Subdivision of the existing retail department store (Unit 116 - 5,396sq.m. - formerly Debenhams) to comprise 2 retail units - 116A (2,431sq.m) and 116B (2,270sq.m) and new service corridor (176sq.m) to the rear of the proposed unit 116B to provide access to the existing service yard; associated modifications including the removal of the existing mezzanine floor within Unit 116 (497sq.m); creation of new retail frontage within the internal mall and associated signage; revisions to existing retail Unit 117 (113sq.m) and 118 (102sq.m) to form a single amalgamated unit (169sq.m) and creation of additional mall floor space (47sq.m) arising from the unit reconfiguration; all associated site and development works including minor revisions to the layout of the existing service yard.
3 signs (1m metre high x 4.5 metres wide aluminium back panels with individual raised illuminated lettering) on the existing tower feature on the western elevation of The Square; 1 sign (1.2m meter high x 6.1 metres wide aluminium back panel with individual raised illuminated lettering) positioned externally on the southern elevation of The Square (south eastern corner).
Amendments to previously granted permission (SD20A/0017) comprising of alterations to façade; installation of roof lights and PV panels.
Renovation and modifications to the original building including a change of use to office, training and distribution centre; proposed changes to the existing internal layout; internal fire stair location moved; extended mezzanine area, additional new toilets; external windows and modifications to the roller door on the rear elevation; new signage to the front elevation and all ancillary works.
28m of new secure metal fencing.
Demolition of existing fire damaged commercial unit and site clearance including all associated site works.
Revisions to previously permitted internal modifications as approved under Ref. SD18A/0399 resulting in the reductions in the kiosk zone at Level 2 only by 196sq.m (from 1073sq.m to 877sq.m) to accommodate a new partially enclosed restaurant/café unit (196sq.m) and associated setting; the new restaurant and seating area will correspond with the footprint of the existing Units 260/262 and 263 and will contain associated facilities including a kitchen, front and rear counters, condiment unit, dining tables, chairs, booths and benches; associated signage and development works.
The development will consist of internal reconfiguration and amalgamation of 4no. existing Level 2 retail units (U238, U239, U240 and U241) to provide two retail units (U238: 516sqm and U240: 1282sqm) and ancillary circulation and general store rooms (c.274sqm) resulting in no overall increase in gross floorspace. Permission is also sought for all associated site and development works and reuse of existing signage zones.
Opening ceremony of the Ireland Games comprising of a procession, ceremony, speeches and entertainment. Audient will include family members, supporters, sponsors and guests of Special Olympics Ireland.
Construction of additional floor area of 192.43sqm to existing warehouse and office building of 1658.44sqm, alterations to layout of 152.11sqm of existing warehouse and alterations to existing parking layout to accommodate disabled parking. New first floor of 169.75sqm internally in existing warehouse, internal alterations at ground level, 2 storey extension to southern elevation of existing warehouse to accommodate new entrance lobby and all associated site works.
Alterations to existing external service area to the north eastern side of The Square Shopping Centre at the entrance to the existing service yard comprising of construction of an external plant area (c.135sq.m) enclosed by 2.4 metre high galvanised fencing to accommodate an Air Handling Unit (AHU) and a Chiller Unit ancillary to the shopping centre; new flat roof boiler room building (c.34sq.m gross floor area) within the proposed new enclosed plant enclosure; installation of a metal frame (2.4 metres wide x 1 metre high and located 2-3 metres above the ground supported by metal stilts) to facilitate the connection of the Air Handling Unit and Chiller within the plant area to the covered service yard area; replacement of mesh panels on existing wall on the western and norther side of the service yard with metal louvered panels; all associated site and development works.
The development consists the installation of 2no. new water tanks and an associated enclosure to the north of the existing office building, the relocation of a previously granted bicycle shelter under planning reference SD21A/0123, from the east of the site to the south-west, and all associated site works at PM Group, Kearney House, Belgard Square, Dublin, D24 XFW2.
