Demolish existing single storey extension at rear; construct a single storey extension at rear; construct a receded porch for front door at garage to tie in with existing.
Single storey side extension to existing two storey dwelling and all associated works.
Planning Permission for the Demolition of existing Garden Shed and proposed creation of new work from home office/ home gym and garden toom to the rear of existing dwelling
7 terraced, 2 storey dwellings (4 end terrace and 3 mid terrace) with attic level and dormer window and 'Velux' to the front roof and 'Velux' to rear roof, each dwelling has new vehicular entrance to the Ballymount Road, 2 car parking space each in front garden, landscaping and boundary walls, new footpath and all associated works.
7 terraced, 2 storey dwellings (4 end terrace and 3 mid terrace) with attic level and dormer window and 'Velux' to the front roof and 'Velux' to rear roof, each dwelling has new vehicular entrance to the Ballymount Road, 2 car parking space each in front garden, landscaping and boundary walls, new footpath and all associated works.
Attic conversion for storage with rear dormer window and a singlestorey front extension with sloped roof.
Construction of a single storey one bedroom dwelling attached to the existing dwelling with new vehicular entrance to both existing and proposed dwellings; new boundary walls and all associated works.
Change of use of 58.4sq.m of the front ground floor single storey part of Unit 1 from office/light industrial use to click-and-collect retail use and ancillary site works.
Attic conversion for storage. With a raised gable to the side and dormer window to the front and the rear, a new gable window, First-floor extension to the rear.
Attic conversion for storage. With a raised gable to the side and dormer window to the front and the rear, a new gable window.
Conversion of attic with consequential alterations to existing rear roof to include a contemporary dormer to create a habitable bedroom with ancillary works.
Two side-facing Velux windows on the front dormer and a Velux window on the front roof slope. New front-facing fenestration on the front dormer. A new dormer to the rear at attic level. A flat-roof single storey extension to the rear.
Installation of a new canopy roof to the south side of the existing Heiton Steel warehouse and all associated site works.
Replacement of existing asbestos roof covering with a new Kingspan insulated roof panels; replacement of rooflights with new and installation of a roof mounted solar photovoltaic panels to include all ancillary works and services.
Change of use from Warehouse to Gym facility, with minor internal modifications including reception area, changing/shower rooms, studio and office all with associated and ancillary site works and external signage.
Construction of a 6.4sq.m full width single storey extension to the front of dwelling.
(i) Demolition of the existing industrial and commercial buildings (15,989sq.m); (ii) construction of a mixed-use development featuring: (a) 1104 'build-to-rent' apartments in 4 blocks varying in height from four to eleven storeys. Each apartment has associated private open space in the form of a ground floor terrace or a balcony and has access to internal communal amenity spaces (totalling 2741sqm) and 5,107sqm of external communal amenity space at ground, first floor and roof levels; and (b) 4 commercial units at ground floor level of Blocks B and D (comprising of 2 in Block B accommodating a cafe/restaurant/bar; 1 in Block D accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2019, as amended; and 1 in Block D to serve the Circle K Belgard petrol station which is to be retained), 1,500sqm of office space across first to sixth floor levels of Block D and a crèche with external play area at ground floor level of Block C. The development is served by a total of 351 parking spaces (including 17 limited mobility parking spaces and 16 car share spaces) and 1860 bicycle spaces (1464 resident spaces and 396 visitor spaces); (iii) road, junction and streetscape upgrade works along First Avenue, Cookstown Road and Old Belgard Road, including the installation a signalised junction at the intersection of First Avenue and Cookstown Road and Old Belgard Road and Cookstown Road; (iv) construction of 3 new roads and 1 pedestrian/cycle link to the Belgard Luas Stop; (v) construction of a 1,688sqm landscaped public plaza with an outdoor flexible events space in the south-western corner of the site; and (vi) associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary fences; plant areas; ESB substations; internal hard landscaping, including footpaths and street furniture; and all associated site development works. Any person may, within the period of 5 weeks beginning on the date of receipt by An Bord Pleanála of the application and on payment of the prescribed fee of €20 (except for certain prescribed bodies), make a submission or observations in writing to An Bord Pleanála, 64 Marlborough Street, Dublin 1 or online at www.pleanala.ie. Any enquiries relating to the application process should be directed to the Strategic Housing Development Section of An Bord Pleanála (Tel. 01-8588100).
