2 storey modular classroom building and a single storey toilet building, steel framed covered walkway structure linking to the existing school, relocation of existing bicycle shelters and all associated site development works.
The development will consist of works located inside the Clonburris SDZ relating to the Stage 2 roads, public parks/open space areas and services infrastructure works (as part of a separate concurrent application) as per the Clonburris SDZ Planning Scheme (2019) to facilitate the future development of the northern part of the overall SDZ comprising: A) The construction of c. 2.3km of a new Link Street Clonburris Northern Link Street (CNLS) and approximately 800m of side streets including ancillary cycle facilities, pedestrian crossings, traffic signals, footpaths, car parking (79 no. spaces) public lighting as well as services infrastructure (including ESB, Comms, gas main, trunk surface water sewer, and watermain) and ancillary works. B) Provision/upgrade of 12 signalised junctions (5 new and 7 upgraded) as follows: Junction 1: R136 & Adamstown Avenue/Thomas Omer Way, Junction 3: R113 & Thomas Omer Way / Ninth Lock Road, Junction 4: CNLS & R136, Junction 6: CNLS, Junction 8: CNLS & R113, Junction 9: CNLS/Neilstown Road & Ninth Lock, Junction 24: CNLS/Neilstown Road & Ninth Lock, Junction 28: R136 & Adamstown Avenue/Thomas Omer Way, Junction 2: CNLS & Thomas Omer Way, Junction 5: CNLS, Junction 7: CNLS, Junction 27: R136 & Adamstown Avenue/Thomas Omer Way along with minor priority-controlled junctions are proposed along the street alignment to provide access to existing development and future development cells within the Clonburris SDZ. C) Approximately 2 km of upgrade of existing streets, including minor priority-controlled junctions are proposed along the street alignment to provide access to existing development and future development cells within the Clonburris SDZ, including pedestrian crossings. D) Provision of 2 main public parks centrally (Na Cluainte Park North) c. 2.78 ha and in the eastern part of the subject lands (c. 0.77 ha) both to include open water attenuation areas. E) Drainage infrastructure works to include surface water attenuation areas, Sustainable Urban Drainage Systems (SUDs) as well as landscaped areas including attenuation ponds and the provision of underground attenuation. Provision of surface water drainage and waste supply trunk infrastructure within the proposed road corridors; wastewater infrastructure including a foul pumping station (known as pumping station no.3) and foul pipe network within proposed road corridors to facilitate drainage connections to future development within the SDZ lands. The easterly section of the development will collect surface water and discharge into an existing outfall situated within Moorfield Walk whereas the western surface water catchment will connect (as part of a separate concurrent application) to an existing surface water outfall on the Griffeen Road (and ultimately to an existing Griffeen River outfall). F) Provision of trunk watermain infrastructure within the CNLS as well as connections to the permitted watermain infrastructure as part of SDZ20A/0021. G) Permission is also sought for all ancillary site development and landscape works associated with the development, including hard and soft landscaping, (tree pits, boundary treatments, road marking, signage, enabling works and temporary construction works, (including site accommodation, site compounds, and temporary construction boundary fencing) as well as temporary project signage (at 6 no. locations) and provision of underground utility connections under the Dublin - Cork Railway line (at 3 no. locations) and Irish water diversions. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
The development will consist of 1) a side garage conversion and second storey side extension, 2) a single storey lean to extension to the rear, 3) the widening of the vehicular front entrance, 4) a front porch extension 5) a roof light on the south facing hipped roof and 6) all site ancillary works.
