Showing 101-150 of 32,021 public recordsThe development consists of Demolition of the existing rear extension and shed. Construction of single storey extension with hipped and flat roof to side and rear; new porch; internal alterations and widening the existing vehicular access and all ancillary site works.
Planning permission for a mixed-use development that will consist of the demolition of the existing Swords Day Centre for Senior Citizens and the development of a mixed-use scheme of 121 no. residential units, 4 no. retail units, a Senior Citizens Centre and a commercial car park in a building up to 8 no. storeys above basement on a site of c. 0.56 hectares. The development will consist of: - Demolition of existing Swords Day Centre for Senior Citizens (399 sq.m.), existing ESB substation (34.5 sq.m.) and removal of existing surface car parking; - Construction of a part 2 no., part 8 no. storey mixed-use building in two 8 no. storey blocks above basement to include 121 no. apartments consisting of 56 no. one-bedroom apartments, 2 no. two-bedroom (3 person) apartments, 52 no. l two-bedroom apartments and 11 no. three-bedroom apartments; - Provision of setbacks at 2nd floor level on the south and east elevation, and at 7th floor level on the southern elevation; - Provision of 4 no. retail units at ground and first floor level (c. 255.3 sq.m.); - Provision of a new two-storey Senior Citizen Centre of c. 807 sq.m.; - Provision of a commercial car parking at basement and ground floor levels comprising 162 no. spaces; - Provision of 11 no. car parking spaces to serve the Senior Citizen's Centre and 59 no. car parking spaces for the residential development at first floor level; - Provision of 238 no. residential bicycle parking spaces (41 no. visitor spaces and 197 no. residential) as well as 15 no. additional bike stands along Forster Way; - Provision of c. 478 sq.m. of communal open space at 2nd floor level and c. 1,074 sq.m. at roof level (527 sq.m + 547 sq.m); - Apartment units will include balconies on the north, south, east and west facing elevations; - Provision of 3 no. vehicular access/egress points along Forster Way; - Provision of 1 no. double substation, plant and switch rooms at basement, ground and 1st floor level; - Provision of photovoltaic array and AOV at roof level; - All associated site development and landscaping/public realm works as well as revision to vehicle circulation necessary to facilitate the development. The proposal includes associated siting, boundary changes, boundary treatment and infrastructural works and site lighting within the area of the proposed development. The gross floor area of the proposed development is c. 16,350 sq.m. gross floor space (excluding basement of c. 3,952 sqm.)
Retention permission for a detached single storey shed/storage extension to side with ancillary works.
Planning permission for a 5-storey apartment building to rear of 47 Main Street, Swords, Co. Dublin ( a protected structure) comprising ground floor car & cycle parking bin stores, additional storage for residents, with two number one bed apartments on 1st and 2nd floor levels and one two bed apartment on 3rd floor level, 5 number apartments in total and a communal roof garden over at upper level and all associated on site works, accessed via existing vehicular entrance to the side of 47 Main Street, Swords, Co. Dublin. AI rcvd 23/11/2023
Change of use from Office to the ancillary area of a Restaurant which includes a preparation area, storeroom, cold rooms, staff changing area and toilets for use by the Restaurant Patrons.
( A Protected Structure) for the following works; new shopfront signage, repair works to the front facade, two new banking teller counters with security glass above, new internal freestanding ATM machine and meeting booth, new secured access gate and steel railing to match existing to rear wall, new paving to staff area to rear and all associated site works.
The development will consist of permission for a new single storey extension to the rear of the existing dwelling.
Erection of 21.5m2 of Solar PV panels fitted to south facing roof on the front elevation.
The development will consist of widening
Planning permission for change of use of restuarant to retail shop Unit 1A.
The construction of a 169sqm single-storey extension
Permission for change of use of existing the ground floor launderette to a retail off-licence & takeaway coffee hub, minor changes to internal layout, alterations to existing shop front signage and all other associated site works. Gross floor area of change of use 145m2.
