Attic Conversion incorporating dormer extension to rear. 3 No Velux Roof lights to front. Minor alterations to front Elevation. All associated site works
1) an Attic extension creating attic storage space of circa 25sq.m, which includes a rear dormer attic extension, roof light windows on the front elevation and 2) a single storey front porch extension of circa 2.3sq.m, associated alterations to all elevations and all ancillary site works.
Planning permission for attic conversion with the addition of 2 no. Bedrooms and en suite. Conversion to include 2 no Dormers to front roof, roof windows to front & rear of existing roof all with associated ancillary works. Strategic Development Zone (SDZ) at 17 Parkleigh drive, Sevenmills Clonburiss, Clondalkin,Dublin 22 D22H2Y7 Strategic Development Zone (SDZ)
10 year permission for roads and drainage infrastructure works as approved under the Clonburris Strategic Development Zone Planning Scheme (2019) to form part of the public roads and drainage networks providing access and services for the future development of the southern half of the overall Strategic Development Zone (SDZ) lands; the roads infrastructure works are for the construction of c. 4.0km of a new road, known as Clonburris Southern Link Street, generally consisting of 7m wide single carriageway, plus on either side of the carriageway landscaped verges, 1.75m wide off-road cycle tracks and 2m wide footpath including public lighting, trees, 288 on-street car parking spaces (including 26 disabled parking spaces), pedestrian crossings, bus stops, a number of vehicular access spurs to facilitate future development of adjoining lands, a total of 8 new junctions (including 3 junctions to facilitate future road developments within the SDZ; 2 junctions with proposed local access roads and 3 new junctions with Hayden's Lane, Lynch's Lane and Ninth Lock Road) and alterations to 4 existing junctions on Newcastle Road (R120), Grange Castle Road (R136), Fonthill Road (R113) and also to the existing access road to Park and Ride facilities at both Kishoge Station and at Fonthill Station; alterations to the existing public roads Newcastle Road (R120), Hayden's Lane Access Road, Hayden's Lane, Lynch's Lane, Grange Castle Road (R136), Fonthill Road (R113) and Ninth Lock Road arising from new junctions with the Clonburris Southern Link Street consisting of reconfiguration of a c.165m long section of Newcastle Road (R120) including road widening and revisions to layout of junction with Hayden's Lane Access Road; incorporation of Hayden's Lane Access Road into proposed Clonburris Southern Link Street; provision of new junction with Hayden's Lane and Clonburris Southern Link Street; incorporation of a c. 26m long section of Lynch's Lane into proposed Southern Link Street and provision of a new junction with Clonburris Southern Link Street; reconfiguration of a c. 260m long section of Grange Castle Road, including road widening and replacement of existing roundabout with signalised junction; reconfiguration of a c. 250m long section of Fonthill Road, including road widening and replacement of existing roundabout with signalised junction; reconfiguration of a c.125m long section on Ninth Lock Road including road widening and provision of a new junction with Clonburris Southern Link Street; construction of 2 local access roads, consisting of c. 110m long road extending north from Clonburris Southern Link Street and providing access to proposed foul pumping station and generally consisting of a 6m wide single carriageway plus on either side of the carriageway 2m wide footpath including public lighting, 2 set-down parking spaces and vehicular access to proposed foul water pumping station; north/south Link Street (c. 240m in length) extending north from southern Link Street to the Kildare-Cork railway line and generally consisting of a 7m wide single carriageway plus on either side of the carriageway 1.3m wide landscaped verge, 1.75m wide off-road cycle lane, 2m wide footpath including public lighting and 2 vehicular access spurs to facilitate future development of adjoining lands; the drainage infrastructure works include 8 attenuation systems (with outfalls to Griffeen River, Kilmahuddrick Stream and existing storm sewers) including 4 ponds, 2 modular underground storage systems and 2 detention basins combined with modular underground storage systems all adjacent to proposed Clonburris Southern Link Street; surface water drainage culverts to existing watercourses; flood water compensation area adjacent to Griffeen River; surface water drainage and water supply trunk infrastructure within proposed road corridors; wastewater infrastructure including a foul pumping station and pipe network within proposed road corridors to facilitate drainage connections to future wastewater drainage infrastructure within the adjoining SDZ lands (including future Irish Water pumping station) and to connect to the existing sewer network in Cappaghmore housing estate; ducting for public electrical services and utilities and the diversion of existing utilities is provided for within the proposed road corridor; Permission is also sought for all ancillary site and development and landscape works associated with the development including hard and soft landscaping, boundary treatments, road markings and signage, enabling works and temporary construction works (including site accommodation, site compounds and temporary boundary fencing); the application is made in accordance with Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Zone Planning Scheme Area as defined by Statutory Instrument No. 604 of 2015; an Environmental Impact Assessment Report accompanies the application.
