    25/5298Granted

    Eastgate Business Park Eastgate Drive Kilcoolishal Little Island, Co. Cork

    Permission for the construction of 1 no. 4 storey office building, a single storey canteen extension and a link corridor between the proposed office building and existing Island Hall office building and all associated ancillary works including modifications to existing car parking areas, bicycle parking, footpaths, plant (including solar panels at roof level), signage, 1 no. bin store and smoking shelter and 1 no. substation and meter room.Decision record indexed
    Decision25 August 2025View record
  2. © OpenStreetMap
    20/5659Granted

    Wallingstown Little Island Co. Cork

    A)The demolition of a 6.3 sq.m modular type environmental monitoring building, b) the construction of a 47.8 sq.m single storey cylinder charging building, c) the construction of a 9 sq.m single storey environmental monitoring building and d) all associated site works. The site currently operates under an Industrial Emissions (IE) licence (PO 136-04) under part IV of the Environmental Protection Agency Act 1992 (as amended for the Protection of the Environment Act, 2003). The new development is on a site to which the Chemical Act (Control of Major Accident Hazards Involving Dangerous Substances) regulations 2015 (S.I. 209 of 2015) applies.Decision record indexed
    Decision25 September 2020View record
  3. © OpenStreetMap
    24/4648Granted

    Little Island Industrial Estate Wallingstown Little Island Co.Cork

    Permission for the construction of an extension to the existing fire water retention pond and all associated site works. A Natura Impact Statement has been prepared and is included in the application. The Establishment holds an industrial emissions licence and is regulated by the environmental protection agency. Under the proposed development the site will remain in compliance with all regulatory requirements under existing licence condition.Decision record indexed
    Decision11 June 2024View record
  4. © OpenStreetMap
    21/4420Granted

    Retail Warehouse Unit No.2 Eastgate Retail Park Eastgate, Castleview Little Island, Co. Cork

    The construction of a new first floor mezzanine to the existing retail warehouse consisting of: 1. Additional retail warehouse floor space, 2. Staff facilities, access stairways, lift and double height store room, 3. Construction of a new ground floor escape door and first floor window to the rear elevation of the existing unit and associated development works.Decision record indexed
    Decision16 April 2021View record
  5. © OpenStreetMap
    23/4485Granted

    Eastgate Retail Park Eastgate Road Kilcoolishal Little Island, Co.Cork

    The partial change of use from existing ground and first floor offices to a health and wellbeing clinic. The development also includes internal and external elevational alterations to the existing building including the re-location of existing signage, car parking, landscaping and all ancillary development necessary to facilitate the development, and will be accessed via the existing entrance off Eastgate RoadDecision record indexed
    Decision24 August 2023View record
  6. © OpenStreetMap
    25/5800Granted

    The Laya Health & Wellbeing Clinic, Eastgate Retail Park, Eastgate Road, Kilcoolishal, Little Island, Co. Cork.

    The continuation of use of the health and wellbeing clinic permitted by Cork County Council Reference 23/4485 (as amended by Cork County Council Reference 24/4634).Decision record indexed
    Decision30 October 2025View record
  7. © OpenStreetMap
    24/4634Granted

    Eastgate Retail Park Eastgate Road, Kilcoolishal Little Island Co.Cork

    Permission for internal and elevational changes to the permitted health and wellbeing clinic (Cork County Council Reg. Ref: 23/4485) including the relocation of a permitted entrance to the South, revised signage proposals, new fire exit to the North and all ancillary development and landscaping works.Decision record indexed
    Decision05 June 2024View record
  8. © OpenStreetMap
    20/4237Granted

    26 Castleview Castleview Little Island Co. Cork

    The construction of a detached dwellinghouse in side garden of existing dwellinghouse and all associated works.Decision record indexed
    Decision22 June 2020View record
  9. © OpenStreetMap
    23/5586Granted

