CONSTRUCTION OF NEW DWELLING HOUSE, DOMESTIC GARAGE/FUEL SHED, INSTALL EFFLUENT TREATMENT UNIT WITH SOIL POLISHING FILTER AND ALL ANCILLARY SITE WORKSDecision record indexed
A DOMESTIC GARAGE/FUEL STORE TO THE REAR OF THE PROPERTY AS CONSTRUCTED AND PERMISSION TO CONSTRUCT A SIDE EXTENSION, CARRY OUT ELEVATIONAL ALTERATIONS TO THE EXISTING DWELLING, RELOCATION OF DRIVEWAY, UPGRADE/RELOCATION OF EXISTING SEPTIC TANK AND ALL ASSOCIATED SITEWORKSDecision record indexed
CONSTRUCTION OF A NEW DWELLING HOUSE, DOMESTIC GARAGE/FUEL SHED, INSTALL EFFFLUENT TREATMENT UNIT WITH SOIL POLISHING FILTER AND ALL ANCILLARY SITE WORKS.Decision record indexed
A 10 YEAR PERMISSION FOR THE CONSTRUCTION OF A SOLAR PV DEVELOPMENT WITH A MAXIMUM EXPORT CAPACITY (MEC) OF UP TO 25MW COMPRISING OF CA.55,000 NO. PHOTOVOLTAIC PANELS LAID OUT IN ARRAYS, ALONG WITH ANCILLARY DEVELOPMENT INCLUDING: 10 NO. POWER HUBS (CA. 15.25M2 X 2.4M) WHICH INCORPORATE AN INVERTER AND A TRANSFORMER, 1 NO. SINGLE STOREY COMMUNICATIONS BUILDING (11.1M2 X 2.5M), 1 NO. SINGLE STOREY CLIENT SIDE SUB-STATION BUILDING (15.25M2 X 2.9M), 1 NO. SINGLE STOREY EQUIPMENT STORAGE BUILDING (7.5M2 X 2.7M), 7 NO. CCTV CAMERAS MOUNTED ON 4M HIGH POLES, PERIMETER SECURITY FENCING, LANDSCAPING, A NEW SITE ENTRANCE AND ALL ANCILLARY WORKS. THE TOTAL DEVELOPMENT AREA WIL BE CA. 31.1HA. AN NATURA IMPACT STATEMENT (NIS) WILL ACCOMPANY THE PLANNING APPLICATIONDecision record indexed
Construction of a two-storey dwelling, single storey garage, wastewater treatment system, percolation area, new entrance, driveway and all associated site development worksDecision record indexed
The amendment to the development previously approved under planning Ref: 23/60196 by a) omitting 4 previously approved No. Lean-to Type Houses (Previous Ref: E 1-4), and replacing with 3 No. Portal Frame type houses (Ref: E1-3), and, b) providing for an alteration to the previously approved stock numbers on the pig farm, resulting in an increase in breeding stock and a reduction in production pigs, at Roundhill and Derry Upper, Kilcormac, Co. Offaly. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) relating to this proposed development will be submitted with this planning applicationDecision record indexed
To demolish 4 No. existing pig houses and to construct 6 No. pig houses and extensions to 2 No. existing pig houses, together with all ancillary structures (to include meal storage bin(s)) and associated site works arising from the above proposed development on an existing pig farm. An Environmental Impact Assessment Report (E.I.A.R.) and Natura Impact Statement (N.I.S.) relating to this proposed development will be submitted with this planning application.Decision record indexed
A SINGLE STOREY EXTENSION TO THE REAR (SOUTH) OF EXISTING SEMI DETACHED DWELLING COMPRISING OF A KITCHEN/DINING ROOM, UTILITY ROOM, HOT PRESS, BATHROOM AND TWO BEDROOMS TOGETHER WITH ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
Permission to construct a new farm building for the housing of livestock with a solid concrete floor and completed with associated siteworksDecision record indexed
CONSTRUCTION OF NEW DWELLING HOUSE, DOMESTIC GARAGE/FUEL SHED, INSTALL SEPTIC TANK WITH PERCOLATION AREA AND ALL ANCILLARY SITE WORKSDecision record indexed
LOUGH BOORA DISCOVERY PARK, LEABEG, BOORA TULLAMORE CO. OFFALY
