Conversion of existing attic space from storage to domestic accommodation incorporating the raising of the wall plate to the rear of the dwelling to form a flat roof structure replacing the back pitch of the existing roof.
Planning permission is sought for the following alterations: • Internal alterations at the ground floor level of the permitted warehouse/logistics unit, including a change of use of 310 sq.m, to provide additional ancillary staff welfare facilities and ancillary office accommodation; • Provision of an additional 158 sq.m at first floor level for ancillary office accommodation; • Amendments to façade treatment including signage and louvres; • Repositioning of the roof mounted Solar PVs; • Other associated alterations including to the landscaped areas; and • All associated development works Retention permission is sought for the following: • Reconfiguration of car parking layout, including amendments to circulation arrangements adjacent to the building entrance. No change is proposed to the overall number of car parking spaces; • Repositioning of the bicycle shelters; • Amendments to façade treatment, including: o Reconfiguration of glazing mullion centres and incorporation of additional opening sections; o Provision of a first-floor opening vent window to Staircore 2; o Minor adjustments to the cladding arrangement at parapet level; • Repositioning of the roof mounted AOVs; and • All associated site development works. The proposed alterations result in an overall increase of 158 sq.m in the total GFA of the warehouse/logistics unit from 3,026 sq.m to 3,184 sq.m (including ancillary office and staff welfare facilities).
Construction of a first floor rear extension and all associated site works.
The change of use from warehouse to data repository facility, alterations to external facades, provision of a new 1100mm parapet, reclad roof, internal alterations, refurbishment of the existing office space, solar panels at roof level, external plant at ground and roof levels and equipment to include 12 condenser modules, an emergency back-up generator and associated fuel storage tank, transformer, extension to the existing sub-station (c. 13sq.m), 2 sprinkler tanks and pumphouse, bin store, 22 parking spaces including 2 electrical vehicle charging points, bicycle parking shelter, landscaping, planting, new security fence, external lighting, CCTV, altered vehicular gates, permeable hard surfaces, alterations to internal foul sewerage and water supply networks, provision of SuDS compliant surface water drainage system and all associated site works.
Erect 525sq.m. of photovoltaic panels on the roof of existing unit with all associated site works.
Change of use of c.12.25sq.m of floorspace within the existing warehouse building on site, from warehouse use to use for the temporary storage of shredded electrical & electronic equipment and components.
Install a second cremator within the existing crematorium building to be powered with electricity; the new unit will be located beside the existing unit within the building (the building was originally designed and built for 2 units); internal alterations to the building including removal of non-load bearing block walls to facilitate the new unit; extension to the west side of the building to provide staff changing facilities and a cremulator room (20.2sq.m); extract system to be connected to the existing flue; partial demolition of existing boundary wall to facilitate a new sub-station/switch room, the laying of underground ducts for ESB connection, underground cabling and all ancillary works to facilitate the development.
The construction of a two storey stand-alone café/restaurant unit, with an overall height of c. 8m and a gross floor area of 441 sq.m, and associated ancillary drive thru lane, located to south of the permitted Apex Hub at Ballymount Industrial Estate (permitted under Reg. Ref.: SD22A/0099 as amended); The ancillary drive-thru lane, includes a canopy and service hatch on the northwestern elevation side of the unit, a height restrictor / entrance barrier on the access lane and a 3.5m wide drive-thru lane; The proposal includes associated drive-thru signage consisting of 1 no. directional sign, 1 no. order station, and 2 no. menu boards/advertisement signs and tenant signage on the southeastern, northeastern and northwestern elevations; The development includes associated soft and hard landscaping, associated outdoor seating area and external bin store for the proposed café/restaurant unit; The development includes a total of 19 no. car parking spaces including 4 no. EV spaces, 2 no. accessible spaces and 3 no. Staff parking spaces, waiting area, bin store and 10 no. cycle parking spaces; The development includes the repositioning of 2 no. permitted pedestrian crossing to the east of the site (permitted under Reg. Ref.: SD22A/0099); and All associated development. The proposed café/restaurant, with associated ancillary drive-thru lane, supersedes the permitted café unit on the subject site under Reg. Ref.: SD22A/0099.
Single storey outbuilding (29.14sq.m) to rear of overall property and associated site works.
