Cairn Homes Properties Limited, intend to apply for permission for development at this site of c.5 ha at Development Area 6 Kishoge Urban Centre, sub sector KUC-S4 (including an area of Development Area 9 Kishoge South East, sub sector KSE-S1), Clonburris SDZ, within the townland of Kishoge, Clonburris, Dublin 22. the development will consist of the removal of existing hardstanding and the construction of a mixed-use development arranged in 11 no. blocks, ranging between 3 & 7 storeys, comprising: 495 no. residential units, including 449 no. apartments (216 no. 1 bed units, 46 no. 2 bed 3 person units, 187 no. 2 bed 4 person units and 46 no. duplex units (22 no. 2 bed 4 person units and 24 no. 3 bedroom units), arranged across Blocks A-F; 2,502 sq.m of retail floorspace, including 1 no. large 2 storey retail unit (over an undercroft car park) and 2no. independent retail units at ground floor of Block B; 4,607 sq.m of employment floorspace within a 6 storey building and 2 no. independent employment units at ground floor of Block B and a bike hub, located at ground floor of the employment building; 483 sq.m creche, located at ground floor level of Block E; and 87 sq.m cafe, located within the employment building. Vehicular access to the site will be from the Clonburris Southern Link Street(as permitted by Reg. Ref. SDZ20A/0021). The development will also consist of the provision of public open space, including an urban plaza; hard and soft landscaping including internal roads, cycle and pedestrian routes, pathways and boundary treatments, street furniture, wetland feature, play areas; signage; basement car park (Blocks B-C); undercroft parking (Blocks A, D and retail box) and surface car parking (403 no. spaces in total, including car sharing and accessible spaces; motorcycle parking; electric vehicle charging points); bicycle parking (long and short stay spaces including stands); ESB substations, piped infrastructural services and connections; ducting; plant; waste management provision; SuDS measures (including green roofs); open attenuation pons; sustainability measures; signage; public lighting; and all site development and excavation works above and below ground.
The development will consist of amendments to a permitted development (Reg. Ref. SDZ23A/0043), comprising: • Alterations to the apartment unit typologies in Blocks B, C, E and F, includin g associated internal layout adjustments and external modifications across all floor levels of each apartment building; • Provision of a shared basement beneath Blocks E and F, including a ramped access, comprising additional car parking spaces, bicycle parking, storage, and circulation areas; • A single-storey extension at roof level on the southern part of Block E, resulting in a 6 storey building; • A single storey extension at roof level on the northern part of Block F, resulting in a part 6, part 7 storey building, with a pitched roof element to the south; • Alterations to the basement level of Blocks B and C, including reconfiguration of car parking spaces, bicycle parking storage, plant areas and ESB substation; • A single storey extension at roof level on the southern part of Block B, resulting in a 6 storey building, with pitched roof element to the south-west; • The provision of an additional pitched roof element to the south-east of Block C; • Alterations to the crèche at ground floor level within Block E, including modifications to the associated outdoor amenity area; and • Extension of the central urban plaza northward, resulting in the removal of private vehicular access to the south of Blocks B and C. The development will also consist of: alterations to the landscaping strategy, including modifications to the urban plaza and communal open space areas associated with Blocks B, C, E and F; minor alterations to the surface car parking areas; relocation and configuration of surface level bicycle parking and waste storage areas; and all associated site development and excavation works above and below ground. The proposed amendments will result in a reduction in the total number of units from 495 no. to 494 no. units, with a revised residential mix comprising 142 no. 1-bed units, 2 no. 2-bed (3 person) units, 326 no. 2-bed (4 person) units and 24 no. 3-bed units. Additionally, there will be an increase in overall car parking provision from 398 no. to 514 no. spaces (basement and surface parking) and a minor increase in the total gross floor area from c. 48,771 sq. m to c. 52,523 sq. m.