Works to the existing roof including installation of 173sq.m of solar pv panels; the erection of a new guardrail on the existing parapet to the perimeter of the roof; alteration to a portion of the existing roof from a pitched roof to a flat roof, installation of roof access hatches and all associated site development works.
Mixed use commercial extension (9,956sq.m gross floor space) to the southern side of The Square Shopping Centre and a new public plaza and all associated site and development works including new signage; Level 1 - no changes; Level 2 - removal of southern mall entrance lobby and construction of new extension to existing Level 2 mall to include 6 retail units (2,611sq.m), a food hall/market hall area for multiple restaurant/food and beverage type uses with associated seating areas (2,041sq.m), a restaurant/cafe unit (67sq.m) and associated ancillary accommodation and circulation (1,534sq.m) and plant rooms (176sq.m) and introduction of new internal service corridor; Level 2 extension is replacing surface parking spaces (140) to the south of the shopping centre and an existing parking area (34 spaces) to the east of the proposed extension is to be reconfigured; creation of Level 3 entrance and creation of new public plaza to replace roof car park (111 spaces) and the new outdoor public plaza (0.74ha) will be used for multi-purpose events, civic and recreational uses and retail and food and beverage concessions involving temporary moveable structures erected on a seasonal basis; the creation of the new Level 3 entrance involves replacement of existing retail unit at Level 3 (Unit 307A) with mall area to include flexible kiosk type retail concession areas; 2 buildings accommodating 9 restaurant/bar units (3,324sq.m) and ancillary accommodation (175sq.m) and associated outdoor seating areas in the new plaza on south facing terraces; Level 4 - ancillary accommodation and service areas (28sq.m) on roof of 2 restaurants buildings within provision for screened plant areas and solar panels; the proposed extension has a maximum building height of 18 metres above existing ground levels; the extension is to replace and supersede the Plot B development previously permitted under Reg. Ref. SD13A/0192 (Bod Ref. PL06S.243280) which included a gross floor space of 5,684sq.m; the permitted northern extension (Plot A) remains unchanged. Permission is sought to amend Condition 3(a) of the Reg. Ref. SD13A/0132 (Bord Ref. PL06S.243280) to facilitate the construction of the proposed southern extension prior to the permitted northern extension (Plot A) subject to a phasing programme to be agreed.
Demolition of all existing 1-3 storey industrial/commercial structures on the site (c. 5,500 sq.m). Construction of a 1-4 storey Transitional Care Facility (c.11,747 sq.m.) providing therapy and treatment space and a pharmacy and general practitioners space at ground floor level and 171 no. bedspaces at 1st to 3rd floor levels. 2 no. internal landscaped areas are provided at ground floor level (c.440 sq.m) and 2 no. outdoor amenity areas are provided at 1st floor level (c.483 sq.m). Provision of a coffee dock area, hairdresser, comms rooms, toilets, staff changing facilities, kitchen area, laundry rooms, lobbies/reception areas, admin areas, storage spaces, staff canteen, LV switch room, mains/ sprinkler tank room/ boiler room, multipurpose rooms, dining rooms, meeting and office rooms, sluice rooms, nurses stations, ancillary refuse storage area, ancillary generator, ancillary ESB substation and switch room associated with the operation of the facility throughout. Provision of Stair/lifts, photovoltaic panels, mechanical plant and green/blue roofs associated with the operation of the facility throughout. Partial provision of the pocket park identified in the Tallaght LAP (c.1,500 sq.m). Provision for the relocation and upgrade of the existing vehicular and pedestrian access point along First Avenue for servicing and staff parking and relocation and upgrade of the existing vehicular and pedestrian site access point along Cookstown Road. Provision of signage on the southern, eastern and northern facades of the proposed building and associated totem signage. All associated site development works above and below ground, services provision, connection to water supply and foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, attenuation/bioretention systems, provision of internal roads and footpaths, tree removal, bicycle storage (60 no. total spaces), staff and visitor car parking (55 no. total spaces) and 3 no. set down/ loading bays.