The construction of a 1-bed infill residential development, new vehicular access, 1 no. within curtilage car parking space and all associated site development and engineering works necessary to facilitate the development. AI received 12/7/2022 AI deemed significant ** Revised public notices received 22/7/2022 CAI received 30/8/2022
Permission for modifications to external plant area to allow for refrigeration equipment upgrade.
For upgrade of the phone kiosk on the public footpath. The development will consist of the replacement of the existing telephone kiosk with a new telephone kiosk, with integral Communication Unit and a 1.53 sq. metre digital advertising display. The proposed structure has an overall height 2.43m, a dept of 0.762m and a width 1.096m.
The proposed development will consist of the construction of a first floor extension to the south east elevation of the existing 2 - storey semi detached dwelling. The proposed extension will comprise a new en-suite bedroom and all associated site works. The proposed development will create a 5-bedroom dwelling.
Permission for upgrade of the phone Kiosk on the public footpath at Main Street, Swords, Co. Dublin. The development will consist of the replacement of the existing telephone kiosk with a new telephone kiosk with integral Communication Unit and a 1.53 sq. metre digital advertising display. The proposed structure has an overall height 2.43m, a depth of 0.762m and a width 1.096m.
Retention permission for the subdivision of the restaurant from adjacent dwelling, and minor internal alterations. Additional Information Received 29/01/2026
Conversion of existing attic space to storage area, to include construction of dormer window and 2 no. velux rooflights to rear. Removal of hip end roof and gabling side elevation to accommodate same, and associated site works.
A new shop front & signage with replacement of two windows with new door & screen and ancillary site works
Permission is sought by Sandeep Mehta for the change of use
Planning permission is sought for change of use from a retail shop to café / restaurant, with allowance for the sale and consumption of hot and cold food on and off the premises, & allowance for delivery pick up from the premises, with new shop front & signage with replacement of two windows with new shop door & screen and ancillary site works. AI received 28/05/25
For retention permission for development site; 148 Carlton Court, Swords, Co. Dublin. The development will consist of: Retention of porch extension to front elevation.
The proposed development will consist of an eight storey hospital/healthcare facility (i.e. a seven storey over lower ground/undercroft level building) comprising main entrance/reception area, atrium winter garden, 1 no. café, 1 no. restaurant, 2 no. retail units, outpatients and diagnostics departments, GP departments and urgent care department all at ground floor level; out of hospital services/primary care at first and second floor levels; endoscopy unit and theatres at third floor level; theatre and building plant at fourth floor level; endoscopy unit and day hospital (20 beds) with staff hub at fifth floor level; day hospital (20 no. beds) with sky garden at sixth floor level; all with associated ancillary/common facilities and office/administration areas; FM department, water tank rooms, 115 no. car parking spaces, 72 no. bicycle spaces and 8 no. motorbike parking spaces all at lower ground floor level. Permission is also sought for an energy centre building; a service yard including plant, ESB substation and bin stores; 94 no. car parking spaces, 12 no. bicycle spaces and 2 no. motorbike spaces at surface level; foul pump station and associated works; 2 no. vehicular access roads to serve the development including works onto existing roundabout; landscaping; footpaths; public lighting; boundary treatments; and all associated site and engineering works necessary to facilitate the development. Add Info received 20th December 2019.
Change of use of existing convenience shop to include
Permission to install a detatched log cabin facing West at the rear of the garden measuring at 15sq.m and approx 2.7m high.
The development will consist of: (a) internal alterations to existing bar, lounge and associated staff and ancillary accommodation, all at first floor level. (b) external alterations to the existing façade on Chapel Lane and Foster Way on north and east elevations. (c) new external roof terrace as part of the roof of the existing building and first floor level creating partial enclosure with a retractable bespoke canopy roof. This area will be accessed by existing staircases internally and have toilets off the terrace area at first floor level. (d) This terrace at first floor level also has a bar, stores and seating areas with planting. (e) Also included are alterations to existing site drainage and mechanical ducting extraction and associated siteworks around the revised first floor layout, internally and at roof level to make it building regulations compliant.