The development will consist of the construction of 3 no. strategic public parks located inside the Clonburris SDZ as per the Clonburris SDZ Planning Scheme (2019) in the southern part of the overall SDZ comprising: Site A) Provision of 'Stage 3' Griffeen Valley Park Extension' public park of c. 15.94 hectares, on 2 no. parcels of land north and south of the Clonburris Southern Link Street in the western part of the SDZ lands comprising landscaped areas, 1 no. all-weather GAA pitch (with floodlighting - GAA pitch is also sized to cater for 2 no. soccer pitches), 2 no. natural soccer pitches, 3 no. tennis courts and 1 no. padel court (with floodlighting), play areas, 1 no. basketball court, 2 no. cricket practice creases, 1 no. cricket crease, rebound wall area as well as allotment areas and coach parking set down area including 27 no. car parking spaces & 78 bicycle spaces (as well as 2 no. pedestrian access points to Haydens Lane) - vehicular access from permitted access under Planning Reg. Ref. SDZ20A/0021 to the Clonburris Southern Link Street; Site B) Provision of 'Stage 4A' Grand Canal Park' public park of c. 7.32 hectares (to the south of the Grand Canal) comprising 2 no. natural soccer pitches, play areas, ESB substation, and allotment area as well as 30 no. car parking spaces [with access from Lockview Road] & 66 no. bicycle spaces; Site C) Provision of 'Stage 5' Na Cluainte Park South' of c. 4.04 hectares located centrally within the SDZ (on 2 no. sites either side of the Clonburris Southern Link Street) comprising landscaped areas, attenuation ponds, 1 x Soccer All Weather Pitch (floodlit), 1 no. natural soccer pitch, 2 no. basketball courts, play areas, 2 no. cricket practice creases, and 1 no. multi-sports pitch (weights table games etc.) and allotment areas as well as 30 no. car parking spaces & 96 no. bicycle spaces, with access provided from the permitted Clonburris Southern Link Street; Permission is also sought for all associated drainage infrastructure works to include surface water attenuation areas including attenuation ponds and revisions to the permitted 'Stage 1' infrastructure under Planning Reg. Ref. SDZ20A/0021 relating to the coach parking area and attenuation area to the north of the Clonburris Southern Link Street and associated ancillary amendments and integration of the 'Stage 1' infrastructure (under construction) with the proposed development (to include relocation of flood compensation area to the west of the Griffeen River, increased landform variation in attenuation area no. 1, revisions to internal paths, removal of retaining walls to attenuation area no. 2, additional planting). Permission is also sought for all ancillary site development (including site accommodation, site compounds, and temporary construction boundary fencing) and landscape works/planting associated with the development, including hard and soft landscaping, 3 no. temporary project signage (at 3 no. locations) and Irish water foul water diversions in Grand Canal Park.
Amendments to existing planning permission Ref: SDZ23A/0043 which included a Large 2 storey retail unit (over an undercroft car park) comprising: A. Ancillary off-licence use of the large 2 storey retail unit, including a designated off-licence display area measuring c. 72 sqm; B. Layout / elevational alterations including: additional customer entrance to Northern elevation, reconfiguration of loading bay ramp and roof (to allow service access to first rather than ground floor level) and associated modifications, reconfigured rooftop plant compound and access arrangements, ventilation louvres, and revisions to façade metal cladding arrangements; and, C. Advertising signage including a total of 5 no. internally illuminated building mounted Lidl logo signs measuring c. 2.5 m x 2.5 m to the North, South, East and West elevations of the large 2 storey retail unit.
Two storey extension to side of existing dwelling incorporating garage & utility at ground floor and ensuite, walk in wardrobe to first floor; pitched roof to match existing; alterations to existing vehicular entrance including new brick pillar and rendered front wall; gate to side of rear garden. Also, retention permission is sought for construction of single storey shed, with pitched roof, to rear garden used as playroom and store and all associated site works.
Amendments to planning permission Reg. Ref.: SD21A/0241, as previously amended by Reg. Ref.: SD23A/0035, SD23A/0203, SD23A/0291, SD24A/0162W and SD25A/0102W. The proposed amendments consist of the following: The provision of an underground firewater retention tank c. 840m3 located to the north of the overall site; The provision of a new entrance onto the New Nanagor Road to service this tank and for infrequent maintenance; Security fencing and associated ground pipework and planting; and All associated and ancillary works
The application site comprises an area of c. 0.15 hectares. The proposed development comprises an alteration to planning permission Reg. Ref. SD21A/0241, as amended by Reg Ref SD23A/0035. There is a separate application under consideration under Reg Ref SD23A/0203 for the provision of a temporary medium voltage substation on lands to the southeast of the application site. The proposed development (for which a temporary 3-year permission is sought) will comprise the following: Construction of a temporary power generation compound, comprising 24 no. generators (to be powered by hydrogenated vegetable oil), associated flues (c. 6m in height), 8 no. fuel storage tanks, a switchgear room, control room, spares containers, and ancillary structures, all within a fenced compound; The proposed generators will be enclosed within an acoustic panel enclosure c. 11m in height; The proposed temporary power generation compound will be located on an area for permitted car parking under Ref Ref SD21A/0241, as amended by Reg Ref SD23A/0035, which will be constructed following the removal of the temporary compound; The proposed development includes all associated and ancillary works.
