to
to

Planning records

Showing 151-200 of 2,063 public records
Page 4 of 20
  1. © OpenStreetMap
    21/5322Granted

    106 Cairn Woods Ballyviniter Lower Mallow Co. Cork

    A two storey extension to the side of the existing dwelling house and all associated site works.Decision record indexed
    Decision29 July 2021View record
  2. © OpenStreetMap
    22/5603Granted

    15 and 16 West End Thomas Davis Street Mallow Co. Cork

    Permission for renovations, alterations and change of use of derelict building previously used as office to restaurant use with staff facilities, office and events room on first floor and permission for the demolition of existing extensions to rear and construction of new extension to same.Decision record indexed
    Decision24 March 2023View record
  3. © OpenStreetMap
    20/6954Granted

    Caranora House Rock Road Mallow Co. Cork

    (A) Demolish existing single storey annex (B) Refurbish existing dwelling (C) Construct a two storey extension to existing dwelling (D) Construct a new storage shed and (E) All ancillary site works.Decision record indexed
    Decision20 April 2021View record
  4. © OpenStreetMap
    23/5846Granted

    4 Shortcastle Street Mallow Co Cork

    Permission for change of use of ground floor in existing 3 storey building from commercial use to domestic use as 3 storey dwelling house and all associated site works.Decision record indexed
    Decision06 November 2023View record
  5. © OpenStreetMap
    25/4688Granted

    No.5 Dromore Drive Ballydahin Mallow Co. Cork

    Permission for alterations to the external elevations of existing dwelling, to block up existing site entrance serving same dwelling, and to construct a new site entrance to serve same dwelling and all associated site works and servicesDecision record indexed
    Decision06 June 2025View record
  6. © OpenStreetMap
    22/6814Granted

    O'Mahony's Centra Spa Glen, Spaglen Td. Mallow Co.Cork

    Permission for retention of (1) an existing refuse shed (25.3 sqm), (2) Electric vehicle charge point cabinet, (3) above ground 1600 litre LPG tank with associated works. Permission is also sought for (1) an AD BLUE fuel pump cabinet and ancillary 5000 litre above ground AD BLUE tank, (2) the construction of 2.5m high hit and miss fencing to screen existing 2 no. sheds and refuse shed and (3) the removal of condition no.3 attached to planning ref no. 20/4178, which called for the removal of the two sheds, (29 sqm) containing plant associated with the car wash operations on the expiration of the period of 3 no. years beginning on date of the grant of this permission, to allow for the 2 no. sheds to remain on site.Decision record indexed
    Decision23 August 2023View record
  7. © OpenStreetMap
    22/4676Granted

    Old Course Spaglen Mallow Co.Cork

    The construction of a residential development of 96 no. dwelling units and all associated site development works. The proposed development consists of the construction of 24 no. 4-bed semi-detached houses, 30 no. 3-bed semi-detached houses, 16 no. 3-bed townhouses, 14 no. 2-bedtownhouses and 6 no. 2-bed duplex units, 4 no. 2-bed apartment units and 2 no. 1-bed apartments units contained in 3 no. 3 storey apartment blocks. Vehicular access to the proposed development will be via the existing entrance from the L-1207. The proposed development also includes open space, landscaping, bicycle parking facilities, bin stores, public lighting and all ancillary site development works. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the application. The NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the offices of the planning authority.Decision record indexed
    Decision10 November 2022View record
  8. © OpenStreetMap
    19/6344Refused

    Old Course Spaglen Mallow Co. Cork

    The construction of a residential development of 95 no. dwelling units and all associated site development works. The proposed development consists of the construction of 32 no. 4-bed semi-detached houses, 36 no. 3-bed semi-detached houses, 8 no. 3-bed townhouses, 7 no. 2-bed townhouses and 6 no. 2-bed duplex units, 4 no. 2-bed apartment units and 2 no. 1-bed apartment units contained in 3 no. 3 storey apartment blocks. Vehicular access to the proposed development will be via the existing entrance from the L-1207 and provision will be made for a pedestrian link with the River Valley housing estate (as previously permitted under Cork County Council Planning Reference 045426). The proposed development also includes open space, landscaping, bicycle parking facilities, bin stores, public lighting and all ancillary site development works. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with this application.Grounds not yet categorised
    Decision20 April 2020View record
  9. © OpenStreetMap
    22/4501Granted

