First floor extension over the existing ground floor extension to the side with proposed use of the entire two storey extension to the side to be a family flat ancillary to the main dwelling with two roof lights in rear roof plane.
Development on a site of c. 0.008 ha located West of the SSR Building of the TU Dublin Tallaght Campus. The development shall consist of the construction of a M&E plant area (28m2) comprising an enclosed pump house and external water tank with 2.4m high screen fencing surround.
Development on a site of c. 0.021 ha located West of the SSR Building on the TU Dublin Tallaght Campus, Old Blessington Road, Tallaght, Dublin 24. The development shall consist of the construction of a 90m3 underground fire fighting storage tank.
Demolition of single storey side shed and construction of a single storey side and rear extension, dormer attic, stand-alone games room and pedestrian access gate to the rear associated site development works.
Located on a section of Belgard Square South. The development includes the closure of the slip road from Belgard Square South onto the N81. This development is proposed to accommodate the increase in the volume of buses in the area as a result of the changes proposed under BusConnects. The volume of buses is set to increase from 22 to 49 buses per hour. It forms part of Government efforts to improve public transport and address climate change nationally, supporting national strategies such as the National Development Plan 2021 - 2030 and the Climate Action Plan 2023. The layover facility will be comprised of bus parking for 10 buses and welfare facilities for drivers. The development consists of two separate parking areas with 7 bus bays in the south layover and 3 in the layby to the north of Belgard Square South. There will be one entrance point into the layover area located on the southern side of Belgard Square South. This layover area will have 2 egress points with a right turn ban in place. There will be a layby located on the northern side of Belgard Square South, across from the layover area. The layover area includes a bus driver welfare facility comprising of two toilet units. The proposed Development includes the closure of the hard shoulder on the northern side of the N81 to accommodate the realignment of the cycle track along the N81. The proposed development includes all the associated works to facilitate the bus layover and welfare facility. This includes drainage works, utility diversions, public lighting, fencing and landscaping. The overall area of the site is approximately 0.7 ha.
Single storey porch and kitchen extension to the front, convert existing garage to a study, erect a single storey extension to the rear and widen the existing vehicular entrance from 2.5 metres to 4.0 metres.
Retention planning permission for alterations to previously approved plan reg SD22B/0482. Alterations to rear hipped roof structure to new extension reverting to a flat roof structure to accommodate a new dormer roof extension to attic level to provide for non-habitable accommodation and a new window to side gable wall to attic
2 storey extension to side of dwelling and 2 storey extension to rear of dwelling. Single storey garage in rear garden. Internal alterations to be carried out.
Footbridge from car park of university campus to Airton Close.
Change of use from Betting Office to Beauty Salon with proposed opening hours of Monday to Sunday, 9:30 a.m. to 8:00 p.m.
Retention planning permission for removal of side flat-roofed utility, garage and shed to one side/rear garden. Construction of a new single storey extension to side and rear of existing end terrace 2 storey dwelling
Sliding steel entrance gate to the main entrance; partial demolition of a section of existing boundary wall; construction of new site entrance piers and the extension of the existing perimeter railings to meet the new piers; 2 new bicycle shelters and all associated site development works.
Change of use from a retail/commercial unit (153sq.m) to a proposed leisure/gym use; removal of rear doorway including all ancillary works required to complete the development.
Erect 1074sq.m or 204.20KWP of photovoltaic panels on the roof of existing commercial building, in cafe / restaurant and 4 retail / commercial, with all associated site works.
On a site bound by Belgard Road (R113) to the east, Belgard Square North to the North, Belgard Square East to the west and Clarity House to the south, demolition of all existing structures on site (with a combined gross floor area of c. 3625sq.m); The construction of a mixed-use residential development set out in 3 blocks including a podium over a basement, ranging in height from 2 to 13 storeys (with core access above to roof terrace), comprising 334 residential units of which 118 will be Build to Rent (BTR) residential units, with associated amenities and facilities across the development; 4 retail/café/restaurant units and 3 commercial spaces associated with the 3 live-work units (723sq.m combined); Childcare facility (144sq.m); 670 bicycle parking spaces including 186 visitor spaces; 117 car parking spaces (including 6 disabled spaces) are provided at ground floor and basement level; Communal space in the form of residential courtyards and roof terraces; Public open space provision including Homezone/tertiary route along the south of the site between Belgard Rd and Belgard Square East; The overall development has a Gross Floor Area of 29,784 sq.m; Of the total 334 residential units proposed, unit types comprise Block A (Build-to-Rent), 91 one bed units; 1 two bed 3 person units; 26 two bed 4 person units; Blocks B & C, 2 live-work studio units; 102 one bed units; 12 two bed 3 person units; 88 two bed 4 person units including 5 duplex units; 1 two bed 4 person live-work unit; 11 three bed units; A portion of the proposed residential development is a 'Build to Rent' scheme in accordance with Specific Planning Policy 7 and 8 as set out in the 'Sustainable Urban Housing: Design Standards for New Apartments (December 2020); All associated works, plant, services, utilities, telecommunications infrastructure, PV panels and site hoarding during construction; A Natura Impact Statement has been prepared in respect of the proposed development and accompanies this application; The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant development plan or local area plan; The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in Section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land.
