To construct new dual sided, sports-wall training area
To construct a new dwelling house and garage complete with a new entrance, sewage treatment system and ancillary works
Of existing extension and alterations to P07/173
To construct new dwelling, utilising existing site entrance and using existing sewer connections, including all ancillary site works
To carry out the following development: Restoration and alterations within the existing stable block courtyard to support tourism development including: 1) A café, 2) Indoor and outdoor dining area 3) Kitchen, 4) Office 5) Signage 6) Welfare facilities, 7) associated ancillary services. The stable block is a protected structure RPS No.: 876 NIAH no.: 20301212 and is within the demesne of Kilrush House/ Vandeleur Estate RPS No.: 873 NIAH No.: 20301212 as noted in the Clare County Development Plan 2017-2023 (as varied) Volume 4. In accordance with the Habitats Directive, Appropriate Assessment Screening has been carried out on the project. An Environmental Impact Assessment (EIA) screening determination has been made and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development
To retain and complete restoration and alterations to the existing stable block to support tourism development to include: new double door ope and double doors in existing stone wall with new external steps to access new ESB meter room and to carry out all associated and ancillary site works to facilitate the proposed development at the above address. The stable block is a protected structure RPS No.: 876 NIAH No.: 20301212K27 and is within the demesne of Kilrush House/ Vandeleur Estate RPS No.: 873 NIAH No.: 20301212 as noted in the Clare County Development Plan 2023-2029 Volume 4
To carry out the following development: Restoration and additions to existing Walled Garden and Gardener's Yard. The proposed development will include: a) The construction of a new wall and entrance gates to the existing Gardener's Yard. b) The installation of a prefabricated storage container in the existing Gardner's Yard. c) The demolition and rebuilding of the existing greenhouse in the Walled Garden. d) All ancillary site works. In accordance with the Habitats Directive, Appropriate Assessment Screening has been carried out on this project. An Environmental Impact Assessment (EIA) screening determnation has been made and concludes that there is no real liklihood of significant effects on the environment arising from the proposed development and and EIA is not required. This development proposes works adjacent to the exterior of a protected structure, RPSs No: 876 NIAH No: 20301212K27 which would materially affect the character of a protected structure. The development is also within the demesne of Kilrush House/ Vandeleur Estate RPS No: 873 NIAH No: 20301212 as noted in the Clare County Development Plan 2023-2029 Volume 4
To erect dwelling house, garage, foul sewer treatment plant, percolation area and new site entrance
To construct new bay window and porch to front elevation
To construct a slatted beef house with an underground slurry tank with internal and external feeding passages
For a machinery/storage shed & planning PERMISSION to construct a slatted shed incorporating a calf creep along with all associated works
To construct bay window to the front of existing dwellinghouse plus all ancillary site works
For development of a Livestock Slatted unit with calving pen and associated ancillary siteworks
For development of a livestock slatted unit with associated ancillary site works
Of the following development: (a) alterations to the existing dwelling house; (b) conversion of shed to use as part of house, including connection to the house; (c) construction of new shed to rear; (d) all associated site works and services
To demolish existing shed at rear of house and construct new single storey extension to rear of dwelling
Of as-constructed ground floor bay window and PERMISSION for alterations to first floor windows on front elevation
To demolish part of the existing dwelling house and to construct an annex extension to the dwelling house to include minor elevational changes and the upgrade of the existing wastewater treatment system along with all other associated site works and services.