    Emmet Street Mallow Co.Cork

    The demolition of existing structures and construction of a residential development of 22 no. apartment and duplex units in 3 no. blocks. Block 1 is 2 no. storeys and comprises 4 no. two bed units. Block 2 is part-1 to part-3 no. storeys and contains 6 no. one bed units, 6 no two bed units and 4 no. three bed units. Block 3 is 2 no. storeys comprising 2 no. one bed units. The development will also include boundary treatments, hard and soft landscaping, car parking, cycle parking, bin storage and all ancillary site development works. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the application. The NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the offices of the planning authority.Decision record indexed
    Decision05 December 2022View record
  10. © OpenStreetMap
    21/5687Refused

    Emmet Street Mallow Co. Cork

    The demolition of existing structures and the construction of a residential development of 28 no. apartments and all ancillary site works. The proposed development will consist of 4 no. apartment buildings as follows; Blocks 1 & 2 (4 no. 1-bedroom apartments over 2 storeys); Block 3 (6 no. 1-bedroom apartments and 12 no. 2-bedroom apartments over 3 storeys); Block 4 (2 no. 1-bedroom apartments over 2 storeys). Ancillary site works to include provision of bin store and bicycle stands. Access to the proposed development will be from Emmet Street and Humes Lane.Grounds not yet categorised
    Decision11 August 2021View record
  11. © OpenStreetMap
    24/4795Granted

    25 Dromore Drive Ballydahin Mallow Co.Cork

    Permission for alterations to front and side of existing dwelling and for the construction of a single storey extension to the rear of same dwelling and all associated site worksDecision record indexed
    Decision17 January 2025View record
  12. © OpenStreetMap
    20/5098Granted

    51 Canon Sheehan Place Gooldshill Mallow Co. Cork

    To demolish the existing domestic store building and to construct an extension to the rear of the existing dwelling, a new separate dwelling house unit to the side of the existing dwelling house and a new vehicular entrance with alterations to the front, side and rear elevation of the existing dwelling house, with all associated site and ancillary works.Decision record indexed
    Decision12 January 2021View record
  13. © OpenStreetMap
    20/6845Granted

    Ballydahin Td. Cork Road Mallow Co. Cork

    (1) The demolition of existing disused shed (2) the construction of a new two storey dwelling, domestic garage and all associated site works and services.Decision record indexed
    Decision08 June 2021View record
  14. © OpenStreetMap
    20/5042Granted

    No. 49 Cairnwoods Ballyviniter Lower Mallow Co. Cork

    To (A) construct a single storey extension to the side and rear of the existing dwelling, (B) construct a single storey domestic garden store to the side of the dwelling, (C) carry out all elevational changes to the existing dwelling and all associated site works.Decision record indexed
    Decision11 September 2020View record
  15. © OpenStreetMap
    19/7081Refused

    Old Course Spaglen Mallow Co. Cork

    The construction of a residential development of 44 no. dwelling units and all associated site development works. The proposed development consists of the demolition / removal of existing foundations for incomplete dwellings permitted under Cork County Council planning reference 045426 (as amended by planning references 055906 and 064071) and the construction of 8 no. 4 bed semi-detached houses, 24 no. 3-bed semi-detached houses, 6 no. 3-bed townhouses and 6 no. 2-bed townhouses. Vehicular access to the proposed development will be via the existing entrance from the L-1207. The proposed development also includes open space, landscaping, public lighting and all ancillary site development works. A Natura Impact Statement (NIS) has been prepared and will be submitted to the planning authority with the application.Grounds not yet categorised
    Decision11 May 2020View record
  16. © OpenStreetMap
    19/6732Granted

    No. 58 Cairn Woods Ballyviniter Lower Mallow Co. Cork

    Construction of a single storey extension to side and a two storey extension and single storey extension to rear of dwelling and all associated site worksDecision record indexed
    Decision21 January 2020View record
  17. © OpenStreetMap
    20/5200Granted

    Rock Road Mallow Co. Cork

    To construct a dwelling and carry out all associated site works including a new site entrance and boundary walls.Decision record indexed
    Decision31 July 2020View record
  18. © OpenStreetMap
    24/6099Granted

    No.3 Woodland View Mallow Co. Cork P51PW2C

    Permission to convert existing attic of dwelling house to habitable accommodation, 2 no. dormer windows to front elevation, 3 no. rooflights to rear elevation and all associated site works.Decision record indexed
    Decision07 January 2025View record
  19. © OpenStreetMap
    23/5390Refused

