Side extension at first floor level to add a bedroom and toilet, and extension of previously approved dormer at attic floor level. Proposed finishes to match and align with existing dwelling inclusive of all associated site works.
Retention of single storey flat roof extension to rear (south west), including kitchen with 2 rooflights, utility room, wc and dining area with sliding door; removal of entrance porch and new front door; change of use from garage to bedroom inclusive of change of garage door to window at front and increased parapet height; single storey blockwork shed with sliding door to rear of the dwelling to be retained inclusive of all associated site works.
Planning permission for an attic conversion including a change of roof profile from hipped roof profile from hipped roof to a half-hipped gable-ended profile, a rear dormer roof extension, two rooflights to the front elevation, a new window to the gable wall and new internal access stairs and all associated site works
Signage for Unit E including the provision of 1 halo illuminated sign to the north eastern elevation; and all associated works. (Development site at Unit E in the townland of Collegeland, Baldonnel Business Park, Dublin 22; the site is under construction and located between Casement Aerodrome and the N7 national route)
Canopy waste compactor/baler on south western elevation and all associated site works on a site under construction and located between Casement Aerodrome and the N7 national route. The proposal amends a previously permitted development under SDCC Reg. Ref. SD20A/0215.
Remove sections of existing grass margin and grass verge and extend concrete apron to front and rear of existing public footpath, install accessible kerb and erect of a proposed new stainless steel and glass bus shelter, 5.2m x 1.85m x 2.8m high on the public footpath with 2 No. LED illuminated Advertising Panels each of 2.0 square metre area.
Permission for demolition off existing single storey garage and the construction of a new two storey extension to the side of the existing house and single storey extension to the rear of the house with all assocciated works.
Change of use of a residential dining area to a kitchen for a home baking business.
The proposed development will consist of the widening of the existing vehicular entrance by 2 metres and extension of the existing driveway to the public road, including associated footpath dishing and ancillary site works.
Conversion of Attic Space comprising of modification of existing roof structure, new gable window new access stairs, 2no roof windows to the front and flat roof dormer to the rear.
Change of use from dry cleaners to takeaway.
Retention of existing single storey extension at rear.
The installation of telecommunications equipment including no. 3 ballast mounted shrouded antennas, no. 1 ballast mounted dish, remote radio units (RRU's), cable trays, GPS, cabinet and all other associated site development works on the building rooftop to provide for high-speed wireless data and broadband services.
Construction of single storey extension to side of existing dwelling comprising 2no. bedrooms, office, playroom, living room, bathroom, and associated site works.
Single storey and 2 storey extension to front of existing dwelling.
Construction of a 68sq.m single storey extension to the side and rear of two storey, semi-detached dwelling and all associated ancillary site development works.
The development will consist of A) minor demolition to the existing house to form new door open to the proposed extension, B) Minor demolition and alterations to the existing garage, C) The construction of a new single storey flat roof extension to the rear of the existing garage, and D) All associated site works.
Construct a new first floor side extension above existing garage together with minor internal alterations and associated site works in order to enable the provision of a new bedroom & bathroom at fist floor level.
A) the part demolition of Muldowney's Pub to the rear; b) the change of use of the front portion of the pub to provide for 2no. 1-bed units; c) the construction of 8 no. own-door residential units within a single three storey block to provide 4no. 1- bed units and 4no. 2-bed units; d) enlargement of residential bin storage; reallocation of permitted car parking to the amended development; e) all ancillary hard and soft landscaping, boundary treatment, signage, engineering and site development works necessary to facilitate the development
Change of use from existing short term tourist accommodation units to full apartment type living accommodation units consisting of 10 two bed ground floor units and 10 two bed duplex type units at first floor level (20 units in total); also, include small elevational changes to facilitate balcony extensions at first floor level and new balcony areas at ground floor level in order to accommodate private amenity space for the individual units; omit Planning Condition 6 of Planning Ref. S01A/0051 (which links the use of units to the City West Hotel); new bicycle shelter and all associated site development works, parking, landscaping and boundary treatment works.
Installation of 360 PV solar panels covering an area of 720 sq.m on roof; all associated site and development works.
Single storey family flat side extension and all associated site works.