Reduction of single storey rear extension; construction of detached 2 storey house in side garden with new access and parking arrangement in front garden and associated works.
Cairn Homes Properties Limited, intend to apply for permission for development at this site of c.5 ha at Development Area 6 Kishoge Urban Centre, sub sector KUC-S4 (including an area of Development Area 9 Kishoge South East, sub sector KSE-S1), Clonburris SDZ, within the townland of Kishoge, Clonburris, Dublin 22. the development will consist of the removal of existing hardstanding and the construction of a mixed-use development arranged in 11 no. blocks, ranging between 3 & 7 storeys, comprising: 495 no. residential units, including 449 no. apartments (216 no. 1 bed units, 46 no. 2 bed 3 person units, 187 no. 2 bed 4 person units and 46 no. duplex units (22 no. 2 bed 4 person units and 24 no. 3 bedroom units), arranged across Blocks A-F; 2,502 sq.m of retail floorspace, including 1 no. large 2 storey retail unit (over an undercroft car park) and 2no. independent retail units at ground floor of Block B; 4,607 sq.m of employment floorspace within a 6 storey building and 2 no. independent employment units at ground floor of Block B and a bike hub, located at ground floor of the employment building; 483 sq.m creche, located at ground floor level of Block E; and 87 sq.m cafe, located within the employment building. Vehicular access to the site will be from the Clonburris Southern Link Street(as permitted by Reg. Ref. SDZ20A/0021). The development will also consist of the provision of public open space, including an urban plaza; hard and soft landscaping including internal roads, cycle and pedestrian routes, pathways and boundary treatments, street furniture, wetland feature, play areas; signage; basement car park (Blocks B-C); undercroft parking (Blocks A, D and retail box) and surface car parking (403 no. spaces in total, including car sharing and accessible spaces; motorcycle parking; electric vehicle charging points); bicycle parking (long and short stay spaces including stands); ESB substations, piped infrastructural services and connections; ducting; plant; waste management provision; SuDS measures (including green roofs); open attenuation pons; sustainability measures; signage; public lighting; and all site development and excavation works above and below ground.
The development will consist of amendments to a permitted development (Reg. Ref. SDZ23A/0043), comprising: • Alterations to the apartment unit typologies in Blocks B, C, E and F, includin g associated internal layout adjustments and external modifications across all floor levels of each apartment building; • Provision of a shared basement beneath Blocks E and F, including a ramped access, comprising additional car parking spaces, bicycle parking, storage, and circulation areas; • A single-storey extension at roof level on the southern part of Block E, resulting in a 6 storey building; • A single storey extension at roof level on the northern part of Block F, resulting in a part 6, part 7 storey building, with a pitched roof element to the south; • Alterations to the basement level of Blocks B and C, including reconfiguration of car parking spaces, bicycle parking storage, plant areas and ESB substation; • A single storey extension at roof level on the southern part of Block B, resulting in a 6 storey building, with pitched roof element to the south-west; • The provision of an additional pitched roof element to the south-east of Block C; • Alterations to the crèche at ground floor level within Block E, including modifications to the associated outdoor amenity area; and • Extension of the central urban plaza northward, resulting in the removal of private vehicular access to the south of Blocks B and C. The development will also consist of: alterations to the landscaping strategy, including modifications to the urban plaza and communal open space areas associated with Blocks B, C, E and F; minor alterations to the surface car parking areas; relocation and configuration of surface level bicycle parking and waste storage areas; and all associated site development and excavation works above and below ground. The proposed amendments will result in a reduction in the total number of units from 495 no. to 494 no. units, with a revised residential mix comprising 142 no. 1-bed units, 2 no. 2-bed (3 person) units, 326 no. 2-bed (4 person) units and 24 no. 3-bed units. Additionally, there will be an increase in overall car parking provision from 398 no. to 514 no. spaces (basement and surface parking) and a minor increase in the total gross floor area from c. 48,771 sq. m to c. 52,523 sq. m.
