Demolition of existing garden shed to rear of existing house; construction of a new garden shed consisting of a storage area and personal gym; attic conversion to home office/study with dormer window to rear roof plane; existing hip roof conversion to gable end roof.
The development will consist of the construction of a part one-storey and part two-storey, four-bedroom dwelling house (235m2); construction of a car garage (32m2); and all associated landscaping and site works.
Installation of approx. 279sq.m of Photo-Voltaic Solar Panels onto the existing roof of retail building shed and forecourt canopy; The solar panels will be used to create green electricity, all of which will be used by the store and all associated site works.
The development will consist of a pay to use portable waste compactor for the acceptance of residual and food waste and a pay to use compactor for mixed dry recyclables. This activity requires the developers to process a waste collection permit/certificate of registration.
The development will consist of the construction of a part one-storey and part two-storey, four-bedroom dwelling house (254m2); construction of a car garage (32m2); and all associated landscaping and site works
The development will consist of; 1. Change of use of existing dwelling from residential use to café use (47 sq.m) with construction of single storey extension (58 sq.m) to the south-west of the existing building. 2. Alterations and enhancements to the existing building elevations 3. Provision of a 1.6m high main ID signage. 4. Ancillary site features to include the installation of 24 no. surfaced car parking spaces with 1 no. E charging space and 10 no. covered bicycle parking spaces. Construction of 1 no. pressure wash slab, refuse compound, low-level blockwork wall, 2.0m high blockwork wall, landscaping surfacing and all associated drainage works.
The erection of 1 no. single storey 3 bedroom dwelling house circa 122 m2 nett internal area (circa 153 m2 gross external area) to include new vehicle access, car parking, new service & drainage connections & other associated site works including partial removal of existing boundary wall & fence, on overall site comprising 0.0752 hectares (circa 752 m2)
Planning permission Sought for to extend existing concrete ridge tiles and tiled roof to form a new Dutch type Roof Structure extend existing side structure to new soffit level with new obscure glazed window' new dormer roof structure and rooflight to existing rear tiled roof; conversion of existing attic area in to a new non-habitable area and internal alterations
Construction of a new detached single storey dwelling with existing vehicular access and ancillary site works.
Changes to previously approved single storey 3 bedroom dwelling house (SDCC Planning Ref SD23A/0287), changes to include revised access & parking configuration to site layout and associated site works, on overall site comprising 0.095 hectares (approx 950 m2)
Modifications to existing domestic shed; raising roof to provide additional first floor head height; revised internal layout to provide for home office, gym, tool store and wc; new window and door arrangement to front and side elevations; connection to existing on site services and all associated development works.
Single storey extension to front, east side and rear comprising a family flat; one and two storey dormer style extension to side and rear, incorporating dormer windows to front and rear; 2 rooflights to existing front roof.
11 residential units consisting of (i) 4 three bed duplex apartments above 4 two bed duplex apartments in a three storey building; (ii) 3 two storey terrace houses (1 three bedroom and 2 four bedroom); communal open space; surface parking; bin and bicycle storage and all ancillary site development works at a site bordered by the R120 to the north, Newcastle Boulevard to the west, Ballynakelly Green to the south and Ballynakelly View to the east.
Top floor roof window to front of 3 storey dwelling.
