The development will comprise the provision of a food processing warehouse facility (11,696 sq m) comprising a coldstore (10,955 sqm) with a maximum roof level height of 18.65 metres and a fire escape stairs extending to 19.8 metres; an ancillary office building (610 sqm) with a maximum height of 8 metres, including office space, meeting rooms, canteen locker rooms, toilet facilities and assoicated facilities; and 4.3 metre high driver welfare facilities building (131 sqm). The proposed development will also include the provision of a new vehicular entrance off the Food Central Access Road; internal roadways; traffic barriers; pedestrian access; 90 No. ancillary car parking spaces; bicycle parking; 52No. HGV parking spaces; 33 No. trailer parking spaces level access goods, hard and soft landscaping; smoking shelter; bioundary treatments; ESB substation; signage; PV panels a truck wash; a diesel tank; 2 No. diesel pumps with a layby for 8 No. trucks; weighbridge; waste storage area; lighting and assoicated site development works above and below ground. The scheme also includes retention permission for 33 No. trailer parking spaces (providing a total of 66 No. trailer parking spaces).
The development subject to Retention Permission consists of amendments to the Food Processing Warehouse facility permitted under Fingal County Council Reg. Ref. FW20A/0202 comprising: the provision of a mezzanine floor level (totalling 131 sq.m, which increases the floor area to c. 11,567 sq.m) comprising workshop and switchgear room with associated external emergency stairs; the reconfiguration of selected internal spaces; the provision of a Permanent Roof Edge Protection System 1.1 metre high railings) in lieu of previously permitted Fall Protection Safety System; the omission of roof vents to freeze cells; the provision of 2 No. roof vents and a water tank frame on the roof of the ancillary office building; elevational changes; modifications to signage; minor changes to finished floor levels; the relocation of the ESB substation; the provision of a sliding gate at vehicular entrance; modifications to the foul sewer and watermains layout; and all associated site and development works above and below ground. All on 6.12 hectare site. The development will also consist of the following proposed amendments to the food processing warehouse facility permitted under Fingal County Council Reg. Ref. FW20A/0202: the omission of the green roof to be provided by the ancillary office building; the removal of the ground mounted solar panels adjacent to the ESB substation; and all associated site and development works above and below ground.
Amendments to previously approved permission FW19A/0215 &
The development will consist of proposed new signage to the front of the existing warehouse building (facing the road) at high level.
A Phase II extension to an existing single storey portal frame temperature-controlled food processing plant warehouse with single storey ancillary offices, loading docks, surface car-parking including accessible spaces and electric charging points, cycle spaces, boundary fencing, landscaping, surface water attenuation & associated plant and equipment. The office building will include toilet and canteen facilities. The works will include landscaping, internal roads, service yard, kerbs, hard and permeable surfaces, footpaths, railings and soft landscaping. All the above includes associated ancillary works and services. Additional Information lodged on 20th April 2020 Significant Additional Information Public Notices lodged on 12th May 2020
Upgrade and modify the existing agricultural entrance
PLanning permission for retention of development.
Construction of a single storey detached dwelling, new road access, on-site wastewater treatment plant and percolation area and associated site works. AI Rcvd 14/3/25
The development will consist of: the provision of c. 72,753sq.m of logistics and associated office uses across 5 no. buildings (Building 1, c. 23,936sq.m and a height of c. 17.25m, Building 2, c. 16,999sq.m and a height of c. 17.2m, Building 3, c. 13,472sq.m and a height of c. 17.25m, Building 4, c. 10,058sq.m and a height of c. 17.25m, and Building 5, c. 8,195sq.m and a height of c. 17.63m), within a business campus setting; associated yard areas, trailer and truck parking together with car and bicycle parking spaces at surface level; a single storey campus management building (c. 93sq.m) with an adjacent canopy and seating area to facilitate outdoor dining / social space; revised and new pedestrian, bicycle and vehicular entrances; internal pedestrian, bicycle and vehicular circulation including a new pedestrian and bicycle link to the R121; associated landscaping, parkland area and public open space, boundary treatments, lighting, signage, CCTV; associated drainage, attenuation and services; and all associated construction compounds and site works. An Environmental Impact Assessment Report accompanies the planning application. AI received 12/12/22
Proposed removal/decommissioning of existing septic tank and provision of new replacement wastewater treatment system & percolation area to serve existing dwelling and all associated works.