    5, 6 & 7 West End Mallow Co Cork

    Alteration/modification of the previously permitted (Ref: 21/6805) internal alterations, refurbishment and change of use of the apartment and office building (Protected Structures Reg. No’s 100,101 & 102). The proposed amendments include: (1) Provision of 2 No. additional residential units (1 bed split level) in lieu of the previously permitted management office at basement and ground floor levels (15 No. residential units in total); (2) Amending Unit 04 at ground floor to a 1 bed unit; (3) Provision of new staircase from the ground to basement in No. 5 West End; (4) Internal wall insulation proposed to external walls of basement level; (5) Internal alterations to third floor and provision of 2 No. roof AOVs; (6) Provision of 4 No. additional resident car parking spaces in lieu of the previously permitted staff parking.Grounds not yet categorised
    Decision17 October 2023View record
  20. © OpenStreetMap
    21/6805Granted

    No's 5, 6 and 7 West End Mallow Co. Cork

    Proposed internal alterations, refurbishment and partial change of use (1082sqm) from office to residential of No’s 5, 6 and 7 West End, Mallow, Co. Cork (Protected Structures Reg, No’s 100, 101 and 102) to provide 13 no. apartments (2 no. studio, 6 no. 1-bed and 5 no. 2-bed) an ancillary split-level management office and ancillary storage areas. External proposals include a new bicycle/refuse store, minor amendments to the existing car park and all associated site works. No alteration to the existing external elevations are proposed.Decision record indexed
    Decision21 April 2022View record
  21. © OpenStreetMap
    20/5596Granted

    The existing staff car park at Dairygold's Nutritional Campus and 5, 6 and 7 West End, Annabella Mallow, Co. Cork

    The construction of a new 215mm solid block boundary wall with piers, of between 2.0-2.4m in height, plastered and capped, and new footpath, between the existing staff car park at Dairygold’s Nutritional Campus and 5 West End. The proposed development will also consist of the reinstatement of the original vehicular access via the archway between 6-7 West End (existing pedestrian/cyclist access, and existing gates to be retained); the blocking up of the existing northern pedestrian access from the existing car park (to match the existing boundary wall); and all ancillary works, including: the removal of existing internal bollards; the removal of the existing guardrail on West End; and the replacement of existing concrete footpath along West End; as well as all site development, drainage and landscaping works. There are no works proposed to the existing buildings at 5,6 and 7 West End (Protected Structures Reg. Nos. 100,101, and 102). The application relates to an establishment which has an Industrial Emissions License (P0403-03).Decision record indexed
    Decision03 December 2020View record
  22. © OpenStreetMap
    20/6790Granted

    Sean Moylan Park Ballydahin Mallow Co. Cork

    Construction of an extension to an existing roof plant enclosure of an industrial building. The height will increase by three metre. No additional floor area is proposed. The application relates to a development which comprises an activity requiring an Integrated Pollution Control Licence (P0247-02) issued by the Environmental Protection Agency.Decision record indexed
    Decision09 February 2021View record
  23. © OpenStreetMap
    25/6674Granted

    82 Cairn Woods, Ballyviniter Lower, Mallow Co. Cork, P51 XHW0

    1) Retention of the existing attic conversion, including 3 no. roof windows to the rear and a gable window to the side. 2) Retention and completion of a single storey extension under construction to the rear of the dwelling. 3) Construction of a proposed single storey extension to the front and side of the dwelling. 4) Retention of the existing boundary wall and fencing to the side and front corner of the property, in a proposal that will include Permission for modifications to the existing fencing and proposed additional screen planting adjacent to the wall and fence.Decision record indexed
    Decision13 March 2026View record
  24. © OpenStreetMap
    21/6442Granted

    St Gobnait's Park Ballydahin Mallow Co. Cork

    Permission for retention of foundations as constructed and permission for the erection of a single storey toilet block and storage building and associated site works.Decision record indexed
    Decision26 October 2021View record
  25. © OpenStreetMap
    23/4200Granted

    Leaselands Mallow Co.Cork

    Permission for retention for two storey detached dwelling house as constructed and all associated site worksDecision record indexed
    Decision21 July 2023View record
  26. © OpenStreetMap
    24/4713Granted

