To build a new dwelling house, install a waste water treatment system & all other associated site and ancillary works
The proposed development will consist of alterations to the Kilfenora wastewater treatment plant and percolation area development approved by An Bord Pleanála under reference ABP-305756-19, and consists of: 1. Modifications to site access and internal roads at the wastewater treatment plant to include (a) raising of access road level from the public road (L1034) to the site entrance gates, to include provision of permeable paving finish, and (b) widening/reconfiguration of internal road in focused areas, permeable paving finish, hard surface area and gully, and provision of petrol interceptor; 2. Modifications to site access and internal road at the percolation area to include new roadside channel drain and provision of permeable paving finish; 3. All ancillary site development and excavation works above and below ground necessary to facilitate the development. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application
The development consists of a) the RETENTION of existing "granny flat" to the rear of dwelling house and b) the replacement of existing sub-standard septic tanks with a new proprietary wastewater treatment system, sand polishing filter and percolation area together with ancillary site works
The development will consist of the change of use of a vacant classroom into a full daycare childcare service and all ancillary site works
For the following development: to erect two number 10m high floodlight poles, associated fittings, including ancillary site works
For the construction of an extension to rear of existing dwelling house including modification of existing extension, alterations and internal layout, installation of new domestic waste water treatment system with polishing filter together with all associated site works
Of 1. the ensuites built onto the eastern gable of the dwelling; 2 the detached garage and boiler house; 3. the detached games room and all associated site and ancillary works
To demolish existing garage and replace with new garage, including all ancillary site works
To construct a lattice type 36 metre multi-user telecommunications support structure, carrying antenna and dishes enclosed within a 2.4 metre high palisade fenced compound together with associated ground equipment cabinets, associated site works and access track
For the construction of a new single dwelling, separate garage, new entrance, driveway, new hedge at boundary, new septic tank, wastewater treatment system and percolation area, soakaways, bored well and all associated site works.
To build a new dwelling house to replace the existing derelict ruin, install a waste treatment system, improve the entrance onto the public road and all associated site and ancillary works
To alter and extend his existing dwelling house and to install a new proprietary wastewater system along with ancillary site works
To alter the planning permission drawings as granted under P24/60628
For development which will consist of a dwelling house with proprietary wastewater treatment system & polishing filter together with ancillary site works
To apply a mural to the South elevation of the community Hall
To construct a private garage/shed along with ancillary site works
To construct a dwelling house and garage, with effluent treatment system, new entrance from public road, and all associated site works
For the erection of a mural on the east-facing gable end of the premises formerly known as 'Maire Rua' Craft shop V95 W0HA. The development will consist of a public mural approximately 7m x 5m in scale and comprise work by a professional artist
For retention permission for use of the ground floor retail unit as a childcare facility
For the development which will consist of three single storey extensions of 36.0sqM, 6.4sqM and 3.4sqm to front, side and rear of the existing dwelling, with site works.
Of the Dwelling House as built on site, previously granted permission for under Reference P00/2296 and all associated site and ancillary works
Of the garage and dwelling house on site, which are larger than those granted under Reference P08/474, the revised site boundaries, the detached office & all other associated site and ancillary works
The development will consist of the construction of an 18 metre-high free-standing communications structure with its associated antennae, communication dishes, ground equipment and all associated site development works. The development will form part of Eircom Ltd existing telecommunications and broadband network
To construct a dwelling house with detached domestic garage, wastewater treatment system and soil polishing filter together with all associated site development works and services
To renovate an existing vacant building and to construct an extension to the rear. Construct new divisional boundary wall to the East, demolish existing outbuildings, provide new gated entrance in existing front wall and build up existing, and carry out all ancillary site works
To Extend the Appropriate Period of Planning Permission for P16-511 to build a dwelling house incorporating and refurbishing the existing structure to the rear as part of the new building, build a garage and install a waste treatment plant, and all associated ancillary works
To renovate and extend the existing dwelling house including the replacement of the existing extension, upgrade of wastewater treatment system, upgrade of existing entrance and all associated site works.