    Inchera Little Island Co.Cork

    Permission for an amendment to the permission granted under ref.15/4926 as extended by ref 20/5549 for renewable bioenergy plant. The amendment consists of: 1) omission of one permitted combined heat and power (CHP) enclosure to reduce the CHP capacity from 4MW to 1MW, 2) replacement of the CHP capacity by installation of a biogas upgrade unit to generate renewable gas from biogas, 3) installation of a gas grid entry unit to facilitate the export of renewable gas to the national gas grid, 4) installation of a carbon capture and storage unit to take the carbon dioxide stream from the biogas with associated tank and filling area to facilitate off-site export for use in industry, 5) amendments to the permitted tank farm to; a) reduce the number of tanks from the permitted 16 process tanks to 9 process tanks. All tanks will remain within the max permitted capacity and height. b) reduce the footprint of the tank farm and increase the bund wall height by 1.3m, 6)ancillary development works include installation of pipe runs, reorganisation of permitted car parking layout, relocation of a weighbridge, relocation of permitted boiler and stack and biogas holder, all to facilitate the proposed amendments. The proposed development is wholly within the permitted site boundary and relates to changes confined to the east of the site covering an area of approximately 0.7ha. The application relates to development which comprises or is for the purpose of an activity requiring an industrial emissions directive licence issued by the environmental protection agency reg no. P1018-01.Decision record indexed
    Decision17 November 2023View record
  10. © OpenStreetMap
    23/4653Granted

    Site No. 5 Eastgate Motormall Eastgate Road, Eastgate Business Park Kilcoolishal, Castleview Co. Cork

    Erection of single storey prefabricated temporary vehicle display building; vehicle display, customer and staff parking areas, removal of existing fence and gates along roadside boundary and installation of stainless-steel bollards, installation of 1 no. illuminated pylon sign; all to remain on site for a period of 36 monthsDecision record indexed
    Decision04 August 2023View record
  11. © OpenStreetMap
    22/4569Granted

    Cork Golf Club Wallingstown, Ballytrasna Little Island Co.Cork

    The construction of a 145m.sq extension to the existing balcony and retention of 26sq.m balcony (171sq.m in total), new access bridge and stairs and alterations to the existing façade, at first floor level to the southern façade of the clubhouse on the grounds of cork golf club.Decision record indexed
    Decision06 May 2022View record
  12. © OpenStreetMap
    25/4732Granted

    MSL Cork Eastgate Road Eastgate Business Park Kilcoolishal, Co. Cork

    Permission for the construction of a new single storey general purpose building with total gross floor area of 221m² (Maximum Height of 5m) along with all ancillary site development works.Decision record indexed
    Decision12 June 2025View record
  13. © OpenStreetMap
    21/6440Granted

    Inchera Industrial Estate Inchera Little Island Co. Cork

    Replacement of existing 60m3 external dry goods storage silo, with 120m3 external dry goods storage silo, with external maintenance access stairway. This development is within a site to which the Major Accident Directive applies. No alteration to the existing Integrated Pollution Prevention and Control (IPPC) license is required.Decision record indexed
    Decision25 January 2022View record
  14. © OpenStreetMap
    25/5034Granted