Amendments to Permitted P.R.R. SD22A/0096 for: a) Demolition of existing stone cottages on which works have commenced; b) reconstruction of cottages in modern materials to match existing structures in form to allow for 2 no. 2-bedroom single storey residential units; c) reuse of the existing roof slates to the front and new roof slates to the rear; d) construction of yard boundary walls within the site using reclaimed stone from the cottages; e) all ancillary landscaping and site development works necessary to facilitate the development.
Demolition of some of the existing structures on site to include a portion of an existing rubble wall; the rear extension of an existing cottage; existing structures, storerooms, and sheds to the west and north of Muldowney's Pub; the reconfiguration, renovation, and extension of the existing cottages on site to provide for 2 two bedroom units; the reconfiguration and renovation of Muldowney's Pub and storage yard; the construction of 21 residential units within 2 three storey blocks to the rear and side of Muldowney's Pub as follows: Block A will provide 6 one bedroom units, giving a total of 6 apartments in this building; Block B will provide for a mix of 3 one bedroom and 12 two bedroom units, giving a total of 15 units within this Block; private open space will be provided in the form of balconies with communal open space provided in the centre of the site. The development will also include the provision of a pedestrian access from Main Street and a pedestrian and vehicular access via the existing car-park entrance to the rear of Muldowney's Pub; Provision of 32 carparking spaces and 44 bicycle spaces, all ancillary hard and soft landscaping, boundary treatment, ESB sub-station, signage, bin and bike stores and all engineering and site development works necessary to facilitate the development.
Amendment to previously permitted Ref. SD20A/0215 consisting of signage for Unit E including the provision of, 2 way finding signs located at entrances to Unit E; 2 totem signs located to the west and north of Unit E; 3 halo illuminated signs to the south-western, north-eastern and south-eastern elevations; all associated works.
The construction a logistics/warehouse unit (Unit E) southwest of Mountpark Baldonnell Phase 1 and west of the older original Business Park, Unit E will comprise of a GIA 60,747sq.m (including 2,020sq.m of ancillary office space and 4,802sq.m of other ancillary areas); Provide for 340 car parking spaces, 22 motorcycle parking spaces and 160 bicycle spaces to serves the proposed development; Flood mitigation works to store and attenuate flood flows from the River Camac; Formations of plateaux on the site with surplus excavated material to allow for future development of Unit F; Access to the site will be from the existing Phase 1 development (referenced above) located on Clonlara Road; amendments to the yard and entrance arrangement for permitted Unit D are proposed (SD19A/0048); All ancillary landscaping, internal roads, associated infrastructure and buildings and site development works to support the development which is primarily greenfield and located between Casement Aerodrome and the N7 national route. The proposal will form part of the second phase of development to that permitted under SD19A/0370 and Phase 1 under SD15A/0309 (ABP Ref. PL06S.246392), as amended by permissions SD17A/0362, SD18A/0266 and SD19A/0048. An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application.
Construction of two logistics/warehouse units (Unit C & D) southwest of Mountpark Baldonnell Phase 1 and west of the older original Business Park. Unit C will comprise of a GIA 11,492sq.m (including 592sq.m of associated office space); Unit D will comprise of a GIA 7,856sq.m (including 400sq.m of associated office space); provide for 193 car parking spaces and 56 bicycle spaces to serve the proposed development; flood mitigation works to store and attenuate flood flows from the River Camac; formation of plateaus on the site with surplus excavated material to allow for future development; access to the site will be from the existing Phase 1 development located on Clonlara Road; all ancillary landscaping, internal roads, associated infrastructure and site development works to support the development; the site is primarily greenfield and located between Casement Aerodrome and the N7 national route; the proposal will form a second phase of Development to that permitted under SD15A/0309 (ABP Ref. PL06S.246392) as amended by permissions SD17A/0362, SD18A/0266 and SD19A/0048; An Environmental Impact Assessment Report (EIAR) is submitted with the planning application.