For the demolition of an existing two-storey end-of-terrace dwelling affected by defective concrete blocks and the reconstruction of a replacement dwelling, with minor alterations and extension, together with all associated site and ancillary works
To revise the plans previously granted under planning reference P23/417
To renovate and extend the existing cottage & all other site and ancillary works
To build a machinery shed with staff office/WC, Storage area and all associated site and ancillary works
The development which will consist of a dwelling house with proprietary wastewater treatment system and percolation area together with ancillary site works.
For the construction of a forest access road and entrance with all ancillary site works
For the development of a dwelling house and garage with proprietary wastewater treatment system and percolation area together with ancillary site works
For the development of a dwelling house and garage with proprietary wastewater treatment system and percolation area together with ancillary site works
To retain the garage and house extension along with ancillary site works
For renovation and extension of existing private dwelling house and all associated site works
The development will consist of: 1. Construction of a new 2-storey school building (1863.6 m2) incorporating 8 classrooms, general purpose room, library, offices, resource and learning rooms and associated ancillary accommodation; and a single classroom Special Education Needs Unit with associated facilities. 2. New site structures and features including retaining walls, cycle area, bin store, mechanical plant compound, hard play court, play areas, sensory garden, tiered seating areas, site furniture and child play installations. 3. New internal site pedestrian and vehicular transport layout including internal roads and turning areas, pedestrian paths, parking for 19 cars, bus and car drop off areas and right of way access points to neighbouring properties. 4. Realignment and widening of the existing north-western entrance to the site on the L1050 Ballinagaddy Road including demolition of existing boundary walls, hedgerows and gate and construction of a new set back vehicular entrance to the east of the existing entrance; with new boundary wall/fence, gates, landscaping and signage. 5. Alterations to the existing north-eastern pedestrian entrance to the site on the L1050 Ballinagaddy Road including repair/re-rendering of block walls to existing set back entrance (including shared boundary wall with Andersons Cottage, a Protected Structure) and replacement of gates. 6. Upgrading, repair and replacement of existing boundaries throughout including boundaries with neighbouring properties with rendered block walls, natural stone walls and metal fencing. 7. Site soft landscaping works throughout including demolition and removal of existing hedgerows, raising and lowering of ground, site soft landscaping including hedges, shrubbery and trees. 8. And all associated site works including site services, site lighting, subsurface attenuation tank and site hard landscaping. The total site area is 3.41 Acres. A Natura Impact Statement (NIS) will be submitted to the local authority with the Planning Application
The development consists of a) the RETENTION of the dwelling house as constructed including RETENTION of the attic conversion an alterations to the fenestrations and b) the RETENTION of 2 no. domestic storage sheds together with ancillary works
To construct a new dwelling house, private garage, site entrance, wastewater treatment system and all associated site works and services
The development will consist of a dwelling house with proprietary wastewater treatment system and polishing filter together with ancillary site works
To RETAIN the installation of an upgraded waste water treatment unit, the renovations and extension to the original cottage and all associated site and ancillary works
The development will consist of PERMISSION to renovate and extend the existing cottage and install a proprietary waste treatment system and polishing filter together with ancillary site works
To create access from my land onto public road, R477 from my farm and enlargement of existing 8ft gate to 12ft
Of the revised boundaries, which differ those previously granted under Ref 01/263
To RETAIN: 1. The demolition and reconstruction of the front boundary wall. 2. The widening of the access point. 3. The clearance of the site and the alterations of ground levels. 4. The use of the site for the open-air storage of hardware materials and planning PERMISSION to demolish the existing storage buildings and replace with external storage racking, to construct retaining wall to yard and all associated site works
To construct a dwelling house with a proprietary wastewater treatment system and polishing filter together with ancillary works
To construct a new dwelling house, garage, sewage treatment system and construct a new entrance onto public road and associated site works.
Of the storage shed and the extension to side and rear of the dwelling house and all other associated site and ancillary works
For development which will consist of the installation of a fresh milk vending machine housed in a garden shed like structure and associated site works