Attic Conversion incorporating dormer extension to rear. 3 No Velux Roof lights to front. Minor alterations to front Elevation. All associated site works
Construction of a new three-storey extension and alterations to Gaelscoil na Camóige agus Gaelscoil Chluain Dolcáin, previously granted planning permission (Ref: SD22A/0352) and currently under construction. The development will consist of providing 2no. Classroom suites of Special Educational Needs accommodation for each school. Both Special Educational Needs units will be inclusive of 2 no. class base rooms, en-suite toilets, withdrawal room associated with each class base, central activity spaces, staff toilets, pupil toilets and shower facilities, storage and office, all at ground floor level, along with the relocation of 2 no. classrooms and en-suite toilets from the ground floor of both schools ground to first and second floor of the proposed three-storey extension The development will also consist of an extension at first floor level, along with minor alterations to Stair Core 4 to the north elevation of Gaelscoil na Camoige and an extension at second floor level along with minor alterations to Stair Core 3 to the west elevation of Gaelscoil Chluain Dolcáin. The development will also consist of the provision of new soft play external areas for both Special Educational Needs units, connections to the existing drainage layout and all ancillary site development works. The total area for the development is 630m2
Construction of two new three storey primary school buildings for Gaelscoil na Camoige agus Gaelscoil Chluain Dolcain providing 16 classrooms each, a shared general purpose area, ancillary teaching and staff accommodation; The development will also consist of the construction of a new single storey PE Hall building for Colaiste Chilliain; The development will also include two new pedestrian access routes, with one located on New Nangor Road and with another located at the junction of New Nangor Road and Old Nangor Road; A new vehicle entrance and exit onto Old Nangor Road to provide a one-way vehicle route with a bus/vehicle set down zone, conversion of existing vehicle entrance to Colaiste Chillian to an in-only entrance; 2 new hard play courts and play space at each primary school with site landscaping, bicycle parking spaces and car parking spaces for each primary school including accessible car parking spaces, internal refurbishment works to Colaiste Chilliain to facilitate the reintegration of teaching accommodation upon Gaelscoil Chluain Dolcain's move to the new school; Removal of the existing temporary changing room and relocation of car park at Gaelscoil Chluain to provide accessible parking spaces and associated works; Connections to public utility and drainage services, boundary treatments, installation of PV panels, alterations to existing drainage layout and associated site development works.
1) an Attic extension creating attic storage space of circa 25sq.m, which includes a rear dormer attic extension, roof light windows on the front elevation and 2) a single storey front porch extension of circa 2.3sq.m, associated alterations to all elevations and all ancillary site works.
Reduction of single storey rear extension; construction of detached 2 storey house in side garden with new access and parking arrangement in front garden and associated works.
Construction of 157 dwellings within the Clonburris South-West Development Area of the Clonburris Strategic Development Zone (SDZ) Planning Scheme 2019 consisting of, 81 houses comprising of 4 two bedroom houses, 65 three bedroom houses and 12 four bedroom houses (all two storey with associated private open space and car parking; 76 apartment units consisting of 26 one bedroom and 50 two bedroom units within Block 1 (4 storeys); Vehicular access will be provided from the permitted street under SDZ21A/0022 and the permitted Clonburris Southern Link Street (SDZ20A/0021) and R113 (Fonthill Road) to the east; All ancillary site development works including footpaths, landscaping boundary treatments, public and private open space areas, car parking (170 spaces) and bicycle parking (170 spaces), single storey ESB sub-stations, bin and bicycle stores and all ancillary site development/construction works all on wider lands bounded generally by the Dublin-Cork railway line to the north, undeveloped lands and Grand Canal to the south and undeveloped lands and the Fonthill Road (R113) to the east, in accordance with the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
The development will consist of the construction of 3 no. strategic public parks located inside the Clonburris SDZ as per the Clonburris SDZ Planning Scheme (2019) in the southern part of the overall SDZ comprising: Site A) Provision of 'Stage 3' Griffeen Valley Park Extension' public park of c. 15.94 hectares, on 2 no. parcels of land north and south of the Clonburris Southern Link Street in the western part of the SDZ lands comprising landscaped areas, 1 no. all-weather GAA pitch (with floodlighting - GAA pitch is also sized to cater for 2 no. soccer pitches), 2 no. natural soccer pitches, 3 no. tennis courts and 1 no. padel court (with floodlighting), play areas, 1 no. basketball court, 2 no. cricket practice creases, 1 no. cricket crease, rebound wall area as well as allotment areas and coach parking set down