To amend the design of the approved development (Planning Reference: 17/1497) which comprises a Solar PV Energy Development. Proposed amendments include (1) change in location and size of substation, (2) two additional temporary construction compounds will be located at the site entrances, (3) the number of modules will decrease, (4) the number of pile driven poles will decrease, (5) the size and number of transformer stations will increase, (6) the total fencing area will increase (7) the total amount of fencing posts will increase, (8) up to 21 CCTV cameras will be installed (9) access tracks will be optimised and increased in width and length, and (10) increase in operational lifetime from 25 years to 35years
New single vehicle garage to the side of existing dwelling
Development of a full off licence for alcohol sales at existing food retail store
(A) planning permission for storage unit and (B) retention permission for gable windows and rooflights to existing dwelling
An entrance, a driveway, an internal stairs and the omission of a window from the side (south east) elevation and all associated garden and site works. Full planning permission is also applied for a garage, a first floor (north west facing) gable end window and all associated works and site works
The construction of a new detached two storey, split-level, dormer style dwelling with separate detached single storey domestic garage, and new on-site waste-water treatment facility to current EPA standards, together with a new private well, and all ancillary site works
Single storey dwelling with garage, entrance, well, effluent treatment system to EPA and all associated site works
The construction of a single storey dwelling measuring approximately 150sqm, the construction of an approximately 45sqm garage/workshop building, the construction of a new entrance to the site, amendments to the existing farm entrance adjacent, construction of a new wastewater treatment system and well and all ancillary site works
(1) demolition of existing porch to rear of cottage (2) addition of 4 No. rooflights to rear of existing pitched roof (3) construction of a new single storey flat roof porch/ entrance extension to the rear (4) construction of a new part single/ part two storey, flat / pitched roof extension with 3 No. rooflights to the rear (5) including all associated ancillary site, new service and wastewater upgrade works
Alterations and additions to an existing 2-storey detached farmhouse. The proposed works comprise the demolition of an existing single storey flat-roofed sunroom/kitchen extension to the rear of the original dwelling, together with the partial demolition of an existing detached out building to the rear of same, and the construction of a new 2-sorey / part single storey extension to the rear, together with the construction of a new single storey utility room extension to the gable end of the original dwelling. The proposed works will also comprise the upgrade of the existing septic tank to meet current EPA standards, together with all ancillary site works
Proposed dwelling, waste water treatment system to EPA standards, garage, entrance and associated works
Dwelling, garage, new entrance onto existing lane, well, treatment unit and soil polishing filter and associate works
A 38KV grid connection cable and associated infrastructure to connect the approved Johnstown North solar farm (consented under planning ref. 171497) to the existing Arklow 220kV Substation comprising the laying of a 3,190m Underground Cabling (UGC) and associated infrastructure, located at Dublin Road, Arklow, Co. Wicklow
(A) Construction of a new home office and garage / storage area, (B) All necessary site ancillary works
1 permission for revised entrance proposal; 2 permission for new wastewater treatment system; 3 the retention for the change of use from agricultural use to farm dwellings on two buildings; 4 the retention of a two-storey extension to one of said buildings; 5 the retention of 2 single-storey glamping short-stay units and associated site works
For retention permission for extensions as built, stone elevations as built, new roof on dwelling as built, internal layout as built, conversion of attic space as built and permission for removal of existing sewage system, installation of new wastewater system to current standards, blocking up existing domestic and agriculture entrances, construction of new entrance onto public road and associate works
Upgrade of existing effluent disposal treatment system to current EPA standards together with a new bored well and all ancillary site works
Single storey entrance porch to the western/ public roadside elevation of 14 sq.m. on foot of warning letter UD5645
Construction of a bungalow, new entrance and driveway off existing laneway, new treatment system to current EPA standards and all ancillary site works
Demolition of an existing underground wastewater treatment plant and ancillary structures and the construction of a new and expanded underground wastewater treatment plant. The proposed development includes the provision of: new underground tanks, chambers, pumps and piping; a mechanical screen (2.43 m in height); 4 no. ancillary control kiosks/cabinets (ranging in height from 1.41 m to 2.14 m); an odour control unit (1.6 m in height); the provision of an extension to the 2.4 m high paladin fence and an associated access gate (4 m wide; 2.4 m in height) extending the enclosed area to facilitate the expanded wastewater treatment plant (by 182 sq m); and the provision of additional planting within the extended fencing. A Natura Impact Statement has been prepared in respect of this planning application
