Newkey Homes (Kilmartin) Limited intends to make a planning application for planning permission to amend the car park layout permitted under P.A. Ref. FW22A/0169 that provided for a total of 157no. spaces for the Kilmartin Neighbourhood Centre on local centre lands to the north of the Tyrellstown Plaza Local Centre, east of Bellgree housing development and west of Hollywood Road, Hollywoodrath, Dublin 15. The amended car park layout arises from the site specific requirements of the proposed anchor-occupier of the development combined with the requirements of condition 13 of permission FW22A/0169 that requires the submission of a revised parking layout to include motorcycle parking spaces, Age Friendly parking spaces, EV and accessible car parking spaces. The amendments required result in revisions to the direction of circulation aisles, footpaths and pedestrian circulation routes, the positioning and orientation of the parking spaces (family and age friendly parking, accessible parking), ‘click and collect’ bays, the introduction of motorcycle parking (15 spaces) and all associated site development works including the relocation of permitted cycle parking spaces within the car park. The proposed amendments result in a reduction in the total number of car parking spaces from 157 to 152. The number of cycle parking spaces remains unchanged.
Minor amendments to existing planning approvals (FW16A/0181; FW18A/0103; FW19A/0212). The development shall consist of the provision of new vehicle & pedestrian entrance gates (to remain open during the adjoining school term hours) and associated fencing; amended external finishes; amended external entrance canopy; extended louvre screening at first floor level; and the retention of minor elevation adjustments, a revised fire escape stairs enclosure and a new retaining wall on the east boundary of the site.
The development consists of modifications to the development permitted under FW16A/0181 for the construction of a Place of Worship. The modifications consist of reconfiguration of the internal layout of the building at ground floor including the lobby area, bathrooms, family rooms and the addition of 3no. new staircores providing access to a new proposed balcony level within the building envelope. The balcony level will accommodated 457 seats along with storage and plant areas. The number of worshippers within the building will increase from c.744 to c.1201. There are minor modifications to external elevations to incorporate the new proposed balcony at 1st floor level and minor alterations to the internal road layout. The height of the building landscaping/boundary treatment, car parking provision and vehicular access point remain as permitted under FW16A/0181.
The development consists of the retention of existing single storey rear extension and front porch to Ground floor, and change of use of attic space to Office/Storage space to 2nd floor, with Rooflights to the rear and all associated ancillary site works required.
Attic conversion for storage with dormer window to the rear. Single-storey extension and first-floor extension to the rear. Two Velux windows to the front roof area. AI received 16/05/24 via portal
Permission for single storey extensions to side and rear and new velux roof windows in main roof at side and rear and associated site works.
New single storey home office/utility area/storage area to rear garden with associated site works.
The development will consist of: Attic conversion for storage with dormer window to the rear. Single - story extension to the front and rear, garage conversion for extended living. First-floor extension to the rear. Two New side bathroom windows.
