To RETAIN attic conversion to domestic store room
For development which will consist of revisions to house design, including changes to the dwelling and garage location to that previously granted under Planning Ref. P18-781. The revisions to dwelling will include changes to elevations and internal layout
Of modifications to existing private dwelling house/ site along with all associated site works and services
To demolish utility room and to construct a new two storey extension to the side of our house, also for a new front porch
To RETAIN a ground floor, single storey, living room extension to rear and shed to side of the dwelling
To construct a new dwelling house, private garage, domestic wastewater treatment system, site entrance and all associated site works and services
Of the changes to the existing dwelling house and the upgraded sewerage treatment system and for PERMISSION to revise the existing boundaries and all other associated site and ancillary works
Of the domestic store at the side of the dwelling and retention permission for extension to the dwelling at the rear and all associated site works
For a revised site boundary and revised position of a single 800kW wind turbine, 73 metres to hub height as granted under P10/453 and P15/812
Of an agricultural structure and all associated site works
For the construction of a single storey detached house, a waste water treatment and disposal system, a bored well, a new site entrance and all associated works
For development on lands located within the site of the Ardnacrusha Generating Station, Castlebank, Ardnacrusha, Co. Clare, Eircode V94 VR0K, in the townland of Ballykeelaun. The development consists of upgrading works to the electricity network within the site comprising: (a) 1 No. new 38kV line/cable interface mast (with a maximum height of c.16m above ground) on the existing Ardnacrusha Nenagh-Birdhill 38kV line; (b) 1 No. new 38kV line/cable interface mast (with a maximum height of c.16m above ground) on the existing Ardnacrusha - Moylish line and an additional c. 30m of overhead line connecting to an existing overhead line; (c) 1 No. temporary 38kV structure (with a maximum height of c.16.55 m above ground) on the existing Ardnacrusha - Tulla / Ardnacrusha - Birdhill 38kV line to remain in place for up to 5 years while works area ongoing (d) all ancillary development. For information purposes only: associated development works include the removal of existing overhead line structures and the undergrounding and/or relocation of existing overhead lines on the site. Such works comprise exempted development, having regard to the provisions of Section 4(1)(g) of the Planning Act (as amended) and Class 28 of the Planning and Development Regulations 2001 (as amended) respectively, and as such are not subject to this application. The proposed works are to existing networks assets located within the site at Ardnacrusha Generating Station - a Protected Structure (Reference No 311) under the Clare County Development Plan, 2017-2023. No works are proposed to the Protected Structure
For (a) modifications to the existing two storey dwelling (b) single storey extension to the existing dwelling (c) conversion of existing sheds to habitable rooms and all ancillary site works
For the construction of a link corridor at the rear of the dwelling to connect the dwelling and garage, conversion of a garage into an en-suite bedroom and construction of a garden and fence to the front of the dwelling. RETENTION permission is also being sought for the replacement of a door and window with a single window to the front of the dwelling
For the following: Removal of existing store to rear garden and erection of a single storey extension to the rear of the dwelling and associated site works
For the construction of a private dwelling house, garage, bored well and all ancillary works
For the construction of a private dwelling house, garage, bored well and all ancillary works
To RETAIN the converted attic including the velux roof lights and solar panels. also the front porch and all associated siteworks
A solar farm on a site of 70 hectares consisting of the following: 309,008 sq. m. of solar photovoltaic panels on ground mounted steel frames; a 38 kV electrical substation with electrical control building and associated compound with palisade fence; the installation of 21 electrical skids within 7 no. electrical compounds (with acoustic barrier fencing); underground power and communication cables and ducts, including underground cabling along the L3056 public road; new and upgraded internal access tracks (including stream crossings as required); 3 no. upgraded site entrances to the public road (one entrance to L-3054 (Lackyle Heights), and 2 no. entrances to L-30541); boundary fencing (including 607m of acoustic barrier fencing on the eastern boundary); landscaping and biodiversity enhancement measures; and all associated ancillary development, site works and services. The solar farm will be operational for 40 years. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and will be submitted to the planning authority with the application.