    Annabella Mallow Co Cork

    Permission for the construction of a new Biomass Plant for the generation of steam as part of the decarbonisation road map for the business. The development will consist of the construction of a single storey woodchip boiler building (840m2) with a height of 16.292m above ground level and a maximum stack height of 27.292m above ground level, the construction of an extension to the existing pipe bridge, new internal access road and yard to facilitate vehicle movements and associated site works. The application relates to an establishment which has an Industrial Emissions Licence, Ref.No. P0403-03. A Natura Impact Statement (NIS) will accompany the application.Decision record indexed
    Decision18 February 2025View record
  27. © OpenStreetMap
    21/4869Granted

    Leaselands Mallow Co. Cork

    Permission for retention of alterations to front and rear facades of existing dwellinghouse and Permission to demolish an existing shed adjoining existing dwellinghouse, construct a new single storey side extension to existing dwellinghouse and to construct a new single storey shedDecision record indexed
    Decision31 May 2021View record
  28. © OpenStreetMap
    21/4045Granted

    Lissanisky Mallow Co. Cork

    The construction of a single-storey side and rear extension and alterations including 4no. rooflights at rear and 1no. window to east elevation of existing dwelling house and all associated site works.Decision record indexed
    Decision22 April 2021View record
  29. © OpenStreetMap
    21/5876Granted

    6 Lacknalooha Lackanalooha,Mallow Co. Cork

    Demolition of existing garage and single storey shed and construction of a single storey extension to the rear and side of the existing dwelling house, replacement of windows, widening of front gate access, a new garden shed and all ancillary works.Decision record indexed
    Decision24 August 2021View record
  30. © OpenStreetMap
    22/4464Granted

    Leaselands Mallow Co. Cork

    To construct a 2 storey dwelling, new site entrance and all associated site works.Decision record indexed
    Decision27 June 2022View record
  31. © OpenStreetMap
    20/4775Granted

    Site B Leaselands Mallow Co. Cork

    Retention of relocation of site boundary to existing permitted dwelling previously granted under Planning Reference 17/4183.Decision record indexed
    Decision10 July 2020View record
  32. © OpenStreetMap
    21/6586Granted

    Leaselands Mallow Co. Cork

    Permission for retention of adjoining canopy to side of dwelling and permission for construction of extension to side of dwelling and all associated site works.Decision record indexed
    Decision12 November 2021View record
  33. © OpenStreetMap
    23/4516Granted

    16 Avondale Park Ballydahin Mallow Co. Cork

    Permission for an extension and alterations to the existing dwelling and all associated site worksDecision record indexed
    Decision15 May 2023View record
  34. © OpenStreetMap
    22/5322Granted

    Old Cork Road Gooldshill Mallow Co Cork

    Permission for an 18m monopole structure with headframe carrying antenna and dishes enclosed within a 2.4 metre high palisade fence compound together with associated ground equipment cabinets and associated site worksDecision record indexed
    Decision02 August 2022View record
  35. © OpenStreetMap
    23/4378Granted

    20 Lacknalooha Lackanalooha Mallow Co Cork

    Domestic shed at the rear of their garden, to be used as domestic use only.Decision record indexed
    Decision27 April 2023View record
  36. © OpenStreetMap
    20/4214Granted

    Carhookeal Mallow Co. Cork

    To construct a new dwelling house.Decision record indexed
    Decision30 March 2020View record
  37. © OpenStreetMap
    24/5478Granted

    Annabella, West End & Park Road (N72), Mallow, Co. Cork.

    Permission for development at this site of approximately 0.0352 hectares located at the permitted pharmacy and office units (totalling 317.3 sq.m gross floor space) of the newly constructed Lidl licensed discount foodstore (granted permission under Cork County Council Planning Reg. Ref. No.: 20/05063). The proposed development consists of the change of use of the constructed pharmacy unit (173.8 sq.m) to shop as defined by Article 5(1) of the Planning and Development Regulations 2001(as amended); the change of use of the constructed office unit (139.7 sq.m) to shop as defined by Article 5(1) of the Planning and Development Regulations 2001 (as amended); and associated signage (totalling 6.12 sq.m).Decision record indexed
    Decision26 September 2024View record
  38. © OpenStreetMap
    21/4465Granted

    No. 50 Cork Road Gooldshill TD. Mallow Co. Cork

    To construct a new domestic entrance and driveway to serve existing dwelling and all associated site works.Decision record indexed
    Decision07 July 2021View record
  39. © OpenStreetMap
    25/4336Granted

    51 Beecher Street Lackanalooha Mallow Co. Cork

    Permission for Retention of change of use of the existing attic space to habitable use, Permission for Retention of the partially constructed extension to the rear of the existing dwelling house and permission to complete same extension and alterations to the existing dwelling house and all associated site and ancillary works.Decision record indexed
    Decision24 April 2025View record
  40. © OpenStreetMap
    23/5695Granted