The proposed development includes the construction of: 6 no. Stage buildings (buildings 1,2,3,11,13 &14) ranging in height between c. 20m and c. 23 m and comprising 11 no. Internal sound stages with overhead catwalks and 2-storey ancillary production offices including office space, plant and switch rooms, toilets, ICT rooms, staff toilets and showers and rooftop plant (totalling c. 35,187 sq. m); 4 no. workshops (buildings 15,16,17 &18) ranging in height between c. 9m and c. 10.5 m and comprising internal workshop areas, staff toilets and showers, ICT, plant and switch rooms(totalling c. 18,244 sq. m); TV studio and reception (building 4) comprising 3 no. TV studios (c. 17.8m height) and various supporting spaces across 3 floors including backstage shooting area, green rooms, hair and makeup rooms, production suites with ancillary offices, wardrobe, laundry room, Technical support offices, vision dept, lighting dept, pro service, run and crew kit room, chief engineer office, studio manager office, scenic store, props store, cameras and grip room, lighting and electrical room, plant room, sound control rooms, vision rooms, recording rooms and toilets at ground floor level; standard dressing rooms, tv post production spaces, kitchen and crew area, toilets, mechanical/electrical room, technical offices, media store at first floor level; star dressing rooms, tv post production, lounge and kitchen and toilets at second floor level; Single storey reception building to include guest holding areas, VIP and Guest service, security offices, staff toilets, showers and locker rooms (c. 10,875sq. m); 2-storey Dining Hall with ancillary 100 seat theatre (building 6) comprising indoor and outdoor dining areas, kitchen, storage and mechanical rooms, toilets and 3 no. meeting rooms at ground floor level; office space and covered outdoor balconies at First floor level (c. 4,351sq. m) Standalone café (building 5) (c. 96 sq. m) 3 no. single storey production suites (buildings 7,8 & 9) comprising offices, conference room, kitchenette, communal areas and toilets (totalling c. 795 sq. m); 3-storey car parking deck (building 19) (c. 14,782.sq.m) to include 438 no car parking spaces ( including 100 no. EV and 27 no. disabled) with ancillary offices (building 20) (c. 4,307sq.m) refuse recycling area and rooftop plant; and Outdoor stage area associated with the TV Studio and Reception Building; Site landscaping to include: an amenity walkway and biodiversity area along the northern boundary of the site; public realm and planting areas in the vicinity of TV Studio and Reception Building and production suite offices; green roofs; and boundary treatments. Hard standing to include backlot area (c. 14,160 sq.m) and 'shooting lanes' (c.18,900 sq.m) to facilitate outdoor filming; Electrical Substation (c 236 sq. m); primary and secondary gate houses (buildings 10 & 12) (c. 19 sq. m each) The proposed development will include the provision of 516 no. surface car parking spaces (including 96no. EV, 13 no. disabled and 13 no. EV / disabled ); Basecamp area to provide 36 no. Large Vehicle parking spaces & 3 no. bus parking spaces to front of reception building as well as provision of Bicycle parking to include 274 no. covered spaces and 96 no. external spaces. Additional works to include removal of existing wall and vegetation at south western boundary; provision of bin store adjacent to the proposed backlot area and additional waste storage area adjacent to proposed dining hall; proposed pump station; rooftop PV panels (Buildings 17 & 18);rooftop plant; Building signage; LED video screen on eastern elevation of TV studio and reception building; public lighting; drainage and services provision; boundary treatments (including security fencing); piped site wide services; pedestrian and cycle links and all ancillary works and services necessary to facilitate construction and operation. The primary proposed vehicular, cyclist and pedestrian entrance from the newly constructed Grange Castle West Access Road will be located at the eastern boundary of the site with a secondary vehicular access at the southeastern corner of the site.
Demolition of existing chimneys & 20.8sq.m extension to rear of existing 122.9sq.m bungalow and construction of new 91.1sq.m single storey flat roof extension to rear.
Alterations/extension of the existing single-storey detached house at Aylmer Lodge comprising of partial demolition of single storey rear extension and shed, and construction of a new single storey extension Modification's to existing fenestration plus all associated internal alterations and site development
Planning permission for a new single storey extension, comprising toilet, sitting room, gym and storage, to side and rear of the existing house with all associated ancillary works
Retention planning permission for 2 storey extension to rear of existing house, a single storey garage to side of existing house with associated ancillary works.
Single storey extension to the side and rear comprising of additional bedrooms and living space.
