Permission is sought for the following works a) to convert
The development will comprise of the completion of the Sentinel Building to provide for 110no. apartments. Particulars of the development will comprise as follows: • The provision of 22 no. 1 bed units, 60 no. 2bed units & 28 no. 3 bed units along with provision of associated residential communal spaces both at terrace roof level and within the building. Ancillary communal spaces at ground level within the building will include for a resident’s gym and resident’s lounge. • The provision of 2 no. additional floors on the existing 6 storey section of the existing Sentinel building. • The provision of associated internal works and elevational works to complete the building. • Provision of associated car parking and motorcycle parking at basement level. • Provision of electric vehicle charge points with associated site infrastructure ducting to provide charge points for residents. • Provision of associated bicycle storage facilities at basement level and bin storage facilities. • Provision of associated bicycle storage facilities at ground level. • Use of existing access from Blackthorn Drive. • Provision of an ESB substation at ground floor level. • All ancillary site development works to include for plant and works to facilitate foul, water and service networks for connection to the existing foul, water, and ESB networks. Website: https://www.thesentinellrd.com
5 year temporary permission for 1: installation of single storey lightweight aluminium frame building (total area 800sqm) for use as an electric vehicle preparation centre. To include dry valeting, Electric vehicle charging, handover bays, ancillary office and staff facilities. 2 Non illuminated building signage. 3 Installation of a seperate single storey lightweight aluminium frame building (total area 105sqm) for use as a wet valeting facility. 4 Rainwaterharvesting tanks (total capacity 36000 litres) and below ground silt and petrol interceptor and attenuation 5. 12 no. electric vehicle exterior charging points. 6 all associated site works.
Retention permission for extension of Mezzanine storage area from that previously granted under planning ref. D94A-0532 and all associated site works.
Permission for a strategic housing development, which will have a Gross Floor Area of 49,342 sqm m will principally consist of: the demolition of the existing structures on site and the provision of a Build-to-Rent residential development comprising 564 No. apartments (46 No. studio apartments, 205 No. one bed apartments, 295 No. two bed apartments and 18 No. three bed apartments) in 6 No. blocks as follows: Block A (144 No. apartments) is part 10 to part 11 No. storeys over basement; Block B (68 No. apartments) is 8 No. storeys over basement; Block C (33 No. apartments) is 5 No. storeys over lower ground; Block D (103 No. apartments) is part 16 to part 17 No. storeys over lower ground; Block E (48 No. apartments) is 10 No. storeys over semi-basement; and Block F (168 No. apartments) is 14 No. storeys over semi basement. The development provides resident amenity spaces (1,095 sqm) in Blocks A, C and D including concierge, gymnasium, lounges, games room and a panoramic function room at Roof Level of Block D; a creche (354 sqm); café (141 sqm); a pedestrian thoroughfare from Carmanhall Road to Blackthorn Drive also connecting into the boulevard at Rockbrook to the west; principal vehicular access off Carmanhall Road with servicing and bicycle access also provided off Blackthorn Drive; 285 No. car parking spaces (254 No. at basement level and 31 No. at ground level); 21 No. motorcycle spaces; set-down areas; bicycle parking; bin storage; boundary treatments; hard and soft landscaping; lighting; plant; ESB substations and switchrooms; sedum roofs; and all other associated site works above and below ground. The application contains a statement setting out how the proposal will be consistent with the objectives of the Dún Laoghaire - Rathdown County Development Plan 2016-2022.The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. An Environmental Impact Assessment Report has been prepared in respect of the proposed development. The application together with an Environmental Impact Assessment Report may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Dún Laoghaire - Rathdown County Council. The application may also be inspected online at the following website set up by the applicant: www.sandyfordcentralshd.ie.