Planning permission for a proposed change of use of 3,875 sq.m. floorspace from office-based industry to office use. The proposed development also includes reconfiguration of car parking area resulting in replacement of 4 no. existing car parking spaces with 40 no. bicycle parking spaces, along with all associated site works to facilitate the development.
The development will consist of 1. Demolition of the existing garage/carport wall attached to the existing house. 2. Construction of a single storey flat roof front extension to consist of a porch and utility Room. 3. Construction of a two storey rear extension with gable ended roof to consist of hall, Lounge/Play room, Master bedroom walk in wardrobe and ensuite on the ground floor and two bedrooms, office and bathroom on the first floor. 4 Construction of court yard in the ground floors proposed to the rear extension and the existing house. 5. General remodel and upgrade of the existing dwelling to suit the proposed layouts. 6. All drainage, structural and associated siteworks to be implemented
Installation of a new external door in the Northwest Elevation to access a new ESB meter enclosure at ground floor of Unit 26C Fashion City, Ballymount Road Upper, Dublin 24
The development will consist of: 1. Removal of the existing rear garden single shed. 2. Removal of front wall carport facade to accommodate the construction of a single storey, pitched roof extension, to consist of an entrance porch and hallway with new stairs. 3. Construction of a new single storey pitched roof rear extension to consist of a kitchen and dining room. 4. Partial raising of the existing roof ridge, front and rear gable walls, to accommodate a new attic conversion (to consist of a bedroom with en-suite) incorporating a tiled pitched roof, with flat roof dormer windows on both side elevations, and a new front facing gable window. 5. General remodel and upgrade of the existing house at all floor levels to accommodate the proposed works 6. All drainage, structural and associated site works.
Permission sought for single storey extensions at front and rear including relocating the front entrance door from the front of the house to the side of the house, the removal of the existing front sitting room window canopy and the installation of 2 Velux rooflights to new rear extension roof and 2 Velux roof lights to existing roof
Design alterations to development permitted under ref. SD21A/0347 (extension to paint workshop) involving removal of existing 436sq.m store unit and enlargement of the permitted 980sq.m extension to 1,661.1sq.m (an increase of 681.1sq.m, bringing the total paint workshop unit to 3,216sq.m), together with new steel roof sheeting at the northern entrance to the permitted extension and the provision of 2 accessible parking bays and 2 electric vehicle parking bays and all associated site development works.
Construction of a single storey extension (980sq.m) to paint workshop with canopy; two access doors with roller shutters and all associated site development works.
The reconfiguration of 47No existing staff car parking spaces to allow for safer movement of vehicles and temporary storage of materials elsewhere in the existing yard, including new staff vehicular and pedestrian entrances and other associated minor works which are similar to what is currently permitted as part of a more substantial development Reg Ref SD19A/0222
Permission is sought by Cleargate Limited for (1) retention of change of use from Cafe/Restaurant to wholesale outlet (25A - unit50sqm) (2) Retention of change of use of Cafe/restaurant to wholesale outlet (unit 25B - 63smq) and (3) Permission for change of use of cafe unit (unit 25 - 61sqm) to wholesale outlet and incorporation into Unit 25B at Fashion City, Ballymount Road Upper, Ballymount Road Upper, Ballymount Dublin 24.
Extension to rear.
Extension to rear.
Retention permission for development at 26 Tamarisk Park, Kilnamanagh, Dublin 24. The proposed development will consist of a single floor rear extension (34.4sqm) with 5 new rooflights and internal associated works for Living & Laundry room (15.7sqm) with WC (2.7 sqm) and bedroom (11.7sqm) with EN-Suite.
Replace condition 4 (stating a limit of 15 children) Ref. SD03A/0384 with a new limit of 32 children in sessional care in compliance with current ratios of floor area to number of children as set out in the childcare act 1991 (Early Years Service) Regulations 2016.
Partial dishing of kerb at vehicular entrance
Alterations and extension to the side and rear to include extra ground floor bedroom and bathroom.
The development seeking retention permission consists of the construction of a single-storey porch to the front of the house, alterations to existing vehicular entrance and the application of stone cladding to the front of the house at ground floor level. The development seeking permission for development consists of narrowing the existing opening to 3.5m.