RECREATIONAL DEVELOPMENT CONSISTING OF REPURPOSING AND REFURBISHMENT OF C.5KM OF PRE-EXISTING NARROW-GAUGE RAIL LINE FOR THE USE OF 10-15 NO. VELO RAIL CARS. THIS RAIL LINE HAD PREVIOUSLY BEEN USED BY BORD NA MONA FOR PEAT PRODUCTION AND TRANSPORTATION. IN ADDITION TO THE CONSTRUCTION OF A TERMINUS STRUCTURE, PEDESTRIAN, AND SERVICE VEHICLE ACCESS PATHS AND ALL ASSOCIATED ANCILLARY SITE WORKS. AN APPROPRIATE ASSESSMENT AND NATURA IMPACT STATEMENT (NIS) HAVE BEEN PREPARED AS PART OF THIS PLANNING APPICATIONDecision record indexed
DEMOLITION OF AN EXISTING COTTAGE, THE CONSTRUCTION OF A PROPOSED TWO STOREY DWELLING WITH ATTACHED GRANNY FLAT, THE BLOCKING UP OF THE EXISTING SITE ENTRANCE, AMENDMENTS TO THE EXISTING ROADSIDE BOUNDARY WITH THE CREATION OF A NEW SITE ENTRANCE, ALL ASSOCIATED SITEWORKS, INCLUDING A PROPOSED SEPTIC TANK AND PERCOLATION AREADecision record indexed
THE CONSTRUCTION OF A TWO STOREY DWELLING HOUSE, DOMESTIC GARAGE, WELL, SEPTIC TANK, PERCOLATION AREA, ASSOCIATED SITEWORKS & NEW ENTRANCEDecision record indexed
(A) DEMOLITION OF EXISTING SLATTED SHED & STORAGE SHED (B) MODIFICATIONS OF EXISTING ENTRANCE (C) CONSTRUCTION OF A MILKING PARLOUR, DAIRY & ANCILLARY ROOMS, DRAFTING & HANDLING FACILITIES, WAITING YARD & UNDERGROUND SLATTED TANK (D) ERECTION OF MEAL BIN, WATER STORAGE TANK (E) CONSTRUCTION OF LIVESTOCK CUBICLE FACILITY WITH UNDERGROUND SLATTED TANK AND ALL ASSOCIATED SITE WORKSDecision record indexed
CONSTRUCTION OF A FRONT & SIDE SINGLE STOREY EXTENSION, CARRY OUT ELEVATIONAL ALTERATIONS TO THE EXISTING DWELLING AND ALL ASSOCIATED SITE WORKSDecision record indexed
Erecting a 30m high telecommunications lattice structure together with antennas, dishes, access track and associated telecommunications equipment, all enclosed by security fencing.Decision record indexed
BOORA AVENUE LEA BEG BOORA BLUEBALL, TULLAMORE, CO. OFFALY
CONVERSION OF THE EXISTING RESIDENTIAL PROPERTY LOCATED TO THE REAR OF THE EXISTING PUBLIC HOUSE FORMALLY KNOWN AS 'LOUGH BOORA INN' TO COMMERCIAL USE, TO RE-ROOF THIS AREA AND TO CONSTRUCT A NORTHERN SIDE EXTENSION TO SAME AND CONSTRUCTION OF NEW SOUTHERN END FLAT ROOFED OUTDOOR DINING AREA, ALTERATIONS TO THE EXISTING FRONT ELEVATION, TO CONSTRUCT A NORTHERN SIDE EXTERNAL STONE CLADDING WALL TO ENCLOSE AN OUTDOOR DINING AREA, CONSTRUCTION OF 35 NO. CAR PARKING SPACES TO INCLUDE 4 NO. EV CHARGING SPACES AND 4 NO. DISABLED ACCESS PARKING SPACES, PROPOSED NEW SITE ENTRANCE WITH PEDESTRIAN CROSSING, A PROPOSED RECEPTION BUILDING TO INCLUDE FIRST FLOOR WORK HUB, INSTALLATION OF 6 NO. GLAMPING PODS, TO CONSTRUCT A TOILET UNIT AND WASTE REFUSE DISPOSAL AREA ALSO TO PROVIDE CAPACITY TO PARK 88 NO. BICYCLES, TO CONSTRUCT 16 NO. PITCH PARKING FOR CARAVAN/MOTORHOME SHORT TERM STAY TO INCLUDE 16 NO. SEPARATE ELECTRICAL AND WATER SUPPLY CONNECTION BOLLARDS, TO CONSTRUCT AN OUTDOOR PLAY AREA, DEMOLISH THE EXISTING HAY SHED AND TO INSTALL A TREATMENT SYSTEM WITH COCO INFILTRATION SYSTEM AND ALL ASSOCIATED AND SITE WORKS AND TO INSTALL AN ATTENUATION SYSTEM FOR SURFACE WATER RUNOFF, TO INSTALL A RAINWATER HARVESTING SYSTEM FOR POTABLE WATER SUPPLY TO THE MAIN BUILDING, REUSE EXISTING WATER MAINS CONNECTION AND ALL ASSOCIATED LANDSCAPING AND SITE WORKSDecision record indexed
THE DEMOLITION OF EXISTING EXTENSION TO THE SIDE OF EXISTING HOUSE AND TO CONSTRUCT A NEW TWO STOREY GRANNY FLAT EXTENSION TO SIDE OF EXISTING HOUSE, NEW WASTE WATER TREATMENT SYSTEM, STORM WATER SOAKAWAY, AND ALL ASSOCIATED SITE WORKSDecision record indexed