Kelland Homes Ltd. intends to apply for permission for development on a site area of 6.3Ha, on lands within the townland of Cappagh, Dublin 22. The proposed development is located west of the Ninth Lock Road, south of the Dublin-Cork railway line, north of Cappaghmore housing estate and Whitton Avenue, and east of an existing carpark / park & ride facility at the Clondalkin Fonthill train station and the R113 (Fonthill Road). The proposed development is located within the Clonburris Strategic Development Zone (SDZ), within the development areas of (I) Clonburris South East (i.e. CSE-S1 & CSE-S2) and (ii) part of Clonburris Urban Centre (i.e. CUC-54), as identified in the Clonburris SDZ Planning Scheme 2019. The proposed development consists of the construction of 294 no. dwellings, creche and retail / commercial unit, which are comprised of: 118 no. 2, 3 & 4 bed, 2 storey semi-detached and terraced houses, 104 no. 2 & 3 bfd duplex units accommodated in 10 no. 3 storey buildings, 72 no. f' & 2 bedroom apartments in 2 no. 4 & 6 storey buildings, 1 no. 2 storey creche (c.520.2m2), 1 no. 2 storey retail /commercial unit (c.152.1m2).Access to the development will by via the permitted road network (under Ref. SDZ20A/0021) which provides access from the Ninth Lock Road to the east and the R113 (Fonthill Road) to the west. The proposed development will connect into the permitted Infrastructural works as approved under the Clonburris Strategic Development Zona Planning Scl1ame (2019) and permitted under Ref. SDZ20A/0021, with the proposed development connecting into the permitted surface water drainage attenuation systems i.e. 1 no. pond, 3 no. modular underground storage systems and 1 no. detention basin combined with modular underground systems. The proposed wastewater infrastructure will connect into a permitted foul pumping station and pipe network within proposed road corridors to facilitate drainage connections to future wastewater drainage infrastructure within the adjoining SOZ lands (Including future Irish Water pumping station permitted under SDZ21A/0006). The proposed development also provides for all associated site development works above and below ground, public & communal open spaces, hard & soft landscaping and boundary treatments, surface car parking (401 no. spaces), bicycle parking (797 no. spaces), bin & bicycle storage, public lighting, plant (M&E), utility services & 4 no. ESB sub-stations. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
27sq.m first floor extension over an existing ground floor to the front, rear and gable.
Clonmill Limited are applying for Permission, for the proposed amalgamation of shop units 19 and 20, at The Mill Shopping Centre Clondalkin, Ninth Lock Road, Clondalkin, Dublin 22. The proposed development will consist of the amalgamation of the existing retail Unit 19 (c. 78 sq.m) and existing retail Unit 20 (c. 74 sq.m) into a single retail unit 19/20 c. 155 sq.m through the removal of the existing wall between the two units. The existing entrance to Unit 20 is to be closed with a partition wall and the shop front glazing to be removed and replaced with a glazing unit to match height to Unit 19. Including all associated site services and development works.
The proposed primary school will extend to c3,355sq.m will be 2 storeys in height and will comprise 16 no. classrooms with an additional 2 classroom Special Educational Needs Unit; a General Purpose Hall and all ancillary teacher and pupil amenities and facilities. The proposed development also provides for hard and soft play areas, including 2 no. outdoor ball courts, bicycle parking, staff car parking, vehicle drop off and set down areas. Photovoltaic Panels (PV) are proposed on roofs in addition to EV Charging Points and a packaged Biomass heating plant. The proposed development also provides for all landscaping and boundary treatments and all associated site development works. Access to the site will be via a new junction and access road off Thomas Omer Way. The new access road will run south off Thomas Omer Way and then west into the site. The proposed access road Is in accordance with the Clonburris Strategic Development Zone (SDZ) Planning Scheme and incorporates public lighting, footpaths and cycle tracks. A further pedestrian / cycle only connection to Thomas Omer Way ls also proposed along the western green corridor, west of the proposed school building.
Change of use of portion of the ground floor (29.48 sq m) from office to residential accommodation and retention permission for the incorporation of the internal courtyard (7.16 Sq m) as part of the residential accommodation.
Change of use of the first floor from offices in No. 43 and restaurant in No. 44 to 3 two bedroom apartments and 1 one bedroom apartment and an interconnecting doorway between the two existing ground floor shop at No. 43 and the takeaway food shop at No. 44 Tower Road; new stone-clad shopfront with an aluminium glazing system and signage in the fascia over each unit.
The development consists of the retention and completion of revisions to a section of the northern site boundary comprising the omission of the pedestrian/cycle access (consisting of ramp and stairs) off Thomas Omer Way and the repositioning of the pedestrian access c. 6 m in an easterly direction to co-join with the permitted vehicular access. The amendments do not involve any changes to the position of the permitted vehicular access itself and the access road remains in accordance with the Clonburris Strategic Development Zone (SDZ) Planning Scheme. Permission is also sought for the relocation of bicycle parking areas within the site; revisions to the permitted boundary treatment along a section of the eastern site boundary; the installation of 3 no. flagpoles in the south-eastern part of the site; and revisions to the site compound including repositioning of bin store area and replacement of previously permitted bio-mass heating with new heat pump and gas storage tank.