Construction of proposed first floor Extension above existing garage at gable end of house. Conversion of existing loft area and the construction of a dormer structure with window to rear roof profile also all associated site works.
The amalgamation of the two retail/commercial units 3b and 4 to a single retail/commercial unit. The development includes all works including the removal of the dividing wall between the two units. The access doors to unit 3b would be closed and access to the amalgamated unit will be via unit 4 only. The development includes all associated works to complete the development.
A telecommunications field technician apprenticeship training area, comprising of a compound, 35m by 25m enclosed by a 3m perimeter fence. The area will contain a number of street cabinets, underground access chambers, underground ducting, half height training poles and a storage unit.
Single storey front extension to living room and hall; new tiled roof over existing garage to match roof over living room and hall; widening of vehicular entrance and all associated site works.
The development consists of the change of use of the ground floor unit from retails use to cafe/patisserie shop including the sale of hot and cold beverages. The following works are proposed: (1) Internal configuring of unit including fit out of unit to facilitate development with provision of serving counter, store, W/C and seating area at ground floor level internally and externally (2) Alterations to ground floor level facade including new glazed door and window, new awning to shopfront, new signage and projecting signage to front facade. (3) All associated site works and ancillary works at this address in accordance with plans as submitted
The temporary use (for the next 5 years 2025-2029 inclusive) of part of the eastern carpark lands for the erection of a temporary tent structure for use as an ice rink for a period not exceeding 3 months per year (November - January) and all associated site and development works including plant, lighting, ancillary signage and with pedestrian routes to the shopping centre and associated car parks. The proposal will result in the loss of c.48 spaces for the duration of the temporary ice rink use.
The development will consist of a single storey rear extension and a single storey front extension to the existing two storey terraced house and will include internal alterations
Demolition of single storey timber frame extension; demolition of disused chimney stack both to side of existing dwelling; construction of single storey ground floor extension to front; construction of ground floor extension to rear of existing dwelling with first floor extension partially over and all associated site works.
Extension of an existing telecommunications lattice tower (providing new overall height of 31.5 metres) carrying existing antennas, dishes and associated equipment and additional new antennas, dishes and associated equipment together with new ground equipment cabinets, new fencing and all associated site development works.
Works to the existing roof including installation of 173sq.m of solar pv panels; the erection of a new guardrail on the existing parapet to the perimeter of the roof; alteration to a portion of the existing roof from a pitched roof to a flat roof, installation of roof access hatches and all associated site development works.
Demolition of existing commercial building (736sq.m) and construction of a single storey cafe/restaurant (79sq.m); single storey bicycle workshop building (32sq.m); improved public realm area to include seating; bicycle parking (60 spaces) and hard and soft landscaping and all associated site and development works.
The proposed development will consist of amalgamation (including removal of internal mezzanine areas) and change of use of Units U133ABC (former An Post) and U133D (former Bodytalk) from Post Office and Retail Use respectively (both Class 1 “shops”) to accommodate a restaurant/ takeaway unit (243sqm) for consumption of hot food on and off the premises, modifications to existing shopfront signage, new tenant sign on eastern elevation and all associated site and development works
Alterations to existing external service area to the north eastern side of The Square Shopping Centre at the entrance to the existing service yard comprising of construction of an external plant area (c.135sq.m) enclosed by 2.4 metre high galvanised fencing to accommodate an Air Handling Unit (AHU) and a Chiller Unit ancillary to the shopping centre; new flat roof boiler room building (c.34sq.m gross floor area) within the proposed new enclosed plant enclosure; installation of a metal frame (2.4 metres wide x 1 metre high and located 2-3 metres above the ground supported by metal stilts) to facilitate the connection of the Air Handling Unit and Chiller within the plant area to the covered service yard area; replacement of mesh panels on existing wall on the western and norther side of the service yard with metal louvered panels; all associated site and development works.
The development consists the installation of 2no. new water tanks and an associated enclosure to the north of the existing office building, the relocation of a previously granted bicycle shelter under planning reference SD21A/0123, from the east of the site to the south-west, and all associated site works at PM Group, Kearney House, Belgard Square, Dublin, D24 XFW2.
A single storey ground floor Granny Flat Extension to the rear of existing dwelling with associated site works. Consisting of 1 bedroom, toilet and open plan kitchen, dining pace and living room with a total combined area of approximately 52msq
Construction of new slate clad pitched roof structure not exceeding 8.950m in height above ground level to cover the existing flat roof to include new dormer roof over stairwell with frosted window to new attic landing level, area 5.67sq.m with roof light over & 'Velux' window within front storage space to south elevation and all associated site works.