    Inchera Little Island Co.Cork

    Permission for the proposed development will consist of the completion of the Renewable Biogas Plant as permitted by extant planning permission ref. 15/4926, extended by ref 20/5549 and amended by ref 23/5586. All demolition, site clearance, earthworks and formation for foundations will be complete under the current permission. The proposed plant will generate renewable biogas from 90,000 tonnes of non-hazardous biodegradable waste (‘Brown bin’ domestic and commercial waste) per annum utilising anaerobic digestion (AD) technology. It is proposed to upgrade the biogas to biomethane and inject it into the adjacent gas grid to replace fossil fuel derived natural gas. Other products from the process include digestate (a nutrient rich biofertilizer) as well as biogenic (natural) carbon dioxide. The proposed development will consist of the construction of: 1) main process building (c.3,762m2 gross floor area (GFA), max 14.5m high) incorporating feedstock reception and processing area, digestate treatment areas, dewatering and storage areas, quarantine areas, an odour control system and associated 25m high stack with signage on the south elevation. 2)Tank farm (c. 3,183m3 footprint, 4m high bund wall) encompassing a total of 6 tanks including four digestor tanks (20.15m max. height, c.3,400m3 capacity) a digestate storage tank (20.15m max. height, c.3,400m3 capacity), a suspension buffer tank ( 10.5m max.height, c.700m3 capacity (, an containerised desulphurisation plant and associated 2 tanks (14m max height, c120m3 capacity), 2 no. enclosed pump rooms (room no.1 -53.58m2 GFA and room no.2 – 23.69m2 GFA), and enclosed feedstock pump room (53.58m2 GFA and 3.6m high), 3 sediment settlement tanks (c.5.84(L), c.2.23m (W) & c.3.78(H) on a raised platform at 6m above ground level, stairwells, pumps, gantry walkways, 2 bund access stairs and tank emergency access ladders; 3) A biogas upgrade plant and gas entry unit; 1 no. containerised Combined Heat and Power (CHP) 1.5MW unit with an associated 28m high stack, a carbon dioxide liquefaction plant, a biogas holder (10.56 max. height, c.2,000m3) with 4 no. c.13.12m high lightning rods, a 9.26m gas flare, a containerised boiler with 10m stack, a transformer station, a propane storage tank, an emergency generator, 2 no. weighbridges, weighbridge office (c.17.2m2 GFA and 4.55m high), a fire water tank (c.1,000m3 and 14.12m high), a bunded vehicle refuelling area with a fuel storage tank (2.5m3) and a wheel wash, 4) Administration building (c.393.25m2 GFA) and a workshop (c.70m2 GFA), 5) 31 car parking spaces (including 2 electric vehicle charging points and a universal parking space), 2 motorcycle parking spaces and a covered bicycle rack; 6) Boundary treatment including 2.4m high perimeter fencing (mix of mesh wire fencing and acoustic fencing), access gates on the south western and north eastern boundaries; and 7) all ancillary site development works and services including landscaping, lighting, 2 no. directional signs, service yard area and internal circulation routes, pipe bridge, footpath and all site drainage works. The application relates to development which comprises or is for the purpose of an activity requiring an Industrial Emissions Directive Licence issued by the Environmental Protection Agency, reg. no. P1018-01. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared and will be submitted to the planning authority with the application.Decision record indexed
    Decision24 July 2025View record
  15. © OpenStreetMap
    25/6096Granted

    Inchera, Little Island, Co. Cork

    The development will consist of permission to amend Condition No. 23 of Cork County Council Planning Register No. 25/05034 to allow construction to extend by one additional hour in the evenings, Monday to Friday, and by one additional hour in both the morning and afternoon on Saturdays. Site development and building works shall only be carried out between the hours of 08:00 to 19:00 Mondays to Fridays inclusive, between 08:00 to 14:00 on Saturdays and not at all on Sundays and Public Holidays. Deviation from these times shall only be allowed in exceptional circumstances where prior written approval has been received from the Planning Authority. Reason: In order to safeguard the amenities of adjoining landuses. The application relates to development which comprises or is for the purpose of an activity requiring an Industrial Emissions Directive Licence issued by the Environmental Protection Agency, Reg. No. P1018-01.Decision record indexed
    Decision25 November 2025View record
  16. © OpenStreetMap
    20/5549Granted