The site is bound by a greenfield site to the north, Hollywood Road to the east, Tyrrelstown Local Centre to the south and existing residential development of Bellgree to the west. The proposed development will consist of the construction of; a Local Centre facility of 2-4 storey height equivalent (up to c. 12.2m) providing a primary retail unit with c. 1,877 sq.m net retail floorspace comprised of c. 1,707 sq.m convenience floorspace (including c. 134 sq.m ancillary off-licence sales area) and c. 170 sq.m comparison floorspace ancillary clothing sales area; back of house storage (BOH), staff facilities at first floor level, lobby and circulation areas (c. 1,527 sq.m); a service yard (c. 644.5 sq.m) and loading bay adjoining BOH area; 3 no. ground floor retail/ retail service units (c. 521 sq.m); cafe unit (c. 335 sq.m) and medical centre at first floor level (c. 750 sq.m). Car parking is provided at surface level to the rear of the Local Centre (157 no. car parking spaces including visitor, disabled, parent & child spaces, and EV spaces). Cycle parking is provided at surface level to the south, west, and north of the Local Centre comprising 76 no. spaces including standard spaces, staff parking, cargo spaces and electric charging stands. road improvement works to the Hollywood Road are proposed as part of the development including the upgrade of pedestrian crossings to the north, segregated pedestrian/ cyclist facilities, a new zebra crossing, 2 no. new bus stops, 3 no. public parking spaces, and taxi set down area. Main vehicular access will be provided through a proposed priority-controlled junction on Hollywood Road. The proposed development also includes for the provision of public realm to the south and landscaping throughout the site including future connection links; associated signage; plant at roof level; allowance for future PV installation at roof level; ESB substation located within the service yard; associated site servicing (water drainage and supply); and all associated site development works above and below ground. AI received 21/02/23 SAI received 07/03/23 CAI received 16/05/23
The development will consist of: i) the provision of 2 no. illuminated Tesco signs ( each sign 2 sqm in area) to the north and west elevations of the Neighbourhood Centre; and ii) the construction of a sheltered canopy ( c.35 sqm) in the car park for the purpose of providing 2 no. dedicated ''Click and Collect'' spaces together with signage and all ancillary site development works.
Construction of a single storey rear extension with apex roof and rooflights.
The development consists of modifications to the development permitted under FW16A/0181 for the construction of a Place of Worship. The modifications consist solely of the change of use of 5 no. ancillary community rooms (total 207m2) to education use. AI Rcvd 06/02/24
The retention of two number, single storey temporary classrooms with an ancillary sanitary and storage link, inclusive of access ramp and two covered bicycle stands, within the site of the existing place of worship and all associated external works, including a soft landscape planting plan for the whole of the site. All surface and foul drainage are connected into existing mains. All existing parking and accesses shall remain unaltered and are for use of the school 8am -5pm Monday to Friday and do not affect the operating hours of the place of worship. AI Rcvd 18/12/2024
The development will consist of the addition of the proposed external seating arrangement (30 seats) 38sqm, mobile planter dividers and outdoor umbrellas to the West of the site for the purpose of consumption of goods purchased at the premises. All outdoor furniture will be stored indoors within the unit overnight and during all non-operating hours.
The development consists of: Change of use from retail to a coffee shop/café for the consumption of food and beverages on and off the premises. New fascia signage with individual letters and the logo are to be illuminated. Installation of a bin store for use by the occupant of Unit 1 at the rear of the Lidl store, and an area for external mechanical plant. All associated works to complete the proposed development.
Change of use of retail unit No.2 to use as a pizza bakery with home delivery service and takeaway, new fascia signage (individual letters and the tile logo are to be internally lit. The signage panels will not be illuminated); external mechanical plant and new doors in gable wall for fire exit and refuse store. The proposed user will operate from 11am to midnight each day in contravention of condition 16 of FW18a/0117 which allows for trading up to 10pm each day. All associated works to complete the proposed development.
Permission for: Replacement of Garage roller shutter door with window and conversion of garage into new playroom, and all associated works.
The development consists of: Retention of 9 car parking spaces in addition to the 100 spaces permitted under PA Ref: FW18A/0117, relocation of 2 Electric Vehicle parking spaces; and, relocation of trolley bay to a canopy at the side of the foodstore.
Universal Developers LLC, intend to apply for a
The application site is located within an overall landholding bound to the south by the R121/Cruiserath Road, to the west by the R121/ Church Road and to the north by Cruiserath Drive. The proposed development comprises the provision of artificial lighting to the substation compound, transformers, and Gas Insulated Switchgear (GIS) building permitted under An Bord Pleanála ref: 30683420 and to the client control building permitted under An Bord Pleanála ref: PL06F.248544/ Fingal County Council Reg. Ref; FW17A/0025, along with all associated site and ancillary works.
