Development will consist of (i) the construction of a sheltered canopy (c. 50 sq.m) in the existing car park for the purpose of providing 2 no. dedicated "Click and Collect" spaces for the existing Tesco store; (ii) ancillary signage; and (iii) all associated site development worksDecision record indexed
A vehicular entrance, dwelling house, domestic garage, domestic wastewater treatment system with polishing filter together with all associated site works at Farranaclara, Donohill, Co. Tipperary.Decision record indexed
The change of house type from that previously approved under permitted Planning Permission reference number 2360120 together with all associated site worksDecision record indexed
Alterations to the previously permitted solar farm as follows: a) Replacement of a permitted single storey terminal electrical station and a separate single storey electrical switchroom (permitted as part of a solar farm permission by Tipperary County Council Reg. Ref. 16600359) with a single storey 20kV substation building on the site of the previously permitted terminal electrical station; repositioning of a permitted storage container, and minor solar panel layout revision adjacent to the proposed substation; repositioning of entrance gate and security fencing at entrance to the solar farm field; and provision of new gate in perimeter security fence adjacent to Ballynilard Stream; and b) Permission to increase the operational period of the solar farm from 25 years to 40 yearsDecision record indexed
Construction of a vehicular entrance, dwelling house, garage, domestic waste water treatment plant with polishing filter together with all associated site worksDecision record indexed
A domestic extension to the rear of the existing dwelling, an extension to the existing domestic storage shed, a boundary wall and including all associated site development worksDecision record indexed
Slatted cubicle shed with loose straw bedded area, manure pit with walls, demolition of old dungstead and associated concrete worksDecision record indexed
The demolition of existing rear annex to existing house, demolition of existing outbuilding, construction of a new extension to side of existing dwelling house, installation of a new upgraded domestic wastewater treatment system with polishing filter, together with all associated site worksDecision record indexed
Revision of the design of the extension to existing house to a single storey extension from that previously approved under governing planning permission reference number 23/60931 together with all associated site worksDecision record indexed
The replacement of a permitted single storey terminal electrical station and a separate single storey electrical switchroom (both previously permitted as part of a solar farm permission by Tipperary County Council under Reg. Ref. 16600359) with 1 no. single storey 20kV substation building on the site of the previously permitted terminal station; repositioning of a permitted storage container, and minor solar panel layout revision adjacent to the proposed substation; repositioning of entrance gate and security fencing at entrance to the solar farm field and provision of new gate in perimeter security fence adjacent to Ballynilard StreamDecision record indexed
(1) previous change of use of part of an existing dwelling to use as general offices, (2) PERMISSION for a change of use of the remaining dwelling part of the existing dwelling to use as general offices and staff facilities and (3) PERMISSION to extend this existing building to provide additional offices and associated staff facilities and all associated site worksDecision record indexed
A 10-year permission for the construction of a 110kV ‘Loop In-Loop Out’ (LILO) substation and associated works on a site of approximately 6.20 hectares. This will include the following: A substation occupying 2.11 hectares, comprising: TSO (Eirgrid) compound with electrical equipment, transformer sub-compound, bus bars sub-compound, cable chairs and substation building (435m2), enclosed by palisade fencing at 0.95 hectares in area. One transformer up to 110kV within the TSO compound and the provision of an area for a second transformer if future Eirgrid expansion is required. Required TSO expansion area enclosed by palisade fencing at 0.79 hectares. Operators compound (with switchroom building, electrical equipment, rainwater collection system) enclosed by palisade fencing at 0.17 hectares. The proposed operators control building will have a gross floor area of approximately 220m2. Perimeter protection area at 0.20 hectares. 7 No. lightning masts to a height of approximately 18m. 1 No. telecoms pole to a height of approximately 20m. Additional space for the possible future requirements for a Harmonics Filter. New entrance to the R507 regional road shared with the proposed solar farm. 5m access road corridor (approx. 1,160m long), and underground cabling route to the substation occupying an area of 3.24ha. Underground cable corridor of approximately 320m in length and provision of 2 no. 16m high mast structures linking proposed substation to adjacent existing overhead 110kV transmission line. Associated construction works and drainage infrastructureDecision record indexed
Change of use of existing garage into a bedroom and ensuite with minor changes to front elevation of the existing dwelling and all associated site worksDecision record indexed
For the following: Single storey extension to the side and rear of the original house; Second floor storage area above the original house, including a dormer window in the rear facing roof slope; And all associated site and ancillary works.Decision record indexed