Demolition of all existing 1-3 storey industrial/commercial structures and small cafe on site totalling c.5,500sq.m in area; construction of a 1-5 storey nursing home/step-down facility (131 bedspaces) over partial basement (total floor area c.6,743sq.m) with central courtyard (c.519sqm); construction of a deck-access apartment development comprising 139 residential units arranged in 2 blocks (Block A - 8 storeys and Block B - 5 to 6 storeys) with a total floor area of c.10,556sq.m excluding deck access (c.1,141sq.m); 2 commercial units comprising a cafe and pharmacy located at ground floor level facing Cookstown Road in residential Block A ( c.292sq.m in area); the residential development consists of 67 one bed/two person units, 12 two bed / three person units and 60 two bed/4 person units with north, south, east and west facing balconies throughout and residents amenity area at ground floor level; central communal open space (c.1,272sq.m); the basement serving the nursing home consists of a sprinkler tank and pump rooms, tank room, plant room and workshop; provision of dining and kitchen areas, siting/family rooms, activity rooms, coffee dock, hair salon, oratory, lobbies/reception areas, ancillary offices and staff areas, stores, toilets, shower/changing facilities, ESB substation, generator, switch room, service yard and waste areas serving the nursing home; provision of an ESB substation, switchboards, waste areas, water tanks and generator serving Blocks A and B; lobbies, stair/lifts, photovoltaic panels and green roofs throughout; partial provision of the pocket park identified in the Tallaght LAP (c.1,165sq.m); new vehicular access from First Avenue and egress onto Cookstown Road via a one-way system through the subject site; entrance signage on the eastern elevation of the proposed nursing home; all associated site development works, services provision, connection to the water supply, foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (307 spaces), car parking (42 spaces), set-down parking spaces including 1 ambulance space serving the nursing home and delivery/loading areas to Cookstown Road and First Avenue.
The development consists of the change of use of the ground floor unit from retails use to cafe/patisserie shop including the sale of hot and cold beverages. The following works are proposed: (1) Internal configuring of unit including fit out of unit to facilitate development with provision of serving counter, store, W/C and seating area at ground floor level internally and externally (2) Alterations to ground floor level facade including new glazed door and window, new awning to shopfront, new signage and projecting signage to front facade. (3) All associated site works and ancillary works at this address in accordance with plans as submitted
Demolition of all existing 1-3 storey industrial / commercial structures and small café on site totalling c.5,500sqm in area; - Construction of a deck-access apartment development comprising 123 residential units arranged in 2 no. blocks (Block A 5 to 7 storeys and Block B 5 to 6 storeys) with a total floor area of c.9,806sqm including the proposed bike shelter (c.93sqm) and excluding deck access (c.901sqm); -Commercial floor space located at ground floor level facing Cookstown Road in Residential Block A (c.421sq.m); - The residential development consists of 58 no. 1 bed/2 person units, 12 no. 2 bed/3 person units and 53 no. 2 bed/4 person units with north, south, east and west facing balconies throughout and residents amenity area at ground floor level; -Central communal open space (c.1,303sq.m); -Provision of an ESB substation, switchboards, waste areas, water tanks and generator serving Blocks A and B; -Lobbies, stair/lifts, photovoltaic panels and green roofs throughout; -Partial provision of the pocket park identified in the Tallaght LAP (c.1,286sq.m); -New vehicular access from First Avenue and egress onto Cookstown Road via a one way system through the subject site; -All associated site development works, services provision, connection to the water supply, foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, temporary foul pump station. attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, pedestrian facilities/public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (302 no. total spaces) comprising 276 no. spaces (serving proposed mixed use development) and 26 no. spaces (serving concurrent transitional care facility application), car parking (32 no. total spaces) comprising 15 no. spaces (serving proposed mixed use development) and 17 no. spaces (serving concurrent transitional care facility application), 2 no loading bays (one each on First Avenue and Cookstown Road), 2 no. setdown/loading areas to the internal road and 1 no. ambulance setdown space serving the adjacent concurrent proposed Transitional Care Facility. The concurrent application has been made to South Dublin County Council regarding a 131 bed Transitional Care Facility on the western portion of the site (SDCC Ref SD22A/0361 refers) currently under appeal to An Bord Pleanála (ABP Ref 317394).
