Retention permission, of the dormer to the rear aspect of the roof, a velux rooflight to the front aspect of the roof, and planning permission for an extension to the front of the dwelling, comprising a porch, and a bay window, with standing seam zinc roof and wall finishes to match existing.
6 floodlighting poles with varying pole top luminaire assemblies (4 poles will be 18.29m high and 2 poles are 12.19m high) located around existing grass pitches and all associated site works.
Construction of an extension and alterations to the existing sports centre building which will include alterations to part of the existing ground floor plan and the construction of a new single storey flat roof extension measuring 303sq.m to the rear and side of existing building. Accommodation will include 4 changing rooms, physio room, gym, refs room, coaching room, TV lounge, store all other associated facilities and site works.
Retention consists of the construction of two rooflights in the main roof to the front of the property.
Roof dormer to the rear of aspect of the roof and the retention of the widened vehicular access.
The development seeking permission will consist of the construction of one dormer window in the main roof to the rear, one rooflight in the main roof to the front of the property and one window in the gable (south) elevation.
The installation of telecommunications equipment including no. 3 ballast mounted shrouded antennas, no. 1 ballast mounted dish, remote radio units (RRU's), cable trays, GPS, cabinet and all other associated site development works on the building rooftop to provide for high-speed wireless data and broadband services.
Installation of a 0.51mx1.42mx1.806m (LxWxH) above ground enclosure, to house a new natural gas district regulating installation including a 3m high lamp post style relief vent stack with all ancillary services and associated site works on the footpath.
Proposed ground floor rear extension for use as family flat
Single storey extension to the side for extended living.
A residential development of 77 dwellings comprised of 63 two storey houses and 14 apartments & duplex units accommodated in one 3 storey building. The proposed houses are comprised of 8 two bed houses & 55 three bed houses; the proposed apartments & duplex units are comprised of 7 one bed apartments at ground floor & 7 three bed duplex units overhead. The proposed development also provides for all associated site development & infrastructural works, car & bicycle parking, open spaces, hard & soft landscaping, boundary treatments and bin & bicycle storage; access to the development will be via a new vehicular entrance at the south-west corner of the site off the Old Naas Road. Permission is also sought to demolish the existing building on site approximately 455sq.m. all on a site area of 2.28Ha, at Gordon Park, Old Naas Road, Kingswood, Dublin 22 bounded to the west by the Old Nass Road, to the south by the Silken Park development and is located in the townland of Brownsbarn.
Permission to demolish the rear porch and construct a corridor to the rear of the house. Retention to retain the existing single storey structure in the rear garden and use it as a bedroom and en-suite, which will be linked to the existing house with the proposed corridor, all with associated site works.
Permission to demolish the rear porch, construct a glazed link to the rear of the house and construct a new extension for a proposed bedroom and ensuite. Retention to retain the existing single-storey structure in the rear garden and use it as a bedroom and ensuite, which will be linked to the existing house with the proposed glazed link.
2 prefabricated units for use as an office (31.5sq.m) and a canteen (23.3sq.m) located adjacent to the existing permitted Retail Shop (Ref. SD16A/0239) within a 0.0125 hectare application area at the existing quarry.
Two storey extension to rear of 9 Ferneood Avenue Springfield Tallaght Dublin 24
Works to existing 2 storey side Extension. Double doors in ground floor front elevation, partial ground floor front extension floor area 3msq. First floor rear balcony & double doors to access balcony. Stairs from ground floor to first floor. Change of use of 2 storey side extension to family flat with floor area 52msq
Retention of non-habitable attic with dormer to rear and widened vehicle access to front.
Retention of single storey extension to rear (circa 12sq.m); first floor extension to rear (circa 2sq.m) and attic conversion (circa 12sq.m).
Installation of a new access door and canopy to the south east elevation at ground floor level, the replacement of 4 spandrel panels with louvred vents below first floor level slab, and a new air handling unit with louvred enclosure and access doors at roof level.
Installation of two internally illuminated external building mounted signs to the existing west and east facades.
Single storey side extension to southern side of dwelling with pitched roof over & 1 no. roof light.
Retention of single storey extension with all associated site works.
Installation of up to 100kW (540sq.m) of roof mounted solar PV panels and all associated works.
Construction of single storey garden room consisting of home office and gym and all associated site works
Construction of two 4 storey office buildings, with a total floor area of 13,250sq.m. The proposed development also provides for plant rooms at roof level (125sq.m each), all associated site development works, landscaping, basement and surface car parking, bike sheds, 2 service buildings (70sq.m each), and 2 new vehicular entrances off Bianconi Avenue, all on a site area of 2.2ha.
