Of the development consisting of the existing 30metre high telecommunications monopole support structure carrying associated antennae and communication dishes, and associated telecommunications cabinets and equipment all enclosed in palisade fencing as previously granted under local authority reference 09845 at St Senan's Rugby Club, Tullyvarraga, Shannon, Co Clare. The development will continue to form part of Eir Ltd. existing and future telecommunications and broadband network.
To Extend the Appropriate Period of Planning Permission P14/573 for placement of a pay-to-use portable waste compactor for residual waste and food waste and a pay-to-use portable waste compactor for dry recyclables
To raise of the existing site level. Installation of a synthetic all weather training pitch. Erection of 3 no. 10m high flood lighting columns. 2.4m high fence with gates accessing the pitch. 3.6m high ball stop netting above the level of the pitch fencing. Relocating of existing localised foul and storm line and installation of underground drainage
To Extend the Appropriate Period of Planning for P16/301 for the Installation of a 2 Classroom Portacabin with toilet facilities including connection to public services and to erect new perimeter fencing on 2 sides of same and for RETENTION permission for the installation of existing Resource Room Portacabin on site including ancillary site works
The development will consist of the change of use of existing convenience shop to include part off-licence use (gross floor area for off-licence use 22 sq.m) and associated works
For development at the existing facility at Building 2, East Park, Smithstown, Shannon, Co Clare. The development will consist of: Installation of a 13MW solar photovoltaic system on the roofs of the Zimmer Biomet premises, along with the associated fixing and mounting systems. Installation of a battery energy storage system to comprise of 2 no. inverters and 2 no. 1.04MWh Batteries. Installation of a back-up generator. Installation of 2 no. transformers. All ancillary development including the construction of supporting concrete plinths, perimeter palisade fencing, electrical cabling, on-site drainage and the relocation of an existing storage unit
The development will consist of; (i) Construction of a new single storey Primary School (1,318m2), new internal road with set-down area and car parking, covered bicycle parking and entrance gate, new site boundaries, hard play area, landscaping and all associated site works on a site area of 1.94 acres, (ii) new site entrance from Bealach Bri, (iii) new bus set down, adjacent to new entrance, on Bealach Bri and associated road works at the junction of the proposed site entrance, (iv) Removal of 5no existing temporary prefabricated classrooms granted planning under 16/301 and RETENTION of pre-school modular cabin granted planning under 17/296
For works to the existing facility at Building 2, East Park, Shannon Industrial Estate, Shannon, Co. Clare. The proposed development consists of: -A two-storey manufacturing expansion 13m high with a footprint of 2168.125 m2 and an overall floor area of 4340 m2 over two floors located to the North and adjoining the existing facility. - The facility shall be clad in micro-rib external cladding to match existing and contain a single loading dock arrangement on its western elevation. - A single storey electrical room measuring 12m x 5m x 3m high constructed from block cavity construction and completed with a built up concrete flat roof shall be located on the eastern side and adjoining the new development. - A single storey metal clad steel structure to house new equipment measuring 12m x 7m x4m high and located on the northern elevation of the existing building adjoining the new development. - A new perimeter roadway extending into the existing northern fallow area. - All associated site works and temporary works
For the development which will consist of a 2 storey Community Care Centre, new vehicular entrance, ESB substation, roof mounted PV panels, associated signage (and potentially illuminated signage) and all associated siteworks
Of the erecting of 1,764.23 m2 or 370.83 kWp of photovoltaic panels on the existing two roofs of our buildings located east and south of our factory land, with all associates site works
To change the design of the dwelling granted under existing planning permission No. P18-630 on Site No. 1 of the development of 4 no. detached dwelling houses with individual entrances, wastewater treatment systems and soil polishing filters with all associated site works
Of internal alterations, fenestration changes and rear extension from what was previously granted under P18-630 together with all associated site development works and services
The development will consist of change of use from retail unit to a veterinary clinic at Unit 30 Skycourt Shopping Centre, Shannon and connection to all services
Of opening an entrance and hanging a farm gate
To construct a storage yard at Smithstown, Shannon, Co Clare. The purpose of the yard is to provide for material such as gravel and also to provide a display area for Walling and Patio materials
To RETAIN a new entrance, construction of a stoned entrance and the alteration of land levels
For works which shall consist of; an extension to the eastern elevation measuring 870m2 to contain new clean room and dispatch facilities, a two-storey extension to the northern elevation measuring 580m2 ground floor an 395m2 first floor to contain new staff welfare facilities, a single storey extension to the northern elevation measuring 640m2 to contain additional warehousing space, a new staff car park with 320 spaces shall be constructed to the north (rear) of the site and accessed by means of a new entrance. A separate new goods entrance shall be constructed to the front of the site to the east of the existing staff entrance. All site ancillary works including temporary relocated car park spaces and access to same
