pillars; 29 no. car parking spaces, including 4 no. universal access parking spaces; school signage; photovoltaic panels at roof level; piped infrastructure and ducting, including the diversion of existing site services; 1 no. attenuation tank; changes in level; site landscaping; revised internal vehicular and pedestrian connections; boundary treatments; bicycle parking; and, all associated site development and excavation works above and below ground. No changes are proposed to the existing gym, science lab and art buildings within the application site on foot of this planning application. The Patrician Academy is a Protected Structure (RPS Reg. No. 78). [Is é a bheaidh san fhorbairt, síneadh aon stórDecision record indexed
Bank Of Ireland, 150 Bank Place Main Street Mallow Co. Cork
Permission to install a new external ATM with associated signage, and proposed new surround panel to the front elevation of the bank building with all associated site works (NIAH protected structure reference number 20815111)Grounds not yet categorised
Saint Jude 53 Beechwood Park Spaglen Mallow, Co. Cork
A) The construction of a granny flat ancillary to the main residence b) the demolition of existing boundary wall to the north and east boundaries and the construction of a new two metre high boundary wall to the north and east boundaries c) all associated ancillary site works.Grounds not yet categorised
Permission to demolish the existing attached garage and rear extension and for alteration and extension to the existing dwelling house (change of plan from that permitted under planning reg. 25/4689), alteration of the existing entrance and all associated site works.Decision record indexed
Permission to demolish the existing attached garage and rear extension, for alteration and extension to the existing dwelling house, alteration of the existing entrance and all associated site works.Decision record indexed
Permission to carry out the following works to upgrade their existing waste water treatment plant which serves their milk processing plant, -, (i) demolish the two existing concrete circular ADF filter tanks and replace with a new rectangular concrete tank, for new biological treatment technology, (ii) new ESB substation and switchroom and equipment plinth; (iii) decommission and remove the two existing metal clad biotowers and (iv) associated site works. This application relates to an establishment which has an Industrial Emissions Licence (PO403-03).Decision record indexed
Nos. 144A and 144B (McDonald's Restaurant) Bank Place Thomas Davis Street Mallow, Co. Cork
Retention permission is sought for plant at roof level. Permission is sought for the provision of a screen for the plant with a maximum height of c.2.539 metres along the edge of the roof on the western elevation.Decision record indexed