Erect a 2,300m2 manufacturing & engineering industrial unit with connecting 440m2 office building along with all associated site development works including storage yard, car parking, signage and connect to the existing servicesDecision record indexed
To erect a 1,555m² extension to the rear and 720m² extension to the side of the existing 2,575 m² manufacturing & engineering industrial unit & 700m² office building along with all associated site development worksDecision record indexed
Alterations and revisions to the already approved permission granted under PRR 20/632. Retention permission is sought for (1) an additional 275m2 of floor area to the already approved 2,300m2 manufacturing & engineering industrial unit now totalling 2,575m2 with minor alterations and revisions to the elevations and (2) minor alterations and revisions to the elevations, floor plan and internal layout of the connecting office building providing an additional 200m2 of office floor area to the original 2nd floor approved storage area with an additional 60m2 fire escape stairwell to the already approved 440m2 office building, now totalling 700m2. All associated site development works including storage yard, car parking, signage, and connection to the existing services and the same as approved under PRR 20/632Decision record indexed
Construction of Biofuel facility comprising of a part 3 storey and part single storey commercial building with a total floor area of 1771m2, covered truck filling / unloading area. Pipe bridge and tank farm storage area. The overall building height is 14 metres with solar panels on the roof. The maximum height of any storage tank is 12 metres and the boiler room chimney is 15 metres. Extension of the existing Kish Business Park access road, footpaths, drainage and water supply to serve the subject site. New internal roads, footpaths, 21 no. car parking spaces, 10 no. cycle parking spaces and parking and circulation areas for 10 no. trucks; 2 no. vehicular entrances, pedestrian access, boundary treatment and landscaping, ESB substation and new underground foul and storm water drainage system for the site including rainwater harvesting, attenuation pond, full retention oil interceptor and associated works. The application site area is 1.6 hectares. An Environment Impact Assessment Report (EIAR) has been prepared and will be submitted to the Planning Authority with the planning applicationDecision record indexed
Erect a 8,875m2 manufacturing & engineering industrial extension with 1,020m2 additional office space to the side of the existing 5,550m2 manufacturing & engineering industrial & office building along with all associated site development worksDecision record indexed
(i) lean to extension (283sqm.) to existing building permitted under PRR 98/9110 and (ii) portacabin building for use as site office in connection with the applicants agricultural contracting businessDecision record indexed
(i) Single storey industrial unit (Gross Area 2,380sqm) in lieu of that allowed under PPR21/951 and (ii) new car park and timber storage compound and all associated site worksDecision record indexed
Single storey 710 sqm industrial unit, comprising of a 236 sqm metal fabrication workshop, and 474 sqm trade sales and display area, plus 272 sqm concrete surfaced yard with security fence to the side of the proposed building, connect into the existing mains sewer and storm water systems, to provide car parking, a 3.5m high sign at the site entrance and all additional site works14 conditions indexed
(i) Single storey industrial unit (Gross area 3150 Sqm) infill extension between existing buildings. (ii) New car park and timber storage compound (0.7 Ha) and all associated site worksDecision record indexed