The development will consist of amendments to the permitted development as approved by South Dublin County Council under Planning Reg. Ref. SDZ2IA/0022 comprising: (i) The construction of 2 no. 2-bedroom ground floor apartments (in place of plant areas) within the permitted apartment block 1A to include terrace and all associated internal and external amendments to facade on northern and southern elevations; (ii) Replacement of render with brick to the southern, western and internal elevations of the permitted apartment block 1A; (iii) Elevational changes to permitted duplex units to replace permitted render finish with brick on external staircases and removal of relief panel strip on 2 no. side elevations; (iv) Amendments to the fenestration arrangements on all elevations of the permitted 'Local Node' building and proposed amendments to the western elevation including change of brick, replacement of render with brick and inclusion of grey brick relief panel. All on wider lands bounded generally by undeveloped lands and the Dublin-Cork railway line to the north, undeveloped lands and the Grand Canal to the south, the R113 (Fonthill Road) to the east and the R136 to the west.
The construction of 569 dwellings, a creche, innovation hub and open space in the Clonburris South West Development Area of the Clonburris SDZ Planning Scheme 2019 as follows: 173 houses comprising 8 two bedroom houses, 153 three bedroom houses and 12 four bedroom houses (147 dwellings in CSW-S4 consisting of 8 two bedroom houses, 127 three bedroom houses & 12 four bedroom houses & 26 three bedroom dwellings in CSW-S3}, all 2 storey comprising semi-detached, terraced, end terrace units (with parking and private open space); (B) 148 duplex apartments/apartments {88 in CSW-S4 & 60 in CSW-S3) comprising 74 two bedroom units and 74 three bedroom units, in 16 three storey buildings. In CSW-S4 Duplex Blocks A,B,C,D,E,F,G,J,K, comprise 8 units (4 two bed & 4 three bed units), Duplex Block H comprises 16 units (8 two bed & 8 three bed units), In CSW-S3 Blocks L, N & O comprise 8 units (4 two bed & 4 three bed units), Block M comprises 14 units (7 two bed & 7 three bed units), Block P comprises 10 units (5 two bed & 5 three bed units), Block Q comprises 12 units {6 two bed & 6 three bed units), all to have terraces/pitched roof; (C) 396 apartments as follows: within CSW-S4, Block 1 consists of 172 apartments (76 one bedroom, 91 two bedroom and 5 three bedroom apartments), in a 2-building arrangement both 6 storeys in height. Within CSW-S3, Block 2 {4 storeys) comprises 16 one bedroom apartments and 22 two bedroom apartments, Block 3 (4 storeys) comprises 16 one bedroom apartments and 22 two bedroom apartments (all apartments to have terrace or balcony); (D) Provision of an innovation hub (626sq.m) and creche (c. 547sq.m) in a part 3/4 storey 'local node' building in CSWS4; (E) Vehicular access will be from the permitted Clonburris Southern Link Street (SDZ20A/0021) and R113 to the east {along with provision of internal haul routes {for construction) to connect to the R136 to the west); (F) Public Open Space/landscaping of c. 4.1 hectares (to include Local Park and MUGA in CSW-S3, Grand Canal Park, along the southern and eastern boundaries of the site to connect to existing Grand Canal towpath) as well as a series of communal open spaces to serve apartments and duplex units (c. 0.39 ha); (G) all ancillary development works including footpaths, landscaping boundary treatments, public, private open space areas, car parking (656 spaces) and bicycle parking (672 spaces), single storey ESB substations/bike/bin stores, 'Gateway' entrance signage (2), solar panels at roof level of apartments, and all ancillary site development/construction works; (H) Permission is also sought for revisions to attenuation permitted under SDZ20A/0021 as well as connection to water supply, and provision of foul drainage infrastructure; this application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015; an Environmental Impact Assessment Report accompanies this planning application; the application applies for 7-year planning permission for development at this site of c. 17.02 hectares (on two parcels of land to include entrance area) within the townlands of Cappagh, Clonburris Little & Kishoge, Co. Dublin all on wider lands bounded generally by undeveloped lands and the Dublin-Cork railway line to the north, undeveloped lands and the Grand Canal to the south, the R113 {Fonthill Road) to the east and the R136 to the west.
The development will consist of amendments to the permitted development as approved by South Dublin County Council under Planning Reg. Ref. SDZ21A/0022, and as amended under South Dublin County Council Reg. Ref.: SDZ23A/0029, relating to the local node building (Block CR) comprising of the temporary change of use of the permitted flexible community space (c.73.7 sq.) located at ground floor level within Block CR to convenience retail use, including the provision of an external bin store (8.4 sq.) and all associated site development works. The proposed change of use will exist for a temporary period of up to 5 years to facilitate retail provision in the local area. The unit will then return to its permitted community space use as approved under SDZ23A/0022.