Planning permission for (i) construction of a two-storey extension to rear of existing guesthouse to accommodate 12 no. ensuite double-bedrooms and ancillary lift, stairwell and circulation space; (ii) revision of external car park to provide for 14 no. additional vehicular parking spaces; (iii) all ancillary works, including SuDS drainage and landscaping, necessary to facilitate the development. The proposed works will increase the number of bedrooms within the guesthouse from 18 no. to 30 no. and the number of vehicular parking spaces serving the guesthouse from 37 no. to 51 no.
The prooposed development comprises: (i) demolition of single-storey annex building to the front of Hildan House; (ii) construction of a two-storey extension to rear of existing guesthouse to accommodate 8 no. ensuite double-bedrooms and associated lift, stairwell and circulation space; (iii) conversion of communal lounge area to provide 2 no. ensuite double-bedrooms; (iv) revision of external car park to provide for 14 no. additional vehicular parking spaces; and (v) all ancillary works, including SuDS drainage and landscaping, necessary to facilitate the development. The proposed works will provide for a 24 no. bedroom guesthouse, comprising 24 no. double rooms, a 4 no. bedroom private residence, comprising 2 no. double rooms and 2 no. single rooms, served by 51 no. car parking spaces.
Proposed removal/decommissioning of existing septic tank and provision of new replacement wastewater treatment system & percolation area to serve existing dwelling and all associated works.
The construction of one new dwelling, biocycle treatment system, soakaway, new boundary walls, new utility connections, alterations to existing vehicular entrance, and all associatd site works.
The development will consist of: revisions to the previously permitted communal facility (93sqm) under Fingal County Council Reg. Ref. FW22A/0167, which includes community space, security office, ancillary storage, covered external social space and associated external areas. These revisions involve interior and exterior modifications to the communal facility and associated external areas, including: (i) Reconfiguration and modification of the internal floor plan to remove the security office and introduce a kitchenette and a meeting room, reducing the total internal floor area from 93 sqm to 66.4 sqm; (ii) Modification to the canopy roof finish from a mono-pitched to a flat roof style, reducing the overall building height from 5.257m to 3.667m (a reduction of c.1.5m); (iii) Reduction of the canopy roof coverage area from c. 606sqm to 405sqm; (iv) Inclusion of dedicated integrated bin store/utilities enclosure (15.5sqm) to serve the communal facility and ancillary site; (v) Changes to elevations and facades, including adjustments to fenestration, minor design feature modifications, and updates to materials; (vi) Provision of a new vehicular access point to the southeast of the site; (vii) Provision of 10 no. car parking spaces and bicycle parking (5 no. bicycle stands); (viii) Provision of an access laneway to the south of the communal facility; (ix) Revisions to the landscaping to the associated external area and all other ancillary works.
For planning permission to erect a 12.0 Ø x (not exceeding 11.5m high water storage tank and associated site ancillary works at Food Central, St. Margarets, Co. Dublin.
The development will consist of a new temperature-controlled warehouse incorporating ancillary offices and storage areas and staff facilities, ESB substation, solar PV panels, loading area with associated dock levellers, hard and soft landscaping, boundary treatments, new vehicular entrance, Access controlled gate, car parking, bicycle parking, HGV parking spaces, trailer parking spaces, lighting, signage, and all associated site development works. AI received 10/10/2022
Permission for (i) demolition of existing dwelling and construction of 1 no. two storey replacement dwelling. (ii) Relocation and upgrade of an existing domestic vehicular access from the existing North Road, R135 and (iii) all associated ancillary works necessary to facilitate the development including wastewater treatment system and percolation area, SUDS surface water drainage, site works, boundary treatments and landscaping.
The development will consist of changes to previously granted temperature-controlled warehouse (planning ref FW22A/0136) Namely 1. Removal of parapet from main warehouse. 2. Revised size of proposed signage 3. New external maintenance stairs to the side elevation to include all associated site development works.
The development will consist of the removal of the existing boundary chainlink/barbed wire fence and gate and replacing them with a new 2.4 metre high plastic coated palisade fence and gate, erection of a 2.4 metre high plastic coated palisade fence and gate around the existing equipment building, and associated site works.
The development will consist of: Relocation of the front vehicular access. Addition of a new front canopy over a reoriented front-facing door. Installation of a new gable window on the front side and a new window to the side rear replacing patio doors.
