The development will comprise the demolition of a single storey return to the rear of the existing dwelling, the construction of a new 61m2 part 2 storey extension to the rear of the dwelling and the replacement of the existing drainage connection with a new connection to the municipal drainage system.
PERMISSION:The development will comprise of the demolition of a single storey return to the rear of the existing dwelling, the construction of a new 63m2 single storey extension to the rear of the dwelling and the replacement of the existing drainage connection with a new connection to the municipal system.
The development will comprise: the demolition of a single storey return to the rear of the existing dwelling, the construction of a new 79m2 part 2 storey extension to the rear of the dwelling and the replacement of the existing drainage connection with a new connection to the municipal drainage system.
We Robert McElroy & Veronika Sedlackova, intend to apply for permission at No.: 22 Brian Terrace, D03 K5P2, Marino -Dublin. The development will consist of to construct new vehicular entrance with front boundary alterations and footpath dishing to the front of the existing property.
The development will consist of to construct new vehicular entrance with front boundary alterations and footpath dishing to the front of the existing property.
PROTECTED STRUCTURE:RETENTION: Permission for the Retention of the subdivision of five number 'live/work' units as originally granted planning permission in 2005 (Reg. no. 4831/03) into ten number one and two-bedroom apartments in the development known as Corn Mill, Distillery Road, Drumcondra, Dublin 3, originally known as the Eircom Site, a Protected Structure. The relevant apartments being; in the three/four storey over basement Block B; on the ground floor, no. 9 (two-bedroom) no. 9A (one-bedroom); on the first floor; no.10 (one-bedroom) and no. 10A (one-bedroom) and on the second floor; no. 16 (one-bedroom) and no. 16A (one-bedroom) and in the six-storey over basement Block C; on the ground floor; no. 21 (two-bedroom), no. 21A (one-bedroom) no. 22 (two-bedroom) and no. 22A (one-bedroom), together with associated internal alterations and all external balcony and terrace area.
RETENTION PERMISSION - The development will consist of retention of a pitched roof with roof lights on a single storey building previously granted permission under WEB1698/23 a rear single storey extension of existing house with flat roof and rooflights and all associated siteworks to rear garden.
Rear single storey extension of existing house with flat roof and rooflights and all associated siteworks to rear garden
The development will consist of redesigning the existing and not adequate vehicular access with the construction of slightly wider ones. Amending works of the existing and not adequate vehicular dishing access. Alterations of the front boundary, and relative ancillary landscape works.
Planning permission to sub-divide the existing two storey house into (1) 2 bedroom 3 person apartment at ground floor; (2) 2 bedroom 3 person apartment at first floor; (3) ground floor extension to the rear and all associated site works.
The proposed development will consist of the installation of 18 no. telecommunication antennas, together with 6 no. dishes, 3 no. equipment cabinets and all associated equipment enclosed behind 2no. profiled reinforced, perforated plant screens. the development will provide high speed wireless data and broadband services for all 3 of Irelands mobile operators, namely Eircom (t/a eir), Three Ireland and Vodafone Ireland. The Planning Authority should please note that this is not an amendment application to the original permitted independent living application submitted to Dublin City Council application dated 06.04.2023 reference 5176/22 and subsequent An Bord Pleanála grant dated 02.01.2024 reference ABP-316593-23, which is now under construction. This is a wholly separate and independent application for new telecommunication infrastructure.
PERMISSION: The development proposes the demolition of the existing 2 storey building on site (approx. 1020.5 sq.m GFA), amendments to the quantum of existing car parking, removal of existing substation on Philipsburgh Avenue, and the construction of 48 no. new residential apartment units ( 48 no. 1 bed units) in 2 no. apartment building, consisting of 1 no. 2-4 storey building (Building A fronting Philipsburgh Avenue) and 1 no. 2-4 storey (Building B rear block). Building A provides 22 no. 1 bed apartment units and Building B provides 26 no. 1 bed apartment units. All units are intended to provide housing for independent living for older residents (60 years plus). An office room (7.2 sq.m), communal room (34.2 sq.m) and Kitchenette/WC (10.5 sq.m) associated with the apartment units will be provided. The development also proposes approx. 372.8 sq.m of communal open space, balconies/ terraces associated with individual apartment units, associated secure bicycle parking, car parking (4 no of spaces) and bin storage, ESB Substation, hard and soft landscaping and all other associated site works and services above and below ground on an overall site area of approx 2681 sq.m Access to the development will be via the existing access point along Philipsburg Avenue, which will be upgraded to provide enhanced pedestrian/vehicular access. Access to adjacent pitch and putt club lands is maintained via the provision of vehicular/pedestrian gates in the south east corner of the site. A Natura Impact Statement has been prepared and submitted with this Planning Application.
Demolition of existing dis-used storage unit & Construction of a new seven storey building, including penthouse to accommodate 11 no. 2 bed apartments with balconies/ penthouse roof terrace, ESB sub station, Bin Stores, Bulk Storage, Bike Store, Tank room all at ground floor level, Revised landscaping layout to provide car parking, with associated external site works.