(1) Demolition of existing single storey dwelling (c.108.5sq.m); (2) construction of a Distribution Warehouse Building comprising warehousing and ancillary areas at ground floor and support offices, staff areas and plant across two floors; (3) the development will be accessed from the existing Profile Park estate road; (4) provision of car parking, cycle parking, security gatehouse, landscaping and boundary treatments (including security fencing and gates); (5) all associated site development and services works (including diversion/culverting/reprofiling of existing stream on site); (6) total gross floor area of the development c.17,006sq.m.
Erect 329sq.m or 67.34 KWp of photovoltaic panels on the roof of the building DUB12 in data centre; all associated site works.
Alterations to an existing house including a first floor extension to the rear
Change of use and amalgamation of Unit 24A with Dunnes Stores Cafe (units 25/26) to increase the cafe's size from 257sqm to 368sqm, including an extended mall seating area and all other associated site works/services
Demolition of the abandoned single storey dwelling and associated outbuilding (206sqm); construction of 2 two storey data centers with plant at roof level of each facility and associated ancillary development which will have a gross floor area of 40,589sq.m consisting of 1 two storey data center (Building 11) which will be located to the south of the site and will have a gross floor area of 24,667sq.m. including 22 emergency generators located at ground floor level within a compound to the western side of the data center with associated flues that will be 22.3m in height; 1 two storey data center (Building 12) which will be located to the north of the site, and to the immediate north of Building 11 and will have a gross floor area of 12,915sq.m including 11 emergency generators located at ground floor level within a compound to the western side of the data center with associated flues that will be 22.3m in height; each of the two data centers will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, and plant including PV panels at roof level as well as a separate house generator for each facility which will provide emergency power to the admin and ancillary spaces; each generator will include a diesel tank and there will be a refuelling area to serve the proposed emergency generators; the overall height of each data center apart from the flues and plant at roof level is c. 14.23m above the finished floor level; the overall height of each data center apart from the flues and plant at roof level is c. 14.23m above the finished floor level; single storey step-up substation (38sq.m) as well as 2 single storey switch substations (121sq.m); AGI Gas Regulator compound that include 3 single storey buildings (134sq.m); construction of a gas powered generation plant in the form of a 13m high single storey building with a gross floor area of 2,714sq.m that will contain 10 gas generators with associated flues that will be 25m in height, and grouped in pairs and threes; the Gas Plant will be located to the west of Building 11; ancillary site development works, that will include reorientation of the Baldonnel Stream, biodiversity management initiatives, attenuation ponds and the installation and connection to the underground foul and storm water drainage network, and installation of utility ducts and cables, that will include the drilling and laying of ducts and cables under the internal road network within Profile Park; other ancillary site development works will include hard and soft landscaping, lighting, fencing, signage, services road, entrance gates, sprinkler tanks and pump room; a temporary gas powered generation plant within a fenced yard containing 21 generator units in containers, each with associated flues (each 25m high), 12 transformers and 10 containers of controls to be located to the west of, and associated with the first phase of Building 11, and will be required for a period of up to 2 years if connection to the national grid is delayed; this temporary plant will not be built if the connection to the national grid is in place prior to the operation of Building 11 at this site that includes an abandoned single storey residential property on the New Nangor Road (R134), Dublin 22; and on land within the townlands of Ballybane and Kilbride within Profile Park, Clondalkin, Dublin 22 on an overall site of 8.7 hectares.
Amendment and modification of SD21A/0241 including the replacement of the permitted 2 sprinkler tanks and pump room with a two storey battery energy storage system (435.56sq.m) over a single level basement that will contain a sprinkler system, water tanks and pump room that will serve the overall permitted development as granted under Ref. SD21A/0241; A single additional car parking space will be provided adjacent to the new building that will be accessed via permitted access road from Falcon Avenue within Profile Park that was granted under Ref. SD21A/0241; 2 new transformers to be located to the north of the permitted switch rooms; 1 life safety generator to be located adjacent to the permitted step up transformer compound within the site.
Detached house and septic tank.
The proposed development will consist of the internal alterations to the existing ground floor retail unit and external alterations to the Ninth Lock Road elevation through the reopening of existing blocked window openings, the formation of a new entrance doorway, and the installation of a new glazed shopfront, fascia and illuminated signage, and all associated site works.
Demolition of an existing lean-to shed and construction of a single storey domestic extension to the side and to the rear of house.
(i) A change of use from existing residential dwelling to guest house, and (ii) the provision of 1 no. accessible bathroom at ground floor level. The development includes drainage, landscaping, boundary treatments and all ancillary works needed to facilitate the development.