Demolition of all existing 1-3 storey industrial/commercial structures and small cafe on site totalling c.5,500sq.m in area; Construction of a 1-5 storey Transitional Care Facility (step-up/step-down) providing 131 bedspaces over partial basement (total floor area c.6,743sq.m) with central courtyard ( c.519sq.m ); The basement consists of a sprinkler tank and pump rooms, water tank room, plant room and workshop; Provision of dining and kitchen areas, siting/family rooms, activity rooms, coffee dock, hair salon, oratory, lobbies/reception areas, ancillary offices and staff areas, stores, toilets, shower/changing facilities, ESB substation, generator, switchroom, service yard and waste areas serving the facility; Lobbies, stair/lifts, photovoltaic panels and green roofs throughout; Partial provision of the pocket park identified in the Tallaght LAP (c.1,286sqm); New vehicular access from First Avenue and egress onto Cookstown Road via a one-way system through the subject site; Entrance signage on the eastern elevation of the proposed facility; All associated site development works, services provision, connection to the water supply, foul and surface water networks on First A venue and Cookstown Road including partial diversion of the foul line to the north east of the site at First A venue, temporary foul pump station, attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, interim pedestrian facilities/public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (76 total spaces), car parking (32 total spaces), set-down parking spaces, 1 ambulance set-down space serving the facility and delivery/loading areas to First A venue.
1 no. 6.25m wide x 2.5m high internally illuminated sign to be mounted on existing front (east-facing) elevation of B&Q premises.
Sliding steel entrance gate to the main entrance; partial demolition of a section of existing boundary wall; construction of new site entrance piers and the extension of the existing perimeter railings to meet the new piers; 2 new bicycle shelters and all associated site development works.
The temporary use (for the next 5 years 2025-2029 inclusive) of part of the eastern carpark lands for the erection of a temporary tent structure for use as an ice rink for a period not exceeding 3 months per year (November - January) and all associated site and development works including plant, lighting, ancillary signage and with pedestrian routes to the shopping centre and associated car parks. The proposal will result in the loss of c.48 spaces for the duration of the temporary ice rink use.
The proposed development will consist of amalgamation (including removal of internal mezzanine areas) and change of use of Units U133ABC (former An Post) and U133D (former Bodytalk) from Post Office and Retail Use respectively (both Class 1 “shops”) to accommodate a restaurant/ takeaway unit (243sqm) for consumption of hot food on and off the premises, modifications to existing shopfront signage, new tenant sign on eastern elevation and all associated site and development works
Demolition of existing commercial building (736sq.m) and construction of a single storey cafe/restaurant (79sq.m); single storey bicycle workshop building (32sq.m); improved public realm area to include seating; bicycle parking (60 spaces) and hard and soft landscaping and all associated site and development works.
Extend the existing two storey building on site that provides after-school education to students in the area, where the new building will facilitate second and third level students; a new shared entrance serving both buildings; proposed extension is a two storey building, matching the scale and massing of the existing building; the building has been designed to achieve a Net Zero Whole Life Carbon standard and this in part is achieved by an external brick skin, a cross laminated timber structural system, harnessing of natural light and extensive use of photovoltaic solar panels; the building programme will provide a lecture theatre, a science laboratory, classrooms, a reading room, offices, a central atrium, and a kitchen facility; the flat roof will carry solar photovoltaic solar panels and a biodiversity outdoor classroom, and all associated site works; relocate the muga within the complex to the east of the existing building and provide additional outdoor sports equipment; all proposed boundary fencing will match the existing boundary treatment in size and material.
Change of use from Betting Office to Beauty Salon with proposed opening hours of Monday to Sunday, 9:30 a.m. to 8:00 p.m.
Two storey two bedroom semi-detached house; Demolition of side rear extension to existing house.