The development will consist of (a) internal alterations to existing bar, lounge and associated staff and ancillary accommodation, all at ground floor level. (b) external alterations and refurbishment/replacement to the existing shop front surrounds, shutters and windows on Chapel Lane on north elevation. (c) minor external alterations to existing entrances on Main Street on west elevation to make these doors disabled accessible. (d) Also included are alterations to existing site drainage and mechanical ducting extraction and associated siteworks around the revised ground floor layout, internally and at roof level to make it building regulations compliant.
The development will consist of (a) internal alterations to existing bar, lounge and associated staff and ancillary accommodation, all at first floor level. (b) external alterations to the existing façade on Chapel Lane and Foster Way on north and east elevations which includes raising of the side boundary walls by 2.5m and including a new escape staircase to east elevation. (c) new roof terrace is being modelled as part of the roof of the new building creating partial enclosure with a retractable bespoke canopy roof. This area will be accessed by 2 staircases internally, one escape staircase externally and have toilets off the terrace garden area (48m2 area) at terrace/second floor level. (d) This terrace garden (245m2 area) at second floor level also has a bar, stores and seating areas with planting. (e) Also included are alterations to existing site drainage and mechanical ducting extraction and associated siteworks around the revised first floor and second floor terrace layout, internally and at roof level to make it building regulations compliant.
The development will consist of a) Internal alterations to existing bar, lounge and associated staff and ancillary accommodation, all at first floor level. b) External alterations to the existing facade on Chapel Lane and Foster Way on north and East elevations which includes raising of the side boundary walls by 2.5m and including a new escape staircase to east elevation. c) New roof terrace is being modelled as part of the roof of the new building creating partial enclosure with a retractable bespoke canopy roof. This area will be accessed by a 2 staircases internally, one escape staircase externally and have toilets off the terrace garden area (40m2 area) a terrace/second floor level. d) This terrace garden (225m2 area) at second floor level also has a bar, stores and seating areas with planting. e) Also included are alterations to existing site drainage and mechanical ducting extraction and associated siteworks around the revised first floor and second floor terrace layout, internally and at roof level to make it building regulations compliant. AI received 31/03/23
NIS Planning permission sought for a hotel development on lands at 76 Main Street, Swords, Glebe Swords. The site is also bound to the rear by Well Road. The proposed development will consist of the demolition of the existing 2 storey building and boundary walls to the south and west of the site, and removal of all associated sheds and structures within the site, and the construction of 1 no. new 5 storey building over basement level (part 3-storey and part 4-storey over a lower ground floor level) hotel building with balconies/terraces, comprising of: (a 1 no. 66-bedroom hotel at ground to 4th floor levels; (b) a licensed restaurant and back of house facilities at ground floor level with external dining areas; (c) a licensed bar at lower ground floor level and a licensed bar at basement level (2 licensed bars in total); (d) 14 no. car parking spaces, 32 no. bicycle parking spaces and 1 no. motorcycle parking space at basement level with plant, bin and bar stores, and 3 no. surface bicycle parking spaces; set down area on Main Street; (e) a new vehicular access from Well Road; (f) pedestrian access from Main Street and Well Road; (g) signage to the front and rear elevations, all along with hard and soft landscaping, boundary treatment, public lighting, and all associated site works necessary to facilitate the development. A Natura Impact Statement (NIS) has been prepared and is submitted to the planning authority with the application. AI received 24/06/24 SAI received 27/06/24
Permission for a 2.5m headframe extension to the existing 15 metre high telecommunications structure for the purposes of carrying antennae and communication dishes, along with ancillary lighting finial, (overall proposed height of main structure 17.5 metres) to be shared with multiple operators.
