Proposed erection of a fully serviced dwelling house and domestic garage, new on-site wastewater treatment system and private well to EPA standards, proposed new entrance onto existing lane, together with associated and auxiliary site works
(i) lean to extension (283sqm.) to existing building permitted under PRR 98/9110 and (ii) portacabin building for use as site office in connection with the applicants agricultural contracting business
Existing single storey pitched roof conservatory extension to the west side of the original house, an existing single storey pitched roof porch extension to the east side of the original house, a single storey pitched roof shed with adjoining glasshouse to the rear, and a single storey pitched roof shed to the rear. All associated landscaping, drainage, ancillary site works and services. Retention permission is also sought for the change of use of dwellinghouse from residential use to commercial short term letting use
Erect an agricultural storage shed all with associated site works and services
The installation of circa. 3,492sq.m array of solar photovoltaic (PV) panels on ground mounted frames on an agricultural plot within the existing Shelton Abbey Open Prison, together with ducting, underground electrical cabling, and all associated site works The proposed development is considered to be within the curtilage of a protected structure (RPS No. 40-05) listed under the current Wicklow County Development Plan 2022-2028. The proposed solar array installation will have no impact on the protected structure, located over 330.00 meters away from the proposed site.
To construct a milking parlour, collecting yard, cattle crush and all associated site works in our farmyard (A protected structure: RPS No. 35-02, Ballymoneen Castlemacadam is located on the site boundary)
1. retention for extensions to existing dwelling. 2. retention for home office/gym building. 3. retention for effluent treatment tank. 4. planning to install a percolation area to comply with current EPA requirements
For proposed change of use from industrial/warehouse to plastics recycling facility and associated works
Erect a fully serviced dwelling house, domestic garage/store, private bored well, on-site wastewater treatment system and all associated site works
The importation of material to in-fill and re-contour the subject site. Once the importation is complete, the applicant will seed the land in line with Teagasc guidelines and return it to agricultural use. The Operational Phase will see the Site being used as agricultural pastureland. The applicant proposes, subject to planning, to import clean greenfield soil and stone to remediate approximately 2.43ha of the total site. The 2.43ha. is divided into 3 distinct phases - Phase 1 is 0.78ha, Phase 2 is 0.77ha and Phase 3 is 0.88ha. A fill plan has been drawn up for the importation of 18,200tonnes to fill Phase 1, 23,085tonnes to fill Phase 2, and 42,721tonnes to fill Phase 3, equating to a total of 84,006tonnes of soil and stone. Permission is being sought for a 5-year period and will be subject to a waste facility permit
Dwelling house with services, domestic garage and all associated site works
95 dwellings comprising 71 no. semi-detached and terrace houses with 2,3 and 4 bedrooms together with 24 apartments in 6 blocks and Creche. The development includes provision of open spaces, roads, footpaths, connection to services and all associated ancillary site development works
A) erect 6No. dwelling houses, consisting of 6No. 3-bedroom dwellings (house type A1), B) provision of vehicular and pedestrian access, C) provision of off street parking facilities, D) Ancillary site works and connection to existing services
(A) Erect 21No. dwelling houses, consisting of 6No. 3-bedroom dwellings (House type A1), 1No. 3-bedroom dwellings (House type A2), 8No. 3-bedroom dwellings (House type B1 & B3 ) and 6No. 2-bedroom dwellings (House type B2), (B) Provision of vehicular and pedestrian access off existing Emyvale Estate Road, (C) Provision of off street car parking facilities, (D) Ancillary site works and connection to existing services
Removal of existing septic tank new wastewater treatment unit & polishing filter and associate works
For as constructed extension to the side and rear of existing dwelling and permission to upgrade effluent treatment system
Replacement waste water treatment system serving existing dwelling and associated works
The construction of a bungalow with garage, new vehicular entrance and driveway, new effluent treatment system to current EPA standards and all ancillary site works
The construction of a bungalow with new entrance and driveway off existing right of way, new effluent treatment system to current EPA standards and all ancillary site works
Retention of extensions and front elevation to house as constructed
New dwelling, garage, new entrance, wastewater treatment unit, soil polishing filter, new well and associate works