Construction of a 68sq.m single storey extension to the side and rear of two storey, semi-detached dwelling and all associated ancillary site development works.
Provision of a warehouse with ancillary office and staff facilities and associated development. The main structure will have a maximum height of approximately 19.1 metres with a gross floor area of 9,158 sq.m, including warehouse area (7,971 sq.m), ancillary office area (701 sq.m) and ancillary staff facilities (486 sq.m). The development will also include: 2 No. vehicular entrances to the site from Bianconi Avenue, including 1 No. for HGVs; a pedestrian entrance from the Citywest Road and Bianconi Avenue; HGV parking and yard; 45 No. car parking spaces, including 3 No. accessible parking spaces; cycle parking; level access goods doors; dock levellers; access gates; lighting; hard and soft landscaping; detention basin; boundary treatments; ESB substation, switch room and site lighting and security room; plant; and all associated site development works above and below ground.
Construction of a three storey building, accommodating 13 residential units and a ground floor cafe (55sq.m); The proposed dwellings are comprised of 6 one bedroom ground floor apartments, with 7 three bedroom duplex units overhead; All associated site development & infrastructural works, car & bicycle parking, open spaces, hard & soft landscaping, boundary treatments, bin & bicycle storage etc; Access to the development will by via the permitted vehicular entrance to the south-west serving the Gordon Park residential development on site bounded to the west by the Old Naas Road, to the south and east by a permitted residential development (Ref. SD21A/0327) known as Gordon Park and is located in the townland of Brownsbarn.
Upgrading and improvement of an existing, established and historic entrance to improve access and egress and overall vehicle user safety to Baldonnell Garden Centre and residential house on site, demolition of existing florist building on site, new gated entrance and all associated site works.
Erection of a new external car wash structure (64sq.m) at the south east corner of the existing building, including for all associated site works, excavations, pumps, drainage, kerbing and landscaping.
Changes of use within parts only of the existing building from storage and production to: (a) use of an area as a marketing suite/showroom (380sq.m ground floor together with an 80sq.m first floor mezzanine extension); (b) automotive academy and training area (925sq.m); (c) construction of additional ancillary office/welfare accommodation (467sq.m) at ground and first floor; (d) two storey briese soleil/sun shade structure to the south elevation; (e) additional windows and glazed screens on all elevations; (f) new single storey hand wash valet structure (146sq.m) on south elevation; (g) new wall mounted signage to west and south elevation; (h) 14 new car parking spaces (previously approved) and 25 new electric car charging points; (i) revisions to existing hard and soft landscaping to accommodate the development; (j) new ramped and stepped access with external terrace to form new entrance area with canopy at existing exit on west elevation; (k) existing 8 metre high water sprinkler tank to be replaced with 11 metre high water sprinkler tank. It is intended that the majority of the premises (6926sq.m) will continue in use for storage and distribution with ancillary office use continuing also.
First floor side extension consisting of 2no. Bedrooms and en-suite over (previously granted) ground storey side extension including utility room and en-suite bedroom with front porch extension and all associated ancillary works.
Widen existing vehicular entrance to 3.5 metres with removal of 1.1 metre length of front garden wall and construction of new entrance pillar and ground storey front porch extension and side extension including utility room and en-suite bedroom with green garden flat roof including all associated ancillary works.
Erection of linear arrays of solar photovoltaic panels on the roof of Unit 2007 together with 4 invertors 1.075m wide x 0.33m deep x 0.55m high together with all ancillary works. There will be 350 panels in all, each 1.34m x 2.28m in size, located on 3 of the 4 south facing sides of the roof area, all concealed from view behind the parapet walling. No panels are proposed on the 4 north facing elevations. The panels will provide sustainable energy to the premises with the surplus being fed into the grid. An additional means of escape is also proposed.
Ground floor side extension with pedestrian access door, pitched roof over and 1 roof light over.
The development seeking retention consists of the construction of a ground floor extension to the rear of the dwelling.
Change of use of 3,397sqm of the existing interlinked complex of buildings of 18,984sqm from a mix of ancillary warehouse, packaging, logistics and research and development uses within part of the ground floor of Block E (2,952sqm) and part of the ground floor of Block G (445sqm) to office based industry that incorporates research and development, ancillary office, gym and other facilities related to the operation of the overall development. The development will include internal works only to facilitate the change of use.
