Development will consist of amalgamation and change of use of unit R1 (restaurant) and unit R2 (restaurant/bar) to gym/fitness centre with mezzanine floor level with a combined gross floor area of 1022sq.m. Permission is also sought for all associated elevational changes, signage, reconfiguration of internal circulation areas and all associated site and development works.
Development on this site (3.02ha) will consist of change of use of Unit 18 (278m²) from retail to office use and provision of a part mezzanine floor level (92m²) to provide an open plan office use within unit 18 totalling 370m² gross floor area. Permission so also sought for all associated elevational changes, signage and all associated site and development works.
Permission for change of use of the existing management suite (246 sqm) at mezzanine floor level and office unit (99sqm) at first floor level to medical centre (health practitioner) and all associated site and development works. No amendments are proposed to the external elevations of the existing Charlestown Centre.
Development at this site (3.02ha) will consist of change of use of Unit 7 from retail to restaurant use at ground (223sq.m) and mezzanine (63sq.m) floor levels to create a licenced restaurant of 286sq.m gross floor area including provision for the preparation of hot food for consumption off the premises (home deliveries and collection). Permission is also sought for changes to the southern elevation of the existing Charlestown Centre at Unit 7 to provide a new entrance door and signage, reconfiguration of the existing planter area and adjoining footpaths and ramp at Charlestown Place to provide an external seating area and delivery bike parking and all associated site and development works.
Development at this site (3.02ha) will consist of change of use of unit 22 from Estate Agent's to restaurant use (93sq.m gross floor area) including provision for the preparation of hot food for consumption off the premises (home deliveries and collection). Permission is also sought for amendments to the eastern elevation of the existing Charlestown Centre at Unit 22 to provide an external seating area, delivery bike parking, signage and all associated site and development works.
The retention of the existing scrolling internally illuminated double sided 'Metropole' advertising display case mounted on an offset leg.
Construction of single storey extension to the front and side of existing dwelling comprising of Entrance porch, Living Room, Dining Room and Bathroom and all associated site works.
The development will consist of the installation of electrical infrastructure between Finglas substation and Huntstown Power Station to facilitate the retirement of existing Electricity Supply Board overhead powerlines and facilitate site clearance for the future development of a data centre and substation (subject to separate planning applications). This will include (i) the installation of approximately three underground cable circuits of 1.2km length (110kV) and one circuit 1.2km length (38kV) and associated underground ducting, joint bays and infrastructure between the existing ESB Finglas substation and an agreed location within Huntstown Power Station (ii) installation of one c.28m double circuit 110 kV cable end tower and one c.17 single circuit 110kV angle mast (iii) removal of 10Nr. existing 110kV timber polesets, 9 Nr. existing 38kV timber polesets, 3 Nr. 38kV lattice steel tower & associated overhead line electrical infrastructure; all associated and ancillary site development, landscaping and construction works, all within the townlands of Johnstown, Huntstown, Coldwinters & Balseskin at Blanchardstown & Finglas, County Dublin. An Environmental Impact Assessment report (EIAR) has been prepared and will be submitted to the Planning Authority with the planning application.
The development will consist of the use of existing hard landscaped areas (c.0.02ha) for display of motor vehicles (cars) for sale with associated boundary treatment and signage. AI Rcvd 06/06/2025
Extension to rear, extension to front porch, attic converted to storage/study space and new front wall added to drive.
Permission is sought for a development that will consist of change of use of Unit 1C (438sq.m gross floor area) from financial services (former Ulster Bank) to medical and related uses. Permission is also sought for signage, removal of existing internal ATM and all associated site and development works.
Planning permission is sought for new single storey one bedroom detached house, located between front gardens of above adjoining sites, services to connect to existing and existing entrance to be used, front boundary wall to be reduced in height to 900mm all associated site works.
Retention is sought for change the of use from light industrial to commercial kitchen with delivery & take away service.
Planning permission to erect 1576m2 of photovoltaic panels on the roof of our existing building of our factory with all associated site works.
