Demolition of all existing 1-3 storey industrial/commercial structures and small cafe on site totalling c.5,500sq.m in area; Construction of a 1-5 storey Transitional Care Facility (step-up/step-down) providing 131 bedspaces over partial basement (total floor area c.6,743sq.m) with central courtyard ( c.519sq.m ); The basement consists of a sprinkler tank and pump rooms, water tank room, plant room and workshop; Provision of dining and kitchen areas, siting/family rooms, activity rooms, coffee dock, hair salon, oratory, lobbies/reception areas, ancillary offices and staff areas, stores, toilets, shower/changing facilities, ESB substation, generator, switchroom, service yard and waste areas serving the facility; Lobbies, stair/lifts, photovoltaic panels and green roofs throughout; Partial provision of the pocket park identified in the Tallaght LAP (c.1,286sqm); New vehicular access from First Avenue and egress onto Cookstown Road via a one-way system through the subject site; Entrance signage on the eastern elevation of the proposed facility; All associated site development works, services provision, connection to the water supply, foul and surface water networks on First A venue and Cookstown Road including partial diversion of the foul line to the north east of the site at First A venue, temporary foul pump station, attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, interim pedestrian facilities/public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (76 total spaces), car parking (32 total spaces), set-down parking spaces, 1 ambulance set-down space serving the facility and delivery/loading areas to First A venue.
Permission sought for the construction of a 2-story, 3-Bedroom detached house with new vehicular access/egress to Alderwood Avenue to the side of existing dwelling
Temporary change of use of part of unit 70 from light industrial to indoor gymnastics sports facility and associated site works.
Demolition of the existing warehouse unit (1,632sq.m) and the construction of a new 5-6 storey building, accommodating 64 apartments, comprised of 20 1-bed apartments, 16 2-bed apartments, 8 3-bed apartments, 20 2-bed duplex apartments and 1 unit at ground floor level to be either retail or cafe. The proposed development also provides for a podium and an undercroft car parking area, at ground floor level, accommodating 37 car parking spaces, 167 bicycle parking spaces, bin storage, plant room and 2 ESB substations. Vehicular access to the development will be from the Cookstown Road. The development includes all private and communal open spaces, landscaping, boundary treatments, vehicular and pedestrian site access, bin storage, bike storage, signage and all associated site development works including service connections, foul and surface water drainage/attenuation and water supply/storage. On a total site area of approx. 0.28ha (0.7acres).
Demolition of existing fire damaged commercial unit and site clearance including all associated site works.
Erection of a new 95.5sq.m three bedroom dwelling house to the side of the existing house with new vehicular access and associated site works.
The development seeking retention consists of the construction of a ground floor extension to the rear of the dwelling.
Construction of kitchen extension to rear.
28m of new secure metal fencing.
Change of use from retail unit to unit for Day Care Centre use along with signage.
3 externally mounted hotel signs which include: (1) a high-level wall mounted sign to the northeast facade complete with individual lettering and LED halo backlighting; (2) a double fronted suspended soffit sign with integrated LED lighting located adjacent to the main entrance at the northeast corner of the site; (3) a sign with integrated LED backlighting installed into the existing glazed facade located over the main entrance door to the north of the site.
Replacement of a portion of the facade; removal of escalators and infill of voids at first floor (ex. mezzanine 93.5sq.m and second floor (ex. food courts 64sq.m); change of use of the mezzanine floor of the previously approved and constructed retail known as C4 to a Primary Care Centre (Class 8); change of use for ground floor, first floor and second floor of the previously approved and constructed retail unit known as Food Court, to a Primary Care Centre (Class 8); 6 external signage locations: (1) at unit C5 entrance (8.17sq.m); (2) at unit C4 entrance (9.36sq.m); (3) above first/second floors entrance (11.4sq.m); (4) to east elevation (6,25sq.m); (5) above unit C5 entrance (1.5sq.m); (6) above unit C4 entrance (0.75sq.m); the change of use area when completed will form an integral part of the previously approved Academic & Primary Care Centre (SD14A/0041, SD14A/0227, SD15A/0147, SD16A/0046 and SD19A/0158 at Tallaght Cross West, Tallaght, Dublin 24.
Change of use, and associated internal works, of part of the existing building (167 sq.m. approx.) from warehouse to part workshop/light industrial (89 sq.m. approx.) and part water sampling hub (78 sq.m. approx.) to facilitate the overall use of the building as an Uisce Éireann Operations Centre; the provision of a window and security shutter on the north eastern façade of the building; the provision of a wash bay and 4 No. materials bunkers in external yard area; 2 No. replacement vehicular gates; a new pedestrian gate; Uisce Éireann signage on front (southwest) elevation; external air handling unit on northwestern side of building; and associated site development and drainage works.
