Erection of 1 no. single storey detached ancillary accommodation garden room (approx. 39.7m2 gross internal area) with gym, den area, office and shower room, and including demolition of existing shed & associated site works in rear garden on overall site comprising 0.024 hectares (240 m2 approx.)
The construction of single storey rear extension, construction of first floor side extension, internal modifications, front elevation window modifications, chimney removal and all associated works
Construction of single storey extension and porch to the front of existing dwelling comprising of living room.
Extension of an existing telecommunications lattice tower (providing new overall height of 31.5 metres) carrying existing antennas, dishes and associated equipment and additional new antennas, dishes and associated equipment together with new ground equipment cabinets, new fencing and all associated site development works.
Construction of a new single storey extension to the front of existing dwelling comprising of living room extension and porch.
Construction of a new single storey, pitched roof, home office and games room (44.9sq.m) and all associated site works to the rear garden.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs, 3no. roof windows to the side and 2no. flat roof dormers to the side.
Single storey extension to the side and front of existing house & associated site works.
Construction of 82 no. residential apartment units and associated commercial floorspace in 3 no. residential apartment blocks 5 to 6 storeys as follows: Block A contains 44 no. apartment units in a 6-storey apartment block (with double height mezzanine corner feature at 5th floor level addressing the corner of Greenhills Road and Broomhill Road). This will consist of 25 no. 1 bed apartments, 17 no. 2 bed apartments and 2 no. 3 bed apartments. All apartment units will be provided with associated private terraces / balconies. Block B contains 23 no. apartment units in a 5-storey apartment block. This will consist of 8 no. 1 bed apartments, 9 no. 2 bed apartments and 6 no. 3 bed apartments. All apartment units will be provided with associated private terraces / balconies. Block C contains 15 no. apartments in a 5-storey apartment block. This will consist of 4 no. 1 bed apartments, 7 no. 2 bed apartments and 4 no. 3 bed apartments. All apartment units will be provided with associated private terraces / balconies. A resident's lounge (c. 73.6 sq.m) for use by occupants of all proposed apartment units is provided at ground floor level of Block C. A commercial unit (c. 148.5 sq.m) front Greenhills Road is also provided at ground floor level in Block C. New vehicular access to the site will be provided from the Broomhill Road. Provision of an area of landscaped public open space (c 776 sq.m) and communal open space (592 sq.m) including c.192 sq.m as a roof terrace area for residents. Lobbies, stair / lifts, photovoltaic panels and green roofs throughout Blocks A, B and C. Provision of 41 no. car parking spaces and 182 no. bicycle parking spaces for residents of the proposed development. All associated site development works, services provision, infrastructural and drainage works, provision of esb substations, bin stores, public lighting, landscaping, open space, and boundary treatment works on this site of 0.69 ha.
The construction of a two storey, mixed use, development consisting of a public house at ground floor level with a gross floor area of 359sqms. The public house includes internal bin storage and other ancillary rooms. The construction of 4 residential apartments (Gross floor area 374sqms) at first floor consisting of 2no. one bed units; 1no. two bed unit; and, 1no. 3 bed unit. All apartments have private space in the form of balconies with a common area at first floor for access to each apartment with access to this common area off the internal entrance lobby; internal, residential, bike storage room and bin storage room at ground floor level. The proposed development includes communal amenity spaces located to the west of the block and at first floor level; parking of 8 spaces including 1 no mobility space, 2 electric vehicle spaces and is accessed via a new vehicle entrance from the Old Belgard Road. New boundary treatments proposed along with a drop off area and wider soft and hard landscaping including a plaza area which ties into the public footpath on the Old Belgard Road; external bike parking areas within these external spaces; and, a connecting footpath to the established local centre to the north. Associated mechanical plant, PV panels at roof level, groundworks, landscaping, drainage including SUDS measures, lighting, engineering and ancillary works necessary to facilitate the development.
Demolish existing garage at side; construct two storey semi-detached house; new entrance; new boundary walls at front and rear and all ancillary works.
Development on a site of c. 0.021 ha located West of the SSR Building on the TU Dublin Tallaght Campus, Old Blessington Road, Tallaght, Dublin 24. The development shall consist of the construction of a 90m3 underground fire fighting storage tank.