Construction of 5 warehouse / logistics units (Units 1, 2 3, 4 and 6), Including ancillary office use and entrance / reception areas over two levels, with maximum heights of c. 17.09 metres and a combined total gross floor area (GFA) of 20,158sq.m; Each warehouse / logistics unit includes car parking to the front, and service yards, including HGV loading bays, to the rear of each unit; Signage zones are proposed for each unit; A total of 200 car parking spaces and 110 cycle spaces are provided for the 5 warehous2e / logistics units; Construction of 3 three storey own-door office buildings (Block SA, SB and SC) with maximum heights of c. 13.45 metres and a combined GFA of 4,194sq.m; Signage zones are proposed at the entrances to the buildings; A total of 77 car parking spaces, 50 cycle parking spaces and a bin storage area are provided for the proposed office buildings; Construction of a cafe/restaurant unit with a maximum height of c. 6.09 metres and a GFA of 213sq.m to be located in the south western section of the site; The proposal includes signage for the unit, associated outdoor seating and a bin store; 14 car parking spaces and 10 cycle spaces are provided for the cafe/restaurant unit; The proposal includes 5 ESB substation buildings; The development is to be accessed off Ballymount Avenue and Calmount Road and includes for alterations and upgrades to the public footpaths and road; The development provides for vehicular and service access points, associated internal access roads, circulation areas and footpaths; The proposal includes landscaping and planting, entrance signage, boundary treatments, lighting, PV panels, green roofs, underground foul and storm water drainage network, including connections to the foul and surface water drainage network on the public roads, attenuation areas and all associated site works and development.
Construction of single storey extension and porch to the front of existing dwelling comprising of living room.
Alterations to Unit 6 permitted under Reg. Ref.: SD22A/0099 The proposed alterations to the permitted Unit 6 are as follows: Internal alterations at the ground floor level of the permitted warehouse/logistics unit to provide additional ancillary staff welfare facilities, an ancillary trade counter and associated office and storage area, and an ancillary innovation area / testing room; Repositioning of Stair Core 2 at ground and first floor level and proposed extension to the ancillary office floorspace at first floor level, with an additional gross floor area of 110 sq.m; Provision of a first-floor mezzanine level of additional warehouse/logistics floorspace with a GFA of 1,180 sq.m, accessed by new stairs from ground floor level; Alterations to the permitted elevational treatment, including: Reconfiguration and additional glazing on the south-east, south-west and north-east elevations as a result of the proposed internal layout alterations; Removal of the office entrance on the south-east elevation and opaque glazing screen from the WC core on the south-west elevation; Alterations to the cladding arrangements and parapet levels on all elevations (no increase in permitted building height); Central repositioning of grade and dock loading doors on the north-west elevation; Additional entrance doors along the south-west elevation to align with the revised internal layout; Other associated alterations including to the landscaped areas and the extent of boundary fencing; Reconfiguration of the car parking layout, including provision of 3 no. additional parking spaces (40 no. spaces in total, including 2 no. accessible spaces and 8 no. EV charging car parking spaces); Provision of 6 no. additional EV charging spaces for delivery vans to the north of the unit within the service yard; All associated site development works. The proposed alterations result in an overall increase of 1,279 sq.m in the total GFA of the warehouse/logistics unit from 3,997 sq.m to 5,276 sq.m (including ancillary office, trade and staff welfare facilities).
2 new signs at site entrance featuring company logo; 5 new signs on building facade featuring company logo and name; 2 Totem signs featuring company logo and opening times etc; all associated site works.
Construct a single-storey extension to the front, and all ancillary works necessary to facilitate the development.
(1) Change of use of the existing ground floor (411sq.m) and first floor (401sq.m) levels from previously granted Showroom/Warehouse storage under Reg. Ref. S01A/0173 and further extended under Reg. Ref. SD02A/0514 to office use. (2) Modifications to the front facade comprising the replacement of the main entrance doors at ground floor level with glazing to match the existing, the installation of a new window to match existing at first floor level and new signage (2sq.m). (3) Modifications to the rear facade comprising the replacement of the existing roller shutter at ground floor level with fixed curtain wall glazing to match existing and the installation of new fixed louvres to match existing at first floor level.
Erect 775.46sq.m or 289.80 kWp of photovoltaic panels on the roof of storage building with all associated site works.
Change of existing ground floor office and workshop area to an additional storage area.