1) the erection of sun-room to the rear of previously permitted kitchen extension; 2) the construction of extension to the front of previously permitted kitchen extension; 3) and all associated site and ancillary worksDecision record indexed
A rooftop solar PV installation on the existing roof, the solar PV array will total 197.74 sqm and include all associated site works and ancillary works. The solar pv array will generate onsite green electricity which wil be used to reduce the company's energy costsDecision record indexed
(i) the construction of an extension to the side of the existing convenience shop building which includes removal of part of the existing covered carwash area (gross floor area 23 sq.m), (ii) the change of use of part of the existing convenience shop to include part off-licence use, gross floor area for off-licence use 21 sq.m, and all associated works. (Gross area of extension 23 sq. m) (Gross floor area of off licence 21 sq. m)Decision record indexed
A) Proposed new single storey flat roof extension to existing school building, B) New passenger lift complete with enclosure and associated structure serving ground and first floor levels C) Associated alterations to the existing school building to accomodate proposed new extension and lift enclosure, D) Alterations and extension to existing external single storey shed structure, E) All associated site worksDecision record indexed
Site entrance as constructed, two roof windows on rear facing roof slope, detached domestic garage and Planning Permission for construction of a new soil polishing filter on the foul drainage system and all associated site and ancillary works.Decision record indexed
The construction of an agricultural shed consisting of a dairy, plant room, milking parlour, an underground soiled water storage tank, the erection of a meal bin and all associated site worksDecision record indexed
St. Anne's Secondary School, Rosanna Road, Tipperary
Construct a Social Area complete with alterations to the existing building, to access and connect to the Social area and to widen existing corridors on the approach, complete with associated works and external works. St. Anne's Secondary School is a Protected Structure (RPS Ref. No. 3 and associated Protected Structures are Ref. Nos. 4 & 5)Grounds not yet categorised
The works within the curtilage of protected structures, namely St. Anne’s Secondary School (RPS No. 3) and associated protected structures on the site (RPS Nos. 4 and 5). The development will consist of the construction of a new single-storey school building measuring 380 sqm, providing 2 no. special education needs classrooms, a multipurpose room and a graphics design lab, together with associated sanitary facilities. The development will also consist of the demolition of an existing single-storey prefabricated building. The development will include a new fenced soft play area, an accessible parking space, connections to public utility and drainage services, and all associated site worksDecision record indexed
St. Anne's Secondary School, Rosanna Road, Tipperary
To construct a P.E. Hall and ancillary accommodation, complete with associated alterations to the existing building, works to the existing building will comprise alterations to the existing single storey link corridor and its front wall to form access to and connect to the new building. St. Anne's Secondary School is a Protected Structure (RPS Ref. No. 3 and associated Protected Structures are Ref. Nos. 4 & 5)Grounds not yet categorised
A first floor extension (13.7sqm) to the rear, refurbishment of the existing ground floor extension (13.3sqm), and all associated site worksDecision record indexed
Alter and extend the existing building, by extending the existing building, by extending and widening the Link Corridors at the rear of the building, complete with associated works, St. Anne's Secondary School is a Protected Structure (RPS Ref. No. 3 and associated Protected Structures are Ref. Nos 4 & 5)Decision record indexed
The construction of a dwelling extension to the existing dwelling to accommodate ancillary family accommodation which includes for modifications to the existing dwelling and all ancillary site worksDecision record indexed
Construction of a house including the construction of a retaining wall and removal of derelict garden shed and all ancillary site worksDecision record indexed
To erect a bungalow, domestic garage, effluent treatment tank and percolation system, entrance and all associated ancillary worksDecision record indexed
(1) the extension to the rear of the existing property and (2) the refurbishment of shopfront and (3) the replacement of windows and front door to front elevation and all associated site works. The extension comprises a single storey and a two storey portion. The property is a protected structure (RPS Ref.38)Decision record indexed
The construction of a vehicular entrance, split level dwelling house, domestic wastewater treatment system with polishing filter together with all associated site worksDecision record indexed
Planning (22/500) for the construction of a vehicular entrance, split level dwelling house, domestic waste water treatment system with polishing filter together with all associated site worksDecision record indexed
The construction of a new dwelling, garage, wastewater treatment system, polishing filter, entrance and all associated site worksDecision record indexed
Extension to the back of dwelling and permission to extend upwards and refurbish existing dwelling and raise blockwork and roof and associated site worksDecision record indexed