Sunroom extension and additional first floor residential accommodation together with free standing storage outbuildings for uses ancillary to main house
Erect a two-bedroom dwelling (maisonette), over the Aughrim Butcher Shop. The 99.17 square meter maisonette has its main entrance through the rear gate and yard (private open space) beside and in line with the adjoining existing development entrances. Permission is also required for any ancillary site works including but not limited to, sewage, water, rear yard paving and car parking
Proposal to extend the existing first floor Office-Storage Area, over Aughrim Butcher Shop, out into the yard at the rear, at the same level, by 36.22 square metres. The extended area will include 3 number south facing Velux Roof Lights in the roof, toilets and any ancillary site works
Proposed two storey extension to dwelling and to upgrade the existing sewage treatment system
Demolition and removal of the existing 3 bed single storey detached dwelling ‘Woodview Cottage’ (84sqm) and for the construction of a new 4 bed two storey detached dwelling (180sqm), for connection to all existing site services above and below ground, for all associated hard and soft landscaping and for the construction of a new 1.2m high timber post and rail fence on the south eastern site boundary
1. Divide the property into two separate dwellings. 2. Permission to provide connections to existing services for the proposed dwelling. 3. Retention for the demolition of boundary wall and relocation of side entrance gate. 4. Retention for constructed boundary wall separating both properties. 5. Retention for carparking area, access pathway and pedestrian entrance
Proposed dwelling, waste water treatment system to EPA standards, garage, new entrance and associated works
Use of building 2 as a self-contained granny flat including built in kitchen
Dwelling and garage with services and all associated site development works
Detached single storey timber clad cabin for office and gym to rear/side of existing house along with associated ancillary works
Single storey extension (19.25 sqm) to side of existing dwelling, all above with associated site works
New three bedroom single storey dwelling new roadside entrance waste treatment system with percolation and soakaway areas & associated site works
Change of use (removal of condition 2 of planning register 96/4483) from holiday home to use a permanent residence.
Change of use (Removal of Condition 2 of PRR:96/4483) from holiday home to use as a permanent residence
Change of use (removal of condition 2 of planning register 96/4483) from holiday home to use as a permanent residence
The change of use (removal of condition no 2 of planning ref 96/4483) from use as holiday home to use as permanent residence
Change of use from shop and showroom to dormer dwelling
Change of use (removal of condition no. 2 of planning ref. 96/4483) from use as holiday home to use as permanent residence
Change of use (removal of condition no 2 of planning ref 964483) from use as holiday home to use as permanent residence
Change of use (removal of planning condition No. 2 of planning Ref. No. 96/4483) from use as a holiday home to use as a permanent residence
Change of use (removal of condition 2 of planning register 96/4483) from holiday home to use as a permanent residence
Change of use (removal of condition 2 of planning register 96/4483) from holiday home to use as a permanent residence.
Change of use (removal of condition 2 of planning register 96/4483) from holiday home to use as a permanent residence
Change of use (removal of condition 2 as attached to PRR96/4483) from Holiday Home to use as a permanent residence
Change of use (removal of condition 2 of planning register 96/4483 ) from holiday home to use as a permanent residence
Change of use (removal of condition 2 of planning register 96/4483) from holiday home to use as a permanent residence
Change of use (removal of condition 2 of Planning Register 96/4483) from holiday home to use as a permanent residence
Change of use (removal of condition 2 of planning register 96/4483) from holiday home to use as a permanent residence
Proposed new dwelling, garage, on-site sewage treatment system to current EPA standards, new road entrance and all ancillary site works
Change of use (removal of condition 2 of Planning Register Reference 96/4483) from holiday home to use as a permanent residence
Change of use from residential to short-term letting use and associated works
Alterations and additions comprising the demolition of existing single storey sunroom to gable end, and the construction of a new single storey living room extension in lieu of same, together with the construction of a new 2 storey dormer extension to the rear, including alterations to exiting window openings to each gable end at first floor level, and new patio doors in lieu of an existing window opening to front elevation at ground floor level, and all ancillary site works, connecting into existing services, at an existing detached 2-storey dormer dwelling
Proposed dwelling, wastewater treatment system to EPA standards, garage, revised entrance and associated works
Domestic garage as built and associate works
Alterations and ground floor extension to the side and rear of existing dwelling to link existing dwelling to existing out building. Alterations and renovation to existing out building to create habitable space and the addition of a draught porch to the main entrance of the existing dwelling
Renovate and reinstate existing abandoned residential dwelling to include reinstatement of roof structure. Permission is sought to make alterations and to erect an extension to existing abandoned dwelling. Permission is sought to install wastewater treatment facilities to current EPA standard and sink a new bored well water supply and and all associated site and ancillary works
Erection of 4 no. new 10m high lightpoles with associated light fittings and all ancillary works at our existing all weather training pitch
To demolish the existing 5m² porch & substandard 20m² outbuilding and erect a 90m² dormer extension to the rear along with minor alterations and revisions to the elevations and internal layout of the existing farmhouse and upgrade the existing on-site effluent disposal system to current EPA standards along with all site development works
Construct slatted cattle shed, concrete aprons and all associated site works
Alterations to a steel framed agricultural shed as a change to that permitted under 17/1393 and all associated site and ancillary works
1) a single-storey sunroom extension to the north west elevation of the existing dwelling and 2) a domestic storage shed along with all associated site development works
New dwelling with new roadside entrance from Killacloran Road and all associated ancillary works to create new access road, surface water soakaway and foul water treatment and percolation area
Replacement of an existing 12m communications pole for an 18 metre high free standing communications structure with its associated antennae, communication dishes, ground equipment and all associated site development works. The development will form part of Eircom Ltd existing telecommunications and broadband network
(1) Two storey extension to rear of existing house. (2) New porch & rooflight to front elevation. (3) New high-level windows at first floor level to south elevation of existing house. (4) Alterations to existing window openings to front & rear elevations. (5) New septic tank & percolation area in new location
Construct (i) cubicle shed with milking area, storage, slatted tanks and loose straw areas (ii) storage shed (iii) calf shed and all associated site works
To erect an extension to our existing dwelling and upgrade of our existing percolation area all with associated site works and services
The importation of material to in-fill and re-contour the subject site. Once the importation is complete, the applicant will seed the land in line with Teagasc guidelines and return it to agricultural use. The Operational Phase will see the Site being used as agricultural pastureland. The applicant proposes, subject to planning, to import clean greenfield soil and stone to remediate approximately 2.43ha of the total site. The 2.43ha. is divided into 3 distinct phases - Phase 1 is 0.78ha, Phase 2 is 0.77ha and Phase 3 is 0.88ha. A fill plan has been drawn up for the importation of 18,200tonnes to fill Phase 1, 23,085tonnes to fill Phase 2, and 42,721tonnes to fill Phase 3, equating to a total of 84,006tonnes of soil and stone. Permission is being sought for a 5-year period and will be subject to a waste facility permit
Erection of a new single storey steel shed building to side/rear of existing dwelling and all associated site works
Proposed dwelling, waste water treatment system to EPA standards, garage, entrance and associated works
The removal of external potting and utility sheds and for building 1 new replacement single storey steel shed building to side / rear of existing dwelling and all associated site works