Retention of the generator compound (391sq.m) consisting of three generators along with three transformers and ancillary 3 diesel tanks and perimeter treatment on a permanent basis on the southern perimeter of the site with Orchard Avenue; The development also consists of the retention of 3 signs (10.94sq.m) as follows: retention of 1 sign (0.57sq.m) on plinth at the corner of Bianconi Avenue and the N82/Citywest Road; retention of 1 sign (4.58sq.m) on the eastern elevation of Block D facing the N82/Citywest Road and retention of 1 sign (5.79sq.m) on the northern elevation of Block M facing Bianconi Avenue. The development will include retention of all revisions to the permitted landscaping and site development works required.
Change of use of 6,299sq.m of the existing interlinked complex of buildings of 18,984sq.m from a mix of ancillary warehouse, packaging, logistics and research and development uses within Blocks E, G and K to an independent office based industry use that would function independently to the remaining Xilinx facility and could be sub-let and subdivided. An area of existing office space of 1,591sq.m at the second floor within Block G will also be sub-let creating an overall independent office based industry use of 7,890sq.m. The development will include the removal of the mezzanine level above the ground floor of Block G (201sq.m) that will reduce total floor area of facility to 18,783sq.m. The development will also consist of the amendment of Condition no. 6 of S94A/0344 and S99A/0908 so that the new independent office based industry use of 7,890sq.m can be sub-let and subdivided and so that the existing office space (10,893sq.m) is not integral or ancillary to the non office uses that are subject of this change of use application. Minor elevation changed are also proposed, including a new entrance within the north elevation of Block E, and additional glazing to the north, west and south elevation of Block G. The remaining Xilinx facility (10,893sq.m) will continue as per its permitted uses. The new office based industry use will be served by the reconfigured 197 car parking spaces of the 568 permitted car parking spaces serving the site with vehicular access via the existing secondary entrance off Bianconi Avenue. 371 spaces will continue to serve the remaining Xilinx facility. Retention permission is also sought for the generator compound (391sq.m) consisting of three generators along with three transformers and ancillary 3 diesel tanks and perimeter treatment on a permanent basis on the southern perimter of the site with Orchard Avenue. The development will include all ancillary landscaping and site development works.
Single storey extension of 57sqm to side and rear of existing dwelling with flat roof.
Detached two storey house with new vehicular entrance to side of 54 Fernwood Avenue as per previously granted application SD16A/155
Two storey side extension; 3 front facing 'Velux' windows and a rear facing dormer window.
Construction of kitchen extension to rear.
Deepening of part (c. 43ha.) of the existing and permitted quarry (An Bord Pleanala refs. 301177 & QD0026) to a quarry floor level of -10mOD using conventional blasting techniques; use of mobile processing plant; product stockpiles; final restoration scheme and all ancillary works within a planning application area of 49.4ha and within the overall landholding of 241.6ha and will be accompanied by an Environmental Impact Assessment Report (EIAR).
Single storey family flat side extension and all associated site works.
Additional 2no. fuel pumps and 2 no. islands. Retention permission is also sought for works completed. The completed works consist of the installation of 4 number underground fuel tanks (each fuel tank has a capacity of 75,000 litres and store HVO and BIO fuels), including a network of pipes and inspection manholes. These new tanks are located below ground in the Southeast corner of the site.
Relocation of 3 fuel pumps and the reconfiguration of permitted fuel islands from 1 long fuel island and 1 small fuel island to now provide for 3 small fuel islands, demolition/removal of single storey building along southern boundary and 1 new truck wash to south-western boundary of site; Planning permission is sought to remove 1 existing truck wash along the western boundary, demolition/removal of existing storage building to the western boundary and alterations to internal road layout to include directional arrows.
Retention of 77sq.m floor space divided evenly between ground and first floors; retention of balcony to front of existing dwelling. Permission for change of use from 289.32sq.m family home to 4 apartments consisting of 3 one bedroom apartments 56.6sq.m (2 person) and 1 two bedroom apartment 67.45sq.m (3 person) units. The development will include balconies to the 2 first floor apartments, access to the development from existing vehicular entrance from Blessington Road (N81), new on site vehicular and pedestrian entrance to accommodate access to rear site, 6 parking spaces, communal garden area at ground floor level, bicycle storage, bin storage, signage, upgraded bio cycle system, site development and boundary treatment works.
Retention permission for a dormer window to the rear roof slope at attic level.
Single storey extension to the front of the existing two storey terraced dwelling with a tiled roof and external finishes to match existing; internal alterations and associated site works.