Retention Planning permission for attic conversion with as non habitable storage space with roof windows to front all with associated ancillary worksDecision record indexed
City North Business Campus, Gormanstown, Stamullen Co Meath
EXTENSION OF DURATION OF PLANNING APPLICATION AA/160168 - the development will consist of construction of a Warehouse/Food Processing building with ancillary two storey office and staff facilities comprising a total gross floor area of 3,645 sq.m, vehicle access from existing access, new HGV access & yard, parking for 57 no. cars & 11 no. HGV's, ESB Sub-Station and all associated site and development works and landscapingDecision record indexed
Lands at City North Business Campus, Stamullen, Co Meath
1. Permission for a warehouse unit with a cumulative gross floor area of 6806.3sq.m of which the warehouse area comprises 4674.4sq.m at ground floor along with a mezzanine floor area comprising 351.8sq.m, the provision of a ground floor office and staff areas comprising 760.4sq.m along with a first floor office comprising 484.2sq.m and a second floor plant storage area comprising 525.4sq.m. The warehouse building will have an overall height of 14.65 metres. 2. Vehicular access will utilise the existing City North Campus Estate roads. 3. The development of associated internal access roads, turning/loading areas, footways, parking areas, electric vehicle charge points and associated ducting, landscaping, lighting, fencing, bicycle and bin storage facilities and associated site works. 4. The provision of façade signage along with provision of a totem sign. 5.The provision of an ESB substation. 6. Provision of attenuation tanks and associated infrastructure as part of the surface water system along with installation of a bypass hydrocarbon interceptor. 7. All ancillary site development, landscaping and construction works to facilitate foul, water and service network connections. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of the proposed development and accompanies this application.Decision record indexed
Infrastructure required to convert the site from a wastewater treatment plant to a screening and pumping station site and comprises: upgraded inlet works and screens, wastewater pumping station, chemical storage and dosing system for septicity control, a temporary welfare unit an administration building to include offices and permanent welfare facilities, decommissioning and demolition of existing tanks and structures, site landscaping. Significant further information/revised plans submitted on this applicationDecision record indexed
Convert existing detached domestic garage into a single storey Independent Living Unit, (to be used in conjunction with the existing disability service operating on the site), upgrade existing on-site sewage treatment unit & percolation area together with all associated siteworksDecision record indexed
The development will consist of the construction of a detached garage, the relocation of the main house entrance from the front to the side of the house with a new canopy roof over, a full wrap of external wall insulation to the existing house, the removal of the chimney to the front and all ancillary worksDecision record indexed
PCI Block 7 City North Business Campus, Stamullen, Co. Meath
The proposed development will consist of: I. Construction of a new ESB Substation, II. Installation of a new generator enclosure, III. All associated site development works including hardstanding areas, and drainage infrastructure.Decision record indexed
The development will consist/consists of The construction of a proprietary steel portal frame shed, clad with a dark green cladding with a lean-to roof to one side. The total footprint of the shed is approximately 108m², and ridge height of 4.3m. The proposed shed is intended for domestic use onlyDecision record indexed
St. Patricks GAA, Cockhill Road, Stamullen Co. Meath K32 C433
Proposed Change of Use to sessional Pre-School for additional ten children and extension of operating hours to 2.00PM Monday – FridayDecision record indexed
Retention for change of use of partial ground floor area from Café to Takeaway. Retention of external signage and all associated site works.Decision record indexed
The development will consist of to provide new toilet & shower facilities building with revised Site Boundaries to previous Planning Permission Ref. No. SA/60009. To connect to Public Mains & provide new proprietary sewage treatment system with associated site works. Permission is also sought for Retention of canteen building. Significant further information/revised plans submitted on this applicationGrounds not yet categorised
The construction of a new single storey detached gym building, located to the east of the existing clubhouse with all ancillary site works and services.Decision record indexed
PCI Pharma Services, Unit 08 City North Business Campus, Co. Meath
The development comprises of retention for various changes to Meath County Council Planning Grant Reference 25/60057 (Previous amendment to Meath County Council Planning Grant Reference 23/60046). Namely these existing items: a) Additional plant elements and security screens, b) Additional smoke ventilation windows and ventilation grilles, c) Flue/Duct from GF Kitchen extract canopy, d) Reconfiguration of the boundary fence and pedestrian gate on South Eastern Side of Existing Building, e) Pedestrian doorset and roller doorset in the compactor room in lieu of double doorset, f) Minor changes to the adjacent external stairway 04, g) All other associated site development works.Decision record indexed