Construction of a gas fired power plant with an electrical output of up to 125MW with associated balance of plant, equipment and buildings including; an Engine Hall building with a height of 18.9m, comprising 6 gas engines and ancillary infrastructure; an Electrical Annex Building with a height of 18.7m; a Workshop building with a height of 5. 1m; a Tank Farm building with a height of 5.68m; a Security hut with a height of 3.27m; an Exhaust Stack with a height of 31.8m; a Gas AGI including a kiosk with height of 3.3m; Radiator Coolers with a height of 8.46m; 2 electrical transformers with a height of 4.98m; Tanks including 2 x Diesel Oil Storage Tanks (volume of 2500m3 combined); SCR Urea Tank (26m3); Lube Oil Storage Tank (26m3); Lube Oil Maintenance Tank (26m3); Pilot Oil Tank (26m3); Fire Water Storage Tank (1000m3); Effluent Collecting Tank (26m3); Underground Surface Water Attenuation Tank (490m3); 2 new access onto the existing private road network with Profile Park; 12 parking spaces, footpaths, landscaping; fencing and all other associated site development plant and equipment and other works including surface water and foul wastewater drainage. An EIAR was submitted with this application.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs and flat roof dormer to the rear.
Proposed rear domestic extension, conversion of existing attic space with change of roof profile to mini-hip with dormer to rear, Velux to front windows to side and all associated site works.
Amendments to a development granted permission under Reg. Ref. SD21A/0167 for a gas fired power plant in Profile Park, Baldonnel. Permission is sought for revisions to the permitted Above Ground Infrastructure (AGI), associated with Gas Network Ireland’s high-pressure gas supply to the power plant which include: • the provision of an E & I kiosk, a regulators & meters kiosk, a gas analyser kiosk, and revisions to the boiler house kiosk with boiler flues. • the provision of a new stormwater attenuation design to serve the AGI compound; • minor revisions to the permitted internal road to serve the AGI; • minor revisions to the permitted fencing surrounding the Gas Pressure Reduction Skid located to the north of the proposed AGI; and • all associated and ancillary works. No changes are proposed to the gas fired power plant or to the site access permitted under Reg. Ref. SD21A/0167. The development permitted under Reg. Ref. SD21A/0167 includes activities which are subject to an Industrial Emissions Licence (Ref Number P1196-01).
Erect 329sq.m or 67.34 KWp of photovoltaic panels on the roof of the building DUB12 in data centre; all associated site works.
(1) Demolition of existing single storey dwelling (c.108.5sq.m); (2) construction of a Distribution Warehouse Building comprising warehousing and ancillary areas at ground floor and support offices, staff areas and plant across two floors; (3) the development will be accessed from the existing Profile Park estate road; (4) provision of car parking, cycle parking, security gatehouse, landscaping and boundary treatments (including security fencing and gates); (5) all associated site development and services works (including diversion/culverting/reprofiling of existing stream on site); (6) total gross floor area of the development c.17,006sq.m.
Demolition of the abandoned single storey dwelling and associated outbuilding (206sqm); construction of 2 two storey data centers with plant at roof level of each facility and associated ancillary development which will have a gross floor area of 40,589sq.m consisting of 1 two storey data center (Building 11) which will be located to the south of the site and will have a gross floor area of 24,667sq.m. including 22 emergency generators located at ground floor level within a compound to the western side of the data center with associated flues that will be 22.3m in height; 1 two storey data center (Building 12) which will be located to the north of the site, and to the immediate north of Building 11 and will have a gross floor area of 12,915sq.m including 11 emergency generators located at ground floor level within a compound to the western side of the data center with associated flues that will be 22.3m in height; each of the two data centers will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, and plant including PV panels at roof level as well as a separate house generator for each facility which will provide emergency power to the admin and ancillary spaces; each generator will include a diesel tank and there will be a refuelling area to serve the proposed emergency generators; the overall height of each data center apart from the flues and plant at roof level is c. 14.23m above the finished floor level; the overall height of each data center apart from the flues and plant at roof level is c. 14.23m above the finished floor level; single storey step-up substation (38sq.m) as well as 2 single storey switch substations (121sq.m); AGI Gas Regulator compound that include 3 single storey buildings (134sq.m); construction of a gas powered generation plant in the form of a 13m high single storey building with a gross floor area of 2,714sq.m that will contain 10 gas generators with associated flues that will be 25m in height, and grouped in pairs and threes; the Gas Plant will be located to the west of Building 11; ancillary site development works, that will include reorientation of the Baldonnel Stream, biodiversity management initiatives, attenuation ponds and the installation and connection to the underground foul and storm water drainage network, and installation of utility ducts and cables, that will include the drilling and laying of ducts and cables under the internal road network within Profile Park; other ancillary site development works will include hard and soft landscaping, lighting, fencing, signage, services road, entrance gates, sprinkler tanks and pump room; a temporary gas powered generation plant within a fenced yard containing 21 generator units in containers, each with associated flues (each 25m high), 12 transformers and 10 containers of controls to be located to the west of, and associated with the first phase of Building 11, and will be required for a period of up to 2 years if connection to the national grid is delayed; this temporary plant will not be built if the connection to the national grid is in place prior to the operation of Building 11 at this site that includes an abandoned single storey residential property on the New Nangor Road (R134), Dublin 22; and on land within the townlands of Ballybane and Kilbride within Profile Park, Clondalkin, Dublin 22 on an overall site of 8.7 hectares.