Proposed extension of playground area to include revised boundary realignment and new vehicular access. Additional Information Lodged on 14th Jan 2020
Permission for the decarbonization by erecting a new single storey, free-standing energy centre, comprising biomass fuel store and enclosed plant room with flue, together measuring 70 sqm in area, and three open-air liquid petroleum gas tanks in a fenced enclosure; installing cowls on elevations of existing school to enable operation of new internal heat recovery units; replacing the existing windows to Tyrrelstown Community Centre and Tyrrelstown Educate Together National School, and the external doors to all existing buildings, with ones matching in appearance but improved in performance; fitting photovoltaic array on the roofs of the existing buildings, relocating two existing open-air bicycle shelters and erecting two new ones in front of Tyrrelstown Educate Together National School; and constructing a new metal fence to protect the existing soft landscaping along part of the western boundary of the site. The project will be carried out in conjunction with remediation of the existing buildings on the site. AI Rcvd 02/05/24
Planning permission to construct a two storey extension to the rear north eastern side of the existing property consisting of ground floor kitchen/first floor bedroom & replace utility window with a side entrance door, new first floor window at the north western side & associated site works. AI received 7/6/2023
Permission has been requested to convert the garden into a combination of storage space, an enclosed pergola, and a smaller garden.
The development will consist of the provision of a 63.18 kWp ground mounted solar PV array consisting of 108 no. 585 w PV panel modules with an approximate total PV area of 285 m2, together with all associated site works and services. This application is in regard to a site subject to an EPA Industrial Emissions License P1060-01.
The development consisting of/will consist of the retention and reconfiguration of the existing temporary car park (27 no. parking spaces ) located to the west side of the car park with associated drainage. The retention of 4 car parking spaces to the south of existing carpark. Planning permission for 2 new automated traffic barriers and removal of adjoining car spaces. planning permission to convert an existing temporary contractor's carpark to new 25 staff carpark spaces and a commercial vehicle set down area for 10 vehicles with associated landscaping lighting footpaths, and access stairs. Total car parking spaces 191 (existing car parking planning permission total 136 spaces) all on a site 5.03 hectares which forms part of a previously permitted Planning Ref. No. FW16A/0080 and FW15A/0038.
The construction of a medium voltage (MV) substation. The MV substation building will have a total gross floor area of c. 30 sq.m, and an overall height of c. 4 metres. The proposed development includes the provision of electrical connections associated with the MV substation, along with all associated hard and soft landscaping, services, and all ancillary works. All on a site with an area of 0.33 hectares. The application site is located to the south of the data storage facility permitted under An Bord Pleanála Reg. Ref. L06F.248544 / Fingal County Council Reg Ref. FW17A/0025, and within an overall landholding bound to the south by the R121/Cruiserath Road, to the west by the R121/Church Road and to the north by Cruiserath Drive.
Planning permission for conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs and 2 no. roof windows to the front.
To view details of this application please visit www.hollystown2shd.ie Submissions/observations to An Bord Pleanala, 64 Marlborough Street, Dublin 1 or online at www.pleanala.ie ABP 312271 A 10 year planning permission for a strategic housing development at a site of c. 25.3 ha at the townlands of Hollystown, Kilmartin, Hollywoodrath, Cruiserath, Yellow Walls, Powerstown, and Tyrrelstown, Dublin 15, which includes lands in the former Hollystown Golf Course and lands identified under the Kilmartin Local Area Plan 2013 (as extended). The lands are bound by the R121 and Hollywoodrath residential development to the east, the under construction Bellingsmore residential development to the south and north, the former Hollystown Golf Course to the north, Tyrrelstown Educate Together National School, St.Luke's National School and Tyrrelstown Community Centre to the west and south and the existing Tyrrelstown Local Centre to the south. The proposed development will consist of the development of 548 no. residential units, consisting of 147 apartments/duplexes and 401 houses, ranging in height from 2 to 5 storeys and including retail/café unit, 2 no. crèches, 1 no. Montessori, 1 no. community hub, car and bicycle