Development of 1 no. single storey CNG (compressed natural gas) compressor installation with a floor area of 23m²; 1 no. single storey ESB MV Substation with a floor area of 33m², 1.8m & 2.4m high fences, fuelling dispensers, forecourt, fuel totem, access to existing private road and associated ground works. AI received 10/12/21
The development will consist of Retention permission for 1) Truck wash and associated plant room 2) Security hut 3) Amendments to internal office and staff accommodation layouts from previously granted planning ref FW22A/0136 4) and minor changes to landscape scheme previously granted planning ref FW22A/0136 And Planning Permission for • a new temperature-controlled warehouse incorporating ancillary offices and staff facilities, solar PV panels, roof smoke vents, loading area with associated dock levellers, high level covered link to existing warehouse and all hard and soft landscaping, boundary treatments, external lighting, LED signs, external roof access stairs and all associated site development works.
Planning Permission for changes to the internal layout. Modifications will include layout changes, minor changes to the elevational and fenestration. Complete with associated site ancillary works at their existing facility located at Food Central, St. Margaret`s, Co. Dublin. For Keelings Retail UC.
Planning permission for the retention
Permission to erect 4,886.00 m2 of photovoltaic panels on the roof of the dry warehouse building and freezer/chiller warehouse building in our factory with all associates site works. AI received 20/08/21
The development will consist of a single-storey extension, an area of 81 sq. m, to the south of the existing dwelling, plus all associated landscaping and site works. Additional Information Received 30/07/25 Clarification of Additional Information Received 15/12/2025
The development will consist of: revisions to the previously permitted Unit 4, which includes a main logistics/warehouse hall and ancillary office building (combined area of approximately 10,058 sqm) under Fingal County Council Reg. Ref. FW22A/0167. These revisions involve interior and exterior modifications to Unit 4 and associated external areas, resulting in a net increase of 139 sqm, including: (i) Modification of the height (from 8.3 to 8 m) and footprint of the permitted ancillary office building, comprising retracting the eastern elevation and extending the building footprint towards the northern elevation; (ii) Internal layout revisions and reconfiguration of spaces within Unit 4’s main logistics/warehouse hall and ancillary office building, including adding c. 116 sqm of mezzanine space for mechanical plant; (iii) Changes to elevations and facades, including adjustments to fenestration, minor design feature modifications, and updates to materials; (iv) Roof level revisions, including increased automatic ventilation openings, reduced permitted photovoltaic panels, 2 no. new roof access points, and relocation of an existing roof access; (v) Relocation of the permitted ESB substation and associated switch room from within Unit 4 to an external area as a standalone structure (c. 49.7 sqm); (vi) Revisions to the layout of permitted car, bicycle, and heavy goods vehicles (HGV) parking areas, resulting in a net reduction of 3 no. car parking spaces and 2 no. HGV parking spaces; (vii) Minor revisions to exterior spaces, including replacing the permitted mineral plaza with planting, omitting the permitted gatehouse, chemical storage and a section of footpath, relocating the permitted refuse area and plant compound, and providing 2 no. pedestrian crossings along with 2 no. access gates and fencing (c. 2.4 m) for the permitted fire tender access route; (viii) Demolition of existing ESB electricity pylon (c. 25 m height lattice tower) and installation of new electricity pylon (lattice tower with maximum height of 37 m) and associated reinstatement works; and, (ix) All other ancillary associated works.
Permission for the construction of a single storey detached 4 bedroom dwelling, wastewater treatment system, landscaping and boundary treatment, modifications of the existing vehicular entrance onto Old Brazil Way and all ancillary works to facilitate the development. AI received 2/3/2022
Permission for a Solar PV Energy Development with a total site area of c 105 ha, to include solar panels mounted on steel supports, associated cabling and ducting, 1 no. client substation, 33 no. MV Power Stations, 8 No. Battery Storage Containers, 1 no. Temporary Construction Compound, access tracks, boundary security fencing and security gates, CCTV, landscaping and ancillary site works. AI received 14/07/21
The development consists of the installation of a photovoltaic solar array to be mounted on the rooftop of 3 no. existing buildings. The proposed development includes the provision of approximately 8,500m2 of photovoltaic solar panels, mounting frames, inverters, electrical cabling and all associated ancillary infrastructure.
The construction of three new vehicle new vehicle accesses and agricultural gates at each site within daa ownership. Each access will be c.4 metres in width and will include a permeable hardstand area. Each proposed agricultural gate will be between 1.2 and 1.5 metres in height. The proposed development will also include the removal of an existing fence at location 3D and construction of a new timber and post perimeter fence c1.3m in height. The proposed development will also include all ancillary works including site excavation and development works above and below ground.