Amendment and modification of SD21A/0241 including the replacement of the permitted 2 sprinkler tanks and pump room with a two storey battery energy storage system (435.56sq.m) over a single level basement that will contain a sprinkler system, water tanks and pump room that will serve the overall permitted development as granted under Ref. SD21A/0241; A single additional car parking space will be provided adjacent to the new building that will be accessed via permitted access road from Falcon Avenue within Profile Park that was granted under Ref. SD21A/0241; 2 new transformers to be located to the north of the permitted switch rooms; 1 life safety generator to be located adjacent to the permitted step up transformer compound within the site.
A new canopy over front door, a single storey front and side extension with roof windows comprising of a playroom, study, utility room and wet room a new single storey rear extension with roof windows comprising of a living area and all associated site works
Retention of 2.44sq.m front porch. Permission for 4.05sq.m ground floor extension to the front; 20.07sq.m ground floor extension to the rear; 9.72sq.m first floor extension to the rear.
Provision of an establishment to which to European Communities (Major Accident Hazards involving Dangerous Substances) Regulations 2006 as amended by Chemicals Act (Control of Major Accident Hazards involving Dangerous Substances) Regulations 2015 apply, constituting a change of use; The new establishment will include all the existing and permitted buildings (SD13A/0143 as amended by SD13A/0265, SD14A/0194 as amended by SD15A/0343, SD16A/0088 as amended by AD17A/0318 & SD20A/0283, SD21A/0203 & SD21A/0288, all within an existing campus; The proposal relates to the total quantum of fuel oil to be stored within existing and permitted tanks across the existing and permitted buildings; For the avoidance of doubt no works or physical development is proposed and the application relates to an existing development which comprises or is for the purpose of an activity requiring an integrated pollution prevention and control (IE) licence.
Construction of a new three-storey extension and alterations to Gaelscoil na Camóige agus Gaelscoil Chluain Dolcáin, previously granted planning permission (Ref: SD22A/0352) and currently under construction. The development will consist of providing 2no. Classroom suites of Special Educational Needs accommodation for each school. Both Special Educational Needs units will be inclusive of 2 no. class base rooms, en-suite toilets, withdrawal room associated with each class base, central activity spaces, staff toilets, pupil toilets and shower facilities, storage and office, all at ground floor level, along with the relocation of 2 no. classrooms and en-suite toilets from the ground floor of both schools ground to first and second floor of the proposed three-storey extension The development will also consist of an extension at first floor level, along with minor alterations to Stair Core 4 to the north elevation of Gaelscoil na Camoige and an extension at second floor level along with minor alterations to Stair Core 3 to the west elevation of Gaelscoil Chluain Dolcáin. The development will also consist of the provision of new soft play external areas for both Special Educational Needs units, connections to the existing drainage layout and all ancillary site development works. The total area for the development is 630m2
Construction of two new three storey primary school buildings for Gaelscoil na Camoige agus Gaelscoil Chluain Dolcain providing 16 classrooms each, a shared general purpose area, ancillary teaching and staff accommodation; The development will also consist of the construction of a new single storey PE Hall building for Colaiste Chilliain; The development will also include two new pedestrian access routes, with one located on New Nangor Road and with another located at the junction of New Nangor Road and Old Nangor Road; A new vehicle entrance and exit onto Old Nangor Road to provide a one-way vehicle route with a bus/vehicle set down zone, conversion of existing vehicle entrance to Colaiste Chillian to an in-only entrance; 2 new hard play courts and play space at each primary school with site landscaping, bicycle parking spaces and car parking spaces for each primary school including accessible car parking spaces, internal refurbishment works to Colaiste Chilliain to facilitate the reintegration of teaching accommodation upon Gaelscoil Chluain Dolcain's move to the new school; Removal of the existing temporary changing room and relocation of car park at Gaelscoil Chluain to provide accessible parking spaces and associated works; Connections to public utility and drainage services, boundary treatments, installation of PV panels, alterations to existing drainage layout and associated site development works.
PERMISSION for development at this site at Grange Castle Business Park. The site is located within the Microsoft Grange Castle Campus and adjoining the existing substation. The development will consist of revisions to parent permission SDCC Reg. Ref. SD24A/0188W to include the following: Removal of internal mezzanine floor level (175sqm). Removal of internal staircase. Introduction of external staircase to be located adjacent the south façade and enclosed in screening panels. All other developments as permitted under the SDCC Reg. Ref. SD24A/0188W: A permitted storage facility (approx. c.401sqm and c.14m in height) and set down area to house machinery for the ongoing maintenance of the existing Microsoft Grange Castle Campus. All associated landscaping, site development works, site lighting, boundary treatments and all other ancillary works.