Alterations to previously approved, but not yet constructed development under planning Ref. Ref. (SD11A/0135 - Block A was approved as a primary health care building and will remain so; Block B was approved as a nursing home building and permission is now sought to use that building as a primary health care us; Permission is also sought for an external café and relocation of sub-station from entrance area to a position on Fonthill Road); alterations to Block A of 3,249sq.m consist of minor internal reconfiguration to stair No. 1 cores, position of lift shafts and circulation areas; alterations to Block B of 3,521sq.m (previously approved use as a nursing home) to facilitate the use as a primary healthcare centre include internal reconfiguration to provide 10 consultation rooms; 37 offices; 7 clinic rooms; 4 administration/reception; 4 large group rooms and associated ancillary uses including a new external lift and stair to car park; a total of 149 car parking spaces are to be provided for the proposed development; this includes 125 spaces at basement level including 6 accessible car parking spaces and 24 spaces at surface level including 3 accessible car parking spaces; alterations to the previously approved permission also include for 20 new bicycle parking spaces; new plant space and storage; the previously approved entrance from Boot Road/Convent Road providing pedestrian, cycle and vehicular access including previously approved landscaping, remain as approved.
Modifications to the Primary Healthcare Centre as permitted under Reg. SD11A/0135 (An Bord Pleanala Ref. PL06S.239890) and SD20A/0054 comprising of relocation of existing bus shelter on Boot Road (Bus Stop No. 3465) by c.75m northwards and construction of a new stainless steel and glass bus shelter including a double-sized internally illuminated advertising panel; Construction of an external stair core from the basement car park to surface level with associated changes to car parking layout.
1 screened bin compound to be relocated to the south-east corner of the site; 2 transformers within individual compounds and adjoining switch room (35.2sq.m) to be located to the east of the permitted data centre to replace screened transformer compound permitted to the south-east of the site; 1 new plantroom (19.8sq.m) and 1 water storage tank to be located to the west of the permitted data centre to replace previously approved fire suppression enclosure and new double gates to replace sliding gates at entrance into the permitted data centre site.
10 year permission for development consisting of removal of an existing unused waste water treatment facility on site and the erection of two data centre buildings, gas powered energy generation compound, and all other associated ancillary buildings and works; the two data centre buildings, DUB 15 and DUB 16, will comprise a total floor area of c. 33,577sq.m over two storeys; the first 2 storey data centre building (DUB15), located to the southwest of the site, will comprise 16,865sq.m data storage use, ancillary office use and associated electrical and mechanical plant rooms, loading bays, maintenance and storage space; a second 2 storey data centre building (DUB16), located to the southeast of the site, will comprise 16,712sq.m data storage areas, ancillary office use and associated electrical and mechanical plant rooms, loading bays, maintenance and storage space; both data centre buildings will reach a height of 20m; emergency generators and associated emission flues and plant are proposed in compounds adjacent to each data centre building; gas powered energy generation is proposed to the north east corner of the site to provide electricity for the proposed development; the application proposes to re-route and widen an existing watercourse constructed following an earlier planning permission; it is proposed to reroute this watercourse along the eastern and southern boundary of the site; landscaping is proposed to the south of the site to screen the buildings; fencing and security gates are proposed around the site; new access roads within the site are proposed along with 71 car parking spaces and 26 cycle spaces, bin stores, site lighting, and all associated works including underground foul and storm water drainage attenuation and utility cables and all other ancillary works; a Natura Impact Statement will be submitted to the planning authority with the application.
Provision of an establishment to which to European Communities (Major Accident Hazards involving Dangerous Substances) Regulations 2006 as amended by Chemicals Act (Control of Major Accident Hazards involving Dangerous Substances) Regulations 2015 apply, constituting a change of use; The new establishment will include all the existing and permitted buildings (SD13A/0143 as amended by SD13A/0265, SD14A/0194 as amended by SD15A/0343, SD16A/0088 as amended by AD17A/0318 & SD20A/0283, SD21A/0203 & SD21A/0288, all within an existing campus; The proposal relates to the total quantum of fuel oil to be stored within existing and permitted tanks across the existing and permitted buildings; For the avoidance of doubt no works or physical development is proposed and the application relates to an existing development which comprises or is for the purpose of an activity requiring an integrated pollution prevention and control (IE) licence.