Atlas GP Limited intend to apply for planning permission for a Large-Scale Residential Development at this site of c. 0.89 ha at the Former Avid Technology site, at the corner of Blackthorn Road and Carmanhall Road, Sandyford, Dublin 18. The development will consist of: 1) 183 no. apartments within four blocks ranging from 4 to 13 storey high over basement as follows: 25 no. studio units, 29 no. one-bed units, 54 no. two-bed units, 75 no. three-bed units All residential units are provided with private balconies / terraces. A creche of c. 337 sq.m. to be located in block D. Communal amenity space (internal) c. 379 sq.m. to be located in Block D (facing Carmanhall Road) Public communal space (internal) c. 351 sq.m. to be located in Block E. Landscaped communal and public open space as follows: 1215 sq.m. of public open space plaza in the courtyard at ground level, 384.49 sq.m. of communal open space and 186.51 sq.m creche play area at ground level and 583.02 sq.m of communal open space at roof level across all blocks. 2) The provision of car, motorcycle and bicycle parking as follows: 64 no. car parking spaces at basement level, 428 no. cycle spaces, 388 of which are long term at basement level and 40 no. short term spaces at ground floor, 4 no. motorbike spaces at basement level, Residential storage space at basement level. 3) Provision of a new vehicular entrance from Carmanhall Road and new vehicular egress onto Blackthorn Road. 4) Telecom mitigation measures to be included 6 no. 300 mm microwave link dishes mounted on 3 no. steel support poles affixed to ballast mounts at roof level on Block D. The development also includes lighting, plant space, site drainage works and all ancillary site development works above and below ground. The application may also be inspected at the following website set up by the applicant: www.carmanhallroadlrd.ie
The development consists of the retention of an external ventilation duct installed following the works undertaken as part of the previously granted permission D23A/0780.
Change of use from cafe to cafe with takeaway provision and associated internal modifications.
Development shall consist of 334 Build to Rent Residential Apartment Units within 4 No. apartment blocks and as follows: 79 No. Studio, 175 No. 1 bed, 80 No. 2 bed, All Residential units provided with private balconies/terraces to the north/south/east and west elevations, Creche 272 sqm., Residential amenity spaces 893 sqm. (including a unit of 146.5 sqm. open to the public, resident's gym, business centre, multipurpose room, staff facilities, multimedia/cinema room, shared working space, concierge and games room). Height ranging from 5 to 16 storeys (over basement). Landscaped communal space in the central courtyard. Provision of a new vehicular entrance from Carmanhall Road and egress to Blackthorn Road. Provision of pedestrian and cycle connections. 125 No. Car Parking, 6 No Motor Cycle Parking and 447 cycle spaces at ground floor/under croft and basement car park levels. Plant and telecoms mitigation structures at roof level. The development also includes 2 No. ESB substations, lighting, plant, storage, site drainage works and all ancillary site development works above and below ground. The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant Development Plan. The application contains a statement indicating why permission should be granted for the proposed development having regard to a consideration specified in Section 37 (2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. An Environmental Impact Assessment Report has been prepared in respect of the proposed development. Website: https://carmanhallroadshd2022.ie/
Permission for a strategic housing development consisting of: (i) construction of a Build-To-Rent residential development within a new part six, part eight, part nine, part eleven storey rising to a landmark seventeen storey over basement level apartment building (40,814sq.m) comprising 428 no. apartments (41 no. studio, 285 no. one-bedroom, 94 no. two-bedroom & 8 no. three-bedroom units) of which 413 no. apartments have access to private amenity space, in the form of a balcony or lawn/terrace, an d 15 no. apartments have access to a shared private roof terrace (142sq.m) at ninth floor level; all apartments have access to 2,600sq.m of communal amenity space, spread over a courtyard at first floor level and roof terraces at sixth, eighth and ninth floor levels, a 142sq.m resident’s childcare facility at ground floor level, 392sq.m of resident’s amenities, including concierge/meeting rooms, office/co-working space at ground floor level and a meeting/games room at first floor level, and 696sq.m of resident’s amenities/community infrastructure inclusive of cinema, gym, yoga studio, laundry and café/lounge at ground floor level. The café/lounge will primarily serve the residents of the development and will be open for community use on a weekly/sessional basis; provision of 145 no. vehicular parking spaces (including 8 no. mobility parking spaces, 2 no. club-car spaces and 44 no. electric charging spaces), 5 no. motorcycle parking spaces, bin stores, plant rooms, switch room and 2 no. ESB sub-stations all at ground floor level; provision of bicycle parking (752 no. spaces), plant and storage at basement level; permission is also sought for the removal of the existing vehicular entrance and construction of a replacement vehicular entrance in the north-western corner of the site off Carmanhall Road; provision of improvements to street frontages to adjoining public realm of Carmanhall Road & Blackthorn Road comprising an upgraded pedestrian footpath, new cycling infrastructure, an increased quantum of landscaping and street-planting, new street furniture inclusive of bins, benches and cycle parking facilities and the upgrading of the existing Carmanhall Road & Blackthorn Road junction through provision of a new uncontrolled pedestrian crossing; and, All ancillary works including provision of play equipment, boundary treatments, drainage works - including SuDS drainage, landscaping, lighting, rooftop telecommunications structure and all other associated site services, site infrastructure and site development works. The former Avid Technology International buildings were demolished on foot of Reg. Ref. D16A/0158 which also permitted a part-five rising to eight storey apartment building. The development approved under Reg. Ref. D16A/0158, and a subsequent part-seven rising to nine storey student accommodation development permitted under Reg. Ref. PL06D.303467, will be superseded by the proposed development. The application contains a statement setting out how the proposal will be consistent with the objectives of the Dún Laoghaire-Rathdown County Development Plan 2016- 2022 and the Sandyford Urban Framework Plan. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. An Environmental Impact Assessment Report has been prepared in respect of the proposed development. The application, together with the Environmental Impact Assessment Report, may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Dún Laoghaire-Rathdown County Council. The application may also be inspected online at the following website set up by the applicant: www.carmanhallroadshd.ie
Permission for temporary retention of development
Permission is sought for: 1. change of use from
The development will consist of the removal of chimney and modification of existing roof structure incorporating flat roof dormer to the rear with zinc external finish (dark in colour), removal of existing vertical tile cladding from first floor level on front elevation & installation of proposed external wall insulation with smooth render finish - neutral in colour.