The development will consist of constructing new vehicular access with front boundary alterations, and footpath dishing to the front of the existing property. Alteration of the right side of the boundary, and ancillary landscape works.
PROTECTED STRUCTURE: The development consists of minor alterations to existing guarding on the roof level surrounding the existing sensory roof garden which was previously approved under Reg. Ref. 2285/11 to allow works to raise the existing guarding to 1.8m high and to allow for remedial works to the existing roof and for all associated site works.
Permission to erect a two-storey extension, to rear, on top of existing dwelling along with rooftop stair enclosure and privacy screen to roof terrace, to a total of 5 storeys, to provide four bedrooms and two bathrooms and ground floor W.C., all at 43 William Street, North, Dublin 1 XA30 with access onto Catherine Court.
Planning permission for creation of vehicular access to the front of house. Works include modification to the existing front garden railing to allow for new gates and dropping of the kerb of the existing public footpath.
The development will consist of the following: A new vehicular entrance driveway to the front onto Clonliffe Road; removal of the existing double doors (4m wide) to the storage shed located to the rear of the property onto the rear access lane, and replacement with new double doors (1.8m wide), all associated site-works, ancillary drainage and landscaping.
Proposed one + two storey extension to rere and side incorporating two no. conservation type rooflights to new side roof
RETENTION:The development will consist of: Retention of the existing temporary telecommunications structure, for a defined period of 24 months, consisting of a 15m transportable monopole structure secured by 4 anchor bolts to 4 No. 2m x 2m x 1m removable concrete ballast blocks; & all associated antennas, dishes and ancillary ground-based equipment cabinets. Situated within the construction site hoarding on a section of land at 80 - 82 Philipsburgh Avenue, Fairview, Dublin 3, D03H3F1.
A proposed single storey extension and a proposed first floor extension over an existing rear single-storey element all to rear at 114 Brian Rd, Marino, Dublin 3,
The development calls for a first-floor structure built above the existing ground floor rear extension, of the main two-storey house No. 153 Clonliffe Road, the proposed plan will consist of two bedrooms, a timber roof deck, including a galvanised steel external stairs.
RETENTION: Retention Permission at No. 153 Clonliffe Road, Drumcondra, Dublin 3. The area to be retained consists of the single storey ground floor extension to the rear of the property with monopitch roof that we believe was constructed approximately 10 years ago.
PROTECTED STRUCTURE: PERMISSION for works to a Protected Property Ltd (7357); consisting of (1) Internal & external renovation of existing dwelling house, consisting of a two-storey terraced building, having a maximum ridge height of 7.63m above existing ground level (2) Removal of the plaster to front elevation and repointing of the original brickwork. (3) The demolition of the existing mono-pitch & flat roof rear extensions, (later additions to the original structure). (4) Construction of a new rear two-storey flat roof extension (5) Ancillary site works, at 163 Richmond Road, Drumcondra, Dublin 3, D03 TK50.
The development will consist of the partial demolition of the return of the existing two-storey end-of-terrace house and the construction of a two-storey extension; a new window on the gable at first floor level, the relocation of the side gate, increasing the height and rendering of the side garden wall and associated hard and soft landscaping and ancillary works.
Planning permission is sought for 2 storey extension to rear of existing house, additional bedroom on first floor and internal modifications proposed and all associated site works.
The development will consist of (a) the demolition of existing returns (area 30.7m2) to the back of an existing two storey terraced dwelling house and their replacement with a new single storey flat roof extension of 48.5m2 and a first floor extension of 2.2m2, (b) the installation of a new artist's studio /workshop building of 52m2 to the rear of new extension, (c) provision of a new velux rooflight to the front slope of the existing roof, (d) removal of north east chimney stack, (e) all associated siteworks
The development will consist of a new vehicle entrance and associated site works to an existing two-storey mid-terrace dwelling.
The development will consist of: Partial-demolition of existing roof and construction of a vertical dormer extension to existing rear return, consisting of one bedroom with projecting bay window and rooflight to bedroom area and new rooflight to proposed internal stairs and landing at second floor level to rear return. The development also includes proposed alterations to first floor rear return existing bedroom and bathroom including new windows and internal layout.
The development seeking permission will consist of the provision of a 4.4m wide vehicular entrance and a bicycle store to the front of the property.
RETENTION PERMISSION: Existing completed single storey portable storage units comprising storage accommodation (54.5M2 approx gross internal area) for use ancillary to the existing pitch and putt course with overall site area 7815m2 (0.78ha) approx, & associated site works including external pathway, works subject to Dublin City Council Enforcement Section 152 Warning Notice of 04.07.2024 of the Planning and Development Act 2000 (as amended)
Permission for reconstruction of existing attic storeroom with installation of new staircase and dormer window to rear and for 2 no. velux rooflights, one to front and one to rear, with all associated site and drainage works.