Retention for granny flat to ground floor on side of existing two storey extension
Single storey extension to front and all associated site works.
Retention of single storey kitchen extension to front side and rear of existing house and all associated site works.
Retention of widening of vehicular entrance in front boundary wall. Permission for dishing of kerb.
1 no. 6.25m wide x 2.5m high internally illuminated sign to be mounted on existing front (east-facing) elevation of B&Q premises.
(i) Retention permission is sought for the mezzanine floor, stairwell and associated meeting room; (ii) (a) change of use of Unit F1 from cafe to car rental office and erection of partition walls to create a reception area, staff offices, staff mess area, wc, store room and staff canteen at ground floor; (b) upgrade works including replacement of mezzanine floor and stairwell; (c) installation of company signage to front of unit; and (ii) change of use from commercial car park to car rental and car share facility at basement level comprising of the following: (a) removal of 3 car parking spaces to provide for single storey car rental kiosk (28.82sq.m) comprising reception area; (b) redesignation of 30 commercial car parking spaces as car rental spaces (3 car club, 3 staff, 12 return and 12 rental spaces); (c) removal of 7 car parking spaces to provide circulation route, and car washing area (69.18sq.m) comprising 2 power washers, 1 wash pad connected to the existing petrol interceptor in the car park and car drying area. The car wash will connect to the mains water connection; (d) erection of company signage over entrance to car park from Belgard Square North; and (e) drainage and all associated site development and ancillary works necessary to facilitate development.
New external signage with internal illumination at high level to Northern façade with internal LED display signage (2.5m x 2.1m) at ground floor level.
Installation of a 7.5m x 8.65m retractable canopy/awning, glazed partitions and planters for a 65sq.m sheltered outdoor seating area to the front of existing commercial unit.
Three storey apartment building containing six apartments with external terraces/private gardens (3 x two bed & 3 x three bed duplex) & one end of terrace two storey house (two bed), landscaping of site and play area, footpath, bin stores, eight car parking spaces, eighteen bicycle parking spaces and all associated site works.
We, Palm grey Limited, intend to apply for development at Crough's Pub, Cookstown Road, Tallaght, Dublin 24. The development will consists of the change of use and refurbishment of the 2nd floor existing staff accommodation to proposed 2 No. 2 Bed Apartments.
Increase the floor area of existing staff accommodation and plant room by 218sq.m on the second floor; provision of 2 additional floors to provide 9 apartments, 6 one bed units and 3 two bed units resulting in a five storey building over basement; new lift and lobby area to the rear to service all five floors; new pedestrian entrance to the eastern boundary and provision of 11 bicycle parking spaces and bin store; all ancillary works necessary to facilitate the development.
Permission to permanently retain the change of use from Civic Offices to medical centre on foot of now expired, 10 year temporary permission (SD08/0594). Proposed uses include public attendance for consultation, treatment and general healthcare provision on all levels from lower ground floor to fourth floor, including retention of existing signage and roof top plant.
To erect photovoltaic panels on a ground mounted system with a 7.37 MWp on 35,243.81 sqm of the land located to the south of the existing Roadstone quarry facility, Cookstown Road, Dublin 24, D24 PKK2. The electricity generated will be used by the Roadstone site. The development will comprise of photovoltaic panels with ground mounted frames together with all ancillary cabling and electrical infrastructure; 1 no. transformer cabin; using all temporary ways and temporary construction compound / set-down area provided by Roadstone Limited
Retention permission for alterations to existing buildings to include, over cladding of brick facade at ground floor level, blocking up of roller shutter doors and over cladding of same and new fire escape doors at Building 1, Units 1a, 1b, 1c, Cookstown Estate Road. Removal of dormant fire escape stairs, over cladding of facade, blocking up of roller shutter doors and over cladding of same and new fire escape doors at Buildings 81a and 81b, Cookstown Estate Road. Demolition of car wash annex building and over cladding of facade at Buildings 2 & 3, at Old Belgard Rd.
Change of use of existing ground floor retail unit to a restaurant with ancillary take away option; related extract system venting out roof level and all associated site works.