1) the demolition of an existing two-storey warehouse/office building on the site (approximately 1,016 sq. m. GFA); 2) the construction of an up to nine storey aparthotel (approximately 7,424 sq. m. GFA) consisting of 122 no. suites (73 no. one bedroom and 49 no. two bedroom) with reception area, administration and back of house facilities, ancillary public areas service, plant areas, waste management areas and storage areas at ground floor, provision of 16 no. surface car parking spaces (including 2 no. disabled spaces) and 54 no. cycle parking spaces; and 3) all other site development works required to facilitate the development including the formation of an additional vehicle access onto Ballymoss Road and set down area in front of the building, ESB substation and switchroom, installation of PV panels on the roof, hard and soft landscaping, landscaped roof terraces on fifth and eighth floor level and public realm upgrades to Ballymoss Road including additional tree planting and crossings over the existing footpath.
Permission for development. The development will consist of: 1) the demolition of an existing two-storey warehouse/office building on the site (approximately 1,016 sq.m. GFA); 2) the construction of an up to nine storey aparthotel (approximately 7,424 sq. m GFA) consisting of 124 no. suites (75 no. one bedroom and 49 no. two bedroom) with associated ancillary support facilities at ground floor including café (83 sq. m. GFA), gymnasium (25 sq. m. GFA), multi-purpose room (26 sq. m. GFA), administration and back of house facilities over a single level basement providing 37 no. car parking spaces (including 2 no. disabled spaces), 36 no. cycle parking spaces, service and plant areas, waste management areas and storage areas; and 3) all other site development works required to facilitate the development including the formation of an additional vehicle access onto Ballymoss Road and set down area in front of the building. ESB substation and switch room, 14 no. surface cycle parking spaces, installation of PV panels on the roof, hard and soft landscaping, landscaped roof terraces on fifth and eighth floor level and public realm upgrades to Ballymoss Road including additional tree planting and crossings over the existing footpath.
Permission for the erection of new single storey hipped roof extension (area 33.28 sqmts) to front, side and rear of existing end of terrace dwelling to include living/kitchen area, bathroom, bedroom and the inclusion of 3 no. Velux roof lights to side elevation (north) and all associated site development works.
Construction of a rear extension, a roof dormer window and associated site works.
The development will consist of: a) the demolition of existing single storey monopitch glazed restaurant conservatory and smoking extension (38 m2) to front (north-west) of existing ground floor restaurant facing Ballymoss Road and replacement with construction of a larger (42 m2) single storey, monopitch glazed restaurant conservatory and smoking area extension to front (north-west) of building. b) Relocation of existing self-illuminating wall mounted entrance sign in existing smoking area to corner of proposed front (north-west) elevation of new conservatory. c) All associated site works and drainage. All of the above at the existing 11 storey apartment building (including basement) known as The Forum.
Construction of proposed entrance canopy, Entrance lobby, three mainstream classrooms with associated toilets, linking corridor circulation, two special education needs classrooms and associated quiet spaces, toilets for independent use, central activity space with daily living skills area, storage, sensoray room, secure lobby, SEN Office, universal access toilet, SEN two staff toilets, alterations to existing existing school consisting of alterations to classroom windows, removal of one tree and part existing hedge in order to form SEN pupil & fire brigade access to building. Also the creation of six additional parking spaces including one disabled parking space and installation of attenuation with infiltration tank.