For the construction of a Dwellinghouse, new entrance and connection to public services including ancillary site works
To construct a dwelling house, garage, access road linking to an existing private entrance onto the public road, new sewerage treatment system and percolation area along with all other necessary ancillary works
Of remedial works carried out to date on the protected structure ( RPS No 881, a disused estate cottage ) with a view to making it a habitable structure at Wilson Road, Kilrush, Co Clare. The remedial works to include reconstructing the floors, replacing the roof and providing 3 No roof lights all as constructed, the demolition and re-construction of a single storey extension to mirror the structure annexed to the north side. Planning PERMISSION is sought to retain and repair the roofs of the outhouses located at the rear of the dwelling
To decommission the existing septic tank and install new wastewater treatment system with all necessary ancillary services
For the following development at Glebe House Building: to (a) provide new disabled access ramp and steps to replace existing ramp and (b) to provide 18 number PV Panels on existing roof as per associated drawings, all within existing site boundaries
To construct new garage, including all ancillary site works
To construct 2 dwelling houses, each with entrance from public road, connection to public services and associated site works
For the erection of 4 no. wind turbines with an overall ground to blade tip height of 150m with a rotor diameter of 136m and a hub height of 82m, the construction of crane hardstand areas and turbine foundations, the creation of a new site entrance onto the L6132, construction of 1 no. temporary construction compound with associated temporary site offices, parking areas and security fencing, installation of 1 no. permanent meteorological mast of 82m overall height, construction of new internal site access tracks and upgrade of existing site track, to include all associated drainage including new clear span bridge crossing of the Moyasta River, development of a site drainage network, biodiversity enhancement measures, construction of 1 no. permanent 38kV electrical substation, 2 no. permanent spoil storage areas, all associated underground electrical and communications cabling connecting the wind turbines to the wind farm substation and to the existing Tullabrack 110kV Substation, all ancillary forestry felling to facilitate construction including the development of one no. borrow pit, vertical realignment of an existing crest curve on the L6132. This application is seeking a ten year permission and a 35 year operational life from the date of commissioning of the wind farm. The planning application is accompanied by an Environmental Impact Assessment (EIAR) and a Natura Impact Statement (NIS)
To extend the existing dwelling house, including part demolition with all necessary ancillary services
To construct a new dwelling house, private garage, a new private road connecting to an existing entrance and connection to public utility services along with all associated works
For development which will consist of: 1 No. enclosed battery energy storage system compound on a total of c. 6.2 hectare site, to include: 1 no. 220kv GIS electrical substation building and 1 no. single storey customer substation building, control and switch room, 220kv transformer and four no. auxiliary transformers, up to 192 battery storage blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units), 16 transformer and 32 inverter units. Including access tracks and site entrance, associated electrical cabling and ducting, security gates, perimeter security fencing, CCTV system, landscaping works and all associated ancillary infrastructure. The proposed development will have a projected life span of 35 years. A Natura Impact Statement has been prepared to accompany this application
To demolish existing sub-standard dwelling and construct new replacement dwelling, using existing sewer connections, including all ancillary site works and utilising existing site entrance area
For the following development to the existing dwelling at the above address: (a) modifications to front entrance porch; (b) to construct a single storey extension to side and rear of the existing dwelling, to include revised internal layout; and (c) to upgrade existing attic space including provision of access stairs and 2 no. additional roof windows, along with all associated ancillary site works.
To construct a new dwelling house access road, entrance private garage and install a new wastewater treatment system along with all associated works.