Construction of a new 125sq.m (9.0m high) single storey side extension to existing facility for the storage of materials ancillary to the existing business currently operating on site with minor internal modifications and associated site development and ancillary works.
Single storey family/utility room extension to front, side and rear; porch extension to front and associated site works to existing dwelling.
On a site bound by Belgard Road (R113) to the east, Belgard Square North to the North, Belgard Square East to the west and Clarity House to the south, demolition of all existing structures on site (with a combined gross floor area of c. 3625sq.m); The construction of a mixed-use residential development set out in 3 blocks including a podium over a basement, ranging in height from 2 to 13 storeys (with core access above to roof terrace), comprising 334 residential units of which 118 will be Build to Rent (BTR) residential units, with associated amenities and facilities across the development; 4 retail/café/restaurant units and 3 commercial spaces associated with the 3 live-work units (723sq.m combined); Childcare facility (144sq.m); 670 bicycle parking spaces including 186 visitor spaces; 117 car parking spaces (including 6 disabled spaces) are provided at ground floor and basement level; Communal space in the form of residential courtyards and roof terraces; Public open space provision including Homezone/tertiary route along the south of the site between Belgard Rd and Belgard Square East; The overall development has a Gross Floor Area of 29,784 sq.m; Of the total 334 residential units proposed, unit types comprise Block A (Build-to-Rent), 91 one bed units; 1 two bed 3 person units; 26 two bed 4 person units; Blocks B & C, 2 live-work studio units; 102 one bed units; 12 two bed 3 person units; 88 two bed 4 person units including 5 duplex units; 1 two bed 4 person live-work unit; 11 three bed units; A portion of the proposed residential development is a 'Build to Rent' scheme in accordance with Specific Planning Policy 7 and 8 as set out in the 'Sustainable Urban Housing: Design Standards for New Apartments (December 2020); All associated works, plant, services, utilities, telecommunications infrastructure, PV panels and site hoarding during construction; A Natura Impact Statement has been prepared in respect of the proposed development and accompanies this application; The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant development plan or local area plan; The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in Section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land.
Three storey apartment building containing six apartments with external terraces/private gardens (3 x two bed & 3 x three bed duplex) & one end of terrace two storey house (two bed), landscaping of site and play area, footpath, bin stores, eight car parking spaces, eighteen bicycle parking spaces and all associated site works.
Change of use, and associated internal works, of part of the existing building (167 sq.m. approx.) from warehouse to part workshop/light industrial (89 sq.m. approx.) and part water sampling hub (78 sq.m. approx.) to facilitate the overall use of the building as an Uisce Éireann Operations Centre; the provision of a window and security shutter on the north eastern façade of the building; the provision of a wash bay and 4 No. materials bunkers in external yard area; 2 No. replacement vehicular gates; a new pedestrian gate; Uisce Éireann signage on front (southwest) elevation; external air handling unit on northwestern side of building; and associated site development and drainage works.
Retention of standalone residential building located at first floor level with external staircase adjacent to existing industrial unit for exclusive residential use for associated Rewinds staff as residential accommodation consisting of three bedrooms, communal living area, communal kitchen area and all associated site works.
Retention Planning Permission for the following: single storey extension (Area 122m2 / c. 6.5m in height) to North elevation of existing industrial building, the installation of a fire escape door to East elevation (rear), alterations to the West (front) elevation, as previously approved under planning reference SD08A/0719 and associated site works at Units A1/A2 South City Business Park, Tallaght, D24HT95.
2 prefabricated units for use as an office (31.5sq.m) and a canteen (23.3sq.m) located adjacent to the existing permitted Retail Shop (Ref. SD16A/0239) within a 0.0125 hectare application area at the existing quarry.
Single storey extension to front and all associated site works.