The proposal is for the construction of two no. single storey pavilion buildings to the west and east of the existing single storey retail and café building. Pavilion building A is for A café / restaurant (GFA of c. 139 sq.m) and Pavilion building B is for a Class 1 shop use (GFA of c. 139 sq.m). The proposal includes signage zones for each unit, associated outdoor seating / terrace area, green roofs, cycle parking and all associated site works. The proposed development supersedes the development permitted under Reg. Ref.: D18A/1080.
Permission for the construction of five terraced three bedrooms dwellings with accommodation at ground, first and second floor levels (including private terraces to the rear at second floor level); 10 No. car parking spaces; revised vehicular and pedestrian entrance onto Leopardstown Road serving the new development; all associated boundary, landscaping and site development works at the rear of the existing dwelling which is to be retained.
Permission for a strategic housing development consisting of the construction of 112 No. Build to Rent Apartments (72 No. one-bedroom apartments; and 40 No. two-bedroom apartments) arranged in 2 No. Apartment Blocks. Block A is principally 4 No. stories in height with a 6 No. storey element, Block B is principally 4 No. stories in height with a 5 No. storey element. This includes c.320 sqm of residential amenity space in 2 No. dedicated spaces located in the Ground Floor of Blocks A and B, together with: post and parcel storage facilities; waste storage facilities; 144 No. secure bicycle parking spaces; and, 1 No. external ESB substation/ switch room (c. 27 sqm). The development will also consist of the provision of: private open spaces (including balconies), communal and public open space areas (including the creation of a public pedestrian link between Leopardstown Road to the north, via the proposed development, to an existing area of open space at Leopardstown Heights south); a communal courtyard and play area; 51 No. car parking spaces and 32 No. external bicycle parking spaces; 2 No. motorbike spaces; boundary treatments and street lighting; the provision of Sustainable Urban Drainage systems (SuDS); changes in levels across the site and associated site excavation works; hard and soft landscaping works; and, all other works and services necessary, above and below ground, to facilitate the construction and operation of the proposed development. The development will also be served by an upgraded vehicular and pedestrian entrance from Leopardstown Road. The application contains a statement setting out how the proposal will be consistent with the objectives of the Dún Laoghaire-Rathdown County Development Plan 2016-2022. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. The application may be inspected, or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and South Dublin County Council. The application may also be inspected online at the following website set up by the applicant: www.rocklawnshd.ie
Permission for the erection of new signage at Sandyford Central Café, Sandyford Central, Sandyford, Co. Dublin, D18WN5V
Permission for development on a 1.37 hectare site. The development will consist of: 1) the demolition of the existing office/warehouse building on the site (approximately 3,150 sq.m. (gross)); 2) the construction of a 27,751 sq.m. (gross) development over a single level basement comprising 4 no. six storey buildings: Block A - 6,185 sq.m. (gross) offices; Block B - 6,185 sq.m. (gross) offices; Block C - 6,185 sq.m. (gross) offices; Block D - 9,170 sq.m. (gross) (9,004 sq.m. offices and a 166 sq.m. cafe at ground floor); a 11,048 sq.m. a single level basement providing 277 no. car parking spaces, 168 no. bicycle parking spaces, staff changing/shower/toilet areas, service and plant areas, waste management areas and storage areas; 3) the construction of a vehicular access to the site on Arena Road; 4) the provision of a public plaza incorporating soft and hard landscaping and water features and 80 no. cycle parking spaces; 5) and all other associated site works required to facilitate the proposed development including a 26sq.m. electricity substation and switch room building.
The development will consist of the removal of the existing single-storey double garage structure at the side of the existing two-storey apartment building and the construction of a new link structure containing a common stairwell and a new two-storey apartment building c/w a pitched roof.
The development will consist of (a) The removal of the existing single storey double garage structure at the side of the existing two-storey apartment block with attic floor level (b) the extension of an existing apartment block, with the addition of 4 extra apartments units, including the construction of a new link structure containing a common stairwell and a new two-storey apartment block with attic floor level c/w a pitched roof at 11/12 Greenlands, Sandyford, Dublin 16. (Consequent on the Grant of Outline Permission Reg ref: D24A/0303/WEB)
The development will consist of (a) The removal of the existing single storey double garage structure at the side of the existing two-storey apartment block with attic floor level (b) the extension of an existing apartment block, with the addition of 4 extra apartments units, including the construction of a new link structure containing a common stairwell and a new two-storey apartment block with attic floor level c/w a pitched roof.