For development at a c.0.015ha site in the car park of Tesco, Ennis Road, Kilrush, Co Clare. The development will consist of; (i) the construction of a sheltered canopy (c. 50 sq.m) in the existing car park for the purpose of providing 2 no. dedicated "Click and Collect" spaces for the existing Tesco store; and (ii) ancillary signage, a pedestrian crossing and all associated site development works
Of the development at a c.0.012 ha site in the car park of Tesco, Ennis Road, Kilrush, Co. Clare. The development consists of RETENTION permission for "Click and Collect" signage in the existing Tesco car park
To apply for a 10 year planning permission for development on a c. 1 ha at Ballygeery West, Co Clare. The development will consist of the development and operation of a 250 to 500 MVA (electrical rating) synchronous condenser. The development which will be located within a site compound of c. 1 hectare behind the existing ESB substation for the purpose of stabilising the electricity grid will consist of the following elements; Compound building, within which the synchronous condenser generator and flywheel will be located (540m2c.7m high), Synchronous condenser, with a 250-500 MVA (electrical rating); Cooling equipment (c.160sqm., c. 3m high); 6 No. modular containers to house electrical and Control equipment (total area of c. 195sqm., c. 5m high), A generator step-up transformer, auxiliary transformer and electrical plant including an external circuit breaker (c.8m high); 1 No. firefighting water tank and pump, An above-ground oil separator and collection pit, Boundary fencing (c.3m high), palisade security entrance gate and CCTV, c.100m of underground cabling ducts and cable to the neighbouring ESB substation, All other ancillary and miscellaneous site works including site clearance; site access, internal roads and development of area of hard standing including a maintenance lay-down area. Planning PERMISSION is being sought for a duration of 10 years
For the construction of an extension & a garage along with all associated works
Of two sheds as constructed within the curtilage of the subject property
To construct gable extension to existing dwelling plus all ancillary site works
To renovate the existing dwelling house to include addition of second floor accommodation, addition of four No. Velux windows to the roof, along with all necessary ancillary services
To construct a dwelling house, shed and proprietary waste water treatment system along with ancillary site works
For development, the development is located in the townlands of Ballykett, Tullybrack East and Tullybrack, Kilrush, Co Clare. The Development will consist of the erection of 4 no. wind turbines with an overall ground to blade tip height of 150m with a rotor diameter of 136m and a hub height of 82m. The development will also consist of the construction of crane hardstand areas and turbine foundations, new site entrance onto the L6132, construction of one no. temporary construction compound with associated temporary site offices, parking areas and security fencing, installation of one no. permanent meteorological mast of 82m overall height, construction of new internal site access tracks and upgrade of existing site track, to include all associated drainage including new clear span bridge crossing of the Moyasta River, development of a site drainage network, biodiversity enhancement measures, construction of one no. permanent electrical substation, ancillary forestry felling to facilitate construction of the Development, all associated underground electrical and communications cabling connecting the wind turbines to the wind farm substation and to the existing Tullabrack 110kV Substation. This application is seeking a ten year permission and a 35 year operational life from the date of commissioning of the wind farm. The Planning Application is accompanied by an Environmental Impact Assessment (EIAR) and a Natura Impact Assessment (NIS)
To construct an additional entrance to dwelling property and construct a new front wall with railing, planning permission to relocate the existing percolation area and planning permission to revise their site boundaries as granted under P09-634 along with all associated works
Proposes to carry out the following development within the existing Fire Station site: 1. To provide proposed steel shed for the purpose of parking existing vehicles. II. All associated site works pertaining to the proposed parking shed. In accordance with the Habitats Directive, Appropriate Assessment Screening has been carried out on the project. An Environmental Impact Assessment (EIA) screening determination has been made and concludes that there is no real likelihood of significant effects on the environment arising from the proposed development
Of minor elevational alterations and planning PERMISSION to erect additional walling to the front of the dwelling and erect entrance gates to the front of the property along with all associated works
For the change of use of a former schoolhouse - currently designated as residential - to a short term let facility
The development will consist of the change of use from school to domestic dwelling, with replacement doors and windows and new windows and door where shown
To Extend the Appropriate Period of Planning Permission of P18/840 to RETAIN the alterations to the existing commercial unit and planning PERMISSION for material change of use from an existing commercial unit to a proposed restaurant with a seating area along with all associated site works
To demolish existing side extension and construct a replacement side extension to the existing dwelling house along with all associated site works
To (a) construct extension to the existing dwelling house and to connect to the existing sheds; (b) construct an extension to the existing sheds; (c) change the use of the existing sheds to residential accommodation; (d) all associated ancillary site works
Of enabling works and planning PERMISSION for change of design and relocation of dwelling house and garage granted under planning P21-719 along with all associated works