Retention of single storey kitchen extension to front side and rear of existing house and all associated site works.
The Construction of Single-Storey Coffee kiosk complete with signage, site entrance, driveway and car parking area and ancillary site works for 10 years
Change of use from warehouse to padel tennis sports facility, with minor internal modifications, including reception, ancillary cafe, seating area, bathrooms / changing rooms, and all associated and ancillary site works.
Planning permission is sought for 2 no. Outdoor Padel tennis court facilities with protected screening around both playing surface, permission also sort to operate a social wine service at existing ancillary cafe located internally and all associated site works
Planning permission is sought for 1 no. Outdoor Padel tennis court facilities with protected screening around playing surface, permission sought for this outdoor playing facility for a period of 5 years only and all associated site works
Retention permission for alterations to existing buildings to include, over cladding of brick facade at ground floor level, blocking up of roller shutter doors and over cladding of same and new fire escape doors at Building 1, Units 1a, 1b, 1c, Cookstown Estate Road. Removal of dormant fire escape stairs, over cladding of facade, blocking up of roller shutter doors and over cladding of same and new fire escape doors at Buildings 81a and 81b, Cookstown Estate Road. Demolition of car wash annex building and over cladding of facade at Buildings 2 & 3, at Old Belgard Rd.
Construction of an extension at first floor level to the front (north) elevation providing an additional 2 bedrooms to the property together with a single storey rear extension providing an additional living room area and wc; with all associated removal works to the existing roof, removal of wall sections, removal of existing windows, site development works, drainage and landscaping.
Demolition of an existing electrical switch room, boiler rooms and existing single storey office building and two associated modern extensions at the rear of the existing Coach House and Stables Buildings; Works to the Coach House and Stables Buildings (currently in office use) include the removal of existing modern interventions (internally & externally) and to restore the buildings to their earlier character when used as stables and coach house; Works include replacement of modern windows and doors with historically accurate ones, lime rendering of external walls, replacement of concrete roof tiles with natural slate and of modern gutters and downpipes; Some modern wall opes will be closed as blind windows; Internally, modern office layouts will be removed and replaced with earlier stables and loft layouts; The change of use of the buildings from office to exhibition/display spaces; Works to the derelict Gardener's Cottage will include its reconstruction based on photographic evidence to reflect its earlier appearance, while the modern windows and door will be removed from the adjacent Cart House to return it to its earlier form, all for use as exhibition/display spaces; Works to the existing two storey Finance Building include altering its south-eastern fa9ade to align with a new courtyard dividing wall, replacing the existing facade with a new glazing system along with solid elements of render, stone & zinc cladding; The internal layout will be reordered to change the use of the ground floor from office to exhibition spaces with retained office and meeting spaces on the 1st floor in a revised layout; A new plant area enclosure with PV array at roof level; The ancillary building to its west will be redeveloped to include a kitchen area on the ground floor and WC facilities at first floor level with new areas of roof and wall in zinc cladding; An existing single storey storage building will be redeveloped and extended for use as a staff office with meeting room, kitchenette, storage room, and WC spaces; A new exhibition building (Machinery Shed) will be constructed, south of the Coach House, white forming a new courtyard between the two buildings; This two-storey pitched roof building will house refurbished antique farm machinery in an exhibition of early farm equipment; The first-floor mezzanine will contain an audio-visual display area and open landings overlooking the ground floor exhibition space; The building will have a PV array at roof level; This building and adjacent landscaped areas will replace an existing car park area of 35 spaces; A new substation, switch room building with back-up generator enclosure will also be constructed as part of the works; All associated site works, plant spaces, civil and utility works and landscaping form part of the application; Belgard Castle is a Protected Structure Ref. 206 and a Recorded Monument - Ref. SMR DU021-026.