Construction 2 logistics/warehouse units (Unit F and Unit G amounting to 15,168sq.m GIA in total) south west of Mountpark Baldonnell Phase 1 and west of the older original Business Park; Unit F will comprise a GIA 6,463sq.m (including 568sq.m of ancillary office space), 65 car parking spaces and 20 bicycle spaces; Unit G will comprise a GIA 8,705sq.m (including 608sq.m of ancillary office space) 87 car parking spaces and 28 bicycle spaces; flood mitigation measures as permitted under SD20A/0215 and SD20A/0319 will service the development and are under construction; access to the site will be from the existing Phase 1 development (referenced below) located on Clonlara Road; totem wayfinding signage; all ancillary landscaping, PV panels; internal roads, associated infrastructure and buildings and site development works to support the development at the townlands of Moneenalion Commons Upper, Brownsbarn and Collegeland, Baldonnell Business Park, Dublin 22; the site is primarily greenfield and located between Casement Aerodrome and the N7 national route; the proposal will form part of the second phase of development to that permitted under SD20A/0215, SD19A/0370 and Phase 1 under SD15A/0309 (ABP Ref. PL06S.246392), as amended by permissions SD17A/0362, SD18A/0266 SD19A/0048 and SD20A/0319; an Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the planning application.
Amend permitted logistics/warehouse units C and D and incorporate other amendments, providing for a resultant; Unit C, 7,937sq.m including 757sq.m ancillary office space (permitted 11,492sq.m total); Unit D, 12,050sq.m including 911sq.m ancillary office space (permitted 7, 856sqm total); Overall increase of 639sq.m for Units C and D; provision of maintenance ramp to swale; resultant amendments to site layout, minor revisions to flood mitigation strategy, yards, elevations, signage, internal road layout, landscaping, ground works, drainage, gates, fencing, services and utilities and all associated and ancillary site development works at a site at the townlands of Moneenalion Commons Upper, Brownsbarn and Collegeland, Baldonnell Business Park and is located between the Casement Aerodrome and the N7 national route and comprising of amendments to the second phase of development permitted under Ref. SD19A/0370 & SD20A/0215.
(1) Demolition of 5 no. existing dwellings and associated outbuildings on the site. (2) Construction of a 176 no. dwellings on the site to the east of Stoney Hill Road comprising 100 no. duplex units and 76 no. houses and with a mix comprising of 16 no. 1 beds, 50 no. 2 beds, 70 no. 3 beds and 40 no. 4 beds with detached, semi-detached and terraced units. The house types include two storey and three storey typologies and the duplex units are three storeys in height. (3) A total of 245 no. surface car parking spaces for the residential development (including visitor, accessible and EV charging spaces) comprising of 152 no. for the 76 no. houses and 93 no. for the 100 no. duplex units. (4) Bicycle parking comprising of 187 no spaces in total (including 3 no. cargo bicycle spaces) in sheltered bicycle stores. (5) Open space comprising of: a) 8,725 sq.m of public open space, including the main park and pocket parks. b) 2,680 sq.m of communal open space, including 100 sq.m of play to serve the duplex units, c) 4,311 sq.m of ecological open space, including landscape buffers. (6) A new vehicular, pedestrian and cyclist access from Stoney Hill Road to the north-west of the residential development site and a secondary access for emergency vehicles only further to the south on Stoney Hill Road. (7) A 2 no. storey creche building of 639.2 sq.m plus an outdoor play area of 591 sq.m located on an existing undeveloped portion of the Peyton site located to the west of Stoney Hill Road. The creche includes 10 no. car parking spaces and 20 no. bicycle parking spaces. The crèche development includes all associated and ancillary works. (8) Infrastructure works to serve the proposed development to include the internal road network, ESB substations/switchrooms, lighting, site drainage works, hard and soft landscaping, boundary treatment, and all ancillary site services and development works above and below ground. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and is submitted as part of the planning application.
Erection of linear arrays of solar photovoltaic panels on the roof of Unit 2007 together with 4 invertors 1.075m wide x 0.33m deep x 0.55m high together with all ancillary works. There will be 350 panels in all, each 1.34m x 2.28m in size, located on 3 of the 4 south facing sides of the roof area, all concealed from view behind the parapet walling. No panels are proposed on the 4 north facing elevations. The panels will provide sustainable energy to the premises with the surplus being fed into the grid. An additional means of escape is also proposed.