area including 27 no. car parking spaces & 78 bicycle spaces (as well as 2 no. pedestrian access points to Haydens Lane) - vehicular access from permitted access under Planning Reg. Ref. SDZ20A/0021 to the Clonburris Southern Link Street; Site B) Provision of 'Stage 4A' Grand Canal Park' public park of c. 7.32 hectares (to the south of the Grand Canal) comprising 2 no. natural soccer pitches, play areas, ESB substation, and allotment area as well as 30 no. car parking spaces [with access from Lockview Road] & 66 no. bicycle spaces; Site C) Provision of 'Stage 5' Na Cluainte Park South' of c. 4.04 hectares located centrally within the SDZ (on 2 no. sites either side of the Clonburris Southern Link Street) comprising landscaped areas, attenuation ponds, 1 x Soccer All Weather Pitch (floodlit), 1 no. natural soccer pitch, 2 no. basketball courts, play areas, 2 no. cricket practice creases, and 1 no. multi-sports pitch (weights table games etc.) and allotment areas as well as 30 no. car parking spaces & 96 no. bicycle spaces, with access provided from the permitted Clonburris Southern Link Street; Permission is also sought for all associated drainage infrastructure works to include surface water attenuation areas including attenuation ponds and revisions to the permitted 'Stage 1' infrastructure under Planning Reg. Ref. SDZ20A/0021 relating to the coach parking area and attenuation area to the north of the Clonburris Southern Link Street and associated ancillary amendments and integration of the 'Stage 1' infrastructure (under construction) with the proposed development (to include relocation of flood compensation area to the west of the Griffeen River, increased landform variation in attenuation area no. 1, revisions to internal paths, removal of retaining walls to attenuation area no. 2, additional planting). Permission is also sought for all ancillary site development (including site accommodation, site compounds, and temporary construction boundary fencing) and landscape works/planting associated with the development, including hard and soft landscaping, 3 no. temporary project signage (at 3 no. locations) and Irish water foul water diversions in Grand Canal Park.
Single storey front, rear and side extension comprising of two bedrooms, 1 en-suite and 1 bathroom; attic converted for storage and roof windows to rear and side of roof; extend wall along site boundary and relocate wall 1.8m high that divides front and rear gardens and relocate access door to rear garden and all associated site works.
Single storey extension at side.
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs and 2no. roof windows to the front and flat roof dormer to the rear
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs and flat roof dormer to the rear.
Roof Profile revised from a double hipped roof to a Dutch gable style to the side and a dormer window to the rear.
Single storey front porch and ancillary site works.
Planning permission is sought attic conversion with projected dormer window to rear roof, storage, games room facility, permission also sought for single storey kitchen to rear of existing house, permission also sought for new single storey building to rear garden for home office / gym use and all associated site works
Wastewater pumping station comprising of (a) below ground 24-hour emergency storage tank; (b) below ground inlet, wet well, flow meter and valve chambers; (c) control and welfare building with green roof and 2 odour control units; (d) boundary wall, fencing, entrance gate and landscaping; (e) site drainage system including a swale; (f) all associated ancillary and enabling works including hardstanding and access, located within the Clonburris Strategic Development Zone.
The development will consist of amendments to the permitted development as approved by South Dublin County Council under Planning Reg. Ref. SDZ22A0018 comprising in the Clonburris Development Areas CUCS3 & CSWS3 of the Clonburris SDZ Planning Scheme 2019 as follows: A) Reconfiguration of internal arrangement in Block E to allow for the replacement of 5 no. permitted 1 bedroom apartments with 5 no. 2 bedroom apartments at first floor to fifth floor levels within Block E (facing internal courtyard), and the replacement of 2 no. 1 bedroom apartments with 2 no. 2 bedroom apartments at ground floor level of Block G and H to result in an overall mix of 257 no. 1 bedroom apartments, 318 no. 2 bedroom apartments and 32 no. 3 bedroom apartments (no change to overall no. of permitted apartments) and all associated elevation changes; B) Reconfiguration and amendment to floor areas of retail/café/retail service units and associated alterations to internal podium level to result in an overall increase of c. 51 sq. m of Gross Floor Area (an overall increase from 1,150 sq. m to 1,201 sq. m), and all internal reconfigurations; C) Inclusion of green roof in place of pitched roof along portion of Block A (eastern block - no change to internal arrangements or profile fronting onto external street); D) Amendments to undercroft car parking arrangements to now provide 378 no. car parking spaces (compared to 385 no. car parking spaces permitted) and alterations to cycle parking in bike stores and surface spaces to now provide 1,620 no. cycle spaces (compared to 1,548 no. cycle spaces permitted) and all internal/external reconfigurations.