The installation of 1No. Skylight and all associated works in the Roof
Conversion of Attic Space to non-habitable space dormer to rear, 2no Velux to front, door to side, single storey extension to rear and all associated site works
Removal of the three existing grounds keeping sheds and a portacabin unit and replacement of these with a new single building facility in the same location to contain all staff and storage requirements for the groundskeeping and maintenance of the Belgard Castle Estate; The proposed building is 795sq.m in area and consists of areas for storage of machinery ground maintenance equipment, general storerooms and a mechanical and electrical plant room; A part mezzanine floor will provide for additional storage space at first floor; Staff facilities to be provided include for an office area, a canteen, changing/locker rooms with toilets and showers; Externally there will a vehicle and equipment wash area, general hardstanding and staff car parking; Associated civil works include connections to a rainwater storage and connection to a RW soakaway, and a connection to the existing mains for foul water services; The building will be clad in green corrugated sheeting, while burnt timber sheeting will clad the staff area, which will also have a sedum green room. A roof mounted PV array, heat pump technology, rainwater storage and all associated site works also form part of the application; Belgard Castle is a protected structure Ref 206, and a recorded monument - reference SMR DU021-026
9 non-illuminated signs to replace existing and 1 new non-illuminated sign.
Retention of alterations to previously approved planning application, Reg Ref No SD24B/0329 for 1) Erection of 41.5 sqm single storey ground floor extension to the rear of the dwelling with two number glazed roof lights. 2) Erection of a 6.3 sqm single storey ground floor extension to the front of dwelling with a pitched roof porch. The alterations include 1.Erect of 56.6 sqm single storey ground floor extension to the rear of the dwelling with four number glazed roof lights. 2) Erection of a 6.3 sqm single storey ground floor extension to the front of dwelling with a pitched roof porch, and change the side extension window to a door with window and all associated works at 33 Tamarisk Way, kilnamanagh, Dublin 24. D24 VNX0.
The proposed development will consist of 1) Erection of 41.5 sqm single storey ground floor extension to the rear of the dwelling with two number glazed roof lights. 2) Erection of a 6.3 sqm single storey ground floor extension to the front of dwelling with a pitched roof porch, 3) Erection of 16.8 sqm first floor extension to the side of the dwelling and alterations to the main roof profile, along with all associated site works.
Single storey extension to front and all associated site works.
Retention permission for development at 26 Tamarisk Park, Kilnamanagh, Dublin 24. The proposed development will consist of a single floor rear extension (34.4sqm) with 5 new rooflights and internal associated works for Living & Laundry room (15.7sqm) with WC (2.7 sqm) and bedroom (11.7sqm) with EN-Suite.
A) Retention permission for the retention of the existing 45m high monopole telecommunications support structure together with all associated antennas, dishes, RRU’s, cabling and equipment to include ground based equipment all enclosed in security fencing. (Permission previously granted under SD12A/0152 on a 5 year temporary permission) and B. Permission for the addition of support steelwork at the top section of the 45m high monopole telecommunications support structure to accommodate ComReg receive antennas, dish, and radio receiver together with associated works bringing the overall equipment height to 48.44m (49.45m including lightning finial)
Change of use, and associated internal works, of part of the existing building (167 sq.m. approx.) from warehouse to part workshop/light industrial (89 sq.m. approx.) and part water sampling hub (78 sq.m. approx.) to facilitate the overall use of the building as an Uisce Éireann Operations Centre; the provision of a window and security shutter on the north eastern façade of the building; the provision of a wash bay and 4 No. materials bunkers in external yard area; 2 No. replacement vehicular gates; a new pedestrian gate; Uisce Éireann signage on front (southwest) elevation; external air handling unit on northwestern side of building; and associated site development and drainage works.