The development will consist of: (i) Construction of a residential development comprising a total of 24 no. units across 4 no. three storeys Apartment (Blocks 1-4). Each Block will contain 2 no.1-bedroom apartments and 4 no. 2-bedroom apartments; (ii) Private amenity space will be provided to serve each apartment unit in the form of a balcony/terrace; Communal open space to serve the proposed apartment blocks is provided to the South-West and North-West; (iii) New vehicular and pedestrian access to the site is proposed off Carlton Crescent to the North; (iv) provision of 13 no. car parking spaces, including 1 no. accessible parking space; (v) provision of a total 54 no. bicycle parking spaces, including 38 no. resident spaces and 16 no. visitor spaces; (vi) provision of internal access road and bin storage; (vii) all ancillary works inclusive of drainage, landscaping and boundary treatments necessary to facilitate the development.
A new standalone, four-storey hotel (3,376.5 square metres), comprising 104 bedrooms and ancillary services, including day café, toilets, reception, foyer, administrative and staff facilities, etc., over a two-level basement car park (1,915 square metres), providing 52 no. car parking spaces, and all associated landscaping, site works and services. Permission is also being sought for demolition of an existing, two storey, pitched roof building within the site, a former builders' providers outlet. The site is bounded to the north by a protected structure, The Old Borough Schoolhouse, a Wetherspoon's Public House, and to the south by a Colortrend Paint outlet. The site is also bounded to the west by the Well Road. The proposed hotel will be built to 'Passive-House' standards of construction and energy conservation. Upon completion, this will be Ireland's first Passive-House certified hotel.
Change of use from part of domestic storage building to a dog grooming salon 14m² with alterations to existing external door and window.
Permission is sought for the removal of part of Condition 1 of permission F18A/0754 - " This permission is for a period of 5 years only" for approved warehouse unit. We seek permission to maintain the warehouse unit permanently on lands within the Abco Kovex site, Swords Business Park, Swords, Co Dublin. AI received 04/12/23
Single storey extension to side and rear of property incorporating new flat roof, new windows and alterations to drainage.
Retention permission for block walls and floor slab currently at rear and planning permission to complete construction of single storey extension all to rear.
The development will consist of: (i) Construction of a residential development comprising a total of 8 no. terraced houses across 2 no.two-storey blocks (Blocks No.1. No.2), and an extension to the rear and partial demolition of the existing 3-bedroom house resulting in a 2-bedroom house, Block No.1 will contain 2 no. 3-bedroom houses and 3 no. 2-bedroom houses. Block No.2 will contain 2 no, 3-bedroom houses and 1 no. 2-bedroom house; (ii) communal open space; (iii) new pedestrian access from Dublin Road; (iv) provision of 18 no. car parking spaces, including 1 no. accessible parking space; (v) provision of a total 36 no. bicycle parking spaces including 32 no. resident spaces and 4 no. visitor spaces; (vi) provision of internal access road and bins stores; (vii) all ancillary works inclusive of drainage, landscaping and boundary treatments necessary to facilitate the development.
The conversion of an existing gym premises at first floor level of 32 to 36 Main Street, Swords to 3 no. apartments consisting of 2 x 2 bedroom apartments and 1 x 1 bedroom apartment. The development involves alterations to existing first floor windows and the construction of 3 no. Balconies, 2 overlooking Main Street and 1 overlooking River Mall. Add Info received 5th August 2020.
Temporary permission sought for a period of five years at Malahide Portmarnock Educate Together Secondary School. The development will consist of the provision of 3 no. ballcourts; a pedestrian and cycle access route running from a new gated access at the north-west corner of the existing school grounds to the existing gate at the southern boundary of the adjoining public open space (adjoining the Waterside development) with associated boundary fencing and public lighting; surface water drainage (including attenuation tank, filter drains, surface water sewer, manhole and headway); and all associated site development works above and below ground.