Development on a site of c. 0.008 ha located West of the SSR Building of the TU Dublin Tallaght Campus. The development shall consist of the construction of a M&E plant area (28m2) comprising an enclosed pump house and external water tank with 2.4m high screen fencing surround.
We, MBCC Foods (Ireland) Ltd, intend to apply for planning permission for development at Costa Coffee, Airton Road Retail Park, Airton Road, Dublin 24. The proposed development will consist of: Provision of a drive-thru lane for the existing Costa Coffee unit, including a canopy and service hatch on the eastern side of the unit, a 2,-3.5m wide drive-thru lane, and associated soft and hard landscaping, Internal alterations to the layout of the existing Costa Coffee unit, Provision of associated drive-thru signage consisting of 2 no. directional signs, 1 order station, and 2 menu boards/advertisement signs, Provision of a new bin store to the northeast of the Costa Coffee unit, Alterations to all elevations of the existing Costa Coffee unit, including new tenant signage on the west, south, and east elevations, An increase of unit floor area by 12 sq.m, Associated alterations to the existing car parking and landscaping including new directional road markings, removal of 7 no. associated parking spaces and provision of 8 no. covered cycle spaces, and All associated development.
Permission to change the use of Unit 3 of Block 2, from retail to a medical practice as well as permission for associated signage area and all associated works to complete the development.
Single storey temporary emergency accommodation structure for working staff, for a maximum period of 2 years, comprising 16 sleep pods, a kitchen/dining area, cleaning and changing rooms and toilet facilities, all associated windows and doors and associated site development works.
First floor pitched roof extension over existing ground floor consisting of 3 bedrooms with a dormer window to front and side roof; 4 roof lights to side roof; extension to porch at ground floor level to front of dwelling.
Demolition of 29.5m2 loading bay and removal of 3 no. storage containers and ancillary 5 no. storage tanks with extension of 394m2 9.0m high warehouse extension with 2 no. roller shutters with internal layout changes for installation of new energy efficient and sustainable equipment to existing commercial laundry with 7 no. new car parking spaces, 24 no. new bicycle spaces in secure standalone shelter with new delivery and loading area covered with new canopy and revised internal vehicular routes while retaining existing entrances to Second Avenue with ancillary site and development works.
Change of use to part of the ground floor from retail to medical use and changes to the ground floor elevation to include new windows and doors to the existing façade.
Demolition of existing factory/warehouse buildings on site (total floor area c. 10,076.8sq.m). Construction of 502 apartments (comprising 197 1-bed; 257 2-bed; and 48 3-bed units) within 6 blocks ranging in height from 4 to 8 storeys. All residential units provided with associated private balconies/terraces to the north/south/east/west elevations. Provision of residential amenity facilities, 3 retail units, creche and services/bin store areas (total non-residential floor area c.1,839sq.m). A total of 202 car parking spaces (at basement and undercroft levels) and 584 no. bicycle parking spaces. Vehicular/pedestrian/cyclist accesses from Greenhills Road and Airton Road. Provision of road improvements and pedestrian crossings. All associated site development works, open space, landscaping, boundary treatments, plant areas, pv panels (at roof level), waste management areas, and services provision (including ESB substations).
Ground floor partial side/front extension and porch; ground floor internal alterations; partial raising of roof ridge height and build up of walls at front and rear to create attic conversion, with dormer roof windows on both side roofs, and window at attic level in front elevation.
Change of use to part of the ground floor (98sq.m), from retail to medical use and changes to the ground floor elevation to include new glazed screen and doors and signage to existing facades.
Retention for internal mezzanine storage area (132sq.m); single storey compressor room extension (12sq.m) to rear of existing building and single storey packaging shed extension (38sq.m) to side of existing building.
Demolition of existing factory/warehouse buildings on site (total floor area c. 10,076.8sq.m). Construction of 502 apartments (comprising 197 1-bed; 257 2-bed; and 48 3-bed units) within 6 blocks ranging in height from 4 to 8 storeys. All residential units provided with associated private balconies/terraces to the north/south/east/west elevations. Provision of residential amenity facilities, 3 retail units, creche and services/bin store areas (total non-residential floor area c.1,839sq.m). A total of 202 car parking spaces (at basement and undercroft levels) and 584 no. bicycle parking spaces. Vehicular/pedestrian/cyclist accesses from Greenhills Road and Airton Road. Provision of road improvements and pedestrian crossings. All associated site development works, open space, landscaping, boundary treatments, plant areas, pv panels (at roof level), waste management areas, and services provision (including ESB substations).
