The construction of a single storey sunroom extension onto the side of house and for the construction of a front door porch with minor alterations to window and door configuration on rear elevation and side elevation including ancillary works. Retention permission is also sought for the upgrading of existing septic tank and percolation area to a new onsite wastewater treatment unit and percolation area in accordance with EPA standards at adjoining lands to north of site for which the applicant has easements to carry out such worksDecision record indexed
Proposed 5 dwellings with associated works including proposed new main sewer to connect this development to the existing Ballycoogue wastewater treatment plant, and connection to watermains17 conditions indexed
Removal of existing septic tank and installation of a new wastewater treatment unit, a TER3 filter unit and 23sqm attenuation layer filter to current standards and including all associated worksDecision record indexed
Dwelling, rear extension and garage as built and permission for removal of existing septic tank, installation of new wastewater treatment unit and soil polishing filter, new site boundary and associate worksDecision record indexed
Permission for: (a) construction of a new agricultural entrance (b) demolition of existing 2 bay shed (c) construction of a machinery shed (d) construction of an agricultural shed comprising of cubicles and feeding area with underground slatted slurry storage tanks (e) construction of a silage pit and all associated siteworksDecision record indexed
Dwelling,garage, upgrade to existing entrance, bored well, effluent disposal systems to current EPA standards and all associated site worksGrounds not yet categorised
For a dwelling, garage, well, effluent treatment system, upgrading existing entrance & provision of a driveway & associated works. The site is accessed via existing right of way.Grounds not yet categorised
Single storey dwelling house, garage, wastewater treatment unit and percolation area, new domestic vehicular entrance onto the existing laneway and all associated site works13 conditions indexed
To demolish the existing 5m² porch & substandard 20m² outbuilding and erect a 90m² dormer extension to the rear along with minor alterations and revisions to the elevations and internal layout of the existing farmhouse and upgrade the existing on-site effluent disposal system to current EPA standards along with all site development worksDecision record indexed
Construction of a fully serviced dormer dwelling house with detached domestic garage and associated site works and new access drive to existing shared entranceDecision record indexed
Construction of a slatted cattle house/store, cattle handling facilities, farm roadway and farmyard entrance, together with associated concrete yards and site worksDecision record indexed
(A) The erection of an Independent Living Unit (granny flat), (B) Upgrading of existing sewerage treatment facilities to include a Bio-Crete Waste Water Treatment Plant with sand polishing filter to comply with EPA Code of Practice 2021 and (C) Ancillary site worksDecision record indexed
Construction of 3 no. digesters, 2 no. digestate storage structures, a liquid feed tank and 4 no. pump houses located in the northern section of the site. 4 no. pasteurisation tanks, a post pasteurisation cooling tank and a pre fertiliser manufacturing tank, located to the southeast of the digesters, in the centre of site. Part single-storey and part two-storey reception hall to accommodate a lab, panel room, tool store, workshop, and storage areas, with a liquid feed intake adjacent to reception hall, located at centre of site. Single-storey solid digestate storage & nutrient recovery building located to east of reception hall, in central portion of site. Odour abatement plant and all assoc. works. Construction of ESB substation, fuel storage tank, CNG compression unit, 2 no. CO2 tanks, CO2 loading pump, CO2 auxiliaries, CO2 liqueufactor, CO2 compressor, GFA, CO2 pre-treatment skid located in eastern portion of site. Construction of emergency biogas flare, biogas treatment skid, biogas compression system, biogas upgrading module, combined heat&power unit & panel room & H2S washing tower located in eastern part of site. Construction of grid offtake skid, biomethane boiler, grid injection unit & 2 no. propane tanks located to southeast of CO2 structures, in eastern section of site. Construction of two-storey office&admin building, located in southeast of site, adjacent to main site entrance. Associated works inc. parking, 3 no. EV, 1 no. accessible parking spaces;bike storage, access arrangements incl. new access point to site from adjacent road to south, weighbridge, provision of solar panels, wwt equipment, attenuation pond in northern portion of site, boundary treatments, lighting, services, lightning protection masts, drainage, landscaping & all assoc & ancillary works. EIAR submitted.Grounds not yet categorised