Permission sought for the construction of 2no., 2 bedroomed, 2 storey semi-detached dwellings on the existing vacant site to the east of 1C Barry Avenue, Finglas, Dublin 11. Application to include pedestrian access to the side off Casement Road, off street parking for each dwelling off Barry Avenue associated site development works and services connections.
Planning permission is sought for the construction of 2no., 2 bedroomed, 2 storey semi detached dwellings on the existing vacant site to the east of 1C Barry Avenue, Finglas, Dublin 11. Application to include pedestrian access to the side off Casement Road, off street parking for each dwelling off Barry Avenue associated site development works and services connections.
Conversion of existing garage area to front to create family ancillary accommodation, with internal modifications, with associated site works
The development will consist of the demolition of all existing buildings on site (total c. 392.22 m2) and the construction of 27 no. apartments in two blocks with balconies and terraces comprising of: 7 no. two-storey apartments in rear two storey Block 2 (c. 684.7 m2) ( 1 no. 3-bed unit, 4 no. 2-bed 4-person units, 2no. 2-bed 3-person units) and 20 no. one-storey apartments in front four storey Block 1 (c. 1446.3 m2) (comprising of 3 no. studio units; 10 no. 1-bed units; 7 no. 2-bed 4-person units) with solar panels on roof; the provision of a single storey bin store(c.33.56m2); communal amenity space (c.186.36m2); removal of hard standing, boundary walls to front and existing services on site as required; modifications of existing vehicular, pedestrian and cycle access; with new pedestrian and cycle accesses from St Margaret's Road; with 14 no car spaces and 58 no cycle spaces; with associated siteworks, services, landscaping, planting, levelling, paving, lighting and boundary treatment.
PERMISSION & RETENTION: Planning Permission is sought for relocation of front door from side elevation to front elevation of existing house, also single storey porch to front of house, permission sought for attached 2 storey 2 bedroom house to front and side of existing house, also permission sought for retention of vehicular entrance to the original house and all associated site works.
Permission is sought for relocation of front door from side elevation to front elevation of existing house, also single storey extension to front of house, permission sought for attached 2 storey 3 bedroom house to front side and rear of existing house, also permission sought for retention of vehicular entrance to the original house and all associated site works.
The proposed development will consist of an extension to the existing food production and warehouse building at Manhattan Peanuts Ltd comprising an additional floor area of 1,913sq.m. and associated external amendments. Works to facilitate the proposed extension include the removal of the existing bin store on site and the removal of the existing sunken ramp and loading bay located to the south-east of the existing warehouse building. The proposed extension will provide for: (i) 1,252sq.m. of additional floor area at ground floor level, comprising warehouse space, a packing room, reception area, storage space, a charging room, plan room and new lift and stair cores; (ii) 26sq.m. of additional floor space at mezzanine level, comprising a clean room; (iii) 321sq.m. of additional floor space at first floor level, comprising a canteen room, toilet facilities, storage space, office space and a meeting room; (iv) 314sq.m. of additional floor space at second floor level, comprising storage space, office space with access to a balcony area and a boardroom. Other works proposed onsite include: (v) provision of a new sunken loading bay, loading area and access ramp at ground floor level, to the south-east of the proposed extension; (vi) the provision of an additional 23 no. car parking spaces (including 2 no. accessible parking spaces and 3 no. EV charging spaces) and 5 no. new truck parking spaces at surface level; (vii) provision of a new secure bicycle shelter located adjacent to the southern site boundary; (ix) provision of new permeable asphalt and grasscrete surfaces surrounding the proposed new extension; (x) provision of a staff courtyard area to the south of the proposed extension; (xi) partial recladding of existing warehouses and the provision of new solar panels to the roof level of the proposed extension; (xii) boundary treatments, hard and soft landscaping, foul and surface water drainage and all associated site development works necessary to facilitate the development.
The development consists of a single storey front extension with window to the side of the existing front porch with a new tiled roof over both, first floor rear extension with two bedrooms, tiled roof, roof lights, windows to rear, internal alterations and all associated site works.