As constructed side extension to existing dwelling and all associated ancillary site works and services
1) existing two storey extension constructed to the front of original farmhouse; 2) construction of single storey extension to side of existing farmhouse and 3) one no. self-contained workers quarters and 4) permission to upgrade sewerage facilities with all associated site works
The demolition of the 16sqm rear extension (total area of existing house is 64sqm), construction of a single storey render clad extension (approx. 111sqm) to the rear of the retained portion of the existing house, changes to selected window opes, external wall finishes and roof of the existing house, a bored well, a new site specific treatment unit and percolation area replacing an existing septic tank and soak pit and all associated site works
Removal of planning condition no. 3 of planning ref 01/5242 (from restricted use of dwelling to use by all classes of persons)
1. Full planning permission is been sought for a proposed secondary treatment system to current EPA guidelines with percolation area and all associated site works, 2. retention permission is been sought for the following (a) an existing glass conservatory circa 19.6sqm connected to existing dwelling (b) the retention of an existing grain store to a games room and office room circa 60.4sqm and (c) the retention of the part conversion of an existing out building to a one bedroom holiday let unit/short term let unit circa 73.5sqm and all associated site works
Erection of 108.80m² side extension to existing 261.12m² shed, along with all associated site development works
Construction of a new dwelling, wastewater treatment unit and polishing filter, new well, new entrance onto public road and associate works
Extend the appropriate period of a permission - 15/695 - Permission for demolition of existing 43sqm dwelling and construction of replacement dwelling. Permission for conversion of existing out building for use as a store, studio and workshop for domestic use along with elevational changes to connect it to the main dwelling. Conversion of another outbuilding to a domestic garage. Existing entrance to be replaced with a pedestrian entrance only and new vehicular entrance created, new well, new waste water treatment system to EPA 2009 standards and associated drainage an site development works
Insertion of a new 49m2 toilet block within the internal courtyard of the existing building and the change of use of the 28m2 first floor of the development from Residential to staff welfare areas solely related to the Ground Floor Operations
Dwelling and effluent treatment system, together with associated site works, including formation of a new dual entrance via existing entrance
The insertion of a new 49m2 toilet block within the internal courtyard of the existing building and the change of use of the 425m2 first floor of the development from residential to restaurant/function room
Extension to the side of dwelling and associated works
A 10 year permission for the construction of a Solar PV Energy development within a total site area of up to 32 hA, to include one single storey electrical substation building, electrical transformer/inverter station modules, battery storage modules, solar PV panels ground mounted on steel support structures, access tracks, fencing and associated electrical cabling, ducting and ancillary infrastructure
(a) Demolition of the agglomeration of five different non-original extensions to the east façade at the rear of the main house, (b) Demolition of the non-original timber-glazed extension and wheelchair ramp at the north-east corner of the main house, (c) Demolition of the non-original timber-glazed extension at the south elevation of the main house, (d) Part demolition of the outbuildings situated to the rear of the main house to expose, retain and express the remaining historic east wall of the c.1892 constructed original outbuilding, which is currently hidden and adsorbed by various non-original additions, (e) Full internal and external refurbishment of the original house to re-instate it to its original form, including the reinstatement of the principal historic entrance to the three-bay façade of the Chief Boatman’s house, (f) The construction of a new glazed link and single storey extension to the rear of the main house, (g) The construction of a new glazed link and single storey extension to the rear and side of the existing cottage (former equipment store), (h) Elevational & internal alterations as shown on attached drawings and conservation reports, (i) All associated site & landscaping work including 2 x new wastewater treatment systems (A Protected Structure)
Development at this site: Coast Guard Station Cottages, Ballynacarrig, Co. Wicklow, A67 RX27 (which is a Protected Structure) the development will consist of revisions to the existing Grant of Permission (Reg. Ref. 21/1388) as follows: Revision of site application boundary to reflect ownership of applicant; Full demolition of the existing non-original extensions to side (single storey with mezzanine floor) and front (single storey bay windows with canopy); Revisions to the extension granted previously to the side and rear of the Cottage including reduced size/ altered footprint shape and changes to roof (part pitched, part flat) and elevation design, This will be a single storey extension to side and rear of Cottage with undercroft storage shed to rear, Overall size of Cottage will increase from 95sq.m to 109sq.m (previously 154sq.m was granted); Alterations to the original Cottage including conversion of the existing door opening into a window and replacement of existing window all on the south-west side, Wall infill with 2no. new windows all on the front north-west side, Partial wall infill on north-east elevation where non-original side extension is to be removed.; To include rooflight and solar panels within new extension roofs; Construction of a new balcony structure with glass balustrading to the rear; All associated conservation works to the Cottage walls / roof / floor, drainage works, hard landscaping with steps and ancillary alterations