    Inchera Little Island Co. Cork

    Construction of a renewable bioenergy plant to generate up to 4MW of electricity from 90,000 tonnes of non-hazardous biodegradable waste per annum utilising anaerobic digestion (AD) technology on a 2.01 hectares site. The proposed plant will comprise the following elements: (1) Demolition of the existing decommissioned waste water treatment plant and associated ancillary buildings and the existing utility building located on the east side of the site (c.1425sqm footprint); (2) Main processing building (c.4500sqm floor area up to 14.5m high) incorporating feedstock reception and processing areas, digestate treatment areas, dewatering and storage areas, quarantine areas and the odour control system (c. 12m high, 773sqm floor area) and 25m high stack; (3) Service yard area including 2no. weighbridges, weighbridge office (c.435m high and 17sqm floor area), 2no. car parking spaces, bunded vehicle refuelling area (c.56sqm floor area) with diesel storage tank (2500 litres), workshop (c. 7m high and c. 70sqm floor area), and 1no. wheel wash; (4) Tank farm (c.2900sqm footprint) encompassing 4no. digester tanks (up to 25.5m max. height, c. 5000 metres cubed), 4no. grit removal buffer tanks (up to 24m max. height, c. 630 metres cubed), 2no. post-digestion buffer tanks (up to 24m max. height, c. 630 metres cubed) and 2no. pasteurisation tanks (up to 19m max. height, c. 217metres cubed), 2no. post pasteurisation and sludge storage tanks (up to 24m max. height, c. 630 metres cubed), 1no. process water tank (up to 25.5m max. height, c. 1280 metres cubed), 1no. concentrate tank (up to 10m max. height, c. 240 metres cubed), 4no. chemical storage tanks (up to 5m max. height, c. 48.1 metres cubed), total 20no. tanks in the tank farm, to include a stairwell tower (up to 25m max. height), gantry walkways, 3m high bund wall, 2no. bund access stairs, and 6no. tank emergency access ladders; (5) 2no. enclosed Combined Heat and Power (CHP) 2MW engines (c. 3.6m high and c.66sqm floor area each), 28m high CHP stack, c.14m high gas storage dome (1800 metres cubed) with 4no. lightning rod electrodes (c.18m high), 8.2m high biogas flare stack, gas treatment equipment enclosed in a c.1.8m high container (c.31sqm floor area) containing a gas booster and dryer and a c.2.5m high container (c.79sqm floor area) containing a boiler, 10m high boiler stack, 3no. bunded electrical transformers (c.5m high with 1m high bund wall and c.117sqm floor area), c.3.0m high substation (c.70sqm floDecision record indexed
    Decision11 September 2020View record
  17. © OpenStreetMap
    24/4877Granted

    Costa Coffee Unit Eastgate Retail Park, Castleview Little Island Co. Cork

    Permission for 1) provision of a drive-thru lane for the costa coffee unit, including a canopy and service hatch on the southern side of the unit, a height restrictor/ entrance barrier on the access lane, 3.5m wide drive-thru lane, and associated hard and soft landscaping. 2) provision of associated signage consisting of 3 no. directional signs, 1 no order station and 3no. menu boards/advertisement signs, 3)alterations to all elevations of the costa coffee unit, including the provision of new signage on all elevations, 4)associated alterations to the existing car parking layout including the removal of 6 no. existing carparking spaces and provision of 2 no. pedestrian crossings, 5) Relocation of new bin store to west of the Costa Coffee Unit. 6) An increase in the floor area of the building by c. 5sq.m and 7) alterations to landscaping, outdoor seating area and all associated development.Decision record indexed
    Decision09 January 2025View record
  18. © OpenStreetMap
    23/5552Granted

    Castleview Little Island Co.Cork

    Permission for the construction of 11 no. residential housing units comprising of 4 no. 2 bed ground floor units, 4 no. 3 bed duplex units and 3 no. 3 bed houses [apartments, duplex units and houses] in a scheme at a site to the north of Cork Golf Club at Castleview, Little Island, Co. Cork. The development also includes the provision of 19 no. car parking spaces, a new vehicular and pedestrian access onto the R623, drainage works, bin storage, bike storage, land scaping, boundary treatments, surface treatments and all ancillary site development worksDecision record indexed
    Decision27 June 2024View record
  19. © OpenStreetMap
    21/6762Granted

    Castleview Little Island Co. Cork

    Construction of a two storey dwelling with a new vehicular entrance and all associated site works.Decision record indexed
    Decision23 March 2022View record
  20. © OpenStreetMap
    23/4743Granted

    Castleview Barrymore Little Island Co.Cork

    Permission for construction of 2 no. 2 storey semi-detached houses, with gross floor area of 115.5m2 each and in total of 231m2., new pedestrian entrance and associated site works. Permission for retention of hard standing area and retention and completion of shared vehicular entrance to the siteDecision record indexed
    Decision07 November 2023View record
  21. © OpenStreetMap
    20/4492Granted

    4 O'Connell Commercial Park Ballytrasna Little Island Co. Cork

    Works to existing warehouse building to include the construction of a loading bay extension and ramp alterations to existing elevations and all associated works.Decision record indexed
    Decision12 June 2020View record
  22. © OpenStreetMap
    24/4238Granted

