The existing partially constructed dwelling house constructed under PA 07/511889, retention permission is also sought on a temporary basis for the existing 2no. mobile homes on the site, permission is also sought to complete the construction of the dwelling house, install percolation area together with all associated site worksDecision record indexed
A) an existing shed at the rear of the site, b) a prefab structure to the rear of the site, c) an extension to the rear of existing dwelling and all associated siteworksDecision record indexed
Provision of a new single storey extension (25.4m2) to the side of the existing house and a single storey extension (34m2) to the rear of the existing house with all associated services and site works, on a site of 0.109 HaDecision record indexed
Single storey detached dwelling, single storey detached garage, site entrance, waste water treatment system and percolation area and all associated site worksDecision record indexed
Retention permission to retain as constructed minor elevational & plan changes to previously granted permission (ref no 17600147) to the sunroom/conservatory extension to the side of my dwelling with all associated siteworksDecision record indexed
Construction of a single storey dwelling house, domestic garage, connection to mains water supply, wastewater treatment system & polishing filter, entrance and all associated site worksDecision record indexed
(a) construction of an agricultural building to include milking parlour, dairy, ancillary rooms, underground slatted storage tank, waiting yard and livestock handling facilities (b) erection of external milk storage tank, meal bins and water storage tanks and all associated siteworksDecision record indexed
1. An overall planning application site area of c. 6.3 hectares consisting of a proposed bio-renewables production facility, buffer screening, ancillary facilities and site access via the existing permitted quarry entrance. 2. The proposed bio-renewables production facility (incorporating anaerobic digestion) compound will cover an area of c. 4 hectares. The production facility will convert feedstocks to end of line co-products, namely bio-methane (gas), compressed bio-methane (bio-CNG), carbon dioxide (CO2), electricity (green), organic fertilisers (pelleted) and water, with integrated solar energy generation. The adjacent Roadstone Killough Quarry plant will utilise the electricity, bio-methane and water. Pelletised fertiliser will be available for supply to local agriculture and traders off-site. CNG and CO2 will be pressurised and stored for ongoing draw-off by tankers to points of re-use off-site. Demolition of existing quarry store building (c. 158m²) to facilitate the proposed development. 3. The facility will consist of the following elements to be constructed: a) two-storey administration building with (gross floor area 664m² and 8.15m in height) to accommodate reception and storage areas, canteen, laboratory, first aid room, control room/electrical switch room, storage room, toilets, offices, conference room, training room and kitchenette, and roof solar panels 315m²; b) dry matter reception building (gross floor area 5,215m² and 12.7m in height) with roof solar panels 4,000m²; c) workshop building (gross floor area 122.1m² and 8.9m in height) to accommodate workshop and internal gantry crane, store and office at ground level and office at mezzanine level; d) bio-conversion building (gross floor area 3,257m² and 12.5m in height) with roof solar panels 2,400m²; e) pre-treatment, equalisation and gas upgrading building (gross floor area 5,685m² and 12m in height) to accommodate pre-treatment & equalisation area (3,527m²), utilities area (376m²), heat recovery plant area (361m²), water treatment recovery area (316m²), and gas upgrading facility (1,105m²) with roof solar panels 3,850m²; f) digestate handling building (gross floor area 692m² and 8.6m in height) to accommodate palletiser station/packing station area (150m²), solid dryer/vacuum evaporator area (392m²) and nutrient adjustment facility (150m²); g) warehouse storage building (gross floor area 158m² and 11.2m in height); h) bio-filling station building (gross floor area 300m² and 9.75m in hGrounds not yet categorised
The following: a) to demolish existing dwelling and outbuildings, b) to construct replacement dwelling with garage and wastewater treatment system and relocate existing entrance to improve sightline with all associated siteworksDecision record indexed
The construction of a new cattle shed with a new feeding barrier and passageway. RETENTION PERMISSION for an existing underground slatted tank and for a roofed area over an existing silage slab and all associated site worksDecision record indexed
New two storey dwelling house, domestic garage, new septic tank and percolation area, entrance and connection to group water scheme and all associated site worksDecision record indexed
1) existing boundaries of the site, 2) as constructed dwelling and location of same, 3) entrance and garage, 4) position of septic tank and percolation area (for previously granted permission, planning ref no 00/63), and full planning permission to upgrade treatment system with all associated site work and ancillary workDecision record indexed
To construct (i) cubicle shed with underground effluent tank and loose area and all associated site works. Permission for the retention for cubicle shed extension is also required.Decision record indexed
The construction/installation of a wastewater treatment unit and percolation area and connection to the existing staff welfare building (former Forge) and all associated site worksDecision record indexed
Townlands of Killough, Clohoge and Graigue, Co. Tipperary
