Construct Bungalow Type Dwelling with Domestic Garage & Effluent Treatment System & Percolation Area With New Vehicular Entrance and all associated site worksDecision record indexed
CONVERSION OF EXISTING GARAGE TO LIVING ACCOMMODATION INCORPORATING THE CONSTRUCTION OF EXTENSION TO GARAGE TO CONNECT WITH HOUSE TO FORM PART OF HOUSE, CONSTRUCTION OF NEW DOMESTIC GARAGE AND ALL ANCILLARY WORKSDecision record indexed
(1) the demolition of a single storey storage shed attached to the main dwelling and (2) the construction of a two storey extension to the side of an existing dwelling and all associated site works.Decision record indexed
A BUNGALOW, PROPRIETARY WASTEWATER TREATMENT SYSTEM, POLISHING FILTER, DOMESTIC GARAGE, NEW ENTRANCE AND ALL NECESSARY AND ASSOCIATED SITE WORKSGrounds not yet categorised
The construction of a dwelling house, garage, installation of sewerage treatment tank with percolation area and all associated site works.Decision record indexed
THE CONSTRUCTION OF A SINGLE STOREY DWELLING, A DOMESTIC GARAGE, A WASTE WATER TREATMENT SYSTEM, A NEW SITE ENTRANCE AND ALL ASSOCIATED SITE WORKSDecision record indexed
Townland of Clonarrow, or Riverlyons, County Offaly
A) The erection of a temporary 100m high lattice type meteorological mast which will be secured to ground anchors by stay wires and will include instruments for measuring local climate conditions, services, and associated equipment; b) A fixed red aviation light will be fitted near the top of the lattice section of the proposed meteorological mast; c) Bird flight deterrent markers fitted to each stay wire at approximately 10m intervals; and d) All associated ancillary works. The temporary meteorological mast development will remain in position for a period of 5 years after which the mast, instruments, services, equipment, and all associated ancillary works will be removed. The purpose of the meteorological mast is to accurately measure the weather conditions at this siteDecision record indexed
The construction of a dwelling house, garage, installation of sewerage treatment system with percolation area and all associated site works.Decision record indexed
Daingean National School, St Mary's Rd Daingean, Co. OffalyR35 AH95
The development will consist of the replacement of aluminum windows and doors with new aluminum windows and doors, upgrade of electrical and mechanical services including installation of Mechanical Ventilation Heat Recovery units to teaching spaces, PV panels to roof, installation of new Air Source Heat Pump and all other associated site works to the Protected Structure Ref: 25-06Decision record indexed
DAINGEAN NATIONAL SCHOOL ST.MARY'S ROAD, OLDTOWN DAINGEAN, CO. OFFALY
THE PARTIAL DEMOLITION OF EXISTING FRONT BOUNDARY WALL AND FOR THE CONSTRUCTION OF NEW PIERS WITH NEW POWDER-COATED STEEL RAILINGS WITH NEW POWDER-COATED STEEL GATES AND ALL ASSOCIATED SITE WORKS TO COMPLETE THE DEVELOPMENTDecision record indexed
DAINGEAN NATIONAL SCHOOL, CHURCH ROAD DAINGEAN, CO. OFFALY R35 AH95
A NEW SINGLE STOREY EXTENSION OF 105.6M2 TO THE FRONT-EAST SIDE OF THE EXISTING SCHOOL, COMPRISING OF A SINGLE MAINSTREAM CLASSROOM, SET ROOM AND ACCESSIBLE TOILET ALONG WITH ALL ASSOCIATED SITE DEVELOPMENT WORKS. THE PROPOSED DEVELOPMENT WILL CONSIST OF WORKS TO A PROTECTED STRUCTURE REF NO. 25-06Decision record indexed