Revisions to granted planning permission Reg. Ref. SD06A/0659 (as extended by Reg. Ref. SD06A/0659/EP for a 255 bedroom hotel in a new landmark building consisting of sub-basement and basement, ground floor and five upper floors (with a total hotel development gross floor space of approximately 28,476sq.m.); 680 underground car parking spaces; 5 coach spaces; 50 bicycle spaces; a new 9m wide vehicular, cycleway and pedestrian access approximately 900m in length from a new roundabout on the Newcastle Road (R120) in vicinity of Newcastle Manor housing estate; fire tender access road and site development and landscaping works; revisions to the permitted hotel development (which is partially constructed) will comprise construction of a retirement village in the permitted hotel grounds which will consist of: 69 individual 3 bedroom single storey retirement homes, ranging in size from 112sq.m. to 164.1sq.m; a single storey medical/health centre (146.7sq.m); a two storey community services centre (844.3sq.m); an outdoor recreation and allotment area with an associated recreation equipment store (245sq.m.) and allotment equipment store (22.8sq.m.); a nursing home/care centre to be located within the permitted hotel building necessitating a change of use of part of the hotel's accommodation block (1,653.7sq.m. at ground floor and 2,351.5sq.m. at first floor) from hotel use (comprising 92 hotel bedrooms in total) to nursing home/care centre use (comprising 60 nursing home/care centre bedrooms with associated dining, healthcare and administration facilities) as well as change of use of 302sq.m. at basement level car parking to nursing home/care centre mortuary, deliveries store and clinical waste store and all associated works, including the provision of a new entrance; new 6.4sq.m. porch and a reception area for the nursing home/care centre; new vehicular lay-by and enclosed outdoor areas for nursing home residents (the gross floor space of the hotel incorporating the nursing home/care centre will now be approximately 29,562sq.m.); and site development and landscaping works including revised site levels to facilitate surface drainage, boundary planting including reinstatement of hedgerows; 2.2m to 2.5m high fencing and automatic gates surrounding the retirement homes; a new 2.5m block wall inside the northern boundary of the site and the relocation of 11 car parking spaces at the eastern side of the access road into the development site (serving the adjacent development to the north, Reg. Ref. SD05A/0344) to the western side of the access road. The proposed revised development will have 666 underground car parking spaces, 204 surface car spaces, 5 surface coach spaces, 1 surface ambulance space and 50 bicycle spaces.
2 semi-detached, dormer bungalows and all ancillary works on site to rear of existing dwelling.
Partial demolition (c.114.3 sq m) of existing single-storey, detached, 5-bedroom bungalow (c.216.7 sq m), refurbishment (c.102.4 sq m) and single-storey, double-pitched and flat roof extension (c.219.9 sq m), to accommodate the primary dwelling (4 bedrooms and ancillary living and welfare areas) and an attached secondary, semi-independent annexe (1 bedroom and ancillary living areas), for integrated use as a multi-generational, fully accessible, family dwelling. And all associated and ancillary site development, landscaping and boundary works, including localized site reprofiling (max. 500mm increase) to match existing ground floor level, new access ramps and covered walkway connecting entrance of house to existing driveway.
Minor alterations to the existing warehouse building including a new canopy to the south; three new level access doors on the south elevation and external waste platform; provision of hardstanding and use of the south of the site for operational parking; removal of the existing fencing dissecting the site; introduction of new fencing, security hut, gate, smoking shelter, cycle shelter, lighting, substation and transformer, acoustic screening to the north west and all other associated works.
Amendments to an existing warehouse building comprising the introduction of a mezzanine floor (c.883.24sq.m) to provide additional office and welfare facilities and a plant area for one air handling unit above (c.181.76sq.m); internal amendments are proposed to provide a new layout to office and welfare facilities; single storey lobby (c.18sq.m) is proposed to the west of the building which will result in the loss of two car parking spaces; minor alterations to the elevations comprising the introduction of three louvres, one to the west and two to the north elevation and a emergency access door to the west elevation; two new condensing units are proposed to the north elevation; one AHU condensing unit and five condensing units are proposed to the west elevation and all other associated works.
