Construction of a new single storey industrial unit with ancillary 2 storey office accommodation (Total Floor Area 2310 sq.m) and all associated site development worksDecision record indexed
Erect a 2,300m2 manufacturing & engineering industrial unit with connecting 440m2 office building along with all associated site development works including storage yard, car parking, signage and connect to the existing servicesDecision record indexed
To erect a 1,555m² extension to the rear and 720m² extension to the side of the existing 2,575 m² manufacturing & engineering industrial unit & 700m² office building along with all associated site development worksDecision record indexed
Minor alterations to previously granted house type under planning permission file ref 21/1210 - all other aspects of the previously granted permission remain unchanged i.e. garage, a new secondary treatment system and percolation area to current EPA guidelines, a new vehicular entrance off public road, well and all associated site worksDecision record indexed
New dwelling, new garage, well, a proposed secondary treatment system to current EPA guidelines with percolation area, a new entrance off public road and all associated site worksDecision record indexed
Alterations and revisions to the already approved permission granted under PRR 20/632. Retention permission is sought for (1) an additional 275m2 of floor area to the already approved 2,300m2 manufacturing & engineering industrial unit now totalling 2,575m2 with minor alterations and revisions to the elevations and (2) minor alterations and revisions to the elevations, floor plan and internal layout of the connecting office building providing an additional 200m2 of office floor area to the original 2nd floor approved storage area with an additional 60m2 fire escape stairwell to the already approved 440m2 office building, now totalling 700m2. All associated site development works including storage yard, car parking, signage, and connection to the existing services and the same as approved under PRR 20/632Decision record indexed
(i) lean to extension (283sqm.) to existing building permitted under PRR 98/9110 and (ii) portacabin building for use as site office in connection with the applicants agricultural contracting businessDecision record indexed
Construction of Biofuel facility comprising of a part 3 storey and part single storey commercial building with a total floor area of 1771m2, covered truck filling / unloading area. Pipe bridge and tank farm storage area. The overall building height is 14 metres with solar panels on the roof. The maximum height of any storage tank is 12 metres and the boiler room chimney is 15 metres. Extension of the existing Kish Business Park access road, footpaths, drainage and water supply to serve the subject site. New internal roads, footpaths, 21 no. car parking spaces, 10 no. cycle parking spaces and parking and circulation areas for 10 no. trucks; 2 no. vehicular entrances, pedestrian access, boundary treatment and landscaping, ESB substation and new underground foul and storm water drainage system for the site including rainwater harvesting, attenuation pond, full retention oil interceptor and associated works. The application site area is 1.6 hectares. An Environment Impact Assessment Report (EIAR) has been prepared and will be submitted to the Planning Authority with the planning applicationDecision record indexed
Erect a 8,875m2 manufacturing & engineering industrial extension with 1,020m2 additional office space to the side of the existing 5,550m2 manufacturing & engineering industrial & office building along with all associated site development worksDecision record indexed
Single storey 710 sqm industrial unit, comprising of a 236 sqm metal fabrication workshop, and 474 sqm trade sales and display area, plus 272 sqm concrete surfaced yard with security fence to the side of the proposed building, connect into the existing mains sewer and storm water systems, to provide car parking, a 3.5m high sign at the site entrance and all additional site works14 conditions indexed
(i) Single storey industrial unit (Gross Area 2,380sqm) in lieu of that allowed under PPR21/951 and (ii) new car park and timber storage compound and all associated site worksDecision record indexed
(i) Single storey industrial unit (Gross area 3150 Sqm) infill extension between existing buildings. (ii) New car park and timber storage compound (0.7 Ha) and all associated site worksDecision record indexed
Installation of a new effluent treatment system and percolation area in full accordance with EPA Cop 2009 standards and all associated site works, together with a new bored well4 conditions indexed
Change to an approved permission Reg. Ref. 20/667 with the addition of a single storey bedroom extension to the rear of a single storey cottage4 conditions indexed
Demolish the existing 2m2 front porch and 40m2 substandard rear extension along with all outbuildings totaling 84m2 and erect 81m2 new single storey extensions to the rear and side of the existing 45m2 cottage along with minor alterations and revisions to the elevations and internal layout of the original cottage and erect an 84m2 garage, upgrade the existing effluent disposal system to current EPA standards, improve the existing vehicle entrance along with all associated site development worksDecision record indexed
Construction of 3 no. digesters, 2 no. digestate storage structures, a liquid feed tank and 4 no. pump houses located in the northern section of the site. 4 no. pasteurisation tanks, a post pasteurisation cooling tank and a pre fertiliser manufacturing tank, located to the southeast of the digesters, in the centre of site. Part single-storey and part two-storey reception hall to accommodate a lab, panel room, tool store, workshop, and storage areas, with a liquid feed intake adjacent to reception hall, located at centre of site. Single-storey solid digestate storage & nutrient recovery building located to east of reception hall, in central portion of site. Odour abatement plant and all assoc. works. Construction of ESB substation, fuel storage tank, CNG compression unit, 2 no. CO2 tanks, CO2 loading pump, CO2 auxiliaries, CO2 liqueufactor, CO2 compressor, GFA, CO2 pre-treatment skid located in eastern portion of site. Construction of emergency biogas flare, biogas treatment skid, biogas compression system, biogas upgrading module, combined heat&power unit & panel room & H2S washing tower located in eastern part of site. Construction of grid offtake skid, biomethane boiler, grid injection unit & 2 no. propane tanks located to southeast of CO2 structures, in eastern section of site. Construction of two-storey office&admin building, located in southeast of site, adjacent to main site entrance. Associated works inc. parking, 3 no. EV, 1 no. accessible parking spaces;bike storage, access arrangements incl. new access point to site from adjacent road to south, weighbridge, provision of solar panels, wwt equipment, attenuation pond in northern portion of site, boundary treatments, lighting, services, lightning protection masts, drainage, landscaping & all assoc & ancillary works. EIAR submitted.Grounds not yet categorised
Dormer type extension to existing bungalow and erect an extension to the side which will consist of the following (a) renovation and extension of the ground floor to create additional living space including the rearrangement of internal layouts with associated demolition works (b) the removal of the existing roof and replace it with a dormer roof space to accommodate bedrooms (c) renovate and extend the existing storage shed and workshop (d) ancillary works7 conditions indexed