Partial change of use from warehouse/storage to office use on ground and first floor level consisting of offices, canteen and toilet facilities, internal staircases, and associated facilities; 1 dock leveller located on the south west elevation to existing loading bay; new external windows & doors for office spaces to the existing south east south west and north west elevations with formation of entrance to office space to existing south east elevation; new carparking/hardstanding to provide 27 car parking spaces inclusive of 2 disabled spaces; external ramped/stepped to approach to office entrance to south west elevation; alterations to existing perimeters gabion walls to the south west of existing site and realignment of kerbing and shrub line to south west elevation; car parking external LED lighting provided by way of lamp standards to car park; alterations to existing surface water drainage and associated site works.
Changes of use within parts only of the existing building from storage and production to: (a) use of an area as a marketing suite/showroom (380sq.m ground floor together with an 80sq.m first floor mezzanine extension); (b) automotive academy and training area (925sq.m); (c) construction of additional ancillary office/welfare accommodation (467sq.m) at ground and first floor; (d) two storey briese soleil/sun shade structure to the south elevation; (e) additional windows and glazed screens on all elevations; (f) new single storey hand wash valet structure (146sq.m) on south elevation; (g) new wall mounted signage to west and south elevation; (h) 14 new car parking spaces (previously approved) and 25 new electric car charging points; (i) revisions to existing hard and soft landscaping to accommodate the development; (j) new ramped and stepped access with external terrace to form new entrance area with canopy at existing exit on west elevation; (k) existing 8 metre high water sprinkler tank to be replaced with 11 metre high water sprinkler tank. It is intended that the majority of the premises (6926sq.m) will continue in use for storage and distribution with ancillary office use continuing also.
Erection of a new external car wash structure (64sq.m) at the south east corner of the existing building, including for all associated site works, excavations, pumps, drainage, kerbing and landscaping.
Change of use from commercial to residential. Construction of first floor extension comprising of 4no. Bedrooms, en-suite and family bathroom. Internal modifications at ground floor level and all associated site works.
Change of use from commercial to residential. Construction of single storey extension to the rear of existing dwelling and internal modifications at ground floor level comprising of 2no. Bedrooms, en-suite, open plan Kitchen, Living and Dining area, Utility Room and Living Room. Conversion of existing attic space to 2no. bedrooms, en-suite and family bathroom comprising of modification of existing roof structure, raising of existing gables, new access stairs, flat roof dormer to the rear and 2no. A-style roof dormers to the front, Construction of front porch and all associated site works.
Erection of a three storey with front dormer, three bedroom detached dwelling in the side garden of existing dwelling with one pedestrian entrance and one vehicular entrance; creation of a new boundary wall between existing house and new dwelling to be known as No. 2A.
Two storey side extension; 3 front facing 'Velux' windows and a rear facing dormer window.
Attic conversion for storage incorporating a dormer window to the front, a dormer window to the rear, and a new gable window to the side.
Attic conversion and dormer roof window on rear slope of roof at attic level.
Retention consists of the construction of two rooflights in the main roof to the front of the property.
Provision of a temporary primary school by way of construction of 2 prefabricated buildings (c 180sq.m & 390sq.m) on a defined site area (c 0.4Ha) to be enclosed within a 2 metre high welded mesh fencing and access gates with associated site works including provision of new site entrance, car parking, drop off area and hard surface play area. Temporary permission for a period no longer than 3 years is being sought.
Expansion of the floor plate of proposed creche/pre-school facility (area 370sq.m) to include adjoining storage space (32sq.m) with revised layout plan to that approved in ref. SHD3ABP-302398-18.
Removal of all existing temporary accommodation and construction of a new 16 classroom part three storey, part two storey primary school (Roll No 19503H); including GP Hall, 2 classroom Special Educational Needs Unit and all ancillary site works. The proposed project also incorporates associated staff car parking, delivery aces, drop off areas, pedestrian/bicycle access, construction of 2 external ball courts, acoustic boundary wall plus additional boundary treatments, landscaping, connection to public services and all associated site works.
A new vehicular entrance and boundary fence to new display surface car parking, on 0.15ha of vacant land, located west of the existing car parking including a 6m high internally illuminated signage totem and tensile fabric canopy structures. Extension of existing workshop by 208sq.m located to the north of Block B and extension of 106sq.m for new vehicle preparation to the north of Block B and internal alterations including a trade parts counter and a new double door on the west elevation of the showroom building, known as Block B, a two storey extension matching the existing height of Block C of 692sq.m to the north of the servicing area of the building known as Block C for vehicle servicing and waiting facilities and an external canopy structure of 200sq.m to the east elevation of the existing parts building known as Block A on an overall site of 2.257ha.