The proposed development will consist of a hotel development consisting of the: demolition of the existing 1 and part-2 storey building (c. 729 sq m); development of a 5-8 No. storey (with setbacks) (excluding roof access areas and roof plant) building to provide a hotel (162 No. bedrooms and related ancillary hotel facilities including reception area, lobby, public bar, licenced restaurant, kitchen, cold room, storage areas, administration and staff facilities, plant, refuse area and bicycle parking area)) with a total new build gross floor of c. 7,099 sq m (excluding c. 20 sq m ESB substation and switchroom); associated lighting; pedestrian, bicycle and vehicular access/egress via Arkle Road; bicycle parking; Sustainable Urban Drainage systems (including green / blue roofs and attenuation tanks); plant and switch rooms; roof-mounted photovoltaic panels, roof plant and associated screening; roofed bin store; associated hard and soft landscaping; and all other associated site excavation, infrastructural and site development works above and below ground including changes in level, boundary treatments and associated site servicing (foul and surface water drainage and water supply). The development will also include the following works to Arkle Road: alterations to the existing pedestrian, bicycle and vehicular access/egress point and the creation of a new access / egress point; removal of public car parking spaces and the provision of a taxi drop-off and servicing area; hard and soft landscaping upgrade works to the public realm; and a services connection from the site to existing connection in the public road.
Permission for a strategic housing development consisting of the demolition of the existing building on site and the construction a ‘Build to Rent’ (BTR) apartment development. This will consist of 2 no. blocks ranging in height up to 15 storeys (over single level basement) along with a single storey kiosk building. The development will comprise 190 no. apartments (92 no. 1-beds, 86 no. 2-beds & 12 no. 3-beds). All residential units provided with private balconies/terraces to the north/south/east/west elevations. The BTR development will also include Resident Support Facilities & Resident Services & Amenities (total floor area c.594 sq.m) including concierge, management area, co working/meeting rooms, multipurpose rooms, relaxation/ sitting areas, parcel area, and resident’s pavilion and bicycle service station. Block 1 will also include a commercial office area, over two floors measuring c.518 sq.m. Block 2 will include a restaurant (c.232 sq.m) and a gym (c.163.5sq.m) accessible to the general public. A café kiosk of c.25 sq.m will be provided on the plaza. Provision of 59 no. car parking spaces in the basement and 474 no. cycle parking spaces at basement/surface level.. Vehicular/pedestrian/cyclist access from Ballymoss Road. A new public plaza will be provided fronting onto Blackthorn Avenue. Communal open space will also be provided at ground and roof levels. All associated site development works, landscaping, boundary treatments, plant areas, waste management areas, cycle parking areas, and services provision (including ESB substations). The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant Dun Laoghaire Rathdown County Development Plan 2016-2022. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. The application may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Dun Laoghaire Rathdown County Council. The application may also be inspected online at the following website set up by the applicant: https://www.siemenssiteshd.ie
Permission for a strategic housing development consisting of the demolition of the existing building on site and the construction a ‘Build to Rent’ (BTR) apartment development. This will consist of 2 no. blocks ranging in height up to 15 storeys (over single level basement) along with a single storey kiosk building. The development will comprise 190 no. apartments (92 no. 1-beds, 86 no. 2-beds & 12 no. 3-beds). All residential units provided with private balconies/terraces to the north/south/east/west elevations. The BTR development will also include Resident Support Facilities & Resident Services & Amenities (total floor area c.594 sq.m) including concierge, management area, co working/meeting rooms, multipurpose rooms, relaxation/ sitting areas, parcel area, and resident’s pavilion and bicycle service station. Block 1 will also include a commercial office area, over two floors measuring c.518 sq.m. Block 2 will include a restaurant (c.232 sq.m) and a gym (c.163.5sq.m) accessible to the general public. A café kiosk of c.25 sq.m will be provided on the plaza. Provision of 59 no. car parking spaces in the basement and 474 no. cycle parking spaces at basement/surface level.. Vehicular/pedestrian/cyclist access from Ballymoss Road. A new public plaza will be provided fronting onto Blackthorn Avenue. Communal open space will also be provided at ground and roof levels. All associated site development works, landscaping, boundary treatments, plant areas, waste management areas, cycle parking areas, and services provision (including ESB substations). The application contains a statement setting out how the proposal will be consistent with the objectives of the relevant Dun Laoghaire Rathdown County Development Plan 2016-2022. The application contains a statement indicating why permission should be granted for the proposed development, having regard to a consideration specified in section 37(2)(b) of the Planning and Development Act, 2000, as amended, notwithstanding that the proposed development materially contravenes a relevant development plan or local area plan other than in relation to the zoning of the land. The application may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy, during public opening hours at the offices of An Bord Pleanála and Dun Laoghaire Rathdown County Council. The application may also be inspected online at the following website set up by the applicant: https://www.siemenssiteshd.ie
Permission for: Installation on the southern (side) facade
Permission for development to comprise the construction
Permission for development to comprise the construction
Retention permission for a new open aluminium glazed canopy structure at ground floor level to the east side and the rear of the existing house.