Construction of new slate clad pitched roof structure not exceeding 8.950m in height above ground level to cover the existing flat roof to include new dormer roof over stairwell with frosted window to new attic landing level area 5.67sq.m with roof light over and 'Velux' window within front storage space to north elevation and all associated site works.
Attic conversion for storage with dormer window to the rear with 2 Velux windows to the front roof area. First-floor extension to the rear. Demolition of the existing shed to the rear and replacement with new shed with a pitched roof
Install additional antennae on top of the existing 40-meter high telecommunications monopole structure to include all ancillary equipment (total height not to exceed 44 meters to the top of the antennae) on behalf of the commission for communications regulation (ComReg). To include associated ground mounted equipment.
Demolition of single storey attached garage to side of dwelling; construction in side garden of end of terrace, two storey three bedroom dwelling with attic conversion with dormer roof to rear; new vehicular entrance and partial dishing of kerb and all associated site works.
Change of use of part of existing unit from industrial use for use as a restaurant facility with sit-down facility, cafe and deli with take away produce (teas, coffees, sandwiches etc) over two floors and all associated site works.
Ground floor rear & side extension with flat roof over & 1No. Roof light over. Window in gable wall at ground floor level. Internal Alterations at ground floor.
Ground Floor Side Extension With Pitched Roof Over
Construction of new slate clad pitched roof structure not exceeding 8.950m in height above ground level to cover existing flat roof; to include new dormer roof over stairwell with frosted window to new attic landing level (area 5.67sq.m) with roof light over and 'Velux' window within front storage space to South elevation; all associated site works.
Dishing of public footpath, verge and kerb. Retention of widening of vehicular entrance and all associated site works.
The development will consist of internal reconfiguration and amalgamation of 4no. existing Level 2 retail units (U238, U239, U240 and U241) to provide two retail units (U238: 516sqm and U240: 1282sqm) and ancillary circulation and general store rooms (c.274sqm) resulting in no overall increase in gross floorspace. Permission is also sought for all associated site and development works and reuse of existing signage zones.
Revisions to previously permitted internal modifications as approved under Ref. SD18A/0399 resulting in the reductions in the kiosk zone at Level 2 only by 196sq.m (from 1073sq.m to 877sq.m) to accommodate a new partially enclosed restaurant/café unit (196sq.m) and associated setting; the new restaurant and seating area will correspond with the footprint of the existing Units 260/262 and 263 and will contain associated facilities including a kitchen, front and rear counters, condiment unit, dining tables, chairs, booths and benches; associated signage and development works.
Subdivision of the existing retail department store (Unit 116 - 5,396sq.m. - formerly Debenhams) to comprise 2 retail units - 116A (2,431sq.m) and 116B (2,270sq.m) and new service corridor (176sq.m) to the rear of the proposed unit 116B to provide access to the existing service yard; associated modifications including the removal of the existing mezzanine floor within Unit 116 (497sq.m); creation of new retail frontage within the internal mall and associated signage; revisions to existing retail Unit 117 (113sq.m) and 118 (102sq.m) to form a single amalgamated unit (169sq.m) and creation of additional mall floor space (47sq.m) arising from the unit reconfiguration; all associated site and development works including minor revisions to the layout of the existing service yard.
Extend an existing garden shed at rear; raise existing boundary wall at side/rear from 1.305 metres to 1.985 metres.
Permission Sought to extend existing garden shed to rear including the raising of roof from 2.680 meters to 3.385 meters
The construction of new slate clad pitched roof structure not exceeding 8.950m in height above ground level to cover the existing flat roof, to include new dormer roof over stairwell with frosted window to attic landing level, roof light over and 'Velux' window to front storage space and all associated site works.
Retention permission for single storey pitched roof entrance hall extension to front (area 6.60sq.m), removal of temporary raised timber flat roof above main roof level and the construction of a new slate clad pitched roof structure not exceeding 8.950m in height above ground level to cover the existing flat roof, to include new dormer roof over stairwell with frosted window to new attic landing level, area 5.67sq.m, with roof light over and 'Velux' window within front storage space to east elevation and all associated site work.
Two13 x 3.07m sign to existing totem and one 50 x 2.18m signage to building facade fronting Airton Road.
Construction of new slate clad pitched roof structure not exceeding 8.950m in height above ground level to cover the existing flat roof, to include new dormer roof over stairwell with frosted window to new attic landing level, area 5.67sq.m., with roof light over and Velux window within front storage space to side / South elevation, widening of driveway entrance to 3.5m clear between gate piers and all associated site works.
Erect a slate clad pitched roof structure with an overall maximum height of 8.950m from ground level to top of the ridge to replace existing flat roof including a front flat roof dormer over stairwell with window and rooflight; 'Velux' rooflight to side of new front roof.