Housing estate on a 1.6744HA site, on the north side of Coolgreany Road, Arklow, comprising of 33 units in total: (A) the construction of six no. 4 bedroom, semi detached 2 storey houses, 26 no. 3 bedroom semi-detached 2 storey houses and one no. 4 bedroom, detached 2 storey house; (B) the construction of a new access road and footpaths (cul-de-sac) and pedestrian access off coolgreaney road and all associated boundary treatment works; (C) provision of a 5,897sqm open space are comprising of 4,097sqm of usable public open space suitable for recreational use; (D) all associated ancillary site development works
Section 42 - extension of appropriate period - 19/1171 - housing estate on a 1.6744HA site, on the north side of Coolgreany Road, Arklow, comprising of 33 units in total: (A) the construction of six no. 4 bedroom, semi detached 2 storey houses, 26 no. 3 bedroom semi-detached 2 storey houses and one no. 4 bedroom, detached 2 storey house; (B) the construction of a new access road and footpaths (cul-de-sac) and pedestrian access off Coolgreaney Road and all associated boundary treatment works; (C) provision of a 5,897sqm open space are comprising of 4,097sqm of usable public open space suitable for recreational use; (D) all associated ancillary site development works
Construction of a single story extension to side / fore of existing childcare facility to accommodate additional ECCE room and bin storage area, New classroom to accommodate 22 children, (area=51m2), with amendments to elevations, with new entrance canopy, & amendment to carparking layout
Construction of a bungalow with garage, new entrance and driveway and a new effluent treatment system to current EPA standards and all ancillary site works
For permission for subdivision of existing sites, a new dwelling, new entrance onto public road, blocking up existing entrance onto public road, wastewater treatment unit and soil polishing filter for proposed dwelling, removing existing septic tank and installing a wastewater treatment unit and soil polishing filter for existing dwelling, new well for proposed dwelling, new site boundaries for existing 2 dwellings and associate works
Demolition of existing chimney on existing dwelling, construction of new rear extension which can be seen from the front of the dwelling, removal of existing septic tank, new wastewater treatment unit & soil polishing filter and associate works
The demolition of the existing single storey lean-to kitchen side extension and the replacement thereof with a single storey gabled kitchen side extension 31.3sqm, 5.3sqm bootroom, a new dining room rear extension 43.6sqm with patio and all associated external works and landscaping
A flat roofed ground floor extension of floor area 9.9 sq.m to the side of the existing dwelling and conversion of the existing attic space to a storage space of floor area 34.3 sq.m. replacing the existing side hip with a gable wall and increasing the height of th rear eaves. The ridge level remains unchanged. The proposals effect the front, side and rear elevations and includes all necessary associated siteworks. The development for retention permission consists of extension to original garden shed of floor area 15.4 sq.m
Erect a 2m2 ground floor extension to the main entrance and a 48m2 first floor dormer extension to the existing 130m2 dwelling with alterations and revisions to the elevations along with all associated site development works
1. Demolition of existing ind building units totalling (C.2784.4m2) comprising of a c.7.1m high Overall Main Building (c.2460m2), a c.4.2m high Sub-station (c. 107.3m2), a c.3.6m high Guardhouse (c.106.2m2), a c.3.6m high East-Building (c.39.1m2), c.5m high Water Tank (c.56.8m2) &c.2.6m high Pump House Building (c.15.1m2), assoc works. 2. Dev of 3 no. Data Centre Buildings, ancillary offices & plant comprising of: Data Centre Building A, - a single storey Data Centre Building, with mezzanine 1st floor level offices (GFA c.10,564m2, building height c.13,658m & structures c.15,137m), made up of 2 no. Data Halls & loading areas with assoc 2 no. Dock Levellers & including 10 no. c.14m high flues, & adjacent 1 no. Standby Power Generation Compounds, consisting of 10 no. HV Diesel Generators &belly tanks (GFA c.530 m2), 1 no. storage fuel tank (GFA c.15m2). Data Centre Building B – a single storey data centre building with mezzanine 1st floor level offices (GFA c.18,508m2, building height c.13,658m &structures c.15,137m), made up of 4 no. Data Halls &loading areas with associated 2 no. Dock Levellers &including 20 no. c.14m high flues, &adjacent 2 no. Standby Power Generation Compounds, consisting of 20 no. HV diesel Generators &belly tanks (GFA c.1,060 m2), 2 no. storage fuel tanks (GFA c.30m2). Data Centre Building C – a single storey data centre building with mezzanine 1st floor level offices (GFA c.18,508m2, building height c.13,658m & structures c.15,137m), made up of 4 no. Data Halls & loading areas with associated 2 no. Dock Levellers &including 20 no. c.14m high flues, &adjacent 2 no. Standby Power Generation Compounds, consisting of 20 no. HV Diesel Generators & belly tanks (GFA c.1,060 m2), 2 no. storage fuel tanks (GFA c.30m2). 3. Upgrading of existing 110 kV Substation to comprise of Compound (c. 8539m2) consisting of 11 kV GIS Switch Room (GFA c.708m2), &4 no. External Transformers (GFA c.550m2), a grid connection, security fence & all assoc works & services. 4. Dev of 1 no. Fire Hydrant Pump Hse (GFA c.129m2) with Sprinkler Tank (c.49m2), 1 no. single storey Security Guard Hse (GFA c.48m2) &2 no. vehicular accesses, internal access rds & 224 no. surface car parking spaces. 5. An upgraded attenuation basin, a proposed ww treatment plant &polishing filter. 6. All assoc site services, with c.2.7m high palisade fence, landscaping, boundary & all assoc site development works above & below ground. An EIAR has been prepared in respect of the proposed dev