parking, open space and public realm, over a site area of c. 25.3 ha, as follows: 1. On lands to the north of the application site (referred to as Sites 2 & 3) the proposed development includes for 428 no. houses and apartments comprising 27 No. 1-bed apartments, 97 No. 2-bed houses, 267 No. 3-bed houses and 37 No. 4-bed houses set out in 401 no. houses (373 no. 2-storey and 28 no. 3-storey) and 9 no. 3-storey apartment buildings (27 no.). A total of 792 no. car parking spaces will be provided for this part of the scheme, of these, 761 no. spaces will be provided for residents with 30 no. spaces provided as visitor parking and 1 no. space for disabled parking. In terms of bicycle parking, a total of 225 no. cycle parking spaces are provided, comprising 180 no. spaces for terraced units (located in 9 no. bike stores with 20 no. bikes in each) plus 45 no. spaces for the apartments. 2. On lands to the south of the application site and north of the Tyrrelstown Local Centre (referred to as Local Centre) the proposed development includes 120 no. apartment/duplex units in 4 no. blocks ranging in height from 3 to 5 storeys (32 no. 1 bedroom, 68 no. 2 bedroom and 20 no. 3 bedroom) all of which have balconies or terraces set out as follows: • Block A, is a 4 storey building, providing 12 no. units with proposed balconies, with a café/retail unit of 154sq.m and community hub of 144.5 sq.m proposed at ground floor. • Block B, is a 3-5 storey building, providing 34 no. units with proposed balconies and ground floor terraces. • Block C, is a 3-5 storey building, providing 44 no. units with proposed balconies and ground floor terraces. • Block D, is a 4 storey building, providing 30 no. units with proposed balconies and ground floor terraces, with a crèche of 500 sq.m with an external play space of 200 sq.m and a Montessori of 280.3 sq.m with an external play space of 185 sq.m proposed at ground floor. • External communal amenity space is provided at ground podiumterrace levels throughout the scheme. • A standalone 2-storey crèche unit is also provided of 529.6 sq.m with an external play space of 243 sq.m, to the south of the site. • Car Parking is provided in a mix of undercroft in Blocks B & C and at surface level with 108 spaces for residential use and 5 no. creche/Montessori staff spaces, 10 no. creche/Montessori set down spaces, 6 no. visitor spaces and 9 no. public spaces on the Link Street. A total of 300 no. bicycle parking spaces are proposed as part of the development comprising 230 no. long stay spaces for residents and 70 no. short stay spaces for both visitors and the non-residential activity. 3. Vehicular access to Sites 2 & 3 to the north of the application site is through the construction of a new vehicular entrance off Hollywoodrath Road (R121), a new footpath and cycle path along the northern and western side of the R121 along the site frontage extending south to the existing Toucan crossing facility over the R121, and provision of 2 no. new Toucan crossings on the R121 (c.0.53 ha) as well as via an extension to Hollystown Avenue link road south of the permitted Bellingsmore development. Vehicular access to the Local Centre to the south of the application site is via the existing access point along Hollystown Avenue and the north-south link route from the existing Tyrrelstown Local Centre which is partially completed and partially under construction. Pedestrian and cycle access is also provided along the R121, through existing roads within the application site and through the creation of a new pedestrian/cycle route to the north at the existing entrance to the clubhouse of the former Hollystown Golf Course. 4. The development of proposed Class 1 public open space of 2.77ha and Class 2 public open space of 1.69ha including pedestrian/cycle routes, seating areas, kick about area, playgrounds, dog park, associated landscaping works including planting, changes in level and boundary treatments. In addition 3.21 ha of linear park under the existing power lines and 2.11ha of ancillary linear open space which includes for SUDS and hedgerow features is provided in the scheme. The proposed Class 1 open space is provided as a north south pedestrian and cycle connection to the north an connecting the site to the Ratoath Road and the future Dublin GAA facilitites at this location. 5. The construction of a new foul outfall sewer, approx. 