    51 Beecher Street Lackanalooha Mallow Co.Cork

    Permission for demolition of a single storey building at the rear of the existing dwelling house and construction of a new single storey extension to rear of the existing dwelling, to install 3 number roof windows on the rear elevation of the existing roof with alterations and all associated site and ancillary worksDecision record indexed
    Decision01 December 2023View record
  41. © OpenStreetMap
    20/5063Granted

    West End Road and Park Road (N72) Annabella Mallow Co. Cork

    Development comprising the construction of a new Licenced Discount Foodstore with ancillary infrastructure and associated site development works (all totalling 2,254.4 sq m Gross Floor Area and ranging in height equivalent from 1 to 2 storeys), at a site of approximately 1.476 hectares. The construction of the proposed Licenced Discount Foodstore (2,215 sq m gross floor area) comprises of: A retail sales area with ancillary off-licence use and bakery (total Net Retail Sales Area of 1,420 sq m), entrance pod, public facilities (incl. lobby and toilets), staff facilities (incl. lobbies, operations office, meeting room, canteen, locker room, showers and toilets), storage (incl. cold storage), IT room, plant room, and delivery area; Rooftop photovoltaic solar panel array extending to a maximum of 907.5 sqm; Corporate signage consisting of 4 no. building mounted corporate internally illuminated signs, 1 no. free standing internally illuminated flagpole sign at the site entrance from Park Road, and 1 no. free standing externally illuminated poster display boards; 1 no. covered trolley bay structure (39.4 sq m Gross Floor Area); Surface car park providing a total of 127 no. car parking spaces (4 no. disabled, 12 no. parent and child, 12 no. EV charging spaces and 101 no. regular) and 14 no. motorcycle parking spaces and 16 no. bicycle parking spaces; Primary vehicular and pedestrian access to the proposed Licenced Discount Foodstore will be provided via an existing site entrance (serving the Dairygold Co-Op Superstore) onto Park Road (N72), which is to be enhanced as part of the proposed development; Pedestrian access will be provided via a new plaza area along the northern boundary of the site with West End Road; and Boundary treatments, hard and soft landscaping, services (including 2 no. below ground attenuation tank) and all other ancillary and associated site development works above and below ground level. This Planning Application will be accompanied by a Natura Impact Statement.Decision record indexed
    Decision03 August 2021View record
  42. © OpenStreetMap
    20/5697Granted

    No. 2 Blackrock Park Ballydahin TD Mallow Co. Cork

    Permission for retention of detached domestic shed as constructed for use as domestic store and utility room and retention of shed as constructed for use as garden utensil store.Decision record indexed
    Decision05 October 2020View record
  43. © OpenStreetMap
    24/5483Granted

    The Mallow South Town Centre Development, (under construction), bounded by West End & Park Road, Annabella, Mallow, Co. Cork.

    Permission for the construction of a single storey retail warehouse (unit 3) to the immediate east of retail unit 2 permitted under application reference 20/4925; roller shutter door to the rear elevation; signage; rooftop plant; extension to the delivery yard area permitted under application register reference 20/4925; and all associated site development and drainage works on a site that forms part of the Mallow South Town Centre Development (under construction). The proposed development will modify condition no. 2, which omitted the proposed retail units 3 and 4, attached to application reference 20/4925. The proposed modified condition no. 2, will exclude the omission of retail unit no. 3. A Natura Impact Statement (NIS) will be submitted to the planning authority with the application.Decision record indexed
    Decision04 July 2025View record
  44. © OpenStreetMap
    20/7001Granted

    Killetra Park Road Mallow Co. Cork

    Permission to carry out the following works to upgrade their existing waste water treatment plant which serves their milk processing plant, -, (i) demolish the two existing concrete circular ADF filter tanks and replace with a new rectangular concrete tank, for new biological treatment technology, (ii) new ESB substation and switchroom and equipment plinth; (iii) decommission and remove the two existing metal clad biotowers and (iv) associated site works. This application relates to an establishment which has an Industrial Emissions Licence (PO403-03).Decision record indexed
    Decision08 April 2021View record
  45. © OpenStreetMap
    24/5590Granted

    25 Upper Blackwater Drive Ballydahin Mallow Co.Cork

    Permission for retention for increasing the width of the existing front vehicular entrance and for Permission to install a storm water drain to the existing front vehicular entranceDecision record indexed
    Decision09 October 2024View record
  46. © OpenStreetMap
    20/4925Granted