The development will consist of: the construction of a warehouse building with a gross floor area (GFA) of 7,511 sq.m, including a warehouse area of 6,766 sq.m and 2-storey office element of 745 sq.m, with a maximum height of 15.2m. Vehicular access to the site will utilise the existing City North Business Campus estate roads and includes works to extend the existing carriageway by approx. 7m to facilitate access to the development site. A total of 98 car parking spaces and 98 secure bicycle parking spaces will be provided. A temporary wastewater treatment plant is to be provided for the treatment of foul effluent before discharge to the existing network. 1 ESB substation is proposed (c.28 sq.m and 3.5m in height). The proposal also includes drainage, landscaping and external lighting and all associated site works to facilitate the proposed development. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of the proposed development. Significant further information/revised plans submitted on this applicationDecision record indexed
PCI Pharma Services, Block 08 City North Business Campus, Stamullen Co. Meath K32 PX88
The development to be retained consist of as constructed modifications to the permitted development comprising 1) revisions to permitted bike store to accommodate 98no. bicycle parking spaces, 2) minor revisions to elevations and external finishes of the building to include alteration of cladding profiles and adjustments to external fenestration and the dimensions and positions of loading bay doors and canopy, and 3) revisions to hard and soft landscaping elements. The proposed development will consist of both internal and external modifications to the permitted development comprising: 1) On the ground floor, the reconfiguration of the approved layout to allow for: a) the construction of a commercial-grade kitchen, staff canteen and associated store facilities, b) construction of a cold/freezer store, c) addition of GMP corridor, garbing and training areas, and engineering workshop, d) creation of new quality control inspection areas, e) new locker room and associated spaces, f) 2 no. production lines and area for future production line, and g) enclosed compactor area. 2) On the first floor, the reconfiguration of the approved layout to allow for: a) new administrative offices, meeting and training rooms, prayer room, and nursing room, b) a pallet gate and goods lift, c) construction of additional protected stairways and corridors, d) new open plan mezzanine, 4,360sqm in area, to provide for future production area, and e) new QC inspection office. 3) Externally, a) Installation of outdoor plant elements, including chillers and generators, and b) fire escape doors and stairways and corresponding pathways. The proposed development includes for the removal of condition No.5 of Reg. Ref. 23/60046 to better reflect to nature of the industrial warehousing and logistics/distribution use of the facility. All office space will remain ancillary to these uses. The proposed development also includes the omission of the permitted temporary wastewater treatment plant, which is now no longer requiredDecision record indexed
Lands situated to the west of the M1 (Junction 7) at City North Business Campus, located in the Townland of Stamullen, Co. Meath.
The development will consist of the omission of Condition No. 2 from the permission granted under Reg. Ref: 23/60046 which states: “2. Prior to the commencement of development, the applicant/developer shall submit details for written agreement of the Planning Authority which comply with the following Transportation Condition(s): (a) The applicant shall submit a detailed design of the pedestrian and cycle route along the red dashed line (as per figure 5-3 of the submitted Traffic & Transport Assessment), and the construction same prior to the occupation of the development. (b) Development shall not commence without the prior written agreement of the Planning Authority and shall there after only be authorised to commence in accordance with the agreed plans. Reason: To ensure there is a satisfactory means of access in the interest of road safety and the convenience of road users (Transportation)”Decision record indexed
Centra Unit 1-4 The Delvin Centre, Main Street Stamullen, Co. Meath
The retention relates to the use of an insulated metal cladding to the rear and side of the constructed rear extension in place of a painted render finish as previously granted under Planning Ref: 22/1706 at “Centra”, Units 1-5, Delvin Centre, Main Street, Stamullen, Co. Meath, K32 X431.Decision record indexed
CENTRA Unit 1-4, The Delvin Centre Main Street, Stamullen Co Meath K32 X431
1. Single storey extension to rear of existing retail unit over existing basement carpark to consist of relocated Post Office, goods store, office and ancillary staff facilities 2. Internal alterations to existing reatil unit 3. New illuminated signage to front elevation (replacing existing) and new signage to side elevation, together with all associated site worksDecision record indexed
Block 2 CityNorth Business Campus, Stamullen, Co. Meath