3km in length to connect to the existing 600mm diameter foul sewer to the south of Powerstown Road which will include decommissioning of the existing Pump House south of Hollystown Park. 6. The development will also provide for all associated ancillary site development infrastructure including landscaped areas and sustainable urban drainage systems under the existing ESB powerlines, and all associated ancillary site development infrastructure including: demolition of an existing shed, ESB sub-stations, public lighting, and foul and surface water drainage; internal roads & footpaths; landscaping; and all associated engineering and site works necessary to facilitate the development. The proposed scheme is designed to integrate with the previously permitted development at Bellinsgmore (Ref FW13A/0088/E1) which is currently under construction and recently permitted residential development on lands to the north east known as Site 1 (FCC Reg. Ref.: FW21A/0042). The application contains a statement setting out how the proposal will be consistent with the objectives of the Fingal County Development Plan 2017-2023 and the Kilmartin Local Area Plan 2013 (as extended). The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes the Fingal County Development Plan 2017-2023 and the Kilmartin Local Area Plan 2013 (as extended), other than in relation to the zoning of the land. An Environmental Impact Assessment Report has been prepared in respect of the proposed development. The application, together with an Environmental Impact Assessment Report, may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Fingal County Council. The application may also be inspected online at the following website set up by the applicant: www.hollystown2shd.ie
A ground floor extension to the side and rear of existing house for purposes of sessional use as a montessori pre-school.
Permission for ground floor extension to the side and rear of existing house for purposes of sessional use as a Montessori pre-school.
The diversion of an existing watercourse, (Powerstown Stream) into an existing drainage channel located adjacent to the north, west and east boundaries of the site. The diverted watercourse will incorporate the provision of a riparian zone (approx. 18-26 metres in width) and a series of swales and ponds. The proposed development will also comprise the provision of 3 No. pedestrian/cyclist bridges on the north, west and east site boundaries; hard and soft landscaping; boundary treatments; signage; changes in levels; and all associated site development works. The proposed development will enable the future development of the subject site. AI received 26/01/23
Conversion of existing second floor attic into a habitable space, to facilitate two new bedrooms and ensuite. Works will include alterations to existing first floor layout to facilitate new access stair and the installation of four new roof lights to the front elevation, six new roof lights to the rear elevation and one new window to the gable elevation. It is also proposed to widen the existing single gate to the side of the property to incorporate a new double gate and all associated site works.
The development will consist of: Retention of single-storey, flat-roof extension to the side of the existing dwelling. Additional Information Received 11/02/2026
Planning permission for the construction of a single-storey rear extension to include a dining room extension and family flat.
The development will consist of amendments and alterations to previously permitted 2-storey Biopharmaceutical Development and Manufacturing Building and ancillary development under Planning Reg. Reference Number FW23A/0342. The proposed development will comprise; (i) Alterations and amendments to the permitted Biopharmaceutical Development and Manufacturing Building facades, including re-arrangement of glazing, louvers and panels, and provision of new doors on all elevations; (ii) Modifications and alterations to stairs including re-arrangement of Stair 1 with reduction in building height from 18.3m to 15.5m; relocation of lift core of Stair 2 including reduction in building height from 18.3m to 15.5m; enclosure of external Stair 4 including modification in height to 18.5m and increase of floor area of approximately 101sq.m. (iii) New mezzanine floor to provide additional floor area of approximately 517sq.m and provision of new stair (stair 5) with increase of floor area by approximately 72sq.m; and provision of additional floor area of approximately 45sq.m at first floor. (iv) Alterations to roof plan with re-positioning of roof solar panels and vents, and the provision for additional roof vents and lighting rods. (v) Associated external works including alterations for re-alignment of high level pipe racks and adjustment to pedestrian canopies links between permitted buildings to provide for uncovered paved pedestrian access. This application relates to development which comprises an activity which holds an Industrial Emissions Directive Licence (Reg. No. P0552-03).
Permission for attic conversion including new dormer roof space to rear, new rooflights to front & removal of existing chimney.
Attic conversion including new dormer roof space to rear of existing house at 22 Wellview Park, Mulhuddart, Dublin 15.