    West End and Park Road Annabella Mallow Co. Cork

    Development on a site which will consist of the demolition of part of the existing Co-Op store, and associated garden centre, agri store, and delivery yard, and the provision of an expanded Co-Op store, and associated part-covered garden centre, agri store and delivery yard; the refurbishment of Annabella Villas (Protected Structure Reg Nos. 70-71) (Unit 1) to provide a restaurant use at lower ground floor and ground floor, to include the sale of hot food for consumption off the premises, and offices on the first floor and second floor; repair works to the Coach Houses (Protected structure Reg No. 72); 7no. new units (Units 2-8) suitable for convenience retail/comparison retail/retail warehousing/restaurant/café use, with retail use to include the sale of alcohol for consumption off the premises, and restaurant/café use to include the sale of hot food for consumption off the premises. A glazed connection, for restaurant use, is proposed between the lower ground floor of Annabella Villas (Protected Structure Reg Nos. 70-71) (Unit 1) and Unit 2. The proposed development also provides for the demolition of part of the boundary wall fronting West End; public realm works on West End; car parking; cycle parking; signage; waste management areas; ESB substation; rooftop plant, including solar panels; and all site development, infrastructural and landscaping works, including modifications to the existing access off Park Road, and improved/new pedestrian connections on West End and Park Road. The northern part of the site is located within an Architectural Conservation Area (ACA-1). An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the application. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application.Decision record indexed
    Decision26 July 2021View record
  47. © OpenStreetMap
    26/0299Granted

    West End And Park Road, Annabella, Mallow, Co.Cork

    Permission for Development on a site which will consist of the demolition of part of the existing Co-Op store, and associated garden centre, agri store, and delivery yard, and the provision of an expanded Co-Op store, and associated part-covered garden centre, agri store and delivery yard; the refurbishment of Annabella Villas (Protected Structure Reg Nos. 70-71) (Unit 1) to provide a restaurant use at lower ground floor and ground floor, to include the sale of hot food for consumption off the premises, and offices on the first floor and second floor; repair works to the Coach Houses (Protected structure Reg No. 72); 7no. new units (Units 2-8) suitable for convenience retail/comparison retail/retail warehousing/restaurant/café use, with retail use to include the sale of alcohol for consumption off the premises, and restaurant/café use to include the sale of hot food for consumption off the premises. A glazed connection, for restaurant use, is proposed between the lower ground floor of Annabella Villas (Protected Structure Reg Nos. 70-71) (Unit 1) and Unit 2. The proposed development also provides for the demolition of part of the boundary wall fronting West End; public realm works on West End; car parking; cycle parking; signage; waste management areas; ESB substation; rooftop plant, including solar panels; and all site development, infrastructural and landscaping works, including modifications to the existing access off Park Road, and improved/new pedestrian connections on West End and Park Road. The northern part of the site is located within an Architectural Conservation Area (ACA-1). An Environmental Impact Assessment Report (EIAR) will be submitted to the Planning Authority with the application. A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application. Extension of Duration to Permission granted under Planning Ref. No. 20/4925Decision record indexed
    Decision07 April 2026View record
  48. © OpenStreetMap
    21/4287Granted

    No. 8 Blackwater Drive Ballydahin Mallow Co. Cork

    Demolition of existing shed and construction of new extension and alterations to rear of existing dwelling and all associated site works.Decision record indexed
    Decision17 May 2021View record
  49. © OpenStreetMap
    21/7004Refused

    Mountnagle Mallow Co. Cork

    The construction of a new rugby sports grounds consisting of (1) three full size playing pitches with floodlighting, (2) one smaller sized training pitch with floodlighting, (3) clubhouse, (4) car park and access roads with public lighting, (5) surround walkway with lighting, (6) private on-site waste water treatment system, (7) storm water soak-pits, (8) entrance, (9) terraced viewing areas, (10) ball-stop netting and (11) all associated site works.Grounds not yet categorised
    Decision10 January 2022View record
  50. © OpenStreetMap
    23/6485Granted

    62 Cork Road Gooldshill Mallow Co Cork

    Permission for retention of a change in design, size and location of a domestic garage and home office from what was granted originally under Pl.Reg.No. 16/7247.Decision record indexed
    Decision15 February 2024View record
Showing 151-200 of 2,063
Page 4 of 20