(a) GAA Skills training wall consisting of 3 no. 5m high pre cast concrete skills walls, Wall 1 =33.5 Wall 2=19.1m & Wall 3 = 46.9m (total length =99.5m) constructed at the south end of the existing clubhouse (b) Extend/enlarge the existing astro pitch area by 876sqm and install a 5m high net/fence to the infill areas. (c) Relocated 4 no. existing flood lights and all associated site development works.
Attic conversion with dormer to rear roof to accomodate stairs to allow conversion of attic into non habitable storage space with roof windows to front roof, all with associated ancillary works.
2 No. additional surface car parking spaces within the existing parking area and associated site works.
Permission is sought for demolition
The proposed development will consist of the construction of a ground floor and first floor extension to the rear with hipped roof.
Retention permission for (i) new first-floor area
Internal alterations to the layout of the existing building together with external alterations and extension of the existing building. The proposed internal and external alterations to the building will facilitate its continued existing Educational use (as permitted in D08A/1075) but as a Dental Educational Centre that will include an ancillary dental clinic for patient treatment/practical work/training to be carried out by dental students in a supervised setting. External alterations to the existing building include: the removal of 2no. ground floor windows to the eastern elevation and replacing it with a door and a louvered screen, replacing existing ground floor windows to the northern elevation with new windows, and removal and blocking up of windows at ground floor to southern elevation. Works of extending the existing building include: The provision of a single storey extension to the north-western corner of the existing building (with balcony/roof terrace above it) to provide a revised entrance lobby to the building, the erection of a new attached external plant room (approx 135 sq.m) and associated loading/service area to the south of the existing building together with associated soft landscaping works. Other works include the removal of an existing bicyle shelter to the south of the building and the provision of a new single-storey, detached bicycle storeroom (approc 38.5 sq.m) with capacity to store 40 no. bicycles to the north of the existing building together with the provision of 20 no. short term bicycle storage spaces (10 no. Sheffield stands). Erection of a new single storey, detached refuse/bin store (approximately 26 sq.m) to the south of the building. The proposed works will result in a reduction of ancillary on-site car parking provision from 46 no. existing car parking spaces to 22 no. car parking spaces (including 4 no. Universally Designed EV parking/charging bays and 2 no. disabled spaces). Provision is also made for 2 no. motorcycle spaces.
The development seeking permission will consist of the construction of a dormer window in the main roof to the rear of the house, the construction of a rooflight in the main roof to the front of the house as well as the construction of a part single-storey, part two-storey extension to the front of the house and all associated site works.
Planning permission for the proposed change of house type to that granted under planning ref D19A/0083, these changes include reducing the front two storey section of proposed, revised front porch design, proposed new window and brick finish to front elevation, enlarging the proposed floor area from 146 sqm to 176.5 sqm, new flat roof study to north west of proposed dwelling, internal changes to ground and first floor plans, revised and new windows to proposed elevations, new flat roof section to east of proposed dwelling and associate works at the site between.
Full permission for the proposed revision and relocation
Permission for the construction of a new two storey detached dwelling house with additional habitable space within the roof. Works at roof level will include a dormer window facing Bearna Park to the rear, solar panels and four Velux roof lights. There will be car parking for two vehicles within the site. The development will also include all associated site development, drainage and landscaping works.
Permission is sought or the demolition of a garage
Proposed development will consist of conversion of existing garage to office at ground floor. Replacement of existing garage door with a new bay window to match existing at ground floor level to front (southwest) elevation. Roof canopy over the existing bay window will be extended to cover both existing and new bay window at ground floor level to the front (southwest) elevation. Retention of existing single storey ground floor conservatory located to the rear of existing dwelling to the northeast elevation inclusive of all associated site works.
Proposed attic roof space conversion with dormer roof window to rear part of roof and stairwell frosted glazed window to side gable wall facade with all associated internal and external alterations to dwelling house.
Permission for the following works
Change of use from restaurant to rejuvenation centre and spa with overnight stays.