Construction of a mixed-use development comprising 594 apartments, office floorspace, 4 retail units, a creche and urban square in the Clonburris Development Areas CUCS3 & CSWS3 of the Clonburris SDZ Planning Scheme 2019 as follows, 594 apartments (255 one bedroom apartments, 307 two bedroom apartments and 32 three bedroom apartments (all apartments to have terrace or balcony; ancillary communal amenity spaces for residents) as follows; Block A (4 and 6 storeys with undercroft) comprises 96 apartments consisting of 36 one bedroom apartments, 48 two bedroom apartments and 12 three bedroom apartments (with creche c. 609sq. m at ground and first floor as well as play area; Block B (6 storeys with undercroft) comprises 77 apartments consisting of 44 one bedroom apartments, 28 two room apartments and 5 three bedroom apartments; Block D (5 and 7 storeys with undercroft) comprises 71 apartments consisting of 39 one bedroom apartments and 32 two bedroom apartments; Block E (6 storeys with undercroft) comprises 100 apartments consisting of 47 one bedroom apartments, 48 two bedroom apartments and 5 three bedroom apartments; Block F (5 and 7 storeys with undercroft) comprises 124 apartments consisting of 57 one bedroom apartments, 61 two bedroom apartments and 6 three bedroom apartments; Block G (1, 2 and 4 storeys with undercroft) comprises 65 apartments consisting of 16 one bedroom apartments, 45 two bedroom apartments and 4 three bedroom apartments; Block H (4 storeys with undercroft) comprises 61 apartments consisting of 16 one bedroom apartments and 45 two bedroom apartments; Mixed use development comprising, commercial office development in Block C of 6 storeys with parapet above to 7 storey equivalent on elevations (c. 4,516sq.m), 1 retail unit at ground floor of Block B (c.147.5sq. m) and 3 retail units at ground floor of Block E as follows (c.106.2sq.m, c.141.6sq.m and c.492.2sq.m respectively) as well as a creche (c. 609sq. m) at ground floor and first floor of Block A; Vehicular access will be from the permitted Clonburris Southern Link Street (SDZ20A/0021) and R 113 to the east; Public Open Space/landscaping of c. 0.52 hectares (urban square) and linear open space (0.72 hectares) as well as a series of communal open spaces to serve apartments over undercroft level (and internal communal open space c. 685 sq.m; The development will also provide for all associated works and infrastructure to facilitate the development to include all ancillary site development works including footpaths, landscaping boundary treatments, public, private open space areas, car parking (396 no. spaces in a mixture of undercroft spaces Block A, Block B&D and Block E&F) and bicycle parking (1,232 spaces at undercroft and surface levels), single storey ESB substations/bike/bin stores, green roofs, solar panels at roof level of apartments, plant areas within blocks and all ancillary site development/construction works; Permission is also sought for connection to water supply, and provision of foul drainage infrastructure. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area ' as defined by Statutory Instrument No. 604 of 2015; An Environmental Impact Assessment Report accompanies this planning application.