Retention of an existing ESB substation (c. 17.5sq.m) to the east of the site; Permission for new welfare cabin (c. 17.1sq.m) and a new guard cabin (c. 2sq.m) to the east of the site; Permission for one high level sign on the south elevation (9.5m above ground level) and one high level sign on the east elevation (8.5m above ground level) of the existing building; Both signs are 6m x 1.8m and non illuminated; Wayfinding signs are proposed across the site and all other associated works.
Retention permission for the following: (a) Dwelling house as constructed. Dwelling as constructed differs slightly from that which was previously permitted under Planning Register Reference No. S01A/0032, (b) Revised site layout including position of dwelling on site also previously permitted under Planning Register Reference No. S01A/0032, (c) Re-aligned entrance / driveway avenue with additional vehicular entrance gateway at subject dwelling. As constructed entrance / driveway avenue and additional vehicular gateway differs slightly from that which was previously permitted under Planning Register Reference No. S01A/0032 and also differs from amended driveway and avenue which was previously permitted under Planning Register Reference No. SD06A/0659, (d) Connection to mains foul services and all associated development works at Skylark Hill House, Newcastle, Co. Dublin. Eircode D22 K2E2
Alterations to previous planning application, Ref. SD13B/0117. The alterations will include revisions to the design of the proposed detached dormer dwelling at the rear of the existing dwelling. Proposed alterations are as follows: (1) new roof window and revised door to front elevation; (2) new sliding door to east elevation; (3) new corner window and new door to west elevation; (4) two new corner windows to south elevation; (5) minor changes to the internal layout of the proposed detached dormer dwelling and all associated site works.
Alterations to previous planning application, Ref. SD13B/0117. The alterations will include revisions to the design of the proposed detached dormer dwelling at the rear of the existing dwelling. Proposed alterations are as follows: (1) new roof window and revised door to front elevation; (2) new sliding door to east elevation; (3) new corner window and new door to west elevation; (4) two new corner windows to south elevation; (5) minor changes to the internal layout of the proposed detached dormer dwelling and all associated site works.
Removal of existing flat roof to the side, along with the hipped roof to the side and rear. To be replaced by a ground-floor flat roof extension with an increased height and roof light to the side, as well as a first-floor flat roof extension to the rear (South), also featuring a roof light. Additionally, there will be a single-story ground-floor flat roof extension to the rear (South). The small timber shed in the rear garden will be removed and replaced with a new shed to serve as a home office and gym.
The provision of a new winter module, a replacement waste platform canopy and amendments to van loading bays at an existing distribution facility.
Planning permission is being sought by Peamount Healthcare CLG for part change of use from ancillary staff accommodation to laundry, and material alterations to include; (i) new door - front elevation (ii) new double doors - side elevation (iii) new double doors - rear elevation (iv) internal alterations and all associated site works at the Avenue Building, Peamount Hospital Campus, Newcastle, Country Dublin
Alterations to existing granted Planning Permission for works at the existing GAA pitch facility (granted Planning Application Reg. Ref. SD22A/0298) at Rathcreedan, Newcastle, Co. Dublin. The subject alterations for which planning permission is sought for are as follows: 1. Addition of 6No. lighting columns, 15m tall pitch lights. 2. Addition of non-illuminated flat board sponsor signage at the north boundary of the pitch area. The extent and location of the signage is defined on the accompanying drawings. All other details remain as per the granted applications Reg. Ref. SD22A/0298.
St. Finians GAA Club, intend to apply for the following retention permission and planning permission at an existing GAA pitch facility at Rathcreedan, Newcastle, Co Dublin. Retention permission is sought for 1,550m2 unmetalled drop-off area/carpark ancillary to the GAA pitch use and planning permission is sought for: GAA pitch goal posts (2No. standard 8m high) coupled with 8m high ballstop nets to the rear of each goal post. Entrance improvements from the existing Newcastle Road (R120) to the site including widening existing gate from 4.2m to 6m with setback gate arrangement to improve sightlines.
