The proposed development consists of the construction of a dormer attic extension by converting the existing attic space for habitation, comprising of 1 no. bedroom, 1 no. en-suite and 1 no. wardrobe. The development will include alterations to the rear elevation, provision of cladding finish to the dormer exterior, and internal alterations to the existing first floor to facilitate access to the attic level.
(A) Construction of 1no. two storey, end of terrace 2-bedroom dwelling (76sqm) with new vehicular entrance off road. (B) All associated site development, landscaping and drainage works to facilitate the development; ancillary works for foul water to public drainage system and provision of surface water soakaway to meet BRE Digest 365 standards for the new dwelling.
For demolishing of existing extension to rear & provision of new entrance & porch to front. Construction of one two storey, two bedroom semi-detached townhouse with solar panels 3m x 2m to front elevation with private entrance adjoining existing property
Permission for demolishing of extension to rear and provision of new entrance and porch to front. Construction of one, two storey, two bedroom semi-detached townhouse with solar panels 3m x 2m to front elevation with private entrance adjoining existing property.
Move entrance & demolish existing extension to rear; construction of 1 two storey, three bedroom dwelling to adjoin existing property.
Provision of an electronic gate.
Construction of two storey extension (55sq.m) with dormer windows to the side of existing dwelling; internal modifications to the existing structure and all associated site works.
The development will consist of: I. 384 residential units with a cumulative gross floor area of 33,190.15 sq.m comprising: a) 122. houses, consisting of 28 two-bed units, 83 three-bed units and 11 four-bed units, ranging in height from 2-3 storeys. b) 84 duplex units, consisting of 48 one-bedroom units and 36 three-bedroom units, ranging in height from 2-3 storeys. c) 178 apartments consisting of 43 one bedroom units and 135 two-bedroom units, ranging in height from 5-7 storeys. II. tenant amenity floorspace with a gross floor area of 139 sq.m. III. 1.49 ha of public open space including a public plaza and 0.15 ha of communal amenity space; IV. the provision of a childcare facility with a gross floor area of 239 sq.m and associated play area; V. the provision of 361 car parking spaces, including 10 disabled parking spaces and 16 reserved for visitor parking and 3 reserved for creche staff. VI. the provision of 734 bicycle parking spaces, including 472 residents bicycle parking spaces and 262 visitor cycle spaces. VII. vehicular access is proposed via 3 access points including the existing Kingswood roundabout on Citywest Avenue to the north, The Walk to the west and from the park and ride access road at the eastern end of the site. Dedicated pedestrian/cyclist links are proposed throughout the site. VIII. ESB substation, 3 x ESB kiosks, rooftop solar photovoltaics, landscaping and all ancillary site and development works.
Change of use from existing restaurant use at ground floor to proposed office use (235sq.m).
Two Storey Extension to the side and single storey extension to the rear with associated internal alternations to the dwelling and all associated site works
Retention/change of use for existing development and shed/outbuilding; the development was originally built for residential purposes but is currently being used as a childcare facility.
Proposed partial ground floor front extension with bay window & pitched roof over to existing bungalow
Two storey end of terrace house to side of existing house with new vehicular access and all associated site works.
Retention and change of use of one single storey detached 2.85m high home office unit to a self-contained living unit.
Permission to construct an extension to rear of dwelling to connect existing home office (22.6sq.m) to the main dwelling & all associated site development works.
Construction of 1 two bedroom, single storey detached short let self-catering tourist accommodation Unit A; 2 two bedroom single storey, semi-detached short let self-catering tourist accommodation Unit B; use of the existing two bedroom bungalow as caretaker residential accommodation and all ancillary landscape and site services works.
A residential development comprising: 526 residential units and all associated site and development works as follows: - 274 3-bed 2 storey terraced units, 185 4-bed 2 and 3 storey terraced and end of terrace units, 67 2-bed apartment/duplex units (37 2-storey, 2 bed terraced duplexes, 18 1-storey 2 bed terraced apartments and 12 1 storey 2 bed end of terrace apartments). The development also provides for a district park (4.58 ha) and a neighbourhood park (0.71 ha) in accordance with the Fortunestown Local Area Plan 2012. Permission is also sought for 789 car parking spaces, bin storage areas, ESB substations and all associated site development and infrastructural works. Vehicular access to serve the proposed development will be provided via two new access points off Garter Lane and via a new signalised junction at the southeastern corner of the site to replace the existing roundabout off Fortunestown Lane. Provision is made for a future access to Bianconi Avenue. In addition, an interim local square is proposed within the subject site providing a direct pedestrian link from the proposed development to the Saggart Luas stop. Two direct pedestrian links are proposed between the subject site and the adjoining school sites permitted under Reg Ref No SD16A/0255 providing a direct link between the school and the proposed district park and a direct link from the west of the school site to the proposed residential development. Lands identified for future development are located along the southern boundary of the current application site adjacent to Fortunestown Lane/Saggart Luas Stop. These areas will be subject of a future planning application (Phase 2) and will include the final design and layout of the local square.