Demolition of existing Public House building and of existing incomplete buildings on the east side of the site; construction of a three storey hotel comprising of 129 bedrooms, reception and ancillary bar (136sq.m) at ground floor, restaurant (311sq.m) in single storey building; associated waste storage to the west of the site; 3 three storey Aparthotel buildings comprising 15 units each (45 units in total) comprising of studios, one bed, two bed and three bed units to the south and south east; 3 small balconies with small terraces under on the north façade of the Aparthotel Block A & B and the west façade of Block C; new vehicular and pedestrian entrance at Boherboy/Saggart Road (L2008); new footpath along the Boherboy/Saggart Road (L2008); parking area for 120 cars and 30 bicycles; extensive tree planting throughout; substation together with all associated site works, boundary treatments and landscaping; total floor area of buildings is 8,313sq.m; existing vehicular entrance to the site on the Blessington Road will remain for emergency use only; An Ecological Impact Assessment is submitted as part of this application.
The development will consist of internal alterations to the existing retail units to facilitate an amalgamation of the units into a single unit of approximately 234 sq.m and a change of use of the amalgamated unit from its permitted Retail use(s) (under planning Ref. SD03A/0857), to a Sports Facility (Gym).
Temporary single storey prefabricated building to be linked to the existing single storey prefabricated building granted under Ref. SD19A/0075; 2 general classrooms each with toilet accommodation (one containing accessible WC); 1 store; entrance lobbies; 1 user assisted toilet; 2 staff toilets and 4 car park spaces all located to the north-rear of the existing school and existing prefabs together with all other ancillary and associated siteworks.
Amendment to Block D4 of the Strategic Housing Development permitted under ABP-310570-21. The proposed amendment to Block D4 is for a reduction in height to 9 storeys (from 13 storeys) and associated reduction in the number of units to 44 (from 60 units); Block D4 will have 4 one beds (no change), 34 two beds (down from 46) and 6 three beds (down from 10) all with associated private balconies/terraces to the north/south/east/west elevations; This will result in the reduction in the total number of residential units across the entire development site from 421 residential units to 405 residential units; Block D4 will also provide 564sq.m residential amenity space at ground floor level (an increase of 9sq.m); Minor amendments to the southern elevation are also proposed. The application includes for all site services required to facilitate the amendment to Block D4.
Planning permission and retention permission for a Large-scale Residential Development (LRD) consisting of amendments to a Strategic Housing Development (SHD) permitted under ABP Ref. 305556-19, as subsequently amended under SDCC Planning Ref’s SD22A/0299 and SD22A/0422 at a site at Citywest Shopping Centre, Fortunestown, Dublin 24. The proposed amendments for which permission is sought, include the following: (i) External alterations to Block F, comprising the relocation of a plant room door at ground floor level from the south elevation to the northern elevation along with the relocation of balconies at the eastern end of the building at 2nd to 6th floor levels together with a reconfiguration of the design of the balconies; (ii) Omission of 3 no. permitted on-street bin stores and replacement of same with a single consolidated bin store near the south-western corner of the shopping centre, together with a reconfiguration of hard / soft landscaping and on-street car parking spaces, resulting in the net loss of 1 no. on-street car parking space in this area; (iii) alterations to the design and configuration of the permitted single storey staircore structure leading to the basement level that is situated at the south-eastern corner of the shopping centre. The amendments for which retention permission is sought, include the following: (iv) Alterations to the permitted siting, design and size of the permitted ESB Substation and Switchroom at Block D together with the reconfiguration of hard / soft landscaping and on-street car parking spaces, resulting in the net gain of 1 no. on-street car parking space in this area; and (v) Internal and external alterations to the layout, design and configuration of the permitted single storey plant room and associated ESB substation / switch rooms at the south-eastern corner of the shopping centre, together with a slight re-siting of the reconfigured plantroom structure. In the interest of clarity, it should be noted that the proposed amendments and amendments to be retained will not result in any change to the total number of residential dwellings permitted on site, or the total number of on-street car parking spaces, as previously permitted. A dedicated website has been set up for this LRD application which can be viewed at: www. Carrigmorewoodsamendment1.ie