(i) Demolition of the existing industrial and commercial buildings (15,989sq.m); (ii) construction of a mixed-use development featuring: (a) 1104 'build-to-rent' apartments in 4 blocks varying in height from four to eleven storeys. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to internal communal amenity spaces (totalling 2741sqm) and 5,107sqm of external communal amenity space at ground, first floor and roof levels; and (b) 4 commercial units at ground floor level of Blocks B and D (comprising of 2 in Block B accommodating a cafe/restaurant/bar; 1 in Block D accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended; and 1 in Block D to serve the Circle K Belgard petrol station which is to be retained), 1,500sqm of office space across first to sixth floor levels of Block D and a crèche with external play area at ground floor level of Block C. The development is served by a total of 351 parking spaces (including 17 limited mobility parking spaces and 16 car share spaces) and 1860 bicycle spaces (1464 resident spaces and 396 visitor spaces); (iii) road, junction and streetscape upgrade works along First Avenue, Cookstown Road and Old Belgard Road, including the installation a signalised junction at the intersection of First Avenue and Cookstown Road and Old Belgard Road and Cookstown Road; (iv) construction of 3 new roads and 1 pedestrian/cycle link to the Belgard Luas Stop; (v) construction of a 1,688sqm landscaped public plaza with an outdoor flexible events space in the south-western corner of the site; and (vi) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary fences; plant areas; ESB substations; internal hard landscaping, including footpaths and street furniture; and all associated site development works. Any person may, within the period of 5 weeks beginning on the date of receipt by An Bord Pleanála of the application and on payment of the prescribed fee of €20 (except for certain prescribed bodies), make a submission or observations in writing to An Bord Pleanála, 64 Marlborough Street, Dublin 1 or online at www.pleanala.ie. Any enquiries relating to the application process should be directed to the Strategic Housing Development Section of An Bord Pleanála (Tel. 01-8588100).
Retemtiomn of change of use from retail to food takeaway.
Single storey extension to front of 2 storey mid terrace dwelling house to consist of enlargement of existing living area and to have tiled mono-pitched roof with roof light. Extension also to adjoin existing front porch. Permission is also being sought for retention of and alterations to existing front porch. Alterations to consist of replacement of existing tiled hipped roof with tiled apex gable roof, and relocation of existing entrance door to side of porch to front of porch.
Permission to demolish the rear porch and construct a corridor to the rear of the house. Retention to retain the existing single storey structure in the rear garden and use it as a bedroom and en-suite, which will be linked to the existing house with the proposed corridor, all with associated site works.
Permission to demolish the rear porch, construct a glazed link to the rear of the house and construct a new extension for a proposed bedroom and ensuite. Retention to retain the existing single-storey structure in the rear garden and use it as a bedroom and ensuite, which will be linked to the existing house with the proposed glazed link.
Change of use of 58.4sq.m of the front ground floor single storey part of Unit 1 from office/light industrial use to click-and-collect retail use and ancillary site works.
Source EV Ireland Ltd. intends to apply for permission for development of an Electric Vehicle (EV) Charging Station at Belgard Retail Park, Belgard Road, Tallaght, Dublin 24, a site of ca. 0.035ha. The development will consist of 5 no. EV charging stations, each serving 2 no. vehicle charging bays, a total of 10 no. charging points. The charging bays will be located in the existing car park replacing 12 no. standard parking bays with 10 no. EV charging bays. The proposed development will utilise an existing, ancillary storage building to house an Medium Voltage (MV) switch room linked to an adjacent ESB substation to service the proposed development, the charging bays will utilise existing established access & egress and includes all other associated above and below ground ancillary works.
Planning permission is sought for 1 no. Outdoor Padel tennis court facilities with protected screening around playing surface, permission sought for this outdoor playing facility for a period of 5 years only and all associated site works
Planning permission is sought for 2 no. Outdoor Padel tennis court facilities with protected screening around both playing surface, permission also sort to operate a social wine service at existing ancillary cafe located internally and all associated site works
Proposed ground floor rear extension for use as family flat
Change of use from warehouse to padel tennis sports facility, with minor internal modifications, including reception, ancillary cafe, seating area, bathrooms / changing rooms, and all associated and ancillary site works.
Two storey extension to the side; single storey extension to the side and rear with courtyard; Extension of the existing single storey shed in the back garden for storage and gym area.
Amendments to previously granted permission (SD20A/0017) comprising of alterations to façade; installation of roof lights and PV panels.
Renovation and modifications to the original building including a change of use to office, training and distribution centre; proposed changes to the existing internal layout; internal fire stair location moved; extended mezzanine area, additional new toilets; external windows and modifications to the roller door on the rear elevation; new signage to the front elevation and all ancillary works.