New 2 storey detached 3 bedroom house
Demolition of all existing 1-3 storey industrial/commercial structures and small cafe on site totalling c.5,500sq.m in area; construction of a 1-5 storey nursing home/step-down facility (131 bedspaces) over partial basement (total floor area c.6,743sq.m) with central courtyard (c.519sqm); construction of a deck-access apartment development comprising 139 residential units arranged in 2 blocks (Block A - 8 storeys and Block B - 5 to 6 storeys) with a total floor area of c.10,556sq.m excluding deck access (c.1,141sq.m); 2 commercial units comprising a cafe and pharmacy located at ground floor level facing Cookstown Road in residential Block A ( c.292sq.m in area); the residential development consists of 67 one bed/two person units, 12 two bed / three person units and 60 two bed/4 person units with north, south, east and west facing balconies throughout and residents amenity area at ground floor level; central communal open space (c.1,272sq.m); the basement serving the nursing home consists of a sprinkler tank and pump rooms, tank room, plant room and workshop; provision of dining and kitchen areas, siting/family rooms, activity rooms, coffee dock, hair salon, oratory, lobbies/reception areas, ancillary offices and staff areas, stores, toilets, shower/changing facilities, ESB substation, generator, switch room, service yard and waste areas serving the nursing home; provision of an ESB substation, switchboards, waste areas, water tanks and generator serving Blocks A and B; lobbies, stair/lifts, photovoltaic panels and green roofs throughout; partial provision of the pocket park identified in the Tallaght LAP (c.1,165sq.m); new vehicular access from First Avenue and egress onto Cookstown Road via a one-way system through the subject site; entrance signage on the eastern elevation of the proposed nursing home; all associated site development works, services provision, connection to the water supply, foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (307 spaces), car parking (42 spaces), set-down parking spaces including 1 ambulance space serving the nursing home and delivery/loading areas to Cookstown Road and First Avenue.
Demolition of all existing 1-3 storey industrial/commercial structures on the site (c. 5,500 sq.m). Construction of a 1-4 storey Transitional Care Facility (c.11,747 sq.m.) providing therapy and treatment space and a pharmacy and general practitioners space at ground floor level and 171 no. bedspaces at 1st to 3rd floor levels. 2 no. internal landscaped areas are provided at ground floor level (c.440 sq.m) and 2 no. outdoor amenity areas are provided at 1st floor level (c.483 sq.m). Provision of a coffee dock area, hairdresser, comms rooms, toilets, staff changing facilities, kitchen area, laundry rooms, lobbies/reception areas, admin areas, storage spaces, staff canteen, LV switch room, mains/ sprinkler tank room/ boiler room, multipurpose rooms, dining rooms, meeting and office rooms, sluice rooms, nurses stations, ancillary refuse storage area, ancillary generator, ancillary ESB substation and switch room associated with the operation of the facility throughout. Provision of Stair/lifts, photovoltaic panels, mechanical plant and green/blue roofs associated with the operation of the facility throughout. Partial provision of the pocket park identified in the Tallaght LAP (c.1,500 sq.m). Provision for the relocation and upgrade of the existing vehicular and pedestrian access point along First Avenue for servicing and staff parking and relocation and upgrade of the existing vehicular and pedestrian site access point along Cookstown Road. Provision of signage on the southern, eastern and northern facades of the proposed building and associated totem signage. All associated site development works above and below ground, services provision, connection to water supply and foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, attenuation/bioretention systems, provision of internal roads and footpaths, tree removal, bicycle storage (60 no. total spaces), staff and visitor car parking (55 no. total spaces) and 3 no. set down/ loading bays.
Demolition of all existing 1-3 storey industrial/commercial structures and small cafe on site totalling c.5,500sq.m in area; Construction of a 1-5 storey Transitional Care Facility (step-up/step-down) providing 131 bedspaces over partial basement (total floor area c.6,743sq.m) with central courtyard ( c.519sq.m ); The basement consists of a sprinkler tank and pump rooms, water tank room, plant room and workshop; Provision of dining and kitchen areas, siting/family rooms, activity rooms, coffee dock, hair salon, oratory, lobbies/reception areas, ancillary offices and staff areas, stores, toilets, shower/changing facilities, ESB substation, generator, switchroom, service yard and waste areas serving the facility; Lobbies, stair/lifts, photovoltaic panels and green roofs throughout; Partial provision of the pocket park identified in the Tallaght LAP (c.1,286sqm); New vehicular access from First Avenue and egress onto Cookstown Road via a one-way system through the subject site; Entrance signage on the eastern elevation of the proposed facility; All associated site development works, services provision, connection to the water supply, foul and surface water networks on First A venue and Cookstown Road including partial diversion of the foul line to the north east of the site at First A venue, temporary foul pump station, attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, interim pedestrian facilities/public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (76 total spaces), car parking (32 total spaces), set-down parking spaces, 1 ambulance set-down space serving the facility and delivery/loading areas to First A venue.