Erection of 228 photovoltaic solar panels with an area of 398sq.m (with average size of 1.3sq.m per panel) on the existing roof slope and all associated alterations to existing elevations, site, drainage and ancillary works.
Retention of existing 15m high telecommunications support structure carrying antennas and dishes; associated equipment container; security fence.
A new part single/part two-storey dwelling, with new vehicular access off Peamount Lane, a proprietary wastewater treatment system, and all associated site and infrastructural works.
Development of the site for purpose of operational vehicle storage, including surfacing and ancillary infrastructure.
Retention of the ancillary, two storey, office space (123.92sq.m) to the western elevation of the warehouse building and continuation of use of this space as a training facility. This space was built smaller than the ancillary office space (289.9sq.m) granted planning under S01A/0301; retention of a three storey extension built within the existing warehouse area (178.79sq.m) and continuation of use of this space as a training facility.
Renovation of existing detached dwelling comprising of single storey peripheral extension. Removal of existing roof structure and remodel of internal layout, comprising of 2 no. bedrooms at first floor level and living room, office, WC and utility room at ground floor level. Construction of new one and two storey extension to the side of existing dwelling, comprising of 2 no bedrooms and en-suite at first floor and open plan kitchen, living and dining space and plant room at ground floor level. Upgrading of effluent treatment system and all associated ground works
A new hazardous medical waste processing facility, including a change of use of the existing building (Building B) on site from general waste disposal to hazardous medical waste processing, and the extension of the current operating hours to 24/7 The demolition/removal of the existing outbuildings/structures including 2 no. storage units, an office and staff room canteen; The construction of an extension (c. 966 sqm) to the existing building c.1,577 sqm on site (Building B) and associated outbuildings including a new boiler house and storage areas; The construction of a new building (c. 984 sqm) to the northwest of the site (Building A); The construction of a new 2 storey office building (c. 287 sqm) to the southeast of the site; Provision of 26 no. car parking spaces, 5 no. truck parking spaces and 18 no. bicycle stands (30 no. spaces) to serve the proposed development; All ancillary landscaping, boundary treatments, associated infrastructure, internal roads, associated processing and treatment plant, weighbridges, pv panels, and site development works to support the development. The operation of the proposed development will require an Industrial Emissions Licence (IEL) from the Environmental Protection Agency. A Review of the existing IEL relating to the site will be sought from the Environmental Protection Agency in relation to the proposed development. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted to the Planning Authority with the planning application and the EIAR and NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy at the offices of the Planning Authority.
The installation of Solar PV Panels to be mounted on the rooftop of an existing warehouse building and all associated ancillary infrastructure. PV Panels will not extend above parapet line.
Hay shed building (2,100sq.m, 9.85m high); ancillary yard (approx. 1,584sq.m) for equestrian/agricultural related vehicle parking and marshalling with access and egress formed from within the existing equestrian farmyard; landscaping, fencing, associated earthworks and surface water disposal to an on-site soakaway.
Installation of 410 Solar PV Panels mounted on the roof of 1 existing industrial building and associated site works and services.
2 two storey extensions to side of existing building (similar to lapsed planning SD17A/0067) and a canopy to front of existing building.
Provision of additional facilities at the existing Greenogue Equestrian Centre (permitted under SDCC Reg. Ref. SD16A/0417 and as amended under Reg. Ref. SD18A/0035) to create a sport horse Centre of Excellence comprising a new indoor sand arena (3,759sq.m); the extension of the existing main outdoor jumping sand arena 800sq.m (resulting in a total of 4,000sq.m); the extension of the existing indoor sand arena by 250sq.m (resulting in a total of 1,625sq.m); a 2 storey training and administration facility (1,300sq.m); a veterinary shed (572sq.m); a hay shed (1,209sq.m); a 2 storey visitor toilets, lockers and storage facility (200sq.m) and a single storey building (673sq.m) to accommodate a laboratory for an Assisted Reproduction Programme. The proposed development also includes the provision of 50 car parking spaces within the existing yard; 20 bicycle parking spaces; plant; hard and soft landscaping; boundary treatments; increased hard standing areas for parking and turning of horse boxes and lorries; and all associated site development works above and below ground at this 7.88 Ha (c.78,800sqm) site.