Change the use of Unit 1 of Block 3 to a veterinary clinic as well as permission for signage areas. Retention of a new entrance door on Block 3; sub-division of Unit 1, Block 2, in to two units (1a and 1b) and the change of use to a barber (Unit 1a) and takeaway (Unit 1b); new signage zones; all associated works to complete the development.
1. Construction of a two storey side extension with a gable ended roof to consist of a living room, WC and utility at ground floor and master bedroom with a walk-in wardrobe and a bathroom on the first floor. 2. Modifications to the existing side boundary wall for provision of a new pedestrian access exiting onto Kingswood Heights Grove. 3. Modifications to the existing front and side walls boundary treatments for provision of a new vehicular access including dished public footpath exiting on The Grove, Kingswood Heights. General remodel and partial upgrade of the existing dwelling to suit the proposed layouts. 5. All drainage, structural and associated site works to be implemented.
Permission for retention for the application of external wall insulation on all facades of the dwelling, with indistinguishable rendered finish throughout all facades.
The development will consist of: (1) Permission for works comprising of: (i) Partial change of use from warehouse to office use at ground floor level [c.270sq.m GFA] and refurbishment of the existing first-floor office [c.263sq.m GFA] in the north of the unit. The office space [c.533sq.m Total GFA] will comprise individual offices, meeting rooms, stairwells and circulation areas, storage areas, plant, canteen facilities, and WC facilities - including a new accessible WC on the ground floor. The proposed works will also include the reinstatement of existing windows and an entrance, the opening of blind windows, and the installation of a new window on the west elevation. (ii) Change of use from motor showroom, including ancillary workshop and office / storage areas, to warehousing [c.1,056sq.m + c.1,065sq.m. GFA] in the south of the unit. The proposed works will include the demolition of internal partition walls, floors, stairs, and doorways in the south-east of the unit. The works will also include the removal of a mezzanine level in the south-west of the unit [c.130sq.m.] and the installation of two new free-standing mezzanine levels [1,056sq.m. GFA at first floor level + 1,056sq.m. GFA at second floor level] with associated stairwells and a service lift in the south-west of the unit. (iii) Reconfiguration of the car park layout to the south and west of the unit to accommodate 35 no. car parking spaces, including 2 no. accessible spaces and 7 no. electric vehicle (EV) charging spaces, and a service yard to the north-east of the unit. (iv) Provision of 15 no. bicycle stands under a dedicated shelter located to the north of the unit, providing secure long-term parking for up to 30 no. bicycles, and provision of 2 no. bicycle stands to the west of the unit, providing short-term parking for up to 4 no. bicycles. (v) Repurposing of the external plant room to a bin store. (vi) Reinstatement and rebranding of 2 no. previously permitted pylon signs (Reg. Ref. SD15A/0190), located to the west and south-west of the unit, respectively. (vii) Provision of designated signage zones located above the glazed sections at the south-west corner of the building, as well as above the office and warehouse entrances on the west and south elevations. (viii) Provision of hard and soft landscaping, including the planting of native trees along the southern and western boundaries. (2) Retention permission for the existing pylon sign located at the main entrance to the site in the south-east corner. The pylon sign is to be rebranded. (3) All associated site development and services work on a site of c.0.8609ha.
(1) Installation of: a free-standing mezzanine structure in the northern warehouse [413 sq.m GFA]; and two-level free-standing mezzanine structures in the central warehouse [1,760 sq.m GFA] and eastern warehouse [2,130 sq.m GFA], including all associated stairwells and service lifts.(2) Amendments to the internal layout of the south western warehouse including: the relocation and modification of the permitted stairwells; the removal of the western entrance lobby; the enlargement of the permitted central service lift; the enlargement of the southern reception lobby.(3) Amendments to the warehouse access doors on the north and east elevations. (4) Provision of: 10 no. additional car parking spaces to the north-east of the building, including 1 no. accessible space; and the repurposing of 2 no. permitted spaces to the west of the building for EV charging spaces.(5) Provision of: 10 no. additional sheltered bicycle parking spaces to the north of the building.(6) Adaptation of the turning head in the north-west corner of the site to facilitate fire tender access, together with all associated landscaping and facilitating works.(7) Modifications to hard and soft landscaping to accommodate the proposed works, with no net loss of permitted trees.(8) All associated site development and services works, above and below ground, on a site of c.0.86ha.