To construct an extension to the rear of the existing dwelling house along with ancillary site works
For a proposed solar farm development which is located across the townlands of Ballycunneen, Drumline, Ballycasey More, Clonmoney West, Firgrove, and Ardkyle, in County Clare. The development will consist of: • Linear arrays of solar PV panels on ground mounted steel supported structures with associated cabling and ducting (including underground cable grid connection to the Drumline 110kV substation); • 2 no. Horizontal Directional Drilling (HDD) locations associated with interconnecting cable routes; • 11 no. proposed single storey MV stations; • A co-located Battery Energy Storage System (BESS) installation (including 20 No. containers with cells and 5no. containers with PCS MV stations); • Site perimeter fencing; • Palisade double security gates at all temporary (3No.) and permanent (3 Nno.). site entrances; • Site access tracks including passing and turning bays; • On-site pole mounted CCTV cameras; • 2no. temporary construction compound/carpark/material storage areas with associated temporary site offices, parking areas and security fencing; • 8 no. steel storage containers; • 5 no. turning bays; • 3 no. temporary construction stage wheel wash systems; • Temporary soil storage areas; and • All associated and ancillary works. The proposed solar farm development spans a total site area measuring 98ha. Permission is sought for a period of 10 years with an operational period of 40 years. The total capacity of Solar PV on the site is estimated to be up to 60MW. The development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413). x YES NO If YES above, important to note that the planning application is subject to section 34D of the Planning and Development Act, 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply. An Appropriate Assessment Screening Report (AASR) and Natura Impact Statement (NIS) has been prepared for this development and submitted with this planning application
To Extend the Appropriate Period of Planning Permission Ref:P14/782 to construct dressingroom facilities, car parking, boundary fencing, entrance, floodlighting, to service proposed all weather facilities incorporating 400 metres running track, all weather training facilities and all associated site works
To construct a running track with ancillary track facilities, changing rooms, enlarged parking area, floodlighting and associated site works
For a motor vehicle valet centre to include tunnel and jet car wash, valet bays, customer waiting facilities, alteration to existing entrance, signage and all associated site development works
To alter the previously approved planning permission for two restaurant units (ref no. P18/486) by subdividing / reducing the area of the area of the originally approved restaurant (unit 1) and constructing a small extension to the rear to provide an additional take away unit. Together with associated elevational changes and site works at the former ESB Premises
To remove the headframe on the existing 12m high telecommunications lattice structure (overall height 14.4m) and extend the structure to an overall height of 20m together with the addition of telecommunications antenna, dishes and associated equipment
For development, the development will consist of an amendment to the permitted amalgamated retail unit as granted under Reg. Ref. No. 23/634 and will comprise the provision of an ancillary off - licence sales area of c. 95.1sq.m and all ancillary site services and site development works
For the amalgamation of units no. 40a (Dealz) and Units 37-40 (Formerly Iceland) to form one single retail unit in the Shannon Town Centre Shopping Centre. PERMISSION is being sought for the outlined as well as signage, internal demolition, and all associated site development works
Of existing single-story extension and wastewater treatment system. Planning permission is also being sought to demolish existing substandard conservatory, construct a single storey extension and a first-floor extension to include a balcony
To construct a detached toilet block facility on site for the use in association with the existing Chapel & Crematorium services and all ancillary site works
For the change of use from vacant office accommodation and ancillary facilities to student accommodation. The proposed scheme consists of the provision of 95 no. bedspaces for student accommodation purposes and ancillary common rooms, laundry facilities, toilet facilities, waste storage etc. 96 no. bike parking spaces are also proposed. Permission is sought for the development outlined herein as well as minor internal demolition and all associated site development works.
To retain air handling unit located to rear of building and 2 no. chiller units with shed located to side of building; and planning PERMISSION for generator located to rear of building, 5 no. chiller units with new shed to side of building, high level louvre panels to existing building and all ancillary site works
For an external plant compound enclosed with a security fence to include Air Conditioning Units with condensers and dedicated outdoor air system on existing roof plant area, Chillers, Thermal Storage Tanks, Pump house, Generators, Transformers, and all ancillary site works
For development consisting of: the amalgamation of unit A28, unit 51 and units 52-54, to form one large retail unit, and the construction of a new fire escape corridor through unit A28 out to the square.