    Inchera Little Island co.Cork

    The removal of an existing steel frame and the construction of an unmanned fuel service station solely for the use of trucks consisting of 1) 1 no. diesel island dispensing diesel on each side; 2) the re-use of 2 no. existing above ground tanks for diesel storage; and 3) all associated ancillary development works including vehicular access, landscaping, drainage, plant and services area. Extension of Duration to Permission granted under Planning Ref. No. 18/6138Decision record indexed
    Decision22 May 2024View record
  23. © OpenStreetMap
    21/7285Granted

    Raddison Blu Hotel Cork Castleview Little Island Co. Cork

    Retention of licensed Bar/Pizza oven Structure.Decision record indexed
    Decision07 July 2022View record
  24. © OpenStreetMap
    24/6394Granted

    Brandon Factory Hill Kilcoolishal Glanmire Co Cork

    Permission for the partial demolition of an existing dwelling and construction of a revised single storey extension (change of design from granted planning 23/4942) to the south and west elevations, changes to the existing dwelling elevations, modifications of the existing roof structure and all associated site development works.Decision record indexed
    Decision13 February 2025View record
  25. © OpenStreetMap
    23/4942Granted

    Brandon Factory Hill Kilcoolishal, Glanmire Co. Cork

    The partial demolition of existing dwelling, construction of new single storey extension to South & West elevations, for changes to existing dwelling elevations and all associated site works.Decision record indexed
    Decision04 July 2023View record
  26. © OpenStreetMap
    22/4416Granted

    Shalom Kilcoolishal Glanmire Co. Cork

    Construction of an extension to front of existing dwelling house, alterations to existing elevations and all associated works.Decision record indexed
    Decision20 April 2022View record
  27. © OpenStreetMap
    21/7380Granted

    O'Connell Commercial Park Ballytrasna Little Island Co.Cork

    Retention of works to existing warehouse buildings previously permitted Per. Reg. Ref. S/96/1181 including the construction of extensions and loading bays, Reduction in roof heights and alterations to elevations, internal alterations and provision of internal office space, provision of ESB substation, provision of signage and all associated works.Decision record indexed
    Decision17 February 2022View record
  28. © OpenStreetMap
    23/5556Granted

    Warehousing development formerly known as O'Connell Commercial Park Ballytrasna Little Island Co Cork

    Erection of 1 no. single-sided totem sign (4m in height and 1.075m in width) and associated site worksDecision record indexed
    Decision15 September 2023View record
  29. © OpenStreetMap
    23/4882Granted

    Existing warehousing units formerly known as O'Connell Commercial Park Ballytrasna, Little Island Co Cork

    The development to be retained at the existing warehousing units comprises the provision of A) 688.98 sqm of internal welfare/office space at ground and first floor levels in existing units 1,2,4,5,7 and 8 to serve the warehousing use: B) Elevational changes comprising of the provision of new and repositioned windows and doors and the closing up of previously permitted openings: and C) The removal of internal walls to facilitate the amalgamation of existing warehouse unit 8 with unit 10, and the amalgamtion of existing warehouse units 5 and 6 with unit 9.Decision record indexed
    Decision28 June 2023View record
  30. © OpenStreetMap
    21/5498Granted

    Inchera AGI Wallingston Industrial Estate Little Island Co. Cork

    The replacement of the current 2.4m high chainlink perimeter fence with a 2.4m high palisade fence. This includes the replacement of a 4m wide access gate located at entrance of the site as well as emergency exits located on the perimeter. Additionally, new single leaf access is to be installed adjacent to the main access gate.Decision record indexed
    Decision21 July 2021View record
  31. © OpenStreetMap
    22/4837Granted

    Castleview Little Island Co.Cork

    The construction of a 30 no bedroom, three-storey extension to the existing Radisson Blu Hotel & Spa. The proposed development makes provision for internal alterations to the existing hotel to accommodate the proposed extension, including the omission of 2 no. existing hotel rooms at upper floors, omission of meeting room/administrative space at ground floor level and all ancillary works including rooftop plant. The proposed development consists of works within the curtilage of a Protected StructureDecision record indexed
    Decision08 June 2022View record
  32. © OpenStreetMap
    21/5574Granted