A new pedestrian entrance only and omission of the secondary vehicular entrance to the new approved front boundary wall as opposed to that granted under P.R.R.: 22/778 along with all associated site development works
To construct a boundary wall in replacement of existing planted hedgerow to the front/roadside boundary of existing dwelling with ancillary works
The proposed development occupies part of the site of (and will supersede) a previously permitted data centre development under Reg. Ref. 20/1285. The proposed development, for which a ten-year permission is sought, consists of the following: Demolition of the existing structures on site (industrial structures and outbuildings) and site clearance works; construction of 3 no. three storey information and communication technology (ICT) facility buildings, each with a gross floor area (GFA) of c. 16,206 sq.m (c. 48,618sq.m GFA in total), and with a parapet height of c. 19.5 metres; each of the 3 no. ICT buildings will accommodate ICT equipment rooms, mechanical equipment rooms, staff welfare facilities, ancillary office space, security rooms, storage, and loading bays; a customer compound, a power trunk building, a transformer compound and a water tank compound area are provided to the north of the ICT facility buildings; the development includes the extension of the existing road and serving the existing industrial park to access the subject site, with gated access points to the proposed ICT facility development to be provided off this roadway; construction of internal road network and circulation areas, footpaths, provision of 124 no. car parking spaces and motorcycle and cycle parking spaces; landscaping and planting, boundary treatments, lighting, security fencing, and all associated site works including underground foul and storm water drainage network, attenuation and percolation areas, and utility cable (including connections to the substation permitted under ABP Ref. 310090-21, resulting in the partial culverting of an existing drainage ditch), on an application site area measuring c. 9.69 hectares. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted to the Planning Authority with the planning application
Dwelling with services and domestic garage and all associated site and ancillary works
Existing single storey extension with a floor area of 15.8sqm to the side and rear of the existing two storey dwelling compromising of a bedroom, shower room and a side entrance hall all connecting into the existing services
Proposed dwelling, waste water treatment system to EPA standards, garage, entrance and associated works
The proposed development seeks permission to amend the development permitted under WCC Reg. Ref.: 23/72 and will consist of the following: • Reconfiguration of the internal layout of the 3-no. permitted ICT facility buildings to include ICT equipment rooms, mechanical rooms, switch rooms, electrical equipment rooms, office accommodation, storage and staff facilities at ground and first floor levels; • Amendments to the southern façade on all ICT facility buildings to include alterations to fenestration, extension of permitted louvered façade treatment, and associated alterations; • An increase of c.113 sq.m to the permitted external generator compound of each ICT facility building at ground floor to accommodate additional plant and equipment; • Amendments to plant and equipment layout at roof level and the provision of 1 no. additional roof-mounted emergency landlord generator on each ICT facility building; • Amendments to the permitted water services compound to provide for 1 no. sprinkler tank, 1 no. hydrant tank, 2 no. hydrant water tanks, 2 no. water storage tanks, 6 no. single storey pump rooms (with a gross floor area (GFA) of c. 52 sq.m each) and 1 no. single storey pump room of with a GFA of c. 46 sq.m; • Revisions to permitted site access arrangements including the omission of a permitted security hut and the provision of a revised sally port entrance system with a single storey gatehouse (c. 43 sq.m) and associated revised internal road network; • Relocation of permitted car parking spaces and the provision of 26 no. additional car parking spaces (149 no. spaces in total), Electric Vehicle (EV) car parking and ducting; • The proposed development also includes alterations to the permitted landscaping and planting, fuel filling areas, boundary treatments, security fencing, lighting, SuDS and drainage, and all associated and ancillary site development works. The operation of the development will require an EPA Industrial Emissions Directive (IE) Licence.