Demolition of existing single storey detached garage and construction of a two storey hipped roof extension to the front and side of existing two storey semi-detached dwelling with associated changes to all existing elevations; extension to consist of additional ground floor living space, toilet and bin stores and an additional first floor bedroom with en-suite toilet along with all ancillary site works.
The development will consist of: The change of use of the existing warehouse to a clean manufacturing area - light industrial. Alterations to the existing south elevation, including the installation of new signage displaying the company name and the removal of the existing balcony. The provision of new double access doors and a new external pathway to facilitate access to the building; including all associated site and ancillary works.
Mixed use development will consist of 28 residential units(comprising 1-1 bed units; 16 2-bed units and 11 3-bed units (including terraces and balconies) an office unit (100sq.m), 2 retail units (87sq.m and 154sq.m), ancillary bin stores (16sq.m) and bike storage area (29sq.m) across 4 blocks (Blocks A to D); the breakdown for the individual Blocks is as follows: Block A (3 storeys (1,497sq.m), 7 apartments and 7 duplex apartments; Block B (3 storeys (851sq.m) 4 apartments and 4 duplex apartments; Block C (3 storeys (777sq.m), 6 apartments and 2 retail units and Block D (2 storey (243sq.m), the refurbishment, alteration and extension of the existing 2 storey former public house (including the demolition of a 3sq.m rear lean-to) and its change of use to 1 office unit and 1 apartment with new bin stores and bike store to the rear. The provision of private open space, communal and public open space; surface car parking (30 spaces); all hard and soft landscaping including boundary treatments; SUDS measures including attenuation tanks; PV panels; changes to levels and all other associated site excavation and site development works above and below ground. Vehicular access will be form Pairc Mhuire to the south. The existing perpendicular public parking on the north side of Pairc Mhuire will be replaced with 4 perpendicular car parking spaces on Pairc Mhuire and 2 parallel car parking spaces on the eastern side of Boherboy Road. The site is bounded by Main Street to the north, public open space to the east, Pairc Mhuire to the south and Boherboy Road to the west. it previously accommodated a petrol filling station and a public house (part of which remains on site).
Change of use for the ground floor of the existing two storey Public House Block D (disused/vacant) and the ground floor of the proposed Block C. The application seeks modifications to Block C and Block D of the previously granted permission SDCC Reg. Ref. SD18A/0202. Block C comprised a 3 storey building accommodating 2 no. retail units on the ground floor and 6 no. apartments (5 no. 2 bedroom and 1 no. 1 bedroom) across the first and second floor. Block D comprised refurbishment, alteration and extension of a 2 storey existing Public House building to accommodate 1 no. commercial office unit on ground floor and 1 no. 2 bed apartment on the first floor along with a new bin/bike store at the rear. The modifications seek a change of use from previously granted retail/commercial use to residential use to provide an additional 4 no. 2 bedroom apartment units on the ground floor of Blocks C & D. The proposed works to Block C include a change of external material finishes and replacing the glazing of retail units with windows for the proposed apartment units on the ground floor to accommodate 3 no. 2 bedroom apartments accessed through entrance corridor. The proposed works to Block D include removing the existing doors/windows and replacing them with new doors/windows to match the existing to accommodate 1 no. 2 bedroom apartment on the ground floor of the existing two storey former Public House. All with associated bin store, bicycle store and associated site works.
Installation of energy storage units at an existing datacentre facility. The energy storage will consist of two new battery storage units, 2 new HV power skids (PCS transformer and HV RMU), two new MV transformers, concrete slab, security fence of 2.4 meters height including two new internal gate entrances.