To apply for a 10-year planning permission for development at land to the west/north west of Ardnacrusha within the townlands of Castlebank, Glenlon North, Glenlon South, Drummin and Ballykeelaun, for the development of a solar farm on a site of approximately 70 hectares consisting of the following; up to 309,008 sq.m of solar photovoltaic panels on ground mounted steel frames; a 38 kV electrical substation with electrical control building and associated compound with palisade fence; the installation of up to 21 no. inverter/transformer stations on 7 no. hardstanding locations; underground power and communication cables and ducts, including underground cabling along the L3056 public road; new and upgraded internal access tracks (including stream crossings as required); 3 no. upgraded site entrances to the public road (one entrance to L-3054 (Lackyle Heights), and 2 no. entrances to L-30541); boundary fencing; landscaping and biodiversity enhancement measures; and all associated ancillary development, site works and services. The solar farm will be operational for 40 years. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and will be submitted to the planning authority with the application
Of the existing kitchen extension to the dwelling house and all ancillary site works
For the demolition of the existing dwelling and permission for the provision of a replacement part one storey, part two storey dwelling, new effluent treatment system and percolation area, new vehicular entrance, connection to auxiliary services and associated site works
To construct a dwelling house, septic tank, horizontal and vertical flow reed beds with distribution area together with all ancillary site development works and services
To RETAIN a development at Cois Sionna, Lackyle, Ardnacrusha, Co Clare. The development consists of a) The connection of an unauthorized garage and home office/study to an existing dwelling, b) an unauthorized extension linking the existing unauthorized garage to the existing dwelling house, c) an unauthorized enclosed porch to the front of the dwelling house, d) an unauthorized connection to an existing foul sewer. The Permission to RETAIN is being sought for an unspecified period of time
For change of use from a retail unit to a food take away
Of a change of use from a retail unit to a fast food takeaway restaurant
For Change of use of existing office unit to new use as a Veterinary Clinic with associated signage
For a period of ten years for a residential development on land bound by the Corbally Road to the east and access road to Carriag Midhe to the south in the townland of Knockballynameath, Athlunkard, Co. Clare. This is a Large Scale Residential Development LRD Application. The proposed development includes: (i) Demolition of existing ruinous house / shed structures; (ii) Construction of 101 no. residential units including 49 no. houses and 52 no. apartments comprising 28 no. one bed units; 24 no. two bed units; and 49 no. three bed units; (iii) Landscaping works including provision of (a) open space and kick about areas; and (b) new pedestrian and cycle connections; (iv) Vehicular access onto the Carraig Midhe Estate road; (v) Relocation of the existing agricultural entrance onto the R463 regional road further north beyond the development site; and (vi) Associated site and infrastructural works including provision for (a) 2 no. ESB substations and switchroom; (b) car and bicycle parking; (c) public lighting; (d) bin storage; (e) temporary construction access; and (f) varied site boundary treatment comprising walls and fencing. The planning application is accompanied by a Natura Impact Statement. All planning application documentation and information is available to view online at the following website set up by the Applicant: https://athlunkardlrd.ie
For development at Cratloe Railway Station House, Ballymorris, Cratloe, Co. Clare V95 A2F3. Cratloe Railway Station House is a protected structure - RPS Ref. 542. The development will consist of the supply and installation of new wastewater treatment system and percolation area
For the change of use of 1930 Café unit to a recreation / fitness unit with all ancillary site works
To construct an entrance, dwelling house, detached garage, advanced wastewater treatment system and soil polishing filter together with all ancillary site development works
For the construction of a new garage to replace the existing garage
For the construction of single storey extensions to the side and rear of existing dwelling house, installation of new upgraded waste water treatment system with polishing filter together with all associated site works
To install new wastewater treatment system, puraflo filtration and percolation area and all associated site works
For the conversion of the existing outbuildings into 2 No. 2 Bed apartments, 1 No. 1 bed apartment and 2 No. Studio apartments, demolition of the remainder of the existing outbuildings as indicated, onsite wastewater treatment system, connection to necessary services, together with all associated ancillary and incidental site works
For development which will consist of: conversion of the existing garage into a double-occupancy communal dwelling unit. Works include internal alterations to provide living, dining, and bathroom facilities for persons with intellectual or physical disabilities, along with modifications to external elevations and all associated site works. The proposed unit will have a gross floor area of 101 sqm and will be located on the north-east side of the existing main residential care unit
To construct a first floor extension over existing side annex to gable of existing dwelling, renovations to existing dwelling and all associated site works
To extend the existing 12m high telecommunications lattice structure to an overall height of 20m together with the addition of telecommunications antenna, dishes and associated equipment all enclosed in security fencing
Of a rear roof dormer box window and retention permission of 2 No. box windows clad in standing seam instead of red cedar
To RETAIN existing front porch extension to existing dwelling house and ancillary site works
Of as constructed extension to existing dwelling house and all associated site works
To extend the existing Sancta Maria Nursing Home, including material alterations to existing building layout, associated material alteration to the existing elevations, revised site layout, close one existing road entrance, replace existing treatment system and percolation area with a new site specific waste water treatment system and percolation area to EPA Guidelines including all ancillary site works at Sancta Maria Nursing Home
For the following works: 1) construct a new dwelling house which will replace the existing cottage on the site 2) To change the use of the existing cottage from use of a cottage to a shed/store 3) install proprietary wastewater treatment system, percolation area and associated ancillary works
To construct a 3 column round roof shed and associated ancillary works
To RETAIN as constructed, domestic garage/store which varies from granted permission P18-604 plus all ancillary site works
Of as constructed domestic garage/store which varies from Planning Refs P18-604 and P20-849, plus all ancillary site works
For the development which will consist of the demolition of an existing dwelling, stables, external sheds & stores, and the construction of a new single storey split-level dwelling with associated carport, detached garage, sheds & store, the installation of gates to the existing site entrance, provision of a wastewater treatment unit and percolation area, and ancillary site works.
For development which will consist of: construction of dwelling house and effluent treatment system with associated site works
Of existing attic development not approved under planning reference number 07/3011 and planning PERMISSION is sought to carry out modifications to include dormer windows to the front and side and replace existing ground floor windows
To construct an extension to the rear and side of the existing house