Daingean National School, Church Road Daingean, Co. Offaly R35 AH95
An amendment to the previously approved planning permission Ref: 2460498 at Daingean National School, Church Road, Daingean, Co. Offaly, R35 AH95 - Protected Structure Ref: 25-06. The amendment includes the construction of a single storey extension to the existing boiler room, revised location of the Air Source Heat Pump compound and all other associated site worksDecision record indexed
TWO STOREY DWELLING, ENTRANCE, GARAGE, WASTEWATER TREATMENT SYSTEM WITH RAISED BED POLISHING FILTER AND ALL ASSOCIATED SITE WORKSDecision record indexed
CHANGE OF HOUSE DESIGN FROM THAT PREVIOUSLY GRANTED UNDER PLANNING REF. 19/517 AND ALL ANCILLARY SITE SERVICES AND ASSOCIATED SITE WORKSDecision record indexed
CONSTRUCTION OF NEW DWELLING HOUSE AND GARAGE, PROPOSED SITE ENTRANCE, SEPTIC TANK AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS AND SERVICESDecision record indexed
CONSTRUCTION OF A NEW SINGLE STOREY DWELLING HOUSE AND DOMESTIC GARAGE, SEPTIC TANK AND PERCOLATION AREA, NEW SITE ENTRANCE, ANCILLARY SITE SERVICES AND ALL ASSOCIATED SITE WORKSDecision record indexed
CONSTRUCTION OF NEW DWELLING HOUSE AND GARAGE, PROPOSED SITE ENTRANCE, SEPTIC TANK AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS AND SERVICESDecision record indexed
For shed. Permission for extension to house, decommissioning existing septic tank, fitting new septic tank and percolation area and all associated site worksDecision record indexed
(A) 1 NO. NEW TWO STOREY EXTENSION TO THE REAR OF EXISTING DWELLING HOUSE, THE DEVELOPMENT IS TO A PROTECTED STRUCTURE (REF 25-51) (B)DEMOLITION OF EXISTING WALL TO THE SIDE OF EXISTING DWELLING TO CREATE NEW VEHICULAR ENTRANCE, PARKING AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
Construct extension to existing agricultural shed to include covered slatted unit, retention of existing silage pit and all associated site works.Decision record indexed
THE DEMOLITION OF EXISTING STRUCTURALLY UNSAFE DWELLING HOUSE AT FRONT OF SITE, TO BE REPLACED WITH 2 NO. PROPOSED 4 BED DWELLING UNITS TO MATCH EXISTING, LOCATED ON SITE OF PREVIOUSLY APPROVED PLANNING PERMISSION REF. 20/563 AND ALL ASSOCIATED SITE WORKS AND SERVICESDecision record indexed
THE CONVERSION OF EXISTING BUILDING INTO 2 SEPERATE 4 BED, THREE STOREY DWELLING HOUSES WITH REPAIRS TO THE ROOF AND REPLACEMENT WINDOWS. CONSTRUCTION OF NEW SITE ENTRANCE AND TWO NO. 3 BED, THREE STOREY SEMI-DETACHED HOUSES AND FOUR NO 3. BED, THREE STOREY TERRACED HOUSES TO THE REAR OF THE SITE, OPEN SPACE AREA, PARKING AND ALL ASSOCIATED SITE WORKS AND SERVICESDecision record indexed
THE CONVERSION OF EXISTING BUILDING INTO 2 SEPERATE 4 BED, THREE STOREY DWELLING HOUSES WITH REPAIRS TO THE ROOF AND REPLACEMENT WINDOWS. CONSTRUCTION OF NEW SITE ENTRANCE AND THREE NO. 3 BED, THREE STOREY SEMI-DETACHED HOUSES AND FOUR NO 3. BED, THREE STOREY TERRACED HOUSES TO THE REAR OF THE SITE AND ALL ASSOCIATED OPEN SPACE, PARKING AND ALL ASSOCIATED SITE WORKS AND SERVICESGrounds not yet categorised