Retention of vehicular access/egress and associated parking provided for the former temporary school accommodation on vacant site to rear.
Retention of alterations to previously approved planning application, Reg Ref No SD24B/0329 for 1) Erection of 41.5 sqm single storey ground floor extension to the rear of the dwelling with two number glazed roof lights. 2) Erection of a 6.3 sqm single storey ground floor extension to the front of dwelling with a pitched roof porch. The alterations include 1.Erect of 56.6 sqm single storey ground floor extension to the rear of the dwelling with four number glazed roof lights. 2) Erection of a 6.3 sqm single storey ground floor extension to the front of dwelling with a pitched roof porch, and change the side extension window to a door with window and all associated works at 33 Tamarisk Way, kilnamanagh, Dublin 24. D24 VNX0.
The proposed development will consist of 1) Erection of 41.5 sqm single storey ground floor extension to the rear of the dwelling with two number glazed roof lights. 2) Erection of a 6.3 sqm single storey ground floor extension to the front of dwelling with a pitched roof porch, 3) Erection of 16.8 sqm first floor extension to the side of the dwelling and alterations to the main roof profile, along with all associated site works.
The development will consist of converting the existing two bedroom detached single storey bungalow to a two storey three bedroom detached house and all associated site works, through the construction of a new additional first floor storey to the existing single storey house with a new pitched roof over, consisting of an attic conversion and rear roof dormer.
Temporary change of use of part of unit 70 from light industrial to indoor gymnastics sports facility and associated site works.
Change the use of Unit 3 of Block 3 from retail to office space (155sq.m gross floor area excluding shared lobby of 34sq.m); signage zones related to the office use; all associated works to complete the development; signage zones located on the fascias of the ground floor retail Unit 2 and two internally illuminated, projecting pharmacy 'cross' signs, for a pharmacy which will be operating from the ground floor retail unit (Unit 2) of Block 3; all associated works to complete the development.
A bicycle storage unit to accommodate 75 no. bicycles to be located within the TU Dublin Tallaght campus, on an area of existing hardstanding to the east of the Main Campus Building and to the west of the Quad, along with all associated site works and services. The bicycle storage unit will be an enclosed, covered single-storey structure. The gross development floor area of the unit will be 101 sqm.
Construct a single storey extension to the rear of the existing warehouse unit including alterations to the existing to accommodate same; All ancillary site works and services.
Construct a single storey extension to the rear of the existing warehouse unit, including alterations to the existing to accommodate same, all ancillary site works and services.
Conversion and extension of the existing garage structure and construction of a new link to the existing single-storey four-bedroom house, to provide a single-storey one-bedroom family flat with kitchen/ living area and outdoor area; construct an additional pedestrian gate in the existing garden wall, to install photovoltaic solar panels to the roof of the house and to complete some ancillary site, landscaping, and drainage works.
The development shall consist of retention of Collect and Go Coffee Dock, together with associated services and signage.
Change of use of two community hall meeting rooms - to be used as Montessori classrooms with separate access and the use of kitchen, storage and WC facilities for the same.
Retention permission is sought for an external, timber framed, flat roof, covered seating area (15.8m²) to the rear garden at side.
Erect 837sq.m for 150.3 KWP of photovoltaic panels on the roof, with all associated site works.
Construction of a single-storey flat-roof extension to the front with two rooflights, and a part two-storey, part single-storey flat-roof extension to the rear.
Demolition of an existing building, 2 new portacabins, a power wash enclosure, fences, gantry and fuel dispensers, revisions to internal site layout to include new vehicular and pedestrian movement arrangements. revised bund walls, relocated stepped access route of tank farm and bottom loading skid, construction of new forecourt fuel area with 2 pump dispensers, new payment building, new single storey office building, new services area with 2 car parking spaces, 12 staff car parking spaces and 8HGV/Tanker parking spaces, all other associated underground and overground infrastructure, drainage, lighting, landscaping, and site development works.