Source EV Ireland Ltd. intends to apply for permission for development of an Electric Vehicle (EV) Charging Station at Belgard Retail Park, Belgard Road, Tallaght, Dublin 24, a site of ca. 0.035ha. The development will consist of 5 no. EV charging stations, each serving 2 no. vehicle charging bays, a total of 10 no. charging points. The charging bays will be located in the existing car park replacing 12 no. standard parking bays with 10 no. EV charging bays. The proposed development will utilise an existing, ancillary storage building to house an Medium Voltage (MV) switch room linked to an adjacent ESB substation to service the proposed development, the charging bays will utilise existing established access & egress and includes all other associated above and below ground ancillary works.
Development of a welfare facility to accommodate a future bus layover which was approved as part of the D24 Neighbourhood Cycle Network Scheme. The proposed development consists of a bus driver welfare facility comprising of two toilet units circa 6 m2 each, hard standing area, and associated infrastructure. The proposed development is approximately 0.05 hectares (ha) in size.
The installation of 6 no. 6m high floodlights around the existing pitch and associated site works and the retention of the existing pitch boundary treatment comprising 2.4m high painted metal mesh fence with access gates with 3m high netting above.
Retention of single storey kitchen extension to front side and rear of existing house and all associated site works.
93sq.m extension for office space at first floor level (internally) to an existing 279.87sq.m light industrial and warehousing unit and all associated site works.
Mixed-use development including 310 "Build-to-Rent" residential apartments, a creche and a number of commercial units (c. 2,289 sqm) on a c. 1.26 ha site; Consisting of the demolition of existing boundary wall and construction of: c. 2,289 sqm of retail/commercial floor space across 10 units including retail, restaurant/café and Class 2 financial/professional services and office use, and a crèche (257sqm) at ground and first floor levels; 310 build to rent residential apartments including 99 one bedroom units, 203 two bedroom units and 8 three bedroom units within a part 6 to part 12 storey development across 3 blocks over partial basement; c. 2,223 sqm of communal external amenity space provided in the form of a ground floor garden and external terraces at fifth, sixth, seventh and eighth floor levels; c. 1,026 sqm of public open space provided in the form of a central courtyard with landscaped areas at site perimeters; c. 1,785 sqm of resident support facilities and services and amenities provided at basement, ground and first floor levels; Vehicular access to the basement development from a new access point at Belgard Square East; A new tertiary route provided in the southern part of the site linking Belgard Square East and Belgard Road; Provision of 130 car parking spaces (including 8 club car spaces and 6 disabled access spaces) at basement level in addition to 5 set down spaces (4 serving creche) and 1 disabled access space at ground level, layby on Belgard Square East, 6 motorcycle spaces and a total of 763 bicycle parking spaces; Provision of 4 Ø0.3m microwave link dishes to be mounted on 2 steel support pole affixed to lift shaft overrun, all enclosed in radio friendly GRP shrouds, together with associated equipment at roof level at Block B; Provision of 3 ESB substations with switch rooms and plant rooms at basement level, hard and soft landscaped areas, bin and bicycle stores, public lighting, attenuation, green roof, plant at roof level, service connections and all ancillary site development works. The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant development plan and local area plan. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land.
