SD21A/0012: Deepening of part (c. 43ha.) of the existing and permitted quarry (An Bord Pleanala refs. 301177 & QD0026) to a quarry floor level of -10mOD using conventional blasting techniques; use of mobile processing plant; product stockpiles; final restoration scheme and all ancillary works within a planning application area of 49.4ha and within the overall landholding of 241.6ha and will be accompanied by an Environmental Impact Assessment Report (EIAR).
Buckandhounds, Bedlesshill, Kingswood, Brownsbarn, Cheeverstown & Belgard, Fortunestown, Tallaght, Dublin 24
DecisionGrant permission
Decided23 March 2021
Application typePermission
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for South Dublin has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Source documents
Original council portal records and source PDFs where available.Nearby precedent
Similar nearby applications linked to this planning decision.- SD24A/0183WThe development will consist of a new enclosed HVO generator (75.6 sq.metres) with bunded transformer and fuel storage tank (double-skinned with leak detection system) on a concrete plinth all within an application area of 310 sq.metres at the existing quarry. The development is a revision to the HVO generator scheme permitted under planning ref. SD23A/0343. / 0.4 km away / 12 September 2024Granted
- SD12A/0137Importation and re-use of excess, naturally occurring earthworks material generated by construction projects to complete construction and landscaping of an existing, partially completed screening berm. / 0.5 km away / 04 October 2012Granted
- SD19A/0223Concrete plant (715sq.m) with a maximum height of 18 metres; extension to the extension to the existing Dry Mortar 'Flomix' plant (302sq.m) with a maximum height of 33.3 metres (Ref. SD16A/0410); truck wash out bays (187sq.m); a water storage tank (35sq.m.); ancillary facilities within a 1.50 hectare application area at the existing quarry. / 0.5 km away / 13 November 2019Granted
- SD23A/0251Remove section of existing grass margin and extend concrete apron to rear of existing public footpath and erect a proposed new stainless steel and glass bus shelter, 5.2m x 1.85m x 2.8m high on the public footpath with 2 no. LED illuminated advertising panels each of 2.0 square metre area. / 0.5 km away / 22 November 2023Granted
- SD19A/0086An extension (600sq.m) to a storage shed (1805sq.m) (Ref.SD12A/0156); cover for 3 existing ground level aggregate storage bays (c.651sq.m); 2 storage containers at quarry garage (c.28.8sq.m); 1 storage container at quarry void (c.28.8sq.m); removal of 2 storage containers (c.59sq.m); extension to storage shed within the retail shop yard (172.5sq.m) (Ref. SD16A/0239) on a site of 0.1822 hectares. / 0.6 km away / 08 May 2019Granted
- SD16A/0293Retention of the following: (1) Quarry control office & garage (1835sq.m) & 5 storage portacabins (14sq.m,14sq.m, 14sq.m 12.6sq.m & 8.4sq.m); (2) ESB switching station (58sq.m) & substation (36sq.m); (3) spare parts storage area (c. 2445sq.m); (4) maintenance shed (117.7sq.m); (5) car park (30 spaces & 627.7sq.m); (6) 2 lampost (10.5m high); (7) 'Clause 804' plant (1177.7sq.m); (8) wet sand plant (684.4sq.m); (9) 2 weighbridges (325.4sq.m); (10) general waste storage area (c. 12.5sq.m); (11) quarry fuelling station with two 9m3 fuel tanks (126.8sq.m); (12) metal recycling storage area (c.310sq.m); (13) truck parking area (c. 6632sq.m); (14) 1 security camera post (2.2m high); (15) 1 lamp post (9.2 high); (16) hydrocarbon interceptor; (17) tyre storage bays (c.140sq.m); (18) dry sand pant (2203.4sq.m); (19) 1 lamp post (10.3m high); (20) quarry stores (163sq.m); (21) effluent holding tank; (22) security station (13.9sq.m) and 2 lamp post (6.5m high); (23) wheel wash (236.3sq.m); (24) 'Tricel' effluent treatment system; (25) settlement lagoon system (3208.9sq.m); (26) sand polishing filter; (27) security fence (2.9m high); (28) overburden storage mound (7.3 ha); (29) perimeter screening berm (5m to 8m high by 1.6km long & 6ha); (30) perimeter screening berm (5.2m high by 310m long & 7930sq.m); (31) plant storage area ( 8356sq.m); (32) perimeter screening berm (9.2m high by 147 long & 4770sq.m); (33) screening berm (8.4m high by 340m long & 5257sq.m); (34) perimeter screening berm (6.5m high by 240m long & 5665sq.m); (35) perimeter screening berm (9m high by 320m long & 1ha); (36) screening berm (2.7m high by 245m long &3125sq.m); (37) screening berm (3.5m high by 950m long & 1.1ha); (38) screening berm (3m high by 243m long & 3030sq.m); (39) screening berm (3.3m high by 238m long & 2088sq.m); (40) settlement pond area (6.4ha); (41) screening berm (3.5m high by 379m long & 4793sq.m); (42) screening berm ( 3.1m high by 244m long & 3743sq.m); (43) internal access road (285m long) to Outer Ring Road entrance/exit, gate, pedestrian gates, footpaths, paladin fencing (1.8m high) & 6 lampposts (6m high); (44) screening berm (5.2m high by 215m long & 4040sq.m); (45) relocation of entrance to C&D recovery site permitted under SD02A/0167 & all ancillary site works; internal roads & landscape planting. / 0.6 km away / 29 June 2017Granted
- SD07A/1047/EP(a) new site access onto outer ring road; (b) 850m of new internal roadway; (c) provision of office, canteen and toilet facilies (270sq.m.); (d) provision of security hut with associated toilet facility (20sq.m.); (e) provision of 1 no. wheelwash; (f) provision of 3 no. weighbridges; (g) provision of 1 no oil interceptor; (h) provision of septic tank and associated percolation area; (i) provision of 20 no. car parking spaces; (j) public information signage; (k) canopy over docket exit area; (l) site landscaping. / 0.7 km away / 26 March 2013Granted
- SD07A/1047(a) new site access onto outer ring road; (b) 850m of new internal roadway; (c) provision of office, canteen and toilet facilies (270m2); (d) provision of security hut with associated toilet facility (20m2); (e) provision of 1 no. wheelwash; (f) provision of 3 no. weighbridges; (g) provision of 1 no oil interceptor; (h) provision of septic tank and associated percolation area; (i) provision of 20 no. car parking spaces; (j) public information signage; (k) canopy over docket exit area; (l) site landscaping. / 0.7 km away / 22 February 2008Granted