M7 Real Estate Ltd. wish to apply for planning permission and retention permission at Century Business Park, Melville Road, Finglas, Dublin 11. Planning permission is sought for the erection of a nonilluminated totem sign at the north west corner of Century Business Park. The proposed development will face towards the vehicular and pedestrian junction of Charslestown Place and St. Margaret’s road. The sign is 7m high, 2.69m wide and has a depth of 0.125m. Retention permission is sought for a nonilluminated estate directory sign, located at the eastern side of, and immediately adjacent to, the entrance of Century Business Park. The sign is 2m high, 3.3m wide and has a depth of 0.10m. Retention permission is sought for a nonillluminated estate directory, located at the rear of Century Business Park, facing onto the primary entrance and access road. It is situated on a grass verge at the far end of a T-junction adjacent to yellow box road markings. The sign is 2.6m high, 3.45m wide and has depth of 0.15m
Retention sought for; 1. Existing single storey lean-to rear extension to dwelling house as laid out and constructed & 2. Existing single storey outbuilding as laid out and constructed, with home office and storage use ancillary to the dwelling house.
We, Central Bank of Ireland, intend to apply for retention permission for a period of 3 years for development at a site located within the townland of Dubber, Co. Dublin. The site is bounded by the R122 to the east and the M50 to the south. The development consists of: - The erection of a 2m high heras fence placed within the site approximately 1 metre back from the existing fence line.
The development will consist of a total combined length of approximately 35m of 1.5m high fencing, Gas Networks Ireland signage, and all associated site development works on a site of 0.0836 hectares at the entrance area to the Network Services Centre.
Ground floor extension to front of existing dwelling with internal modifications and associated site works.
Conversion of attic space to sensory room with dormer window to back & Velux rooflight to front and all associated site works.
The development will consist of the construction of a 228 sq.m single storey canopy structure over the existing raised loading platform on the western side of the building.
Ground floor extension to front of existing dwelling with internal modifications and associated site works.
The development will consist/consists of: (1) ground floor extension to front and first floor extension to the rear of existing dwelling (2) new detached domestic garage at the rear of the site to be used as gym and storage (3) new entrance gates and all associated site works.
Planning permission for attic conversion with dormer to rear roof to accommodate stairs to allow access to attic conversion as non habitable storage space with roof windows to front all with associated ancillary works.
• Demolition of 2 no. existing residential dwellings and ancillary structures to the east of the site (c.344qm total floor area); • Construction of 2 no. data hall buildings (Buildings A and B) comprising data hall rooms, mechanical and electrical galleries, ancillary offices including meeting rooms, workshop spaces, staff areas including break rooms, toilets, shower/changing facilities, storage areas, lobbies, outdoor staff areas, loading bays and docks, associated plant throughout, photovoltaic panels and screened plant areas at roof levels, circulation areas and stair and lift cores throughout; • External plant and 58 no. emergency generators located within a generator yard to the east and west of Buildings A and B at ground level. The area is enclosed by a c.6.5m high louvred screen wall; • The proposed data halls (Buildings A and B) are arranged over 3 storeys with a gross floor area of C.37,647sqm each; • The overall height of the data hall buildings is c28m to roof parapet level and c32m including roof plant, roof vents and flues. The total height of Buildings A and B does not exceed 112m OD (above sea level); • The proposed development includes the provision of a temporary substation (c.32sqm), water treatment building (c. 369sqm and c.7.7m high), 7 no. water storage tanks (2,800m3 in total and c.6.4m high each), 2 no. sprinkler tanks (c.670m3 each and c.7.9m high each) with 2 no. pump houses each (c.40sqm and c. 6m high each); • The total gross floor area of the data halls and ancillary structures is c.75,775sqm; • All associated site development works, services provision, drainage upgrade works, 2 no. attenuation basins, landscaping and berming (c.6m high), boundary treatment works and security fencing up to c.2.4m high, new vehicular entrance from the North Road, secondary access to the south west of the site from the existing private road, all internal access roads, security gates, pedestrian/cyclist routes, lighting, 2 no. bin stores, 2 no. bicycle stores serving 48 no. bicycle spaces, 208 no. parking spaces including 10 no. accessible spaces, 20 no. electric vehicle charging spaces and 8 no. motorcycle spaces; • Existing electricity overhead lines traversing the site will be undergrounded under concurrent application Ref. FW21A/0144; • A proposed 220kv substation located to the south west of this site will be subject of a separate Strategic Infrastructure Development application to An Bord Pleanála under section 182A of the Planning and Development Act 2000 (as amended); • An Environmental Impact Assessment Report (EIAR) is submitted with this application. AI received 11/02/2022 AI deemed significant ** revised public notices 24/2/2022
Alterations to development previously approved under Reg. Ref. FW23A/0006: the alterations comprise of:(a) increased height of external staircase to access the roof; (b) increased floor area across the three storeys from 893.7sq m to 919.6sq m and resultant amended South Elevation and (c) change from 'Blue Roof' to other SUDS measures
Construction of three storey extension to the Convent Buildings for Radiology, Education and Storage, with external staircase, rooftop solar panels, plant and screening and ancillary works at The National Orthopaedic Hospital.