CONSTRUCTION OF A DWELLING HOUSE, GARAGE, INSTALLATION OF SEWAGE TREATMENT TANK WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKSDecision record indexed
The construction of a new dwelling (208.13 sq m) and domestic garage (40 sq m). Permission is also sought for the installation of a wastewater treatment system and polishing filter, and permission to construct a new domestic entrance and all associated site worksDecision record indexed
(A) DEMOLISH EXISTING SHEDS AND THE REMAINS OF A FORMER DWELLING HOUSE (B) CONSTRUCT A NEW DWELLING HOUSE WITH A NEW ENTRANCE, DETACHED GARAGE, ONSITE WASTEWATER TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS.Decision record indexed
EXISTING GARAGE OUTBUILDING AND PLANNING PERMISSION FOR PART REMOVAL OF FRONT BOUNDARY WALL FOR NEW FRONT DRIVEWAY WITH ALL ANCILLARY SITE WORKSDecision record indexed
The development will consist of the retention of a single-storey extension to the rear of the existing dwelling, including all associated site works and servicesDecision record indexed
EXISTING DAINGEAN WASTEWATER TREATMENT PLANT AT ST. MARY'S ROAD, TOWNPARKS DAINGEAN, CO. OFFALY
THE UPGRADE OF THE EXISTING DAINGEAN WASTEWATER TREATMENT PLANT AND WILL CONSIST OF THE FOLLOWING: THE CONSTRUCTION OF A NEW STORM WATER HOLDING TANK COMPLETE WITH INTERNAL CLEANING SYSTEM, INTERNAL STORM RETURN PUMPS, ACCESS STAIRS AND PLATFORM; CONSTRUCTION OF NEW SLUDGE DRYING REED BEDS COMPLETE WITH SLUDGE FEED PIPEWORK, FILTRATE RETURN PIPEWORK AND A FILTRATE RETURN PUMPING STATION; CONSTRUCTION OF NEW FINAL EFFLUENT WASH WATER PUMPING STATION; INSTALLATION OF A NEW MANUAL BYPASS CHANNEL AND GRIT CLASSIFIER ONTO THE EXISTING INLET SCREEN, INSTALLATION OF A GRP KIOSK TO HOUSE ELECTRICAL CONTROL PANEL; AND ALL ANCILLARY SITE WORKSDecision record indexed
A) CONSTRUCTION OF SILAGE PIT B) CONSTRUCTION OF CUBICLE SHED WITH ASSOCIATED UNDERGROUND SLATTED TANKS C) INSTALLATION OF SOLAR PANELS ONTO ROOF OF PROPOSED CUBICLE SHED AND ALL ASSOCIATED SITEWORKSDecision record indexed
Revised site boundaries, revised location of the house and Septic tank on site, PREVIOUS GRANTED UNDER PLANNING PERMISSION REF. NO. 24/60281 AND ALL ASSOCIATED SITE WORKS’Decision record indexed
(A) CONSTRUCTION OF A NEW ENTRANCE AND ACCESS ROAD; (B) CONSTRUCTION OF A MILKING PARLOUR, DAIRY & ANCILLARY ROOMS, DRAFTING & HANDLING FACILITIES, WAITING YARD & UNDERGROUND SLATTED TANK; (C) ERECTION OF MEAL BIN, WATER STORAGE TANK AND ALL ASSOCIATED SITE WORKSDecision record indexed
The development will consists of PROPOSED SINGLE STOREY TYPE DWELLING, NEW VEHICULAR ENTRANCE, SEPTIC TANK SEWAGE TREATMENT SYSTEM, PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS.Decision record indexed
Construct a dwelling house, garage, installation of sewerage treatment system with percolation area and all associated site worksDecision record indexed
Erect a new single storey dwelling house, connection to a new septic tank & percolation area and the erection of a new domestic garage and all ancillary site worksDecision record indexed
(A) FOR EXCAVATION WORKS (B) PLANNING PERMISSION FOR CONSTRUCTION OF STRAW BEDDED LIVESTOCK SHED WITH UNDERGROUND SLATTED TANK AND ALL ASSOCIATED SITEWORKSDecision record indexed