    Hoffmann Park Inchera Little Island Co. Cork

    Proposed change of use/alterations of an existing pharmaceutical facility building to a data centre including ground and first floor extension to the existing building. The proposed development will include demolition of an existing storage shed, connection to existing mains services and provision of ancillary plant/services including 3 no. chillers, 1 no. fuel storage tank, 3 no. generators, 1 no. medium voltage electrical substation, and 3 no. switch rooms, together with all associated site works.Decision record indexed
    Decision03 June 2022View record
  33. © OpenStreetMap
    25/5963Granted

    Spar Convenience Store, Eastgate Retail Park, Castleview, Little Island, Co. Cork, T45A363

    Permission for the construction of a two storey extension to the rear of the existing building, planning permission for the construction of a single storey bin store, Planning Permission for internal and external alterations to existing building, and all associated site works.Decision record indexed
    Decision17 December 2025View record
  34. © OpenStreetMap
    19/6683Granted

    Unit No. 1, Eastgate Village Eastgate Castleview Little Island, Co. Cork

    The change of use of an existing two storey unit (Planning Reference: 02/5877) from its permitted use of public house on ground floor and restaurant on first floor to office use at ground and first floor levelsDecision record indexed
    Decision14 January 2020View record
  35. © OpenStreetMap
    20/6693Granted

    Unit No. 1, Eastgate Village Eastgate Castleview Little Island, Co. Cork

    The construction of a new window to the existing east elevation of the ground floor of the office unit.Decision record indexed
    Decision01 February 2021View record
  36. © OpenStreetMap
    23/4867Granted

    Unit No. 1, Eastgate Village Eastgate, Castleview Little Island Co. Cork

    Change of use, construction of new mezzanine floor, a new sign and alterations to an existing two storey building. The application consists of: (1) Change of use of the existing building from permitted office use (Pl.Reg.No.: 19/6683) and previously public house and restaurant (Pl.Reg.No.: 02/5877) to a veterinary hospital, (2) Construction of a new mezzanine floor to part of the existing building providing 247.25 sq.m of additional floor area. (3) Construction of a section of new flat roof to close over the existing rooftop services well. (4) Alterations to the existing north elevation to increase the height of an existing door, provide 4 no. air conditioning ventilation grills and a vent stack. (5) Provision of a new 11.52 sq.m sign to the existing east elevation and (6) Sub-division of the existing service yard area to provide an external dog run area and staff bicycle parking.Decision record indexed
    Decision26 June 2023View record
  37. © OpenStreetMap
    25/5191Granted

    Ridgeway Kilcoolishal Glanmire Co.Cork

    Permission for retention of alterations to the permitted extension of the existing dwelling houseDecision record indexed
    Decision11 August 2025View record
  38. © OpenStreetMap
    19/6776Granted

    Ballytrasna Little Island Co. Cork

    Retention of development consists of a 510 sq.m single storey temporary offices and 130 car park spaces. Planning permission for development will consist of the following (i) a new detached 2 storey 252sq.m utility building to include ESB & electrical switch rooms at level 1 and control room, WC & MCC room on level 2 (ii) a detached single storey 63sq.m sprinkler pump house and associated sprinkler water storage tank (iii) 8 no. bunded external product storage tanks with a 250sq.m covered tanker unload facility and associated pipe rack (iv) the conversion of an existing covered external chemical storage area to an internal entrance area of 130sq.m to contain a new entry ramp (v) provision of 195 new additional car parking spaces (vi) re-positioning of 2 no. existing boundary gates and 1 new staff entrance gate which will include a covered walkway within the site boundary and all associated site development works for the above.Decision record indexed
    Decision23 January 2020View record
  39. © OpenStreetMap
    20/4741Granted

    Tower Hill Kilcoolishal Glanmire Co. Cork

    Permission for the construction of a new single storey extension to existing dwellingjouse, new domestic garage and all associated site works.Decision record indexed
    Decision20 July 2020View record
  40. © OpenStreetMap
    19/6851Granted

    Ashford Kilcoolishal Glanmire Co. Cork

    An increase in operation hours of playschool from 9:00am to 12:00pm (permitted under planning grant 07/13385) to 9.00am to 12.30pm.Decision record indexed
    Decision31 January 2020View record
  41. © OpenStreetMap
    23/4711Granted

    No. 5 Island Cross Little Island Co. Cork

    Permission to demolish the single storey rear annex and to construct a new two storey extension at the rear of existing dwelling.Decision record indexed
    Decision11 September 2023View record
  42. © OpenStreetMap
    21/4392Granted