Construction of a 3 storey (part 4 storey) data centre known as 'DB8' to include data halls, electrical/plant rooms including internal generators, offices, lobbies, ancillary staff areas including break rooms and toilets, stores, stair/lift cores throughout and photovoltaic panels at roof level; the total gross floor area excluding hot air plenums and external staircase is c.9,601sq.m and the overall height of the data centre ranges from c.16m to c.20m to roof parapet level and up to c.24.48m including roof top plant, flues and lift overrun; provision of 5 external generators, 8 fuel tanks and ancillary plant contained within a plant yard to the north of DB8; provision of a water tank plant room, air cooled chillers and ancillary plant contained within a chiller plant yard to the south of DB8; provision of a water sprinkler pump room (c.23sqm), 2 sprinkler tanks (c.12m high each), heat recovery plant room (c.17sqm), ESB substation (c.44sqm), waste/bin stores (c.52sqm); total floor area of ancillary structures and plant (c.303sqm); provision of a delivery yard and loading bays, 64 car parking spaces, 5 motorcycle spaces, bicycle shelter serving 14 spaces, smoke shelter, internal access roads and footpaths, vehicular and pedestrian access to the west from Falcon Avenue and closure of an existing vehicular entrance from Falcon Avenue; all associated site development works, services provision, drainage works including attenuation, landscape and boundary treatment works including berming, hedgerow protection areas and security fencing; no buildings are proposed above the existing ESB wayleave and SDCC watermain wayleave to the west and north of the site; the area to the southwest of the site (temporary meadow) is reserved for a future data centre, subject of a separate application to South Dublin County Council on a site bounded to the east and south by Grange Castle Golf Club, to the north by Nangor Road (R134) and to the west by an estate road known as Falcon Avenue. This application is accompanied by a Natura Impact Statement.
10 year permission on a site is bounded to the east and south by Grange Castle Golf Club, to the north by Nangor Road (R134) and to the west by an estate road known as Falcon Avenue) for modifications to the permitted data centre granted under SDCC Reg. Ref. SD21A/0186 comprising the following, reconfiguration and alterations to the data centre building to include removal of front of house offices at third floor level, alterations to floor levels at second floor to provide consistency between front of house and data halls, parapet height increase of front of house to c.16.8m, provision of storage at second floor level in lieu of relocated internal generators to the external generator yard and associated elevational alterations; extension of loading dock at ground floor level by c.6osqm in area with minor height increase to c.5.3m; removal of 3 air plenums to the front (north) elevation and provision of screening to generator flues in lieu of omitted plenums; alterations at roof level to include removal of 2m high gantry screening; alterations to the permitted generator plant yard to the north of the data centre to include the removal of fuel tanks, reconfiguration of plant and generators, provision of 2 additional external generators (increase from 5 to 9 external generators), provision of 4 additional external plant rooms, provision of diesel pump tank cabinets and stepover, relocation of generator yard doors and enlarged generator yard to accommodate the proposed modifications; increase in plant areas by c.77sq.m; reconfiguration of plant within the permitted chiller plant yard to the south of the data centre; removal of 1 sprinkler/water tank and removal of stairs and door to the side of the waste compound; reconfiguration of car parking and motorcycle spaces and removal of 1 accessible space. 64 total number of car parking spaces; the proposal also includes provision of on-site gas power generation compound ( c.2,604sq.m in area) in the area previously reserved for a future data centre; the compound comprises 7 modular plant rooms (totalling c.180sq.m in area), 10 gas fired generators and associated flues c.14.7m high, gas skid, associated modular plant, boundary treatment surrounding the compound c.6.5m high and 2 vehicular access points including general and emergency access; all associated site development works, services provision, drainage works, access, landscaping and boundary treatment works; no buildings are proposed above the existing ESB and SDCC wayleaves to the west and north of the site; the overall Gross Floor Area of the development is reduced by c.44sq.m to c.9,795sq.m from previously permitted under SDCC Reg. Ref. SD21A/0186; the application is accompanied by a Natura Impact Statement.
Widening of the site entrance to provide for a separate lane for the entrance and exit of cars to separate car traffic from heavy good vehicle traffic and associated works at Kilcarberry Business Park, Clondalkin, Dublin 22.
Retention for conversion of retail premises to (a) first floor 1 bedroom apartment and (b) ground floor 1 bedroom apartment.
Retention of 2 apartments previously used as a two storey retail premises comprising a 1 one bedroom apartment at ground floor level and 1 two bedroom apartment at first floor level; Permission for internal amendments and minor elevational alterations at first floor level to the southern and western elevations along with proposed new bin storage, bicycle parking and all other ancillary site development works.