Permission for amendments and alterations to the approved expansion of the existing Biopharmaceutical Manufacturing Campus granted planning permission under Fingal County Council planning references FW22A/0300 and FW23A/0230 at College Business and Technology Park, Blanchardstown, Dublin 15. The proposed development will comprise: (i) An amendment to the permitted Waste Management Facility to include; An increase the floor area of the permitted Waste Management Building from approved floor area of 155 sqm to 209 sqm and maximum height of 7.5 m; An increase in the fenced yard area of the approved Waste Management Yard from approximately 1,430 sqm to approximately 1,680 sqm; Associated works including re-positioned plant/equipment, additional chemical store cabinets, an enlargement of approved surface water attenuation tank, footpath adjustments to provide for an access ramp and changes to the approved landscape plan. (ii) An amendment to the permitted Chemical Material Store to reduce its floor area from the approved floor area of 1,220 sqm to 811 sqm and maximum height of 15.65m and to include within the chemical material yard associated plant / equipment, chemical storage cabinets, repositioning of the approved Regenerative Thermal Oxidiser (RTO) abatement unit, and provision of a new Electrical Control Room for the RTO with floor area of approximately 14.4 sqm and maximum height of 2.8m and repositioning of the approved pump house. This application relates to development which comprises an activity which holds an Industrial Emissions Directive Licence (Reg. No. P1030). The application relates to the provision of an establishment to which the Major Accident Regulations apply.
The proposed development will comprise of: (i) Construction of a liquid waste lift station building, for process wastewater, comprising of a floor area of approximately 63 sq.m, with a maximum height of approximately 6.2m, to include underground tank approximately 5,000 litre capacity, roof extract vents with a maximum height of approximately 7.6m, and associated high level pipe racks to a maximum of height of approximately 6.8m. (ii) Construction of a tanker loading area comprising of an overground tank approximately 50,000 litres capacity and bunded concrete apron comprising of an area of approximately 106 sq.m. The tank height will be approximately 5 m above established ground level and will have a diameter of approximately 4.5m. (iii) Installation of a modular electrical building comprising of approximately 40 sq.m, with a maximum height of 3.9m to provide for battery storage and associated equipment. (iv) Provision of solar photovoltaic panel canopy structure over existing car parking, comprising of a solar panel area of approximately 340 sq.m and maximum canopy height of approximately 3.9m. (v) All associated infrastructure including alterations to existing internal access routes to allow access to truck loading yard, provision of drainage infrastructure and all ancillary site and development works. This application relates to development which comprises an activity which holds an Industrial Emissions Directive Licence (Reg. No. P0552-03).
1. The construction of 580 no. residential units consisting of 468 no. houses and 112 no. apartment and duplex units, ranging from 1 to 3 no. storeys set out as follows: * 468 no. houses consisting of 232 no. 2-bed units, 186 no. 3-bed units and 50 no. 4-bed units * 112 no. apartments and duplexes consisting of 104 no. 1-bed units and 8 no. 3-bed units 2. A total of 892. car parking spaces will be provided for this scheme comprising 824 no. resident parking spaces and 68. visitor parking spaces and 2,234 no. cycle parking spaces will be provided for this scheme comprising 2,174 no. resident cycle parking spaces and 60 no. visitor cycle parking spaces 3. A total c.2.25ha Class 2 Open Space comprising 15% of the total developed area including pocket parks (including both formal and informal play area), fitness areas, sitting areas, kick-about and ecological regeneration areas. In addition, c. 1.86ha of linear park to the north located under existing ESB powerlines provides a linear open space connection to Sites 2&3 (as permitted under ABP Reg. Ref. 312271), Site 1 (as permitted under FCC Reg. Ref. FW21A/0042 and under construction) and to permitted Dublin GAA facility (FCC Reg. Ref. FW22A/00198). A further 2.41ha of open space is provided within the scheme comprising open space areas, drainage and hedgerow corridors that can not be considered Class 2 Open Space but provide ample open space areas 4. A total c. 2.55 ha of Open space is provided in c. 3.5HA park permitted under Hollystown Site 1 (FCC Reg. Ref. FW21a/0042) 5. A new pedestrian and cyclist facilities, future potential connections to lands to the west and proposed connections to Tyrrelstown Park as agreed with Fingal County Council. Principal vehicular access to the application site provided by the new road extension to 'The Avenue', and internal road network of Sites 2&3 to the east (as permitted under ABP Reg. Ref. 312271. The Application also provides vehicular access to the future potential school site to the south if required as indicated in Fingal Development Plan 2023-2029. 6. The proposed scheme is designed to integrate with recently constructed development at Bellingsmore (FCC Reg. Ref. FW13A/0088/E1), under construction development on Site 1 (FCC Reg. Ref. FW21a/0042) and permitted Strategic Housing Development on Sites 2&3 (permitted under ABP Reg. Ref. 312271) and completes the last phase of the Hollystown-Kilmartin lands in accordance with the Kilmartin Local Area Plan 2023 (now expired). An Environmental Impact Assessment Report has been prepared in respect of the proposed development.