For development which will consist of the installation of a compact modular substation and ancillary site development works; to facilitate 2 no. shared electric vehicle charging units and 4 no. charging bays and ancillary site works within a partially reconfigured parking area
For development at Ulster Bank, Unit A29, Skycourt Shopping Centre, Shannon Town Centre, Tullyvarraga, Shannon, Co Clare V14 T850. The development consists of shopfront alteration which comprise of: fitting of new branded signage (after removal of existing signage/ or over existing signage) onto existing shopfront, replacement of existing ATM with new ATM (location retained). 2 No. internally located digital marketing LED screens, to be viewed externally through the existing glazing. Minor internal alterations to existing front banking hall to consist of new internal SSBM / ATMs within a new room
For development which will consist of the reconstruction and change of use of Hastings Farmhouse, a protected structure, formerly a thatched, earthen-walled dwelling house, for community educational use, with bicycle parking, and connection of existing sewerage. The development will include the provision of a new 28 sq.m. services building, bin store and electrical cabinet adjacent
For development at this site located to the north of the Airport Road (R471) Tullyvarraga, Shannon, Co Clare. The development will consist of the construction of a single storey discount foodstore (to include off licence use) with a gross floor area 1,837 sq.m. (net retail area 1,336) and a 2 storey café /restaurant (c.350sq.m) with terrace fronting onto the Airport Road. The development includes the erection of 1 no. free standing double sided internally illuminated totem sign, 5 no. internally illuminated gable signs (all elevations), 1 no. internally illuminated, free standing entrance sign and 1 no. entrance glass sign. The proposed development will be served by 106 no. car parking spaces (including 5 disabled spaces and 2 electric vehicle spaces). Vehicular/pedestrian access to the site will be provided from a new distributor and internal road layout served by a new entrance from the R471. The proposed development includes the construction of a single storey ESB Substation, lighting, all landscaping (including boundary treatment), relocation of bus shelter (on Airport Road), and site development and drainage works on a site of c.1.04 hectares
For development which will consist of proposed roof-mounted photovoltaic, PV, panels on the existing profiled metal roof and alI associated siteworks
Of (i) change of use from office to retail and (ii) signage and the replacement of window with a door on the east elevation and ancillary site works
For change of use from office to a halal deli and retail, signage to east elevation, extractor vent to west elevation and ancillary site works
The construction of an extension consisting of new Reception / Visitors Centre, internal alterations, amendments to entrance hard landscaping & car-parking, signage to building, alterations to existing elevations and all associated site works
To relocate the existing temporary 'Polytunnel' structure to a new location within the site for a period of 5 years along with associated site works. The works are to take place within the curtilage of a protected structure (RPS No 664)
To extend existing covered process area with a 40m.sq. covered unit,
For development which will consist of proposed roof-mounted photovoltaic, PV, panels on the existing profiled metal roof and alI associated siteworks
For development which will consist of a new dwelling house, shed, site entrance & site access road, wastewater treatment system and associated site works
For 1) Construction of a new 540 m2 fully bunded sodium hypochlorite building with a 60 m2 lower mezzanine floor and 10 m2 upper mezzanine floor, including 2No. external underground brine storage tanks; 2) Construction of a new 102 m2 mezzanine floor extension to an existing storage area within an existing warehouse; 3) Construction of a new 32 m2 extension to an existing ESB substation on site; 4) Demolition of an existing internal ramped accessway and removal of 2 No. existing temporary containers off site; 5) All ancillary site development works and services to facilitate the development including drainage, external plant, external pipework to adjacent storage tank and utility connections. The proposed development site is controlled by an Industrial Emissions Licence (Register No. P0076-02) authorised by the Environmental Protection Agency.
Of the following: a) RETAIN existing 1st floor living area and rear storage shed. b) PERMISSION to extend the front wall of the house to enlarge existing bedrooms
For development: this application is an amendment to previously approved CCC ref. P24/60422. The development will consist of the installation of a c. 2.4 m high composite fence around the existing compact modular substation, and ancillary site development works
To RETAIN the development. The development consists of the constructed stand alone storage building and PERMISSION for development. The development consists of the construction of an extension to the main building for storage and associated site works
To extend the existing 30 metre high, free standing lattice communication structure by an additional 3 metres in height to allow for additional antennae, dishes and all ancillary equipment at ESB Telecoms Ltd Telecommunications Compound at ESB Drumline 110kV Substation
To alter, renovate and extend the existing cottage and to make alterations to the existing shed/outbuilding along with all associated site works, including a new domestic wastewater treatment system