(1) CONSTRUCTION OF A NEW EXTENSION TO EXISTING LIVESTOCK FARM BUILDING TO CONTAIN MILKING AREA, CUBICLES, EXTENDED SLATTED UNDERGROUND SLURRY STORAGE TANKS AND ALL ANCILLARY SEPARATION & TREATMENT AREAS, AND TO INSTALL CUBICLES IN THE EXISTING BUILDING; ALL COMPLETED WITH ASSOCIATED SITEWORKS. (2) PERMISSION TO CONSTRUCT A NEW FARM BUILDING TO CONTAIN DAIRY, PLANT ROOM, FARM OFFICE, STORAGE AREA AND EXTERNAL MILK STORAGE SILO; ALL COMPLETED WITH ASSOCIATED SITEWORKSDecision record indexed
CONSTRUCTION OF A NEW DWELLING HOUSE, DOMESTIC GARAGE/ FUEL SHED, INSTALL SEPTIC TANK WITH PERCOLATION AREA AND ALL ANCILLARY SITE WORKSDecision record indexed
CONSTRUCTION OF ONE 4.2MW WIND TURBINE WITH AN OVERALL TIP HEIGHT OF UP TO 150M; CONSTRUCTION OF THE WIND TURBINE FOUNDATION, HARDSTANDING AND ASSEMBLY AREA; PROVISION OF A SITE ENTRANCE AND AN ACCESS TRACK WITHIN THE SITE; CONSTRUCTION OF AN ON-SITE 20KV SUBSTATION AND UNDERGROUND ELECTRICAL CABLE; AND, ALL ASSOCIATED SITE DEVELOPMENT AND ANCILLARY WORKSGrounds not yet categorised
•The construction of one Enercon E138 Wind Energy Converter on an 81m tower with an electrical rating of 4.5MW and an overall tip height of 149.38m. •Installation of the hardstanding area for the Wind Energy Converter. •Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site. •Construction of the proposed substation building which will be located c. 340m from the proposed wind energy converter and surrounded by stock proof fencing. It will be a single storey building, measuring 53m2 and c. 5m in height. •Construction of proposed internal site access track, constructed from permeable material and which will run from the site entrance to the Wind Energy Converter hardstanding area. •All associated ancillary infrastructure and preparatory works such as provision of the site entrance. The power rating associated with the proposed wind turbine is 4.5 megawatts (MW). The proposed Project will have a 30-year lifespan.Grounds not yet categorised
A CHANGE OF USE OF THE ORIGINAL DOMESTIC GARAGE TO STUDY, AN EXISTING GARAGE/FUEL STORE (51.33M2) LOCATED AT THE REAR OF THE SITE. ALSO A KITCHEN/DINING EXTENSION TO THE REAR OF EXISTING DWELLING (23.8 M2) AND ALL ANCILLARY WORKSDecision record indexed
CONSTRUCTION OF A SINGLE STOREY DWELLING, SINGLE STOREY DOMESTIC GARAGE, BORED WELL, WASTEWATER TREATMENT SYSTEM, PERCOLATION AREA AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
Construction of a single story dwelling and garage. The application will also include an effluent treatment unit, percolation area, new domestic entrance and all associated site works and drainage.Grounds not yet categorised
(A) DOMESTIC GARAGE AS CONSTRUCTED (B) REAR EXTENSION AND FRONT PORCH TO DWELLING HOUSE AND ASSOCIATED SITE WORKS AS CONSTRUCTEDDecision record indexed
THE CONSTRUCTION OF A PROPOSED TWO-STOREY DWELLING,DOMESTIC OUTBUILDING, A PROPOSED WASTEWATER TREATMENT SYSTEM AND POLISHING FILTER, A PROPOSED BORED WELL, ALL ASSOCIATED SITEWORKS, INCLUDING A PROPOSED SITE ENTRANCEDecision record indexed
Construction of new single/dormer type dwelling house, install septic tank with percolation area, form new entrance & all associated site worksDecision record indexed
TO DEMOLISH EXISTING DWELLING HOUSE AND DECOMMISSION EXISTING SEPTIC TANK. PERMISSION IS ALSO SOUGHT TO ERECT NEW REPLACEMENT DWELLING HOUSE, NEW SEPTIC TANK TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKSDecision record indexed
CONSTRUCTION OF A NEW DWELLING HOUSE, GARAGE, SITE ENTRANCE, WASTE WATER TREATMENT SYSTEM WITH POLISHING FILTER, BORED WELL AND ALL ASSOCIATED SITE WORKS AND SERVICESDecision record indexed
New 2 storey dwelling house, domestic garage, treatment system with percolation area, new site entrance and all associated worksDecision record indexed