The development will consist of the construction of a 5.51 metre high, single storey plant building with a total floor area of 214 sq./m and the provision of an extension to an existing structural steel pipe rack, part at a height of 5.95 & part at a height of 10.1 metres, located to the South of the proposed building, and associated site works. This application relates to development which comprises an activity which holds an Industrial Emissions Directive Licence (Reg. No. P0552-03).
EIAR NIS The development will consist of all site buildings and infrastructure required to support the new facility including; (a) A 2-storey Biopharmaceutical Development and Manufacturing Building sized approximately 11,670 square metres and approximately 15.5 metres high, with roof-mounted plant and equipment, including solar panels. (b) The refurbishment and extension of the existing 2-storey Laboratory, to include ground-mounted and roof-mounted plant and equipment, including solar panels and an extension to the existing plant room at roof level sized approximately 115 square metres and approximately 9.1 metres high. (c) A single story pedestrian and materials link sized approximately 420 square metres and approximately 7 metres high from the proposed Production Building to the existing Warehouse. (d) A single story pedestrian canopy from the proposed production building to the existing administration building, sized approximately 520 square metres and approximately 8.3 metres high. (e) A single storey pedestrian canopy from the proposed production building to the existing laboratory building, sized approximately 234 square metres and approximately 8.3 metres high. (f) Provision of new car parking spaces including an additional 185 car parking spaces, including accessible car parking spaces, electric vehicle charging, motorcycle parking, dedicated car-pooling spaces and cycle parking, all accessed from the R121. (g) Proposed site infrastructure includes bunded tanks, pipe-bridges, sprinkler and water tanks, surface water harvest tanks, docks and yard areas, including associated items of plant and equipment, heat-pumps, underground pumping facilities, internal roads and paths, fencing and site lighting, and the use of the existing BMS site entrances for heavy goods vehicles. (h) The development includes modifications to the existing internal road network. (i) Proposed new landscaping includes new landscaped and planted areas, modifications, replacement and reinforcement of the existing landscaping. (i) Proposed New Signage based at ground level and on the proposed building façade. (k) The works will include temporary contractor compounds including temporary construction cabins, temporary car parking and the temporary use of existing site entrance road (currently not in use) to the north of the site from the Cruiserath Road, during construction activities. (l) Proposed new surface water management infrastructure for the site, consisting of Sustainable Drainage features including a detention basin, rainwater harvest cisterns and distribution pipework. (m) Modifications to existing buildings in the Development and Manufacturing Campus including elevational alterations and modifications to the existing satellite administration, canteen and laboratory buildings to the south of the site, adjacent to the proposed development. (n) All Associated Site Works. The proposed development will be built in 2 phases, with phase 2 comprising of approximately half of the proposed administrative floor area and the proposed pedestrian canopies to the existing administration and laboratory buildings. This application consists of a development for an activity for which a licence under Part IV of the Environmental Protection Agency Act 1992 (as amended by the Protection of the Environment Act, 2003) is required. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) accompany this planning application, and they will be available for inspection or purchase at the office of the Planning Authority.
