(1) CONSTRUCTION OF A PROPOSED SINGLE STOREY ANNEX EXTENSION TO EXISTING HOUSE, (2) AMENDMENTS TO EXISTING WINDOWS AT THE FRONT AND SIDE OF THE HOUSE, (3) NEW WINDOW TO THE EXISTING GABLE AND (4) INTERNAL RENOVATION WORKS AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
(1) RENOVATION WORK TO EXISTING HOUSE INTERNALLY, INCLUDING WORKS TO GROUND AND FIRST FLOOR (2) EXTERNAL WORKS TO EACH ELEVATION INCLUDING NEW BI-FOLD DOORS, CANOPY PORCH AND NEW WINDOW CONFIGURATIONS TO FRONT, REAR AND BOTH SIDES OF HOUSE, NEW DORMERS AND VELUX WINDOWS TO FRONT AND BACK ROOFS AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
ARD NA G-CEAPAIRÍ, NA DOIRE BEAGA, LEITIR CEANAINN
ATHRAÍODH SUÍOMH NA TEAGHAISE AR AN LÁITHREÁN, ATHRAÍODH SUÍOMH BEALACH ISTEACH AN LÁITHREÁIN, SUÍOMH AN UMAIR SHEIPTIGH AGUS AN LIMISTÉIR SHÍOTHLAITHE, FUINNEOG BHÁ TÓGTHA IN IONAD DHÁ FHUINNEOG, TEILGEAN TÓGTHA CHUIG NA HINGEARCHLÓNNA TOSAIGH LE FUINNEOGA ARDA AGUS CLÚDACH CLOICHE, FUINNEOG TÓGTHA IN IONAD DOIRSE DÚBAILTE CEADAITHE AR AN TAOBH-INGEARCHLÓ, AGUS GARÁISTE FAOI 25M² ATÁ CEADAITHE MAR FHORBAIRTDecision record indexed
(1) REFURBISHMENT OF EXISTING DWELLING HOUSE, TO INCLUDE PARTIAL DEMOLITION OF EXISTING DWELLING AND ALTERATIONS TO EXISTING ELEVATIONS, (2) CONSTRUCTION OF FRONT AND SIDE EXTENSIONS TO EXISTING DWELLING, (3) USE OF EXISTING VEHICULAR ENTRANCE ALONG THE PUBLIC ROAD, GRANTED UNDER PLANNING REF. NO. 21/51634 TO SERVICE THE PROPOSED DEVELOPMENT AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
CONSTRUCTION OF A SPLIT LEVEL DWELLING AND ALL ASSOCIATED SITE AND ANCILLARY WORKS INCLUDING NEW WASTEWATER TREATMENT SYSTEM. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATIONDecision record indexed
(1) TEMPORARY LIVING ACCOMMODATION & TEMPORARY SEPTIC TANK AND PERMISSION FOR (1) DEMOLITION OF A HABITABLE DWELLING (2) CONSTRUCTION OF A DWELLING AND THE INSTALLATION OF A WASTEWATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKSDecision record indexed
DEMOLITION OF EXISTING SHED & ERECTION OF A DWELLING HOUSE WITH ATTACHED DOMESTIC GARAGE AND WASTEWATER TREATMENT SYSTEM INCLUDING ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
MEADÚ DE DHÁ STÓR A CHUIR LE TAOBH AN AMHAIRCLAINN INA MBEIDH (1) CISTIN AGUS MEADÚ LEIS AN BIALANN, (2) SEOMRA FUAIM, LEITHRISÍ, SEOMRA CLEACHTADH, OIFIG AGUS ÁIT STÓRAILE AR AN CHÉAD URLÁRDecision record indexed
INSTALLATION OF A PERMANENT HYDROMETRIC GAUGING STATION ON THE CATHEEN RIVER INCLUDING THE FOLLOWING WORKS: (A) CONSTRUCTION OF A WEIR STRUCTURE; (B) CONSTRUCTION OF EROSION PROTECTION WORKS; (C) INSTALLATION OF INSTRUMENTATION, INCLUDING STAGE BOARD WITH WATER LEVEL LOGGER, TELEMETRY BOX AND ANTENNA; AND (D) ALL ASSOCIATED SITE WORKSDecision record indexed
EXISTING DWELLING BASE AND WALLS INCLUDING EXISTING SITE WORKS AND PERMISSION FOR CONSTRUCTION OF A DWELLING HOUSE WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKSDecision record indexed