Demolition of all existing 1-3 storey industrial / commercial structures and small café on site totalling c.5,500sqm in area; - Construction of a deck-access apartment development comprising 123 residential units arranged in 2 no. blocks (Block A 5 to 7 storeys and Block B 5 to 6 storeys) with a total floor area of c.9,806sqm including the proposed bike shelter (c.93sqm) and excluding deck access (c.901sqm); -Commercial floor space located at ground floor level facing Cookstown Road in Residential Block A (c.421sq.m); - The residential development consists of 58 no. 1 bed/2 person units, 12 no. 2 bed/3 person units and 53 no. 2 bed/4 person units with north, south, east and west facing balconies throughout and residents amenity area at ground floor level; -Central communal open space (c.1,303sq.m); -Provision of an ESB substation, switchboards, waste areas, water tanks and generator serving Blocks A and B; -Lobbies, stair/lifts, photovoltaic panels and green roofs throughout; -Partial provision of the pocket park identified in the Tallaght LAP (c.1,286sq.m); -New vehicular access from First Avenue and egress onto Cookstown Road via a one way system through the subject site; -All associated site development works, services provision, connection to the water supply, foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, temporary foul pump station. attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, pedestrian facilities/public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (302 no. total spaces) comprising 276 no. spaces (serving proposed mixed use development) and 26 no. spaces (serving concurrent transitional care facility application), car parking (32 no. total spaces) comprising 15 no. spaces (serving proposed mixed use development) and 17 no. spaces (serving concurrent transitional care facility application), 2 no loading bays (one each on First Avenue and Cookstown Road), 2 no. setdown/loading areas to the internal road and 1 no. ambulance setdown space serving the adjacent concurrent proposed Transitional Care Facility. The concurrent application has been made to South Dublin County Council regarding a 131 bed Transitional Care Facility on the western portion of the site (SDCC Ref SD22A/0361 refers) currently under appeal to An Bord Pleanála (ABP Ref 317394).
Construction of a new single storey extension to the front of existing dwelling comprising of living room extension and porch.
Retention of 3 standalone coated steel prefabricated units comprising of 2 single storey prefabricated units (each c.31sq.m GFA) and associated entrance ramps used for canteen and welfare use respectively; 1 single storey prefabricated modular unit (c.199sq.m GFA) and associated entrance ramp used for office use; all site development works are proposed on a site of c.0.245ha.
Garage conversion and extensions at first floor to side and at ground floor with level access deck to rear.
Change of use from permitted retail use to retail use including the sale of alcohol for consumption off the premises (i.e. off licence use) within the overall permitted retail unit; off licence floor area 8sq.m and is ancillary to the primary retail use.
(a) the construction of a two storey mezzanine floor structure, (b) the installation of a new escape door to the rear elevation, and (c) all associated site works.
Erect 1050sq.m of photovoltaic panels on the roof of existing warehouse unit with all associated site works.
Retention of change of use of existing detached single storey building to family unit. Permission for the construction of a single storey link extension from existing building to existing house, minor internal amendments to existing structure and all associated site works.
Retention of change of use of existing detached single storey building to family flat. Permission for the construction of a single storey link extension from existing building to existing house; installation of a ground floor side window in existing house; minor internal amendments to existing structure and all associated site works.
The proposed development will consist of a high-power electric vehicle charging points and associated infrastructure consisting of the following: I. Installation of 4no. electric vehicle charging bays & 2no. charging units. II. Installation of a new ESB Unit Substation. III. Installation of a new CT Metering cabinet. IV. Associated revisions to existing car parking spaces & landscaped area. V. Erection of associated signage. VI. All associated site development works including lighting, drainage infrastructure and line marking.
The construction of a 250m2 mezzanine floor extension within an existing warehouse building, and all associated site works.