EXTENSION OF DURATION OF PLANNING PERMISSION AA160220 - The creation of a warehouse development comprising of an extension to the existing local distribution road with 2 vehicular access points serving the facility, the construction of the single structure subdivided into 2 units with a warehouse total gross floor area of 2930m2 and offices with 937m2 total gross floor area, provision of 38 No. car parking spaces, 20 No. bicycle spaces and loading/unloading area, and all ancillary and associated site development worksGrounds not yet categorised
St Patrick's National School, Cockhill Road Stamullen, Co. Meath
Single storey extension to existing junior school building for one ensuite classroom, access corridor and all associated site worksDecision record indexed
The development will consist of to provide new toilet & shower facilities building with revised Site Boundaries to previous Planning Permission Ref No. SA/60009. To connect to Public Mains & provide new proprietary sewage treatment system with associated site works. Permission is also sought for Retention of Administration Office & Canteen Building. Significant further information/revised plans submitted on this applicationDecision record indexed
Whytes Public House, Main Street, Stamullen Co. Meath
The development consists of the following: (1) the retention of a single storey covered area to the front of Whytes Public House, (2) the retention of a smoking area to the rear of the property, (3) the retention of an external dining area to the rear of the property and (4) the retention of a store shed to the rear of the propertyDecision record indexed
Lands at, City North Business Campus, Stamullen Co. Meath
A 10 year permission for development at this site on lands at City North Business Campus, Stamullen. Particulars of the development comprise as follows: 1. The provision of 3no. warehouse units with a cumulative gross floor area of 19,612.8sq.m comprising: a. Warehouse unit number 14 floor area comprises 4177.9sq.m of which the warehouse area comprises 3399.7sq.m at ground floor, the provision of a ground floor reception area comprising 130.3sq.m, a first floor office area comprising 316.2sq.m and a second floor plant area comprising 331.7sq.m. The warehouse building will have an overall height of 16.65 metres. b. Warehouse unit number 15 floor area comprises 9624.6sq.m of which the warehouse area comprises 8277.2sq.m at ground floor, the provision of a ground floor office and staff area comprising 450.9sq.m, the provision of a first floor office area comprising 446sq.m and the provision of a second floor plant area comprising 450sq.m. The warehouse building will have an overall height of 16.65 metres. c. Warehouse unit number 16 floor area comprises 5810.3sq.m of which the warehouse area comprises 4996.3sq.m at ground floor, the provision of a ground floor office and staff area comprising 279.1sq.m, the provision of a first floor office area comprising 260.2sq.m and the provision of a second floor plant area comprising 275.8sq.m. The warehouse building will have an overall height of 16.65 metres. 2. Vehicular access will utilise the existing City North Campus roads with an extension of the Campus road. 3. The development of associated internal access roads, turning/loading areas, footways, parking areas, electric vehicle charge points and associated ducting, landscaping, lighting, fencing, bicycle and bin storage facilities and associated site works. 4. The provision of façade signage for each warehouse unit. 5. The diversion of existing ditches to include for the extinguishment and infilling of the drainage ditch as installed as part of site works for unit number 8 (as granted under permission 2360046). 6. The provision of an ESB substation. 7. The provision of an external water storage tank and associated water pump house within the curtilage of warehouse unit number 15. 8. The provision of 2no. wastewater pumping stations within the curtilage of warehouse unit numbers 14 and 15. 9. Provision of attenuation tanks and associated infrastructure as part of the surface water systems along with installation of bypass ………..Decision record indexed
The development will consist of the installation of a new wastewater treatment plant and percolation area along with all associated site worksDecision record indexed
The development will consist of the construction of a detached dwelling and garage, new vehicular entrance, along with all associated services, service connections, landscaping and site development works.Decision record indexed
A flower shop together with associated use, car park area, waste water treatment system and all ancillary site works. Significant further information/revised plans submitted on this applicationDecision record indexed
Proposed dwelling house, detached domestic garage, roadside entrance, effluent treatment system and percolation area and all associated works. Significant further information/revised plans submitted on this applicationDecision record indexed
The construction of 3 no. detached dwellings (one with detached garage and 2 no. with attached car ports), new vehicular entrances, along with all associated services, service connections, landscaping and site development works. Significant further information/revised plans submitted on this applicationGrounds not yet categorised