(i) Demolition of the existing industrial buildings, (ii) construction of: (a) 252 'build-to-rent' apartments in a two to nine storey development. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to 613sq.m of internal communal amenity space (including a concierge and management facilities, communal gym, flexible meeting rooms, library/co-working space, lounge, cinema/multimedia room and external covered game area); 1792sq.m of external communal amenity space at first and second floor levels; and a 65sq.m external covered communal amenity area at first floor level. The development is served by an under-croft carpark accessible from the south-western corner of the site providing a total of 73 parking spaces (including 58 standard spaces, 10 go-car spaces and 5 mobility impaired user parking spaces) and 500 bicycle spaces at ground floor level (372 resident spaces and 128 visitor spaces); and (b) 2 commercial units (comprising of a 95sq.m unit accommodating a café/restaurant and a 145sq.m unit accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended) and a 275sq.m crèche, with associated 86sq.m play area, at ground floor level; (iii) road, junction and streetscape upgrade works along Fourth Avenue and Cookstown Road, including the installation a signalized junction at the intersection of Fourth Avenue and Cookstown Road; (iv) Construction of a temporary access road along the southern site boundary; and (v) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary treatment; plant areas; ESB substations; and all associated site development works.
(i) Demolition of the existing industrial buildings, (ii) construction of: (a) 252 'build-to-rent' apartments in a two to nine storey development. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to 613sq.m of internal communal amenity space (including a concierge and management facilities, communal gym, flexible meeting rooms, library/co-working space, lounge, cinema/multimedia room and external covered game area); 1792sq.m of external communal amenity space at first and second floor levels; and a 65sq.m external covered communal amenity area at first floor level. The development is served by an under-croft carpark accessible from the south-western corner of the site providing a total of 73 parking spaces (including 58 standard spaces, 10 go-car spaces and 5 mobility impaired user parking spaces) and 500 bicycle spaces at ground floor level (372 resident spaces and 128 visitor spaces); and (b) 2 commercial units (comprising of a 95sq.m unit accommodating a café/restaurant and a 145sq.m unit accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended) and a 275sq.m crèche, with associated 86sq.m play area, at ground floor level; (iii) road, junction and streetscape upgrade works along Fourth Avenue and Cookstown Road, including the installation a signalized junction at the intersection of Fourth Avenue and Cookstown Road; (iv) Construction of a temporary access road along the southern site boundary; and (v) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary treatment; plant areas; ESB substations; and all associated site development works.
Retention of ground floor front extension to living room and porch.
The development seeking retention permission consists of the construction of a single-storey porch to the front of the house, alterations to existing vehicular entrance and the application of stone cladding to the front of the house at ground floor level. The development seeking permission for development consists of narrowing the existing opening to 3.5m.
(i) demolition of existing substation and removal of existing advertisement structure on site; (ii) construction of a residential development of 197 apartments (79 one-bedroom, 105 two-bedroom and 13 three-bedroom) in 4 blocks (ranging in height from seven to eight storeys with eighth floor level roof garden) as follows: - Block A containing 41 apartments (6 one bedroom, 34 two bedroom and 1 three-bedroom) and measuring eight storeys in height (with eighth floor roof garden); - Block B containing 79 apartments (33 one bedroom, 34 two bedroom and 12 three bedroom) and measuring eight storeys in height; - Block C containing 42 apartments (24 one bedroom and 18 two bedroom) and measuring seven storeys in height; and, - Block D containing 35 apartments (16 one bedroom and 19 two bedroom) and measuring seven storeys in height; (iii) all apartments will have direct access to an area of private amenity space, in the form of a balcony, and will have shared access to internal communal amenities including 2 resident lounges (114.7sq.m), gym (98sq.m) external communal amenity space (1,490.8sq.m) and public open space (1,667sq.m); (iv) provision of 78 vehicular parking spaces (including 3 car-share parking spaces, 4 mobility parking spaces, and 8 electric vehicle parking spaces), 4 set-down vehicular parking spaces (including 1 mobility parking space) and 448 bicycle parking spaces (including 100 visitor parking spaces) at ground floor/ground level accessible via new vehicular entrance gate off access road off Greenhills Road; (v) provision of 4 commercial units (871.5sq.m total) and 1 childcare facility (329.7sq.m) with associated external amenity space (168.8sq.m) located at ground floor level; and, (vi) all ancillary works including public realm/footpath improvements, landscaping, boundary treatments, internal footpaths/access roadways, bin storage, foul and surface water drainage, green roofs, removable solar panels, ESB substation and all site services, site infrastructure and associated site development works necessary to facilitate the development.