A 10-year permission for the development of a solar farm on a site of 222.23 hectares consisting of the following: 745,168 sq. metres of solar photovoltaic panels on ground mounted steel frames; 23 no. inverter/transformer stations; underground power and communication cables and ducts; boundary security fencing; 1 no. Medium Voltage (MV) Ring Main Unit (RMU) Control Building; new internal access tracks and associated drainage infrastructure; continued use of existing site entrances off the L-4106 and L-13101 local roads; CCTV/Lighting posts; landscaping and all associated site services and works. The project will also include biodiversity enhancement and bat/bird and archaeological buffers within the site. The development is located proximate to Killough Castle and Tower House, which is a Protected Structure (TRPS 1029). Temporary works to the existing splayed entrance onto the L-4106 are proposed to accommodate construction works for the solar farm. The solar farm will be operational for 40 yearsDecision record indexed
The construction of a single storey dwelling house, domestic garage, entrance, effluent treatment system together with all associated site worksDecision record indexed
A) develop single-storey extensions to sides and rear of existing dwelling b) refurbish and alter existing dwelling and all associated worksDecision record indexed
(1) the material widening and works to provide wing walls and gate to a pre-existing entrance onto the R661; (2) the construction of stables (223m2), an exercise sand arena (1160m2), horse walker (114m2), muck heap with underground run-off tank, access farm roadways and all associated site worksDecision record indexed
(1) a single storey front porch, (2) a single storey flat roof side extension, (3) a single storey lean-to rear extension, (4) an attic conversion with skylight windows to front and rear of dwelling, (5) 2 no. single storey outbuildings to the rear of the existing dwellingDecision record indexed
A) construction of part two-storey, part single storey detached dwelling, b) detached garage, c) new site entrance, d) new bored well, e) new waste water treatment system and percolation area, f) all associated site worksDecision record indexed
Alterations to works granted under PA 201575, the alterations include the demolition of existing outhouses and Permission to construct a single storey extenson along with all associated site worksDecision record indexed
1. Extensions and renovations to existing dwelling and conversion of existing outbuildings for residential use 2. Garage 3. Carry out improvements to sightlines at existing domestic entrance 4. Provide new on site foul sewerage treatment 5. all ancillary works.Decision record indexed
To (i) extend an existing dwelling, (ii) change the use of part of the existing dwelling to a domestic garage and install a garage door to same, (iii) construct a new entrance, (iv) construct a new waste water treatment system and all associated site development worksDecision record indexed
Unauthorised demolition works to existing dwelling and Planning Permission for the renovation and refurbishment of existing dwelling including extensions to the rear and side along with provision of first floor over existing dwelling, Planning Permission is also sought to relocate existing entrance, install a new septic tank together with all associated site worksDecision record indexed
A two-storey dwelling, domestic garage, effluent treatment tank, percolation system, entrance and all associated ancillary worksDecision record indexed
A two storey extension to existing single storey dwelling house to include kitchen living area and 2 number bedrooms along with ancillary site worksDecision record indexed
A) proposed new extensions to the existing dwelling; b) associated alterations to existing dwelling external elevations to accommodate proposed new extensions & internal layout; c) demolition of existing garage structure and associated outbuildings; d) all associated site works;Decision record indexed
Renovation of existing derelict cottage, construct a two storey extension and domestic garage, install an effluent treatment system together with all associated site worksDecision record indexed
Renovation and extension to existing cottage, to include the provision of a new effluent treatment unit and percolation system and all other ancillary works. Permission granted under 17/600520Grounds not yet categorised
Construction of new dwelling with a new entrance, a new garage, a new well, a new septic tank and percolation area and all associated site worksDecision record indexed
Works carried out combining two existing agricultural entrances into 1 recessed agricultural entrance with fencing, gates, a hard standing for agricultural vehicles and all associated worksDecision record indexed
The construction of a new extension to the side of the existing dwelling, permission to decommission the existing septic tank and permission to install a new septic tank and percolation area. RETENTION PERMISSION for a as constructed front extension to the existing dwelling and all associated siteworksDecision record indexed
A) construction of a new part two-storey, part single-storey detached dwelling, b) new detached garage, c) new site entrance, d) new connections to existing utilities, e) new waste-water treatment system and percolation area, f) all associated site worksDecision record indexed
Extension to existing dwelling along with a new garage, to demolish existing sheds, decommission an existing septic tank and installation of a new waste water treatment system and new soil polishing filter, block up an existing entrance and PERMISSION for RETENTION of a vehicular entrance and all associated siteworksDecision record indexed