VEHICLE ENTRANCE AND VEHICULAR ACCESS ROAD AND PERMISSION FOR ERECTION OF AN AGRICULTURAL SHED WITH STORAGE AREA AND ALL ASSOCIATED SITE WORKSDecision record indexed
CONSTRUCTION OF A DWELLING HOUSE AND DOMESTIC GARAGE WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKSDecision record indexed
ERECTION OF A PITCHED ROOF ON THE EXISTING FLAT ROOFED EXTENSION TO THE REAR OF THE EXISTING DWELLING, NEW WINDOWS TO THE REAR AND SIDE ELEVATIONS OF THIS PART OF THE DWELLINGDecision record indexed
(1) REMOVAL OF FIRST FLOOR ROOF PROFILE (2) INCREASED ROOF HEIGHT WITH NEW ROOF PROFILE WITH ASSOCIATED ELEVATIONAL AMENDMENTS (3) CONSTRUCTION OF A NEW SIDE ACCESS ENTRANCE WITH ESCAPE STAIR CASE AND BIN STORAGE UNDER (4) EXTENSION TO THE REAR & SIDES OF THE PREMISES TO CATER FOR NEW FIRST FLOOR MULTI-PURPOSE ROOM WITH ASSOCIATED BAR FACILITY, RESTAURANT AREA, MUSIC LOUNGE, TOILETS FACILITIES AND STORES / CHANGING ROOM (5) ERECTION OF NEW SMOKING ROOM AND (6) ERECTION OF NEW SITE SIGNAGE TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
REFURBISHMENTS, ALTERATIONS & EXTENSIONS OF EXISTING PART TWO-STOREY / PART THREE STOREY HOTEL BUILDING CONSISTING OF: (1) DEMOLITION OF EXISTING STAIRCORE (46.5 SQ/M) ON THE EAST ELEVATION AND REPLACEMENT WITH NEW STAIRCORE (198 SQ/M) FROM LOWER GROUND FLOOR LEVEL TO THE PROPOSED NEW SECOND FLOOR LEVEL WITH NEW PLANT ROOM AT LOWER GROUND FLOOR LEVEL AND NEW HOUSEKEEPING/STORAGE ROOMS AT GROUND, FIRST AND SECOND FLOOR LEVELS, (2) REFURBISHMENT OF EXISTING PART TWO STOREY, PART THREE STOREY CONCRETE STRUCTURE, (3) ALTERATIONS TO INTERNAL LAYOUTS AT EXISTING LOWER GROUND FLOOR, GROUND FLOOR AND FIRST FLOOR LEVELS (3,003 SQ/M) PROVIDING NEW RECEPTION/ADMINISTRATION AREA, BAR/RESTAURANT, CUSTOMER TOILET/KITCHEN/STAFF FACILITIES/PLANT AND 69 GUEST BEDROOMS, (4) PROPOSED NEW ADDITIONAL SECOND FLOOR (1,337 SQ/M) ABOVE EXISTING BUILDING INCORPORATING NEW FULLY SERVICED WEDDING VENUE/FUNCTION ROOM, BAR/RESTAURANT PLUS OUTDOOR TERRACE AREA, (5) PROPOSED NEW THREE STOREY EXTENSION (2,029 SQ/M) ATTACHED TO THE NORTH EAST OF THE EXISTING BUILDING TO PROVIDE 11 NEW GUEST BEDROOMS (80 IN TOTAL) AND 15 NO. NEW TWO BEDROOM APARTMENTS, (6) PROPOSED NEW PART SINGLE STOREY, PART FOUR STOREY EXTENSION (266 SQ/M) TO THE SOUTH ELEVATION OF THE EXISTING BUILDING TO PROVIDE EXTENDED KITCHEN FACILITIES, NEW LIFTS, STAIRCORE AND EXTERNAL TERRACE AREAS, (7) PROPOSED EXTENSIONS TO NORTH AND SOUTH ELEVATIONS OF THE EXISTING BUILDING TO PROVIDE FOR REVISED ELEVATIONAL TREATMENT AND EXTERNAL BALCONIES AT GROUND AND FIRST FLOOR LEVELS, (8) ALTERATIONS AND REFURBISHMENT OF EXISTING HEALTH AND BEAUTY SPA (632 SQ/M) ATTACHED TO THE WEST OF THE HOTEL BUILDING, (9) REPLACEMENT OF EXISTING ONSITE WASTEWATER TREATMENT FACILITIES AND PERCOLATION AREAS WITH NEW ONSITE WASTEWATER TREATMENT SYSTEM AND PERCOLATION AREAS, (10) REFURBISHMENT OF EXISTING CAR PARKING FACILITIES AND CONSTRUCTION OF ADDITIONAL CAR PARKING AREAS TO ACCOMMODATE 143 NO. CAR PARKING SPACES IN TOTAL AND 30 NO. BICYCLE PARKING SPACES AND (11) ALL ASSOCIATED SITE DEVELOPMENT AND LANDSCAPING WORKS. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION.Decision record indexed