The installation of an energy storage unit at an existing data centre facility. The development involves the placement of three ISO 40ft. shipping containers containing back up storage units at Keppel Data Centre, Citywest Avenue, Citywest Business Park, Dublin 24
The proposed development comprises amendments to a Strategic Housing Development scheme permitted under ABP Ref. ABP-308088-20. consisting of modifications to the previously permitted development (ABP Ref. ABP- 308088-20), comprising: replacement of 2 one bedroom unit with 1 two bedroom unit and an entrance lobby / concierge at ground floor level within permitted Block C; replacement of 3 three bedroom units with 3 two bedroom units and additional residential amenity spaces at first, third and fifth floor levels within permitted Block C; replacement of 2 two bedroom units with 2 one bedroom units and additional residential amenity spaces at ground and third floor levels within permitted Block D; and the provision of an enlarged stretcher lift through all floor levels of permitted Blocks C and D. The total number of residential units proposed will decrease from 224 to 223 as a result of the proposed amendments; The proposed development will also consist of: amendments to the permitted car parking areas at basement levels resulting in a total loss of 29 car parking spaces (151 car parking spaces are provided in total at basement level); the provision of c. 275sq.m of residential amenity space (incl. reception, office, staff amenities, multi-purpose spaces, meeting rooms and lobbies) at basement level of permitted Block C and D; minor elevation amendments to permitted Block D; the provision of a new external stair well to the eastern elevation of permitted Block D providing access from the ground floor level to the basement level; reduction of the roofed area above the basement ramp of permitted Block A and B; the provision of sprinkler tank rooms, landlord plants, comms room and attenuation tanks at basement level of permitted Blocks A, B, C and D; the provision of PV solar panel at all roof levels; amendments to hard and soft landscaping areas; and all associated site excavation and development works above and below ground.
Cairn Homes Properties Limited intends to apply for planning permission for a Large-Scale Residential Development (LRD) comprising amendments to a previously permitted Strategic Housing Development (SHD) (An Coimisiún Pleanála Reg. Ref. ABP-308088-20), as amended by SDCC Reg. Ref. SD22A/0357, at Garters Lane, Saggart, Co. Dublin. The development will comprise the provision of a new single storey ESB substation with associated switch room (21.5 sq m total with maximum height of c. 3.4m to the top of the parapet) to the north east of permitted Block B, associated minor revisions to soft landscaping and all associated site development and excavation works above and below ground.
224 apartment units arranged in 4 blocks and all associated public open spaces, communal amenity spaces and private amenity spaces comprising terraces/balconies. The proposed blocks are arranged over 2 single level basements (accessed via 2 vehicular ramps to east of the site) and comprise 5 to 6 storey blocks with an 8 storey element as part of Block A. Vehicular access to serve the proposed development will be provided via a new access at Garters Lane and will also provide access to lands to the east (development permitted under ABP ref PL06S.305563). Permission is also sought for 191 car parking spaces (180 at basement level and 11 at surface level); 470 bicycle parking spaces (290 at basement level at 180 at surface level); 1 ESB substation; 1 cycle store, hard and soft landscaping, pedestrian and cycle links, boundary treatments, public lighting, bin storage areas at basement, surface water drainage infrastructure and attenuation tanks, and all associated site development and infrastructure works.
224 apartment units arranged in 4 blocks and all associated public open spaces, communal amenity spaces and private amenity spaces comprising terraces/balconies. The proposed blocks are arranged over 2 single level basements (accessed via 2 vehicular ramps to east of the site) and comprise 5 to 6 storey blocks with an 8 storey element as part of Block A. Vehicular access to serve the proposed development will be provided via a new access at Garters Lane and will also provide access to lands to the east (development permitted under ABP ref PL06S.305563). Permission is also sought for 191 car parking spaces (180 at basement level and 11 at surface level); 470 bicycle parking spaces (290 at basement level at 180 at surface level); 1 ESB substation; 1 cycle store, hard and soft landscaping, pedestrian and cycle links, boundary treatments, public lighting, bin storage areas at basement, surface water drainage infrastructure and attenuation tanks, and all associated site development and infrastructure works.
A community Mural on the wall at 1 the rear of 1a Knockmore Avenue, Tallaght. This community mural is a project funded by the Creative Ireland Mural Grant in collaboration with the Connect 4 project, connect for life and members of the local community. The mural draws its inspiration from the poem authored by Emmet O'Brien in partnership with Sean Farrell and the Connect 4 project. The central theme of both the mural and the poem concerns the positive impact of sport on mental health.