The development will consist of the construction of a two-storey extension to the side of the existing property to provide ancillary accommodation comprising a new front entrance serving a kitchen, dining and living area at ground floor level, and one double bedroom and bathroom at first floor level. Works to the existing property will include the demolition of a section of gable wall at ground floor level and the extension of the existing hip roof, as well as other minor internal alterations, and all associated external works required to facilitate the development.
RETENTION: Retention planning permission for change of use from garage/workshop to residential use of existing single storey flat roofed structure (38.7m2) in rear garden
The development will consist of the conversion of an existing granny flat in rear garden to being part of the family house. Works include the construction of a new glazed walkway to the north-west boundary, addition of two new rooflights and all other associated renovation and landscape works to this terraced house.
Permission for the construction of a first floor extension to rear and side over existing return, insertion of 2 windows (1 obscured) at first floor level to existing east (side) elevation and all associated site works.
We Dawit Beyene & Terri O'Sullivan, intend to apply for permission to construct a side extension (single-story) at first floor of 28 Fairview Green, Marino, D03 P4E5, Dublin Co. Dublin. The proposed extension is of 17.84 sq. m. The development will include some minor alteration at ground floor of 3.8 sq m, and an amalgamation at first floor of 6.63 sq m with the proposed extension. The total development area is 28.3 sq m. The development will include minor alteration of the landscape, bins storage and all the ancillary site works and drainage.
PROTECTED STRUCTURE: permission for demolition of existing store building and construction new temporary classroom, including all ancillary & associated site works, all within the boundary of protected structures Ref.: 50120086 & Ref.: 50120087 at St. Josephs Primary School C.B.S., Marino Park Avenue, Fairview, Dublin 3, D03 PF72.
RETENTION: Retention for an amendment to full planning permission (previously granted, plan ref reg: WEB1777/21) for the realignment over two storeys of the external back wall of the extension, façade alterations to the rear elevation, minor internal layout modifications along with the associated site works.
Full planning permission for the construction of a two storey rear extension, along with the associated site works
The development will consist of: 1) The construction of a new part single storey and part two storey extension to the rear of the existing house including the removal of the existing single storey lean to return and boiler shed at the rear; 2) The removal of the existing open porch and the construction of a new porch and bay window to the front of the existing house; 3) The creation of a vehicular access and parking space to the front of the existing house; 4) including all ancillary site works.
Permission sought for proposed (A) Conversion of auxiliary single storey areas to side & rere of dwelling, incorporating fenestration changes to front and height increases of between 0.3-1.07m to perimeter walls and including (B) Ancillary family accommodation to side element
Provision of new front vehicular access with dropped kerb, including partial removal of existing concrete plinth and iron railings, and installation of permeable paving to new front driveway.
Planning permission for the demolition of the existing "Leech Papers" factory, site clearance and construction of a new six storey over partial basement apartment scheme. The scheme consists of: 33 one bedroom apartments; 8 two bedroom apartments; private balconies and 567 sqm of communal facilities (bulk storage area, meeting rooms, coffee lounge, laundry room & management suites) located on ground floor with storage for 41 bicycles. The development also includes an internal landscaped courtyard with communal bin storage, ESB substation, new boundary walls service connections and associated site development works at "Leech Papers" 1A-1C Shamrock Place, Dublin 1, D01 NV67.
For the removal of the existing rear single storey ground floor and existing first floor toilet and its replacement with a new extension at ground floor [22.51sq.m.] and a single bedroom and toilet at first floor level [10.32sq.m]. The construction of a new 'velux' rooflight and new porch doors at front elevation, internal insulation and retrofitting together with all associated works.
The development will consist of: amendments to a permitted development, previously granted permission under Dublin City Council planning Ref. 3091/20 and 1369/23, located at the junction of East Wall Road and Alfie Byrne Road on East Wall Road, Dublin 3,D03 F2H3. The proposed development consists of the provision of 4 no. internally illuminated signs located at Block A [Hotel], to the ground floor front entrance canopy, the North elevation at 15th floor level, the East elevation at 15th floor level and the West elevation at 15th floor level, totalling 10m2 in area, with all associated services and site works, all on a site area of c. 0.35 Ha.
The development consists of demolition of existing single storey extension to the rear of existing house & for the construction of a single storey extension to the side and rear of existing house and for all associated site works.
The development will consist of the demolition of a single storey garage structure and a single storey outbuilding and the construction of a two storey apartment building consisting of 2 no. one bedroom apartments, including a balcony at first floor level to front of the proposed property, facing onto St Joseph's Villas, and a new boundary wall within the curtilage of No 17 Richmond Street North, together with bicycle storage, bin storage, landscaping, and all associated site works and services.
The construction of a new extension and new bay window to the rear of main house, a new porch to the front and side of main house, a first floor window on north gable, external insulation on existing house, new north boundary at front and all associated ancillary works including demolition as necessary to facilitate new construction.
A proposed one & two-storey extension to rere, incorporating alterations to 2 no first floor rere windows