(1) DEMOLITION OF EXISTING SHED AND (2) CONSTRUCTION OF A DWELLING AND GARAGE WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKDecision record indexed
(1) TWO NUMBER MOBILE HOMES (ONE USED FOR LIVING ACCOMODATION AND ONE USED FOR ARTISTS STUDIO) WITH CONNECTION TO EXISTING PROPRIETARY WASTE WATER TREATMENT SYSTEM AND (2) CREATION OF SITE ENTRANCE AND ACCESS ROAD AND PERMISSION FOR ERECTION OF A DWELLING HOUSE WITH CONNECTION TO EXISTING PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKSDecision record indexed
LEIS AN TEACH CÓAITHE ATÁ LEATH THÓGHTA AGUS A BHÍ CEADAITHE FAOI UIMHIR TAGAIRTHA 10/30321 A CHRÍOCHNÚ MAR ATÁ SUITE AR AN SUÍMH SEO I MBAILE FEARANNDecision record indexed
INSTALLATION OF A PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKS TO SERVE DWELLING CURRENTLY CONNECTED TO EXISTING COMMUNAL TREATMENT SYSTEMDecision record indexed
ATÁ A BHEAS SAN FHORBAIRT NÁ CEAD COINNEÁLA I GCOMHAIR SHÍNEADH TÍ AR CHÚL AN TÍ AGUS UILE OIBREACHA FORBARTHA BAINTEACH LEIS AN TSUÍOMHDecision record indexed
SÍNEADH DHÁ STÓR ATÁ ANN AGUS ATÁ LOCHTACH Ó THAOBH MICA DE A SCARTHÁIL AGUS SÍNEADH NUA A THÓGÁIL INA ÁIT, BEALACH ISTEACH SÍOMH NUA A THÓGÁIL AGUS NA HOIBREACHA SUÍOMH UILIG A BHAINEANN LEISDecision record indexed
(1) CONSTRUCTION OF AN EXTENSION AT GROUND FLOOR AND FIRST FLOOR TO THE REAR OF EXISTING DWELLING, (2) ALTERATIONS TO THE EXISTING WINDOWS AND PROVISION OF NEW PATIO ACCESS, ALL ON THE SOUTH-WEST SIDE OF THE DWELLING AND (3) ALL SITE DEVELOPMENT WORKSDecision record indexed
(1) DOMESTIC GARAGE, (2) HORSE STABLE AND (3) FUEL STORE AND PERMISSION FOR (1) DEMOLITION OF EXISTING SUN ROOM AND ERECTION OF AN EXTENSION TO THE SOUTH EAST ELEVATION OF DWELLING HOUSE, (2) ERECTION OF A NEW FRONT PORCH ON THE FRONT SOUTH WEST ELEVATION OF DWELLING HOUSE, (3) CHANGES TO THE ELEVATIONS OF DWELLING HOUSE AND (4) ADDITION OF TWO DORMER WINDOWS TO THE ROOF TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
(1) RENOVATION OF AN EXISTING COTTAGE, (2) CONSTRUCTION OF A NEW TWO-STOREY EXTENSION TO THE SIDE OF THE COTTAGE, (3) CONSTRUCTION OF A SINGLE STOREY DOMESTIC GARAGE TO THE REAR OF THE EXISTING COTTAGE AND (4) INSTALLATION OF A NEW WASTEWATER TREATMENT SYSTEM AND ASSOCIATED SITE WORKSDecision record indexed
CONSTRUCTION OF A DWELLING HOUSE AND GARAGE TOGETHER WITH INSTALLATION OF A NEW WASTEWATER TREATMENT SYSTEM AND ASSOCIATED SITE WORKSDecision record indexed
ERECTION OF A DWELLING HOUSE AND DOMESTIC GARAGE WITH PROPRIETARY WASTEWATER TREATMENT SYSTEM INCLUDING ALL ASSOCIATED SITE WORKSDecision record indexed