The development will consist of a designated EV charging hub and access road, consisting of 8 no EV charging bays ( inclusive of 1 no. accessible bay) in phase 1 and 6 no. EV charging bays in phase 2 of the development, together with ancillary equipment, ESB sub-station/switch room and accessible toilet facility. All associated site works, landscaping, lighting and ancillary works necessary to facilitate the proposed development.
The developement consist / will consist of the following: 1. Retention permission is sought for: a) Extension to as-built Farm Shop (Reg. Ref. F15A/0564) consisting of cafe area of 34.24 sqm together with outdoor seating area. Works to facilitate this alteration were inclusive of internal amendments, changes to windows, doors and opes of the as-built development; and b) Alterations to car parking layout and access arrangements including the retention of 5 no additional car parking spaces (in addition to 25 no previously approved under F15A/0564). 2. Planning permission is sought for: a) Change of use from existing store to cafe seating area to southern end of existing building. b) A 215.53 sq. meter extension to existing Farm Shop and Cafe, together with outdoor seating area. The extended areas will consist of: i) Farm shop cold room and main store, kitchen and ancillary areas, lobby, cafe seating, plant rooms and bin store to the eastern side of existing building; ii) Meeting room, staff facilities, storage facilities and 1 additional female toilet in addition to existing toilet facilities to the western side of existing building; iii) New entrance lobby to the northern side of existing building. c) Associated signage for proposed development. d) PV solar panels to roof of building. e)Alterations and extension to the as-built car park and access arrangement to provide for an additional 10 no car parking spaces (inclusive of 3 no accessible spaces), together with 5 no motorcycle spaces, 20 no bicycle spaces and a delivery van set-down area. f) A designated EV charging hub and access road to the northern end of the site consisting of 8 no EV charging bays (inclusive of 1 no. accessible bay) in Phase 1 and 6 no. EV charging bays in Phase 2 of the development, together with ancillary equipment, ESB sub-station/switch room and accessible toilet facility. g) Decommissioning and removal of existing wastewater treatment system, new foul drainage connection via proposed pumping station to existing foul drainage system to the northern end of the development site adjacent to Food Central Road, surface water discharge via attenuation controlled outlet to adjoining drain on eastern side of site. h) All associated site works, landscaping, lighting and ancillary works necessary to facilitate the proposed development. i) Alterations to the hours of operation from 9.00am - 5.00pm Monday to Saturday, to 7.30am - 7. 00pm Monday to Friday and 8.00am - 7.00pm Saturday to Sunday.
The development consists / will consist of the following: 1. Retention permission is sought for. a) Extension to as-built Farm Shop ( Reg. Ref. F15A / 0564) consisting of café area of 34.24 sqm, Works to facilitate this alteration were inclusive of internal amendments, changes to windows, doors and opes of the as-built development: and b) Alterations to car parking layout and access arrangements including the retention of 5 no additional car parking spaces ( in addition to 25 no previously approved under F15A/0564). 2- Planning permission is sought for: a) Change of use from existing store to café seating and flower display area to southern end of existing building. b) A 203.87 sq. meter extension to existing Farm Shop and Café. The extended areas will consist of: i) Farm shop cold room and main store, kitchen and café seating area, lobby, plant rooms and bin store to eastern side of existing building; ii) Meeting room, staff facilities, storage and 1 additional female toilet facility to western side of existing building; iii) New entrance lobby to northern side of existing building, c) Associated signage for proposed development. d) PV solar panels to roof of building, e)Alterations and extension to the as-built car park and access arrangement to provide for an additional 10 no car parking spaces (inclusive of 3 no accessible spaces), together with 5 no motorcycle spaces. 20 no bicycle spaces and a delivery van set-down area. f) Decommissioning and removal of existing wastewater treatment system, new foul drainage connection via proposed pumping station to existing foul drainage system to the northern end of the development site adjacent to Food Central Road, surface water discharge via attenuation controlled outlet to adjoining drain on eastern side of site. g) All associated site works, landscaping, lighting and ancillary works necessary to facilitate to proposed development. h) Alterations to the hours of operation from 9.00am-5.00pm Monday to Saturday. to 7.30 am-7.00 pm Monday to Friday and 8.00 am-7.00pm Saturday to Sunday.