Part 8 - submissions should be made to the relevant department as specified on the site notice (not to the Planning Department) - construct 2 No. social housing units and all associated works. The accommodation shall consist of the following: 1 No. 2 bed and 1 No. 3 bed single storey units
Erection of a ground floor extension (incorporating a domestic garage/store), first floor extension and to carry out alterations to existing dwelling house. Permission is also sought for a new replacement wastewater treatment system to current EPA standards and to decommission the existing system on site and to carry out associated ancillary site works
Erect an agricultural shed along with all associated site development works
The change of use of an existing retail unit to assembly and recreation use including the provision of a coffee dock and a gift shop, removal of condition no. 5 from previous planning permission Reg. Ref. 99/785 and the installation of a playground adjacent to the building; together with associated ancillary site works
The decommissioning and demolition of the existing Avoca Wastewater Treatment Plant, and the construction of a new Wastewater Treatment Plant to include: a new foul pump station, inlet works, storm tank, aeration tank, 2 no. final settlement tanks, sludge drying reed beds, 2 no. RAS/WAS Pump Stations, new administration building, final effluent outfall headwall, emergency flow headwall, surface water drainage settlement pond and outfall, and all ancillary works including pipework, pumps, sumps, chambers, air blowers and tanks;new access off the Tower Avenue: and all associated site development, site excavation and landscaping works, including fencing/boundary treatments, above and below ground
Replacement of 2 no. semi detached houses (House Type C) at sites 1a & 2a The Drive to 2 no semi-detached houses (House Type ABs) and for the replacement of 4 no. terrace houses (House Type E) at sites 8, 9, 10 & 11 The Green to 4 no. terrace houses (House Type D1t), together with all associated site works within an existing estate (Heatherside being constructed at present) pursuant to Plan Reg. Ref 08/610066, 13/610035 & 19/373
A) construction of an agricultural building to include cubicles, underground slatted slurry tank, milking facilities, livestock handling facilities, dairy & ancillary rooms, B) erection of a meal bin and all associated site works
Installation of a walking track with public lighting around the perimeter of the community field encompassing the GAA and soccer pitches (approx. 620m). The track shall be elevated on the easterly side where Irish Rail have erected a boundary fence. This area shall be protected with a handrail/fence so it can be used as a viewing and amenity area for games and accessed one end by a ramped area and the other end by steps and associated site works
Revisions to development permitted under Reg Ref 08/610066 (as extended by Reg Refs 13/610035 and 19/373 and revised by Reg Refs 16/1418, 18/1033 and 19/266 and concurrent revisions applications Reg Ref 20/187 and shall provide for the replacement of 55 no previously permitted units located in 'Phase 3' (comprising 6 no type B, 16 no type C, 17 no type D and 16 no type X 3 bedroom semi detached / terraced two storey house units), with 84 no residential units (comprising 68 no 2 storey houses and 16 no apartment / duplex units arranged across 3 storeys). Permission is also being sought for the omission of 22 no previously permitted units comprising 6 no houses (consisting of 2 no 3 bedroom semi detached two storey type C house units and 4 no 3 bedroom terraced 2 storey type D house units) and 16 no apartments (consisting of 8 no 2 bedroom single storey / ground floor apartment unit and 8 no 3 bedroom 2 storey / duplex apartment units) located to the north of the site and in their place the provision of an enlarged area of public open space
Outline Planning Permission is sought for the following works: 1. A change of use from an existing single-storey ancillary workshop (55sqm) to a single-storey dwelling, with ancillary site works and appropriate wastewater treatment system; 2. A single-storey extension (40sqm) to the east elevation.
Single storey extension to side/rear of existing house including widening of entrance and parking area with ancillary works
Extend the appropriate period of 08/610066 - residential development comprising a creche; 185 houses with 4 house types; 8 duplex units over 8 apartments; new access/relief road and infrastructure linking Vale Road to Lamberton Avenue; all services and ancillary site development works; relocation of part of existing overhead ESB lines; with temporary effluent treatment plant and sewerage pumping station at Yardland Td