Demolition of existing single storey cottage (no. 46 Main Street) and an existing single storey extension to the rear of the existing book makers office (no. 48 Main Street); change of use of the remaining ground floor of no. 48 Main Street from book makers office to Cafe/Restaurant, with a further change of use of the first office area to cafe/restaurant associated facilities. Construction of a new two storey building comprising of a new book makers office and and extension of the proposed cafe/restaurant to ground floor with a cafe/restaurant with roof garden area to first floor. Also construction of a residential building to the rear of the site comprising of a three storey building with 3 no. one bed apartments and 2 no. two bed apartments (5 no. apartments in total), cycle parking areas, bin stores, landscaped areas and all associated site development works.
The demolition and removal of 4 no single storey sheds/ancillary residential buildings and 1 no. glass house, all located to the rear of the existing property.
The development will consist of; (i) demolition of 4 no. sheds/ancillary residential storage buildings and glass house; (ii) construction of 4 no. semi-detached single-storey, two bedroom dwellings to rear (east) of site each served by private garden to rear; (iii) revision of existing front garden vehicular parking area serving No. 51 Dublin Road to provide 2 no. separate vehicular parking areas (providing a total of 6 no. car parking spaces) and new front garden area for No. 51 Dublin Road; (iv) revision/relocation of existing northern vehicular entrance and provision of new pedestrian entrance - both to serve the proposed dwellings; (v) provision of new pedestrian/bicycle access lane to serve proposed dwellings via Dublin Road; (vi) provision of communal amenity space (900 sq.m) and bin storage area to serve the proposed dwellings; and, (vii) associated boundary treatment, landscaping, SUDS drainage and all other ancillary development works necessary to facilitate the development.
The developments will consist of (1) alterations to existing carpark to provide additional carparking spaces (2) Demolition of existing bin store with replacement bin store to be constructed (3) single storey extension to the rear of the existing school building to accommodate 1no. classroom and associated specialist ancillary rooms (4) minor amendments to existing classroom to facilitate access to extension (5) to connect to existing mains services (6) and all associated landscaping and ancillary works. AI Received 27/02/23.
Retention and continuation of use of a ground floor cabin
(i) Retention permission for 'Click and Collect' signage in the existing Tesco car park; and (ii) permission for the construction of a sheltered canopy (c. 50 sq.m.) in the existing car park for the purpose of providing 2 no. dedicated 'Click and Collect' spaces for the existing Tesco store, a pedestrian crossing and all associated site development works.
Intend to apply for permission and retention permission for development at a c. 0.0157 ha site in the car park of Tesco Holywell Centre. The development consists of: (i) retention permission for the relocation of the existing ''Click and Collect'' signage; (ii) planning permission to extend the existing canopy ( as permitted under Reg. Ref. F21A/0523) by c. 25.61 sq.m to provide a total of 3 no. sheltered ''Click and Collect'' car parking spaces for the existing Tesco store; and (iii) all associated site development works.
NIS The Proposed development will consist of the demolition of the existing structures on site and the construction of 8 no. apartment units (2 no. 1-bed and 6 no. 2 bed units) and 1 no. cafe/restaurant with associated outdoor terrace, within a three to four-storey building. All apartments will be provided with private balconies and communal open space at podium level. The development will also provide for a total of 7 no. car parking spaces, 32 no. bicycle parking spaces, bin store and plant room at under croft level with access via St Colmcille's Court, hard and soft landscaping; boundary treatment and all associated site works, necessary to facilitate the development. A Natural Impact Statement (NIS) has been prepared and is submitted to planning authority with the application. AI Rcvd 14/10/2024
Demolition of existing structures on site and construction of 20 no. apartment units (11 no 1-bed and 9 no. 2- beds), within a four to five storey block, over basement. All apartments will be provided with private balconies and communal open space. 12 no. car-park spaces and 24 no bicycle parking spaces will be provided at basement level with access via St. Colmcille's Court. The proposed development will also provide for associated hard and soft landscaping: boundary treatments and all associated site infrastructure and engineering works necessary to facilitate the development. A natura impact statement (NIS) has been prepared and is submitted to planning authority with the application.