The development will consist of a single storey self-contained family flat side extension and all associated site works
Retention permission at site 514, Greenogue Industrial Park Rathcoole, Co Dublin for the First Floor Ancillary Offices measuring 216m2. All other development details remain as per granted planning permission Reg. Ref SD05A/0281
Construction of a new Battery Energy System Storage (BESS) and Power Trunk building and all associated elements; Demolition of all existing structures on site associated with the current golf centre - including main clubhouse and a number of ancillary structures (total 1,009.84sq.m); Construction of a two storey power trunk building (maximum height 10.3m) over basement of 1,982.61sq.m containing MV switchgear; Construction of a BESS to reach a total capacity of 186.3 MWe; The facility will be within an open three storey structure (maximum height of 17.3m), totalling 18,560.9sq.m in area, containing 63 battery containers, & 63 no containers containing power invertors, step up transformers and electrical switchgear and roof level array of 1384 PV panels; 1 two storey administrative welfare buildings (298.26sq.m) associated with the BESS facility; It will be provided with a pre-cast wastewater treatment plant (up to 6 P.E.) discharging to percolation area with polishing filter for foul effluent; 1 single storey Fire Pump and Water Service Plantroom of 174.1sq.m, with associated water tank -associated with the BESS facility; 1 underground rainwater harvesting tank (volume 125 cubic meters - associated with the BESS facility of 35sq.m; 9 car parking spaces (including 3 disabled and 2 electric vehicle charging parking spaces) and 8 cycle spaces; The removal of an existing 15m high telecommunication support structure; Internal road network and new servicing access road from an entrance on Peamount Lane - with amendments to the existing entrance, comprising widening the entrance, provision of new security checkpoint, setting back of the boundary to achieve sufficient visibility splays, and reinstatement of appropriate boundary treatment along the Peamount Lane frontage; Site landscaping, planting, berms and retaining walls along site boundaries and security fencing; and all associated site services, lighting, infrastructural works and attenuation (SUDS features, underground storage and an above ground pond).
The proposals will comprise of amendments to Unit 7 (K78 V6TY) constructed under Reg. Ref.: SD23A/0301 (as amended by Reg. Ref.: SD24A/0224W and SD25A/0011W). The proposed amendments will consist of: • Change of use from logistics/warehousing to logistics/warehousing/light - industry to accommodate a manufacturing use; • Reconfiguration of the layout of the unit resulting a slight increase in the total GFA from 12,650 sqm to 13,333 sqm. The warehouse floor area of the unit will decrease from 11,509 sqm GFA to 10,652 sqm of manufacturing floor area for the new use and the associated office space will increase from 994 sqm to 2,518 sqm; • Amendments to the elevations to accommodate the changes to the layout of the unit; • Provision of a canopy at the entrance of the building on the southern elevation and a new outdoor terrace (c. 110 sqm) to the south of the unit; • Reconfiguration of the car parking spaces to the south of the unit and provision of a new overflow car parking area to the west of the service yard; • A total of 213 no. car parking space will be provided to serve the development; • New entrance to overflow car park from internal link road to the south; • Provision of 10 no. van spaces to the south west corner of the service yard; • Installation of a containerised generator within the service yard area; • Provision of new tenant signage on south elevation: • Relocation of existing signage on the south elevation to the east elevation; • Provision of carpark totem to overflow parking; • Provision of additional PV panels at roof level and; • All associated site development works and landscaping works