    Little Island Industrial Estate Ballytrasna Td., Little Island Co. Cork

    Construct extensions to the front and rear of existing commercial premises and Permission for Retention of first floor mezzanine area.Decision record indexed
    Decision12 July 2021View record
  43. © OpenStreetMap
    19/6863Granted

    23 Tower Hill Kilcoolishal Glanmire Co. Cork

    Retention of a two storey domestic garage with storage on 1st floor and a two storey domestic store with external staircase. Permission is sought for construction of a two storey dwellinghouse, alterations and subdivision of existing entrance to serve both existing and proposed dwellinghouse, installation of two no. wastewater treatment systems to serve existing and proposed dwellinghouse and all associated site works.Decision record indexed
    Decision10 March 2020View record
  44. © OpenStreetMap
    20/5627Granted

    Ballytrasna Little Island Co. Cork

    An extension to the existing production building, expansion of the site utility services, and provision of a new waste water treatment plant at this site. The proposed development will comprise of: (i) a three storey 1,723 sqm extension to a maximum height of 21.145m, including roof mounted equipment, to the north-west side of the existing single storey production building (maximum height of 9.35m), (ii) expansion of the utility yard to the west and north of the extension which will include; a chilled water system and buffer tanks, a clean-in-place system, a bunded diesel storage tank, a diesel generator and associated flue, a new boiler flue, a juice unloading bund, a 24 sqm single storey extension to the sprinkler pump house, and associated equipment access platforms and pipe racks (iii) a 118 sqm single storey chemical drum store lean-to enclosure (iv) a new waste water treatment plant, which will include c.1,856 sqm area of bunded tanks, a 165sqm single storey control building, a 64 sqm single storey electrical substation building, and a reconfigured access from the public road (v) the decommissioning and relocation of 40 No. existing car parking spaces from the existing R&D facility to a proposed extension to the car park (under construction) permitted under planning application reference 19/06776, and the addition of 13 No. new parking spaces (vi) temporary contractor’s compound, and (vii) all associated underground services, site development works and landscaping. The proposed development will also include the demolition and removal of redundant structures and equipment and the decommissioning of the existing waste water treatment plant. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted to the Planning Authority with the application.Decision record indexed
    Decision20 November 2020View record
  45. © OpenStreetMap
    22/5935Granted

    Site 5A Euro Business Park Courtstown, Ballytrasna Td. Little Island Co.Cork

    Light industrial building, divided into 4 separate units to provide an integrated supply for, Solar Voltaic Panels, Energy Management Systems, Domestic Battery and Heat Pump installations, with additional parking and associated site works.Decision record indexed
    Decision05 April 2023View record
  46. © OpenStreetMap
    20/5019Granted

    Jones Engineering Euro Business Park Ballytrasna Little Island, Co. Cork

    New external signage comprising 2 no. pillar signs, one each at the front and rear of the site and two internal direction signs.Decision record indexed
    Decision03 July 2020View record
  47. © OpenStreetMap
    21/7289Granted

    Lands at Factory Hill Kilcoolishal Glanmire Co.Cork

    Construction of a new two storey detached dwelling, new site entrance with vehicular access from public road, domestic wastewater treatment system and all ancillary site development works.Decision record indexed
    Decision19 April 2022View record
  48. © OpenStreetMap
    21/5771Granted

    Lands at Factory Hill Kilcoolishal Glanmire Co. Cork

    Construction of a new split level dwelling, new site entrance with vehicular access from public road, domestic wastewater treatment system and all ancillary site development works.Decision record indexed
    Decision06 October 2021View record
  49. © OpenStreetMap
    23/5491Granted

    Factory Hill Kilcoolishal Glanmire Co Cork

    Construction of single storey office/gym for domestic use and all ancillary site works.Decision record indexed
    Decision07 November 2023View record
  50. © OpenStreetMap
    20/6249Granted

    North Esk Business Park Dunkettle Glanmire Co. Cork

    To construct a new two storey building for office accommodation, staff facilities, parking, entrance off existing estate road and all ancillary site works.Decision record indexed
    Decision26 March 2021View record