Retention for conversion of retail premises to first floor two bedroom apartment and ground floor one bedroom apartment.
To change condition No. 4 of Planning Application SD20A/0062 to increase the number of children attending any one session from 16 to 20
Revision of previously approved planning SD09A/0313 including increase the number of children attending the playschool to 16 (maximum) in any one session; change opening hours to 9am - 12pm (morning session) and 12:30pm - 3:30pm (afternoon session), Monday to Friday; minor internal changes to the playschool; all associated site works.
Proposed porch extension and garage conversion with tiled roof.
Internal separation of the house and associated granny flat to provide for 2 permanent houses and extension of rear garden. Part of the development site is located within the Clonburris Strategic Development Zone.
Internal separation of house and associated granny flat to provide for 2 permanent houses.
784 photovoltaic panels on the roof of the existing building with all associated site works.
Install a new LPG Safety Installation in a caged enclosure 1.8m x 1.2m x 1.2m (LxWxH) servicing the existing LPG storage installation with all ancillary services and associated site works situated within the Clonburris SDZ (Strategic Development Zone) area.
Demolition of existing 7.15 sq/m ground floor rear extension, change of use of 10.8 sq/m garage to habitable space; construction of an 18 sq/m first floor side extension; construction of a 33.2 sq/m ground floor rear extension; construction of a 2.3 sq/m porch to the front of existing dwelling and conversion of attic space to storage room.
Retain the two rooftop lattice telecommunications support structures carrying antennas and link dishes.
Install a new LPG Safety Installation in a caged enclosure 1.8m x 1.2m x 1.2m (LxWxH) servicing the existing LPG storage installation with all ancillary services and associated site works.
The development consists of a two-storey extension to the side, a single-storey extension to the rear, a rear dormer roof, and necessary ancillary work to facilitate the development.
A new canopy over front door, a single storey front and side extension with roof windows comprising of a playroom, study, utility room and wet room a new single storey rear extension with roof windows comprising of a living area and all associated site works
Retention of 2.44sq.m front porch. Permission for 4.05sq.m ground floor extension to the front; 20.07sq.m ground floor extension to the rear; 9.72sq.m first floor extension to the rear.
Attic extension creating attic storage space of circa 24sq.m, which includes a rear dormer attic extension, roof light windows on the front elevation, associated alterations to all elevations and all ancillary site works.
Conversion of the attic space to a bedroom and ensuite. This will involve the construction of a dormered extension with two windows to the rear section of the existing roof.
2 storey modular classroom building and a single storey toilet building, steel framed covered walkway structure linking to the existing school, relocation of existing bicycle shelters and all associated site development works.
Change permitted house type to a three bed, detached dwelling and associated works.
The development will consist of works located inside the Clonburris SDZ relating to the Stage 2 roads, public parks/open space areas and services infrastructure works (as part of a separate concurrent application) as per the Clonburris SDZ Planning Scheme (2019) to facilitate the future development of the northern part of the overall SDZ comprising: A) The construction of c. 2.3km of a new Link Street Clonburris Northern Link Street (CNLS) and approximately 800m of side streets including ancillary cycle facilities, pedestrian crossings, traffic signals, footpaths, car parking (79 no. spaces) public lighting as well as services infrastructure (including ESB, Comms, gas main, trunk surface water sewer, and watermain) and ancillary works. B) Provision/upgrade of 12 signalised junctions (5 new and 7 upgraded) as follows: Junction 1: R136 & Adamstown Avenue/Thomas Omer Way, Junction 3: R113 & Thomas Omer Way / Ninth Lock Road, Junction 4: CNLS & R136, Junction 6: CNLS, Junction 8: CNLS & R113, Junction 9: CNLS/Neilstown Road & Ninth Lock, Junction 24: CNLS/Neilstown Road & Ninth Lock, Junction 28: R136 & Adamstown Avenue/Thomas Omer Way, Junction 2: CNLS & Thomas Omer Way, Junction 5: CNLS, Junction 7: CNLS, Junction 27: R136 & Adamstown Avenue/Thomas Omer Way along with minor priority-controlled junctions are proposed along the street alignment to provide access to existing development and future development cells within the Clonburris SDZ. C) Approximately 2 km of upgrade of existing streets, including minor priority-controlled junctions are proposed along the street alignment