Demolition of the existing industrial and commercial office buildings totalling c.4,628sqm; Construction of a Build-to-Rent Housing Development comprising 170 apartment units and crèche arranged in 2 blocks across 4-7 storeys over basement car park (total gross floor area c.13,880sq.m excluding basement); The residential development consists of: 9 x1 bedroom studio apartments; 94 x1 bedroom/2 person apartments; 2 x2 bedroom/3 person apartments; 34 x2 bedroom/4 person apartments; 24 x2 bedroom/4 person duplex apartments and 7 x3 bedroom/5 person apartments with north, south, east and west facing terraces/balconies throughout; Internal communal amenity spaces at ground and fourth floor levels comprising reception, gym, lounge, cinema/tv room, events rooms and ancillary areas; External communal open space including children's play areas and informal amenity spaces at ground floor level between Blocks A and B; Communal roof garden at fourth floor level - total external communal open space c.1,005sq.m; Public open space at ground floor level to the east and south of Block B totalling c.1095sq.m; 1 creche with associated outdoor play area at ground floor level; 73 car parking spaces comprising 64 basement spaces, 4 accessible parking spaces and 5 visitor spaces at surface level; 354 bicycle spaces comprising 264 resident spaces at basement level and 90 visitor spaces at ground floor level; Reconfiguration/removal of existing car parking to the north of the site and access road resulting in a total of 28 car spaces serving the adjoining site; All associated plant including heating centres, gas room, water storage room, break tank room, comms room and bin storage at basement level, ESB substation and switch room at ground level and circulation spaces and stair and lift cores throughout; Vehicular/pedestrian access to the east from Belgard Road. All existing vehicular entrances serving adjoining sites maintained. Fire/emergency and refuse vehicle access and pedestrian access to the south from Colbert's Fort; All associated site development and infrastructural works, services provision, foul and surface water drainage, extension to the foul network, access roads/footpaths, lighting, landscaping and boundary treatment works.
Demolition of the existing industrial and commercial office buildings totalling c.4,628sqm; Construction of a Build-to-Rent Housing Development comprising 170 apartment units and crèche arranged in 2 blocks across 4-7 storeys over basement car park (total gross floor area c.13,880sq.m excluding basement); The residential development consists of: 9 x1 bedroom studio apartments; 94 x1 bedroom/2 person apartments; 2 x2 bedroom/3 person apartments; 34 x2 bedroom/4 person apartments; 24 x2 bedroom/4 person duplex apartments and 7 x3 bedroom/5 person apartments with north, south, east and west facing terraces/balconies throughout; Internal communal amenity spaces at ground and fourth floor levels comprising reception, gym, lounge, cinema/tv room, events rooms and ancillary areas; External communal open space including children's play areas and informal amenity spaces at ground floor level between Blocks A and B; Communal roof garden at fourth floor level - total external communal open space c.1,005sq.m; Public open space at ground floor level to the east and south of Block B totalling c.1095sq.m; 1 creche with associated outdoor play area at ground floor level; 73 car parking spaces comprising 64 basement spaces, 4 accessible parking spaces and 5 visitor spaces at surface level; 354 bicycle spaces comprising 264 resident spaces at basement level and 90 visitor spaces at ground floor level; Reconfiguration/removal of existing car parking to the north of the site and access road resulting in a total of 28 car spaces serving the adjoining site; All associated plant including heating centres, gas room, water storage room, break tank room, comms room and bin storage at basement level, ESB substation and switch room at ground level and circulation spaces and stair and lift cores throughout; Vehicular/pedestrian access to the east from Belgard Road. All existing vehicular entrances serving adjoining sites maintained. Fire/emergency and refuse vehicle access and pedestrian access to the south from Colbert's Fort; All associated site development and infrastructural works, services provision, foul and surface water drainage, extension to the foul network, access roads/footpaths, lighting, landscaping and boundary treatment works. Any person may, within the period of 5 weeks beginning on the date of receipt by An Bord Pleanála of the application and on payment of the prescribed fee of €20 (except for certain prescribed bodies), make a submission or observations in writing to An Bord Pleanála, 64 Marlborough Street, Dublin 1 or online at www.pleanala.ie. Any enquiries relating to the application process should be directed to the Strategic Housing Development Section of An Bord Pleanála (Tel. 01-8588100).
Demolition of the porch side entrance. Demolition of the existing garage. In the side garden. New single storey three-bedroom detached house with two dormer windows to the rear. New vehicular access for the existing house. Remove part of the front wall to allow access.
3 bedroom dormer bungalow with 2 dormer windows to rear, new vehicular access and all ancillary services.
Retention of timber log cabin in back garden to rear and side of house, for use as office, gym, play room/games room and storage area along with ancillary works
For the demolition of single storey pitched front roof and rear conservatory and construction of new flat roof to single storey front structure, new single storey rear extension and internal ground first floor modifications together with new dormer attic structure consisting of bedroom and en-suite, conversion of existing shed to games room with new front elevation window and new rear glazed doors and all associated works.
Change of use from Warehouse to Gym facility, with minor internal modifications including reception area, changing/shower rooms, studio and office all with associated and ancillary site works and external signage.
Ground floor side extension with pedestrian access door, pitched roof over and 1 roof light over.