Revised extension design to that granted under planning ref 19/517, increasing the height of existing dwelling roof, construction of new domestic garage and associate works
1) The construction of sites for 8 no. additional mobile homes, the installation of a mobile home with associated external deck area and parking area on each site and access driveway, external lighting, berm mounding and landscaping; 2) The construction and installation of 1 no. 5-a-side football pitch, 2 no. pickleball courts, and 1 no. padel tennis court; 3) The construction of a hard standing area to provide for the storage of boats and jet skis, car parking spaces, storage containers and recycling containers; and 4) All associated site development works including drainage, pedestrian pathways, landscaping and water features
Construction of a storage/machinery shed and all associated site works
Alterations and extensions to an existing 179.8m² dwelling. The works will include the following: 1. The removal of an existing 12m² sunroom. 2. A proposed new single storey extension to side and rear of existing dwelling measuring circa 61.sq.m. 3. An additional circa 11.5m² of habitable area to an existing upper floor Attic space 4. Modifications and alterations to existing ground and upper floor plans and elevations to incorporate new layout and design. 5. All new landscaping, patios and all associated site works
Removal of existing septic tank and installation of new wastewater treatment unit, polishing filter to current standards and associate works
Construction of a bungalow with garage and car port, new entrance and access driveway, new treatment system and percolation area to current EPA standards and all ancillary site works
(i) a new entrance (ii) existing entrance to be closed and made obsolete (iii) the importation of material to in-fill and re-contour the subject site, and all associated site development works. Once the importation is complete, the applicant will seed the land in line with Teagasc guidelines and return it to agricultural use. The Operational Phase will see the site being used as agricultural pastureland. The applicant proposes, subject to planning, to import clean greenfield soil and stone to remediate approximately 3.72ha. of the total site. The 3.72ha is divided into 4 distinct phases - Phase 1 is 1.82ha, Phase 2 is 0.58ha, Phase 3 is 0.66ha and Phase 4 is 0.66ha. A fill plan has been drawn up for the importation of 41,552tonnes to fill Phase 1, 25,243 tonnes to fill Phase 2, 28,596 tonnes to fill Phase 3, and 28,596tonnes to fill Phase 4, equating to a total of 123,987tonnes of soil and stone. Permission is being sought for a 5-year period and will be subject to a waste facility permit
Single storey dwelling house & garage with proposed effluent disposal system to current EPA requirements and associated site works
Of a gazebo structure located over an existing decking area.
Demolition of the existing rear extension and replacement with a new extension to the side and rear of the existing cottage and for decommissioning the existing septic tank and installation of a new effluent treatment system to current EPA standards and all ancillary site works
Extension and alterations to existing dwelling and garage. The works will include A. Construction of 12.6m2 single storey infill extension to connect existing 30m2 garage (now being converted) to existing 174m2 single storey dwelling. B. Conversion of existing garage to become part of the main dwelling which will contain a new bedroom and study and alterations and modifications to external elevations including 2 new rooflights. C. Minor alterations and modifications to existing dwelling layout and elevations and all associated site works
The removal of existing septic tank, installation of new wastewater treatment unit and soil polishing filter to current regulations and associate works
Period of 10 years for a proposed solar farm and BESS (battery energy storage system) development which will consist of the construction of PV panels mounted on metal frames, inverters, battery storage infrastructure (BESS units, and MV Stations), new access tracks, underground cabling, perimeter fencing with CCTV cameras and access gates, a temporary construction compound, a substation and all ancillary grid infrastructure and associated works. It is proposed to use the consented Ballymoney Solar Farm access point (Pl Ref: 19/627 and ABP Ref: 305289-19). The solar farm and BESS would be operational for 40 years. A Natura Impact Statement (NIS) will be submitted with this application
Amendments to previously approved planning reg. ref. 22/461: i. revised site boundaries; ii. amendment to condition 3(a); iii. all necessary ancillary & site works to facilitate this development
A) change of use from consultants rooms, previously approved under PP 16/750, to include the provision of workshop-type short term overnight accommodation directly associated with Grassroots Nutrition b) All necessary ancillary & site works to facilitate the development