We, Glenveagh Homes Ltd, intend to apply for planning permission for development at this site of c.7.71 ha at Hollywoodrath Road (R121) in Hollystown Dublin 15. The site is bound by the R121 to the south and east with emerging residential areas of Hollywoodrath beyond the R121; existing residential areas of Redwood and The Oaks to the north and east; and the remaining former Hollystown Golf Course Lands to the west. The proposed development will consist of: 69 no. houses comprising 52 no. 2-storey houses and 17 no. 3-storey houses (13 no. 2-bed units, 39 no. 3-bed units, 17 no. 4-bed units), private open spaces (including terraces at first and second floor level), carports incorporated into the footprint of each dwelling (providing 125 no, parking spaces) that also accommodate bike storage (138 no. cycle spaces) and refuse storage, and all associated roads, services, visitor parking (13 no. car spaces and 8 no. cycle spaces), public open spaces (Class 2), changes in level, hard and soft landscaping and boundary treatments where required on a residential area of c.1.94 ha. The proposed development also includes: 1. The construction of a new foul outfall sewer (c.0.97 ha), approx. 3km in length to connect to the existing 600mm diameter foul sewer to the south of Powerstown Road which will include decommissioning of the existing Pump House south of Hollystown Park. 2. The construction of a new vehicular entrance off Hollywoodrath Road (R121), a new footpath and cycle path along the northern and western side of the R121 along the site frontage extending south to the existing Toucan crossing facility over the R121, and provision of 2 no. new Toucan crossings on the R121 (c.0.53 ha). 3. The development of proposed (Class 1) public open space including walking routes, seating areas, kick about area, playground, dog park, associated landscaping works including planting, changes in level and boundary treatments, and 10 no, public cycle parking spaces (c.3.5 ha). 4. The development of ancillary landscaped areas and sustainable urban drainage systems under the existing ESB powerlines (c.0.77 ha), and all associated ancillary site development infrastructure including: ESB sub-station, public lighting, and foul and surface water drainage; internal roads & footpaths; and all associated engineering and site works necessary to facilitate the development.
The development will consist of a 24 classroom Primary School extending to 2 storeys in height, with a Gross Floor Area of c. 4.232sq.m. The proposal primary school will also incorporate a 2 classroom special educational needs unit in addition to all ancillary pupil and teacher facilities including external hard and soft play areas and 2 no. ballcourts. The proposed building will incorporate photovoltaic panels on roofs with a bio mass heating unit also proposed. Vehicular access to the development is provided via a new access off Hollywoodrath Avenue along the northern site boundary. Bicycle parking, car parking and bus set down areas are provided within the site boundaries. A separate pedestrian/cyclist access is also proposed off Hollywoodrath Avenue, with a second pedestrian access proposed along the southern site boundary off Bay Meadows Avenue, also known as The Avenue. A new pedestrian crossing on Bay Meadows Avenue also forms part of the proposed development works. A non-vehicular access to the school, for use by emergency services only, is also provided along the southern site boundary. The proposed development also provides for an ESB sub-station in addition to all associated site development works including alterations to ground levels, on-site external lighting, landscaping and boundary treatment.
Permission is sought for the construction of
The proposed development is for a centralised waste yard which comprises a bunded and fenced enclosure with vehicular entrance & exit points, pedestrian access gate, a single storey waste storage building, a separate sheltered drum wash station, and associated site works & lighting. AI received 13/07/21
Planning permission sought for attic conversion to include two each roof windows to front and rear with relocated solar panels.
Planning permission is sought for development which will consist of: Change of use of an existing two storey premises from Community Spaces with outdoor area to the rear and office use only to Community Space with outdoor area to the rear, office use and small retail outlet only totalling 519 sqm.
The development will consist of