Change of use of 3,397sqm of the existing interlinked complex of buildings of 18,984sqm from a mix of ancillary warehouse, packaging, logistics and research and development uses within part of the ground floor of Block E (2,952sqm) and part of the ground floor of Block G (445sqm) to office based industry that incorporates research and development, ancillary office, gym and other facilities related to the operation of the overall development. The development will include internal works only to facilitate the change of use.
Retention of the generator compound (391sq.m) consisting of three generators along with three transformers and ancillary 3 diesel tanks and perimeter treatment on a permanent basis on the southern perimeter of the site with Orchard Avenue; The development also consists of the retention of 3 signs (10.94sq.m) as follows: retention of 1 sign (0.57sq.m) on plinth at the corner of Bianconi Avenue and the N82/Citywest Road; retention of 1 sign (4.58sq.m) on the eastern elevation of Block D facing the N82/Citywest Road and retention of 1 sign (5.79sq.m) on the northern elevation of Block M facing Bianconi Avenue. The development will include retention of all revisions to the permitted landscaping and site development works required.
Retention for a porta cabin with an area of c. 54sq.m; Retention for mobile home with an area of c. 54sq.m; Retention for installation of electronic gates with a width 10m; Retention for installation of hardstanding / cement yard with an area of c. 1,020sq.m.
Change of use of 6,299sq.m of the existing interlinked complex of buildings of 18,984sq.m from a mix of ancillary warehouse, packaging, logistics and research and development uses within Blocks E, G and K to an independent office based industry use that would function independently to the remaining Xilinx facility and could be sub-let and subdivided. An area of existing office space of 1,591sq.m at the second floor within Block G will also be sub-let creating an overall independent office based industry use of 7,890sq.m. The development will include the removal of the mezzanine level above the ground floor of Block G (201sq.m) that will reduce total floor area of facility to 18,783sq.m. The development will also consist of the amendment of Condition no. 6 of S94A/0344 and S99A/0908 so that the new independent office based industry use of 7,890sq.m can be sub-let and subdivided and so that the existing office space (10,893sq.m) is not integral or ancillary to the non office uses that are subject of this change of use application. Minor elevation changed are also proposed, including a new entrance within the north elevation of Block E, and additional glazing to the north, west and south elevation of Block G. The remaining Xilinx facility (10,893sq.m) will continue as per its permitted uses. The new office based industry use will be served by the reconfigured 197 car parking spaces of the 568 permitted car parking spaces serving the site with vehicular access via the existing secondary entrance off Bianconi Avenue. 371 spaces will continue to serve the remaining Xilinx facility. Retention permission is also sought for the generator compound (391sq.m) consisting of three generators along with three transformers and ancillary 3 diesel tanks and perimeter treatment on a permanent basis on the southern perimter of the site with Orchard Avenue. The development will include all ancillary landscaping and site development works.
Development at a site of 1.65ha comprising of the erection of secure anti-climb wire-mesh fencing around the perimeter of the existing building at a height of 2.1m, with associated landscaping works to screen the fencing. The provision of electronic vehicular access gates off the internal access road for access to rear service compound and car parking, vehicular barriers, and internal access footpaths, in addition to all associated site development works.
Erection of secure fencing and gates to the perimeter of the site, including all associated site development works, landscaping and planting.
The construction of a 4-storey Primary Care Centre building which will provide HSE Services such as general primary care, mental health, disability and older person services; The building will accommodate GP rooms, day care centre with associated kitchen facilities and external deck amenity space, pharmacy, treatment/consultation rooms, primary care administrative offices, as well as ancillary accommodation including staff facilities, offices, meeting rooms, reception/waiting areas, ESB substation and plant; The development will be accessed via the existing avenue to the Citywest Campus entered from Garters Lane at the existing traffic light controlled junction, with a new internal road layout from the existing roundabout on the access avenue to provide 2 no. vehicular entrances to car parking within the subject site; The car parking will be divided into a dedicated staff car park and a visitor car park with both to be controlled by barrier access and a total of 158 no. car parking spaces provided; The proposal also includes bicycle parking, service yard, pumping station, SuDS drainage, PV panels at roof level, signage, landscaping, boundary treatment and all associated site works and services.
Retention Permission sought for widening of entrances, laying of hard standing over grassland plus permission for the construction of a storey and a half dwelling plus a dethatched domestic garage, a domestic waste water treatment system plus a surface water soakaway and all associated site works.