Permission for an extension to the staff car parking area and the retention of car parking on the tennis court and associated site works. Add Info requested 10/05/21 Add Info received 06/07/21
Installation of a new window to the front elevation (West). Window dimensions is 2000mm (W) x 968mm (H).
The development will consist of the construction of a two-storey extension to the rear of the dwelling incorporating an extended kitchen/living area and additional en-suite bedroom at first floor, plus all associated site works.
The development comprises the construction and operation of 3 no weighbridges (each with a dedicated weighbridge office), a new 2,160m2 soil waste inspection and quarantine shed, new site offices and associated parking facilities. The development will facilitate internal re-routing of soil intake for future backfilling and restoration of Huntstown South Quarry (previously approved under planning permission Ref. FW12A/0022). AI received 20/02/23.
Single storey extension, 156 sq.m at ground floor providing staff changing facilities, public waiting area and new link corridor from the radiology department to the physiotherapy department, and new plant access route at roof level.
Planning permission for the installation of photovoltaic (PV) solar panels comprising an array of 498.82msq on the roofs of three buildings at The National Orthopaedic Hospital Cappagh - St. Michael's Hall, the Recovery unit and the Operating Theatres and all associated works.
RETENTION: retention permission for single storey garage to side, canopy to front and stone cladding to front.
Permission for the demolition of the existing entrance conservatory and the construction of a main entrance lobby incorporating a waiting area and external portico and all associated works at ground floor level.
Permission for the following: Erection of a single truck loading bay (dock leveller) of appx. 35 sqm to the southern (rear) facade.
Planning permission at 13A Casement Drive, Finglas, Dublin 11 (corner site at the junction of Casement Drive & Casement Grove) for a development which will consist of the construction of a two storey detached development including the modification of existing permitted development planning register reference 3488/19, the modifications to include the alteration of the permitted ground floor one bed apartment to a two bedroom apartment and associated layout and elevation changes and the development of the existing permitted first floor two bedroom apartment with enclosed stairs and a balcony (2 no. units). Development works include a pedestrian access located at Casement Grove and ancillary site development works.
Planning permission is sought at the rear of 103 North Road, Finglas, Dublin 11 for the construction of two no. two storey dwellings to consist of at ground level; kitchen/dining & living area at first floor level two bedrooms & office, vehicular access to North Road & associated site works.
The development seeking permission will consist of the provision of a dormer window in the main roof to the rear of the property and one rooflight in the main roof to the front of the property
The development consists of the demolition of existing single storey pitched roof porch to the front of the dwelling and the construction of a new single storey pitched roof extension to the full width of the front and side of the existing dwelling to incorporate extended sitting room, porch and bike store. The development is to include internal alterations, landscaping and all ancillary site works and drainage as required.
Retention and planning permission for an extension to the staff car parking area and the retention of car parking on the remodelled grass area and bicycle parking and associated site works including storm water drainage from the existing private road and wetland pond, all on the campus of the hospital off Ratoath road, Finglas, Dublin 11. AI received 2/6/2023
Planning Permission to erect 1,795.23 m2 or 371.68 Kwp of photovoltaic panels on the roof of our existing Huntstown Power Station plant with all associated site works at Huntstown Bioenergy Limited, Johnstown, Dublin, D11 N28R, site that currently operates under an Industrial Emissions (IE) License (P0993-02).