Microsoft Ireland Operations Ltd. intend to apply for PERMISSION for development at this site at Grange Castle Business Park, New Nangor Road (R134), Clondalkin, Dublin 22. The site is located within the Microsoft Grange Castle Campus and adjoining the existing substation. The development will consist of a storage facility (approx. c.401sqm and c.14m in height) and set down area to house machinery for the ongoing maintenance of the existing Microsoft Grange Castle Campus. All associated landscaping, site development works, site lighting, boundary treatments and all other ancillary works.
Attic extension creating attic storage space of circa 24sq.m, which includes a rear dormer attic extension, roof light windows on the front elevation, associated alterations to all elevations and all ancillary site works.
The proposed development comprises amendments to planning permission Reg. Ref.: SD21A/0241, as previously amended by Reg. Ref.: SD23A/0035, SD23A/0203, SD23A/0291 and SD24A/0162W. The proposed amendments consist of the following: The provision of a sprinkler tank to a height of c. 11m (c. 12.8m to top of maintenance ladder) with a diameter of c. 10.1m located to the north west of the overall site; The provision of a pumphouse to the east of the sprinkler tank comprising c. 73sq.m; Security fencing and associated above ground pipework; and All associated and ancillary works.
Single storey front, rear and side extension comprising of two bedrooms, 1 en-suite and 1 bathroom; attic converted for storage and roof windows to rear and side of roof; extend wall along site boundary and relocate wall 1.8m high that divides front and rear gardens and relocate access door to rear garden and all associated site works.
Install a new LPG Safety Installation in a caged enclosure 1.8m x 1.2m x 1.2m (LxWxH) servicing the existing LPG storage installation with all ancillary services and associated site works situated within the Clonburris SDZ (Strategic Development Zone) area.
10 year permission for development consisting of removal of an existing unused waste water treatment facility on site and the erection of two data centre buildings, gas powered energy generation compound, and all other associated ancillary buildings and works; the two data centre buildings, DUB 15 and DUB 16, will comprise a total floor area of c. 33,577sq.m over two storeys; the first 2 storey data centre building (DUB15), located to the southwest of the site, will comprise 16,865sq.m data storage use, ancillary office use and associated electrical and mechanical plant rooms, loading bays, maintenance and storage space; a second 2 storey data centre building (DUB16), located to the southeast of the site, will comprise 16,712sq.m data storage areas, ancillary office use and associated electrical and mechanical plant rooms, loading bays, maintenance and storage space; both data centre buildings will reach a height of 20m; emergency generators and associated emission flues and plant are proposed in compounds adjacent to each data centre building; gas powered energy generation is proposed to the north east corner of the site to provide electricity for the proposed development; the application proposes to re-route and widen an existing watercourse constructed following an earlier planning permission; it is proposed to reroute this watercourse along the eastern and southern boundary of the site; landscaping is proposed to the south of the site to screen the buildings; fencing and security gates are proposed around the site; new access roads within the site are proposed along with 71 car parking spaces and 26 cycle spaces, bin stores, site lighting, and all associated works including underground foul and storm water drainage attenuation and utility cables and all other ancillary works; a Natura Impact Statement will be submitted to the planning authority with the application.
1 screened bin compound to be relocated to the south-east corner of the site; 2 transformers within individual compounds and adjoining switch room (35.2sq.m) to be located to the east of the permitted data centre to replace screened transformer compound permitted to the south-east of the site; 1 new plantroom (19.8sq.m) and 1 water storage tank to be located to the west of the permitted data centre to replace previously approved fire suppression enclosure and new double gates to replace sliding gates at entrance into the permitted data centre site.
Roof Profile revised from a double hipped roof to a Dutch gable style to the side and a dormer window to the rear.
Single storey front porch and ancillary site works.
Change permitted house type to a three bed, detached dwelling and associated works.
Construction of 157 dwellings within the Clonburris South-West Development Area of the Clonburris Strategic Development Zone (SDZ) Planning Scheme 2019 consisting of, 81 houses comprising of 4 two bedroom houses, 65 three bedroom houses and 12 four bedroom houses (all two storey with associated private open space and car parking; 76 apartment units consisting of 26 one bedroom and 50 two bedroom units within Block 1 (4 storeys); Vehicular access will be provided from the permitted street under SDZ21A/0022 and the permitted Clonburris Southern Link Street (SDZ20A/0021) and R113 (Fonthill Road) to the east; All ancillary site development works including footpaths, landscaping boundary treatments, public and private open space areas, car parking (170 spaces) and bicycle parking (170 spaces), single storey ESB sub-stations, bin and bicycle stores and all ancillary site development/construction works all on wider lands bounded generally by the Dublin-Cork railway line to the north, undeveloped lands and Grand Canal to the south and undeveloped lands and the Fonthill Road (R113) to the east, in accordance with the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
Single storey extension at side.