For widening of existing front vehicular entrance to 3.5m with gated access and associated dishing of kerbing. Works also include removal of existing boundary hedge with 1A The Rise and construction of 1.2m side boundary wall between the front gardens of the houses and all associated works
New rear dormer structure at attic level and conversion of the attic space to habitable space with ensuite
Retention of north-eastern boundary wall (height 1.3m), including a 1.57m wide pedestrian entrance
(i) The construction of two number four bedroomed detached houses with dormer structures and all associated works. The houses consist of living room, utility, kitchen, WC and store at ground floor, three bedrooms, WC and store at first floor bedroom/attic area with ensuite at dormer attic level. (ii) raising existing side boundary wall to 2m high up to main building line on the north east, construction of new boundary wall between two dwellings and new 3.5m wide front entrances to both dwellings. (iii) private amenity space, boundary treatment, landscaping, SuDS drainage and all ancillary works necessary to facilitate the development. (iv) removal of existing trees at south-east of the site and replanting of same species trees to the north-east (v) extending the public road and footpath to be taken in charge on Elmcastle Court and relocating existing public lighting pole at south-east of site.
The construction of a new single storey extension to the rear of existing truck and van test centre which will include the erection of a raised parapet and external cladding and external signage to the elevations and for all ancillary site works at Murphy's Truck Centre, Turnpike Road, Ballymount, Dublin 22.
Amendments to previous approved Planning Permission Ref. SD21A/0044 for part change of use to facilitate new coffee shop unit at ground floor and a school aged child care unit at part of first floor level, that will be used during primary school term, with area remaining for club activity use at all other times and all associated works.
Construction of a new two storey clubhouse (658sq.m); new external activity area (405sq.m); new boundary fencing for external activity area and all associated site works adjacent to existing all weather pitch.
Retention of 2 single storey extensions to the industrial use at Plant Area 2 including a 124sqm extension with a sliding door entrance and a sloping lean to roof to the east and a 34sqm extension with a rolling shutter and a sloping lean to roof at the south west; and all associated site works.
(i) Demolition of existing ancillary outbuildings and removal of front boundary treatment to Turnpike Road; (ii) alterations to existing single-storey cottage including demolition of existing front porch, partial demolition to the side/south of the original building, partial demolition of non-original rear extension and replacement of rear pitched roof with a flat roof; (iii) change of use of the cottage from residential to commercial use providing a reception area, coffee shop, multi-purpose studio, changing rooms and associated facilities; (iv) construction of 3 no. enclosed padel courts within 2 no. single-storey structures to the rear of existing cottage; (v) provision of 17 no. car parking spaces (including 1 no. accessible space), 15 no. bicycle parking spaces and refuse/storage facilities; (vi) provision of a new 6.0m wide vehicular entrance via Turnpike Road; and, (vii) all associated works, including new boundary treatments, landscaping, SuDS and drainage necessary to facilitate the development.'
Part two storey and part single storey extension to side and rear of dwelling with subsequent sub division of dwelling into 1 two storey, three bed dwelling (floor area 91.5sq.m) and 1 two storey four bed dwelling (floor area 152.30sq.m); re-instate front boundary wall incorporating 2 new vehicular entrances and associated site works.
Retention of 3 standalone coated steel prefabricated units comprising of 2 single storey prefabricated units (each c.31sq.m GFA) and associated entrance ramps used for canteen and welfare use respectively; 1 single storey prefabricated modular unit (c.199sq.m GFA) and associated entrance ramp used for office use; all site development works are proposed on a site of c.0.245ha.
Permission for retention for the application of external wall insulation on all facades of the dwelling, with indistinguishable rendered finish throughout all facades.
Single Storey to the rear. Demolition of existing garage, Alterations to boundary walls to the side and rear and all associated site works to existing dwelling house
Construction of new side dormer structure at attic level and conversion of the attic space to a bedroom and bathroom. The dormer structure allows for stair access and a functioning bedroom and bathroom with limited space available from the existing hipped roofed structure
Change of use of existing detached warehouse unit to vehicle service workshop including new internal works to from new staff canteen and toilet accommodation; new fire door exit doors; roller shutter door to existing elevations and attached illuminated building signage.
Demolition of the existing sunroom to rear and the construction of a single storey extension with garage to side and rear of existing house and a porch extension to front. New boundary wall to side. A first floor pitched roof extension with 2 rooflights, 2 dormer windows and the installation of solar panels on the South West facing roof.
The installation of 1No. Skylight and all associated works in the Roof