THE DEVELOPMENT WILL CONSIST OF A GRID STABILISATION FACILITY COMPRISING OF: THE CONSTRUCTION UP TO 4 NO. ROTATING STABILISERS, 5 NO. BATTERY STORAGE CONTAINERS, 1 NO. CONTROL ROOM, 2 TRANSORMERS AND ANCILLARY EQUIPMENT WITHIN A SITE AREA OF APPROX. 1.46 HECTARES. IT IS PROPOSED TO CONNECT THE PROPOSED DEVELOPMENT TO THE ADJACENT EIRGRID SUBSTATION BY UNDERGROUND CABLE WHICH WILL TRAVERSE THE PERMITTED AND UNDER CONSTRUCTION PEAKING PLANT. THE ROTATING STABILISERS WILL BE SUPPORTED BY 10 NO. ELECTRICAL EQUIPMENT ROOMS WHICH WILL CONTAIN ANCILLARY POWER SUPPLY PRODUCTS INCLUDING A STATIC FREQUENCY CONVERT (SFC), MV SWITCHGEAR, EXCITERS AND LV DISTRIBUTION, AND STEP-UP / DOWN TRANSFORMERS. A HEATING VENTILATION AND AIR CONDITIONING SYSTEM (HVAC) WILL BE ATTACHED TO EACH ROTATING STABILISER, 4 NO. AUXILIARY TRANSFORMERS ARE ALSO PROPOSED. THE BATTERY CONTAINERS WILL HOUSE INDIVIDUAL BATTERY COMPONENTS WITH 2 NO. FITTED EXTERNAL HVAC SYSTEM FOR EACH. 13 NO. INVERTER STATIONS AND 14 AUXILIARY TRANSFORMERS ARE PROPOSED FOR THE BATTERY CONTAINERS. THE ENTIRE SITE WILL CONSIST OF VARIOUS UNDERGROUND CABLES AND DUCTS, BOUNDARY SECURING FENCE, COMPOUND LIGHTING AND PALISADE GATES AND FENCING, NEW INTERNAL ACCESS TRACK, SECURITY LIGHTING, CCTV, HARDSTANDING AREAS AND ALL NECESSARY FOUNDATION WORKS. PERMISSION IS ALSO SOUGHT FOR 2 ELECTRICAL TRANSFORMERS (UP TO 220KV), ASSOCIATED HV EQUIPMENT AND UNDERGROUND ELECTRICAL GRID CONNECTION CABLING AND DUCTING CONNECTING THE DEVELOPMENT TO THE NATIONAL GRID AT THE ADJACENT ESB/EIRGRID SUBSTATION. PLANNING PERMISSION IS SOUGHT FOR A PERIOD OF 10 YEARS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATIONDecision record indexed
58 sqm single storey stable / storage block and permission for alterations and revisions to the internal layout of the original farm outbuildings and for change of use into 3 no tourist accommodation units, upgrade the existing effluent disposal system for additional loading along with all associated site development works9 conditions indexed
Single storey 710 sqm industrial unit, comprising of a 236 sqm metal fabrication workshop, and 474 sqm trade sales and display area, plus 272 sqm concrete surfaced yard with security fence to the side of the proposed building, connect into the existing mains sewer and storm water systems, to provide car parking, a 3.5m high sign at the site entrance and all additional site works14 conditions indexed
Demolition of existing outbuilding and the erection of a three storey detached building to side of present pub with 4 no units at ground level with retail / restaurant use, with 2 no office suites at first floor, with 4 no apartments (2 no 2 bed duplex's and 2 no 1 beds) at first and second floor levels with balconies and on each and west elevations. The construction of a two storey restaurant building and the reconfiguration of the existing carparking layout and associated site works
Reclamation of land through the filling of material comprising clay, silt, sand, gravel or stone on a site having an area of 9.82 hectares, for the purpose of improvement of land, together with site access and roadway and other ancillary site works12 conditions indexed
Demolition of existing administrative building (c185 sqm) security building (c29 sqm) and workshop (c169 sqm) and construction of a new film studio building comprising a stage area (c2017 sqm) and a 5 storey support building comprising support spaces, stores / props, waiting areas, changing areas, hair / make up, production offices / admin, loading areas, plant, and associated ancillary areas. Total gross floor area of the new film studio building (stage & administrative building) is c 4049 sqm, undercroft car park replacing existing surface car parking along with additional surface car parking and provision of temporary car parking within Ardmore Studios site (for duration of construction period) including in proximity to Ardmore House (Protected Structure No B21). Provision of a new single store security building (c19 sqm) and redesign of main site entrance and internal road layout, along with new footpaths, cycle parking, control points, security gates and deliveries / layby. Relocation of existing pillars from main entrance to the avenue within the Ardmore site. All associated site development works, landscaping, boundary treatments and services provision16 conditions indexed
Importation of greenfield soil and stone for the improvement of lands for agriculture requiring the importation of 18,576 cubic metres of inert greenfield soil and stone from neighbouring sites over a period of up to two years. The development will include a temporary mobile wheel wash with two associated temporary concrete tanks and all ancillary site works. The application is accompanied by a Natura Impact Statement11 conditions indexed
Part single, part two storey, three bedroom dwelling with home office, driveway, boundary treatment, provision of new on site wastewater treatment system, and all ancillary works necessary to facilitate the development. The dwelling will be accessed via an existing internal driveway and vehicular entrance on Sea Road13 conditions indexed