to provide access to existing development and future development cells within the Clonburris SDZ, including pedestrian crossings. D) Provision of 2 main public parks centrally (Na Cluainte Park North) c. 2.78 ha and in the eastern part of the subject lands (c. 0.77 ha) both to include open water attenuation areas. E) Drainage infrastructure works to include surface water attenuation areas, Sustainable Urban Drainage Systems (SUDs) as well as landscaped areas including attenuation ponds and the provision of underground attenuation. Provision of surface water drainage and waste supply trunk infrastructure within the proposed road corridors; wastewater infrastructure including a foul pumping station (known as pumping station no.3) and foul pipe network within proposed road corridors to facilitate drainage connections to future development within the SDZ lands. The easterly section of the development will collect surface water and discharge into an existing outfall situated within Moorfield Walk whereas the western surface water catchment will connect (as part of a separate concurrent application) to an existing surface water outfall on the Griffeen Road (and ultimately to an existing Griffeen River outfall). F) Provision of trunk watermain infrastructure within the CNLS as well as connections to the permitted watermain infrastructure as part of SDZ20A/0021. G) Permission is also sought for all ancillary site development and landscape works associated with the development, including hard and soft landscaping, (tree pits, boundary treatments, road marking, signage, enabling works and temporary construction works, (including site accommodation, site compounds, and temporary construction boundary fencing) as well as temporary project signage (at 6 no. locations) and provision of underground utility connections under the Dublin - Cork Railway line (at 3 no. locations) and Irish water diversions. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs and flat roof dormer to the rear.
Conversion of existing attic space comprising of modification of existing roof structure; new gable window; new access stairs and flat roof dormer to the rear.
The proposed primary school will extend to c3,355sq.m will be 2 storeys in height and will comprise 16 no. classrooms with an additional 2 classroom Special Educational Needs Unit; a General Purpose Hall and all ancillary teacher and pupil amenities and facilities. The proposed development also provides for hard and soft play areas, including 2 no. outdoor ball courts, bicycle parking, staff car parking, vehicle drop off and set down areas. Photovoltaic Panels (PV) are proposed on roofs in addition to EV Charging Points and a packaged Biomass heating plant. The proposed development also provides for all landscaping and boundary treatments and all associated site development works. Access to the site will be via a new junction and access road off Thomas Omer Way. The new access road will run south off Thomas Omer Way and then west into the site. The proposed access road Is in accordance with the Clonburris Strategic Development Zone (SDZ) Planning Scheme and incorporates public lighting, footpaths and cycle tracks. A further pedestrian / cycle only connection to Thomas Omer Way ls also proposed along the western green corridor, west of the proposed school building.
The development consists of the retention and completion of revisions to a section of the northern site boundary comprising the omission of the pedestrian/cycle access (consisting of ramp and stairs) off Thomas Omer Way and the repositioning of the pedestrian access c. 6 m in an easterly direction to co-join with the permitted vehicular access. The amendments do not involve any changes to the position of the permitted vehicular access itself and the access road remains in accordance with the Clonburris Strategic Development Zone (SDZ) Planning Scheme. Permission is also sought for the relocation of bicycle parking areas within the site; revisions to the permitted boundary treatment along a section of the eastern site boundary; the installation of 3 no. flagpoles in the south-eastern part of the site; and revisions to the site compound including repositioning of bin store area and replacement of previously permitted bio-mass heating with new heat pump and gas storage tank.
The installation of an aircraft noise monitoring terminal on a standalone, tiltable mast structure (6m in height) along with associated works including electrical connection on land adjacent to the Skatepark at Clondalkin Leisure Centre, Old Nangor Road, Clondalkin, Co Dublin.
2 storey extension to side. Rear attic storage with dormer window to rear. Roof window to the front. Garage conversion for extended living.
The development will consist of the construction of two small dormer windows in the main roof to the rear of the property