The development will consist of Retention Permission sought for widening of entrances, Laying of hard standing over grassland plus permission for the construction of a storey and half dwelling plus a detached domestic garage. A domestic waste water system plus a surface water soakaway and all associated site works.
Installation of two internally illuminated external building mounted signs to the existing south-west and north-west facades.
New main entrance door and canopy, installation of external signage and removal of existing draught lobby to south-west facade, installation of 5no. glazed doors and 4no. louvred panels to existing glazed facades, provision of 198sqm of photovoltaic panels below parapet level of flat roof, 2no. free-standing signage totems, 8no. new Electric Vehicle charging points, 2no. bicycle parking shelters and miscellaneous landscaping works.
Provision of a 3 storey office development with a total gross floor area of c. 2,992sq.m (excluding the c. 205sq.m plant room at roof level); Provision of 51 car parking spaces (including 2 accessible spaces and 27 EV spaces with charging points), accessed via the existing vehicular entrance from Lake Drive; Provision of 2 pedestrian access points to the north and east of the site, bicycle parking facilities, an ESB substation (c. 22sq.m), waste storage facilities (c. 20sq.m); signage, soft and hard landscaping works, PV panels, external lighting, piped infrastructure and ducting, SuDS drainage and all ancillary site excavation and development works above and below ground.
Construction of two 4 storey office buildings, with a total floor area of 13,250sq.m. The proposed development also provides for plant rooms at roof level (125sq.m each), all associated site development works, landscaping, basement and surface car parking, bike sheds, 2 service buildings (70sq.m each), and 2 new vehicular entrances off Bianconi Avenue, all on a site area of 2.2ha.
Change of use of an existing single storey detached store (floor space - 154sq.m) to a research and development gas innovation workshop and store.
Replacement of non-original PVC windows with timber sash windows with thermally efficient slim-line double glazing in the protected structure and ancillary landscaping; retention of single storey pavilion incorporating open plan kitchen / dining / living room to rear of the house and minor internal alterations for senior parental accommodation and permission for alterations to elevational treatment of pavilion and garage.
Provision of a warehouse with ancillary office and staff facilities and associated development. The main structure will have a maximum height of approximately 19.1 metres with a gross floor area of 9,158 sq.m, including warehouse area (7,971 sq.m), ancillary office area (701 sq.m) and ancillary staff facilities (486 sq.m). The development will also include: 2 No. vehicular entrances to the site from Bianconi Avenue, including 1 No. for HGVs; a pedestrian entrance from the Citywest Road and Bianconi Avenue; HGV parking and yard; 45 No. car parking spaces, including 3 No. accessible parking spaces; cycle parking; level access goods doors; dock levellers; access gates; lighting; hard and soft landscaping; detention basin; boundary treatments; ESB substation, switch room and site lighting and security room; plant; and all associated site development works above and below ground.
The development will consist of alterations to the existing east elevation to include the provision of a new external fire escape stairs to facilitate the internal subdivision of the existing office building, together with all associated site and ancillary works.
The installation of an external Air Handling Unit, to be housed in a new timber and metal clad enclosure adjacent to Unit 3030, Lake Drive and the installation of a Heat Pump Unit to be installed within an existing plant enclosure, with additional cladding proposed, in the north east corner of the carpark of Unit 3030 and all ancillary engineering and landscape works necessary to facilitate the development at Unit 3030 Lake Drive, Browns barn, Dublin 24 D24 KX6Y. (Previous planning reference SD25A/0185W )
The development will consist of erection of back-lit signage to the west elevation of Unit 3018.
Land recontouring/infilling works on c.16,000sq.m. of a folio size of c.2.4ha (allowing buffers); volume of material to be placed on site is c.35,000m3 with an average fill level of c.3.5m above existing.
Land recontouring/infilling works on c 16,000sq.m of a folio size of c 2.4 ha (allowing buffers); the volume of material to be placed on the site is c 35,000sq.m with an average fill level of c 3.5m above existing - the material is clean, inert soil and stone from the Saggart Water Reservoir construction site located directly adjacent to the north of the proposed infill site; a small section of hedgerow (6m wide) will be required to be removed between Saggart Water Reservoir construction site and the proposed infill site to allow access for lorries and infill equipment onto the proposed infill site.
Alterations to existing east and west elevations to include 10 external vents; installation of new photovoltaic solar panels to existing roof; provision of 10 bicycle parking spaces; 2 EV chargers; 1 external condenser and all associated site works.