Demolition of existing single storey vacant house, garage and outhouse (total gross floor area (GFA) c.291.2sq.m) and removal of existing temporary construction car park; Construction of a single 1-4 storey Central Administration Building and 2 2-storey (with mezzanine) data centres (DUB14 & DUB15) all to be located west of data centres DUB9, DUB10, DUB12 & DUB13 within the MS campus; The Central Administration Building (c.6.03m to c.19.85m high) will comprise central office administration, with staff cafeteria, staff gym and reception (GFA c.3,520sq.m), with provision of PV panels on the roof; each data centre (c.15.6m high to parapet height and c.18.65m to top of roof plant) will include data halls, admin blocks (comprising offices, canteen, loading dock, storage and ancillary areas) and a variety of mechanical and electrical plant areas/structures including Modular Electrical Rooms (MERs), battery rooms and transformer areas. GFA of DUB14 is c.28,072sq.m and GFA of DUB15 is c.28,173sq.m (c.56,246sq.m in total); DUB14 will also include 21 diesel generators and associated sub-stations (E-houses) and 11 mechanical flues (each c.30.75m high); Provision of a gas generator compound (to serve DUB15) containing 20 generators, 5 E-houses and 5 flues (c.25m max height); Provision of a Gas Networks Ireland gas skid including 3 kiosk buildings; Expansion of existing electrical sub-station compound (originally granted under SD07A/0632) to provide 3 additional transformer bays. 3 E-houses and 1 control room, 2 auxiliary transformers; 2 sprinkler tank and pump house areas, 1 additional rainwater harvesting plant; Provision of 168 permanent car parking spaces and 40 cycle parking spaces; Provision of additional western access to the MS campus (to serves the Central Administration Building) from the Business Park estate road (including bridge over the Griffeen River) with existing temporary access to be extinguished; Physical integration with the remainder of the existing MS campus (including internal access roads and landscaping) with associated modifications to the western boundary of the DUB09/DUB10/DUB12/DUB13 data centre development as permitted under SD16A/0088; Provision of a new temporary construction car park (with 802 car spaces, shuttle bus stop and shelter) on site north of the main entrance to the business park; Total gross floor area of the development will be c.59,766sq.m; All associated site development works, drainage and services provision, landscaping, boundary treatments (including security fencing) and associated works; An Environmental Impact Assessment Report (EIAR) has been submitted with this application; The application relates to a development which comprises an activity requiring an integrated pollution prevention and control (IE) licence.
Conversion of existing attic space comprising of modification of existing roof structure; new gable window; new access stairs and flat roof dormer to the rear.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs and flat roof dormer to the rear.
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs and 2no. roof windows to the front and flat roof dormer to the rear
We, Vantage Data Centers DUB11 Ltd. are applying for permission for development at this site on lands to the south of the New Nangor Road (R134), Dublin 22; and on land within the townland of Ballybane within Profile Park, Clondalkin, Dublin 22. The development will consist of an amendment and modification of the permitted Gas Networks Ireland (GNI compound that was granted as part of, and under SDCC Planning Ref. SD21A/0241 that will include: - Replacement of the permitted vehicular access to the GNI compound from within the data centre campus to being directly off Legacy Drive that will include a modified internal access road; - New internal layout of the GNI compound that will include the replacement of the permitted boiler kiosk (42sqm), skid kiosk (89sqm) and analyser kiosk (3sqm); with a single storey boiler house kiosk (19.7sqm); single storey regulators / meters kiosk (36.8sqm); single storey electrical kiosk (14.6sqm); as well as all associated infrastructure and ancillary works; and - 3 no. floodlighting columns (each 8.537m in height) within the GNI compound that will be surrounded by a 3m high fence and vehicle gates.
Retention for conversion of retail premises to (a) first floor 1 bedroom apartment and (b) ground floor 1 bedroom apartment.
Retention of 2 apartments previously used as a two storey retail premises comprising a 1 one bedroom apartment at ground floor level and 1 two bedroom apartment at first floor level; Permission for internal amendments and minor elevational alterations at first floor level to the southern and western elevations along with proposed new bin storage, bicycle parking and all other ancillary site development works.
Retention for conversion of retail premises to first floor two bedroom apartment and ground floor one bedroom apartment.
Planning permission is sought attic conversion with projected dormer window to rear roof, storage, games room facility, permission also sought for single storey kitchen to rear of existing house, permission also sought for new single storey building to rear garden for home office / gym use and all associated site works