Keelings UC intend to apply for planning permission for the retention of a number of amendments to the completed Keelings Flowers unit (Warehouse facility including ancillary office space, staff facilities and site works) at c. 3.38 Ha site at Food Central, St Margaret's, Co. Dublin, as permitted under Fingal County Council Planning Reg. Ref. FW21A/0187. Retention is sought for the following amendments: 1) reduction in number of vehicular access points off new access road into site from two to one, 2) re-configuration of car parking arrangements whilst maintaining the approved number of 69 spaces, 3) relocation of bicycle parking area with an increase from 40 to 46 spaces, 4) addition of pedestrian and vehicular access gates, 5) additional area (46.8 m2) to rear (north) of ground floor office block 6) additional area (46.8 m2) to rear (north) of First Floor office block, 7), additional gantry area (56 m2) for external plant equipment at roof level, 8) amendments to the site boundary (fence) line, increasing the site area by 0.097 Ha 9) external elevation modifications, 10) Paladin fencing to site finished green in colour instead of black.
Keelings UC intend to apply for planning permission at a c. 3.284 Ha site at Food Central, St Margaret's, Co.Dublin. The lands are principally bounded by undeveloped lands to the south and east of the site with industrial units to the north and west. The development will comprise the construction of a warehouse unit (c. 8,617 sq m) including ancillary office space (457 sq m), staff facilities and associated development. The warehouse will have a maximum roof level height of 11.8 metres and a maximum plant height of 13.1 metres. The development will also include the provision of a new vehicular, pedestrian and cyclist entrance off the Food Central Access Road; internal roadways; 69 No. ancillary car parking spaces; bicycle parking; HGV parking spaces; trailer parking spaces; van parking spaces; dock levellers; hard and soft landscaping; boundary treatments; external canopy; smoking shelter; external stairs; pump house; water tank; compost storage area; waste storage area; lighting; signage; and associated site development works above and below ground.
To construct a new fully serviced private dwelling house consisting of a two storey/part dormer bungalow with wastewater treatment system and alterations to existing driveway to create shared access at the above location.
Permission to construct a new fully serviced private dwelling house consisting of a part two storey/part dormer bungalow with wastewater treatment system, alterations to existing driveway to create shared access and all associated site works at the above location.
‘the construction of a new detached, part two storey, part single storey, four bedroom dwelling, Existing entrance removed, new shared vehicular entrance, new wastewater treatment unit and all associated site development works’.
The development will consist of the construction of a new detached part two storey, part single storey, four bedroom dwelling, existing entrance removed, new shared vehicular entrance, new wastewater treatment unit and all associated site development works.
The retention of the existing storage building, offices, staff welfare facilities, car-parking and hard-standing service yard. existing site servicers parking and hard-standing service yard. Retention Permission and Permission for the permanent continuation of use of the site and the existing structures and hard-standing service yard on site associated with the daily operations of the facility, including the parking and storage of plant hire equipment, existing site services, boundary treatments and all ancillary site development works necessary to facilitate the permanent use of the facility on site.
A. Retention of single storey domestic shed with amendments to all elevations. B. Partial demolition of existing domestic shed. C. All associated site works at rear.
The retention application consists of an extension to truck and agricultural tractors yard previously granted planning permission Ref. No. P3680/84 to include offices, fuelling station petrol interceptors, O'Reilly Oakstown treatment system and percolation area and parking area including all associated site works.
Planning permission for development at lands at
The lands are princupally bounded by undeveloped
Permission is sought for: (i) The Construction of a refrigeration centre, ancillary office space and staff facilities (ii) The development also comprises the provision of ancillary car parking spaces, internal roads, provision of bicycle parking; HGV parking; hard and soft landscaping; boundary treatments; new entrance gates; smoking shelter; lighting; signage; ESB substation; PV Panels and associated site development works. Additional Information Received 16/06/026 Significant additional information received 23/06/26
‘the decommission of existing septic tank, new wastewater treatment unit for existing house, the construction of a new detached, two storey three bedroom dwelling, access from existing vehicular entrance to be shared, new wastewater treatment unit and all associated site development works’. AI Rcvd 17/07/2024
Permission for (A) the change of use of two existing staff accommodation buildings to ancillary office and storage accommodation associated with Keelings existing farm business,; and (B) the temporary retention of four ancillary structures/buildings used to facilitate safe operation procedures associated with Covid 19.
Permission is sought for a new temperature-controlled warehouse incorporating ancillary offices and staff facilities ancillary to the main warehouse. The development will also include the continuation of the vehicular, pedestrian and cyclist entrance road and associated lighting and drainage off the Main Food Central Access Road permitted under FCC Reg. Ref. FW21A/0187. Including PV panels, roof smoke vents, loading area with associated dock levellers, all hard and soft landscaping, boundary treatments, external lighting, LED signs, new vehicular entrance, car parking, bicycle parking, HGV parking, a truck wash facility, smoking shelter and all associated site development works AI received 07/03/2025