The proposed development principally comprises: the demolition and removal of existing boundary walls and railings on the main development site's eastern, western and northern sides; and the construction of a mixed-use development in 2 No. blocks (Block A to the south and Block B to the north) with a gross floor area of 23,540 sq m (including basement of 275 sq m) and ranging in height from 1 No. to 7 No. storeys (with mezzanine level) over basement. The development includes a total of 199 No. residential dwellings (6 No. studios, 47 No. 1-bed, 98 No. 2-bed and 48 No. 3-bed) in the 2 No. blocks, with Block A comprising 49 No. 'senior living' apartment units and Block B comprising 150 No. 'standard' apartment units. The development also includes 2,123 sq m of non-residential floor space, with the following uses proposed: 4 No. retail units (totalling 331 sq m); 4 No. class 1 / class 2 commercial units (totalling 387 sq m); a bicycle sales and repair shop (81 sq m); an off-licence (64 sq m); a bar (151 sq m); a café (87 sq m); a medical centre (210 sq m); a dental practice (72 sq m); a pharmacy (195 sq m); a beauty/health salon (195 sq m); and a crèche (350 sq m) with external play area. The development also comprises: an undercroft car park accessed via a new entrance/exit at Belgard Square East which provides 58 No. car parking spaces; a gated service lane to the south of Block A, with entrances/exits off Belgard Square East and Belgard Road; 2 No. pedestrian/cycle crossings, at Belgard Square East and Belgard Road; continuation of the northbound cycle lane from Belgard Road onto Old Blessington Road; alteration to the median and northbound right turn at Belgard Road onto Abberley Square; cycle parking; internal communal amenity spaces for the senior living units; hard and soft landscaping, including public open space, communal amenity space and incidental spaces; private amenity spaces (as balconies and terraces facing all directions); boundary treatments; 2 No. sub-stations; plant/operational rooms; bin stores; public lighting; blue roofs; rooftop PV arrays; lift overruns and rooftop opening vents atop both blocks; 4 No. 0.3 m diameter microwave link dishes mounted on 2 No. steel support poles affixed to the Block B lift overrun, all enclosed in radio-friendly GRP shrouds; and all associated works above and below ground. Note for the mixed-use question below: there are too many non-residential uses proposes relative to the lines available, so we have provided the residential floor area and the combined non-residential floor area. See submitted materials for details of the individual non-residential uses. The main development site (approximately 0.91 Ha) is generally bound: to the north by Old Blessington Road; to the east by Belgard Road.
Single storey domestic shed/workshop and all associated site works.
Single storey front extension and all associated site works.
Located on a section of Belgard Square South. The development includes the closure of the slip road from Belgard Square South onto the N81. This development is proposed to accommodate the increase in the volume of buses in the area as a result of the changes proposed under BusConnects. The volume of buses is set to increase from 22 to 49 buses per hour. It forms part of Government efforts to improve public transport and address climate change nationally, supporting national strategies such as the National Development Plan 2021 - 2030 and the Climate Action Plan 2023. The layover facility will be comprised of bus parking for 10 buses and welfare facilities for drivers. The development consists of two separate parking areas with 7 bus bays in the south layover and 3 in the layby to the north of Belgard Square South. There will be one entrance point into the layover area located on the southern side of Belgard Square South. This layover area will have 2 egress points with a right turn ban in place. There will be a layby located on the northern side of Belgard Square South, across from the layover area. The layover area includes a bus driver welfare facility comprising of two toilet units. The proposed Development includes the closure of the hard shoulder on the northern side of the N81 to accommodate the realignment of the cycle track along the N81. The proposed development includes all the associated works to facilitate the bus layover and welfare facility. This includes drainage works, utility diversions, public lighting, fencing and landscaping. The overall area of the site is approximately 0.7 ha.
Provision of a 9.7sq.m extension to the north-western corner of the building to facilitate additional staff room space; the installation of a new high level window along the western elevation of the building; the replacement of the existing sliding entrance door with a new automatic swing door along the southern elevation of the building; the removal of the existing wall in the external bin storage area/corral to facilitate an increase in area by 17sq.m and the provision of close boarded timber fencing; the removal of a door on both the northern and eastern elevation of the building. The proposed development will also include: the removal of 1 No. Parking space; the replacement of 3 No. car parking spaces with 2 No. Electric Vehicle Charging spaces; the provision of 3 No. additional pedestrian entrances along the southern boundary of the site onto the pedestrian walkway connecting Belgard Square East to the R113; bicycle parking; the rearrangement of the external seating area; signage; and all associated site development works.
Permission for development at McDonald's restaurant, Belgard Square East, Belgard Road, Tallaght, Dublin 24, D24 HW74. The development will consist of proposed new revised signage to the south, east and west elevations, upgrade works to the existing sky sign including new flat display panel sign, and all associated works necessary to facilitate the development.
Demolition of the porch side entrance. Demolition of the existing garage. In the side garden. New single storey three-bedroom detached house with two dormer windows to the rear. New vehicular access for the existing house. Remove part of the front wall to allow access.
3 bedroom dormer bungalow with 2 dormer windows to rear, new vehicular access and all ancillary services.