(i) provision of a single-story extension (2.4m x 8.92m) to the front of the structure; (ii) internal works as follows: (a) plastering of internal walls with insulated lime plaster, (b) build-up of existing front window opes internally only on 1st floor level (maintaining window slats), and (c) internal layout revisions including the omission of existing partition walls/doors and provision of new partition walls at ground and first floor levels; (iii) restoration of roof slates with replacement where required. (iv) change of use of the structure from an ancillary storage building to guesthouse use to provide for 2 no. additional guesthouse suites, each inclusive of 1 no. bedroom, 1 no. living area and 1 no. bathroom; (v) The development includes all ancillary site works, inclusive of landscaping, tree-removal and drainage, necessary to facilitate the development. The proposed guesthouse will form part of the existing guesthouse use within Towerville and will result in a total of 9 no. guesthouse bedrooms provided on site. The subject building is within the curtilage of Towerville, a protected structure.
Proposed material alterations/change of use of office accommodation to part of existing first floor level to (1) extension of existing medical centre (previously granted permission ref. no. SD15a/0327), (2) a new four bedroom self-contained apartment with own door access via existing office entrance door at ground floor level. The works will utilise existing connections to foul and surface water drainage but will include the provision of a new water supply to serve the proposed apartment and all site works associated with the proposals at Tower Road Shopping Centre, Tower Road, Clondalkin, Dublin 22.
Proposed material alterations of existing shop units known as unit 1 and unit 2, the proposed alterations will include for removal of the existing party wall between the units to create a single shop unit, together with replacement of the existing shop front to unit 2, provision of new signage and all associated works.
Permission to (a) construct extension to front of existing building & (b) convert existing Laundry room to bedroom with en-suite associated with Guest House / B&B.
(i) a change of use from existing residential dwelling to guest house, (H) the provision of 1 no. accessible bathroom at ground floor level, (Hi) changes to the external elevations inclusive of the widening and lowering of existing door ope to 0.8m on the south elevation, widening of gate into courtyard to (from O.8m to 1m wide) and subdivision of an existing window opening on the north elevation of the building, (iv) internal layout revisions including the omission of existing partition walls/doors at ground and first floor levels and provision of new partition walls to facilitate new internal layouts, and (v) provision of 1 no. accessible car parking bay. The development includes all ancillary site works, inclusive of boundary treatments, landscaping and SuDS drainage, necessary to facilitate the development, at Towerville, Tower Road, Dublin 22, D22 XTS1 (a protected structure: RPS Ref: 419).
PERMISSION for development at this site at Grange Castle Business Park. The site is located within the Microsoft Grange Castle Campus and adjoining the existing substation. The development will consist of revisions to parent permission SDCC Reg. Ref. SD24A/0188W to include the following: Removal of internal mezzanine floor level (175sqm). Removal of internal staircase. Introduction of external staircase to be located adjacent the south façade and enclosed in screening panels. All other developments as permitted under the SDCC Reg. Ref. SD24A/0188W: A permitted storage facility (approx. c.401sqm and c.14m in height) and set down area to house machinery for the ongoing maintenance of the existing Microsoft Grange Castle Campus. All associated landscaping, site development works, site lighting, boundary treatments and all other ancillary works.
Microsoft Ireland Operations Ltd. intend to apply for PERMISSION for development at this site at Grange Castle Business Park, New Nangor Road (R134), Clondalkin, Dublin 22. The site is located within the Microsoft Grange Castle Campus and adjoining the existing substation. The development will consist of a storage facility (approx. c.401sqm and c.14m in height) and set down area to house machinery for the ongoing maintenance of the existing Microsoft Grange Castle Campus. All associated landscaping, site development works, site lighting, boundary treatments and all other ancillary works.
Amendments to previous grant of permission SD14A/0157. Change of use of part first floor plan to create 2 addtional bedrooms, alterations and refurbishment of existing nursing home and all associated site works.
The proposed development comprises amendments to planning permission Reg. Ref.: SD21A/0241, as previously amended by Reg. Ref.: SD23A/0035, SD23A/0203, SD23A/0291 and SD24A/0162W. The proposed amendments consist of the following: The provision of a sprinkler tank to a height of c. 11m (c. 12.8m to top of maintenance ladder) with a diameter of c. 10.1m located to the north west of the overall site; The provision of a pumphouse to the east of the sprinkler tank comprising c. 73sq.m; Security fencing and associated above ground pipework; and All associated and ancillary works.
Retention permission for the existing telecommunications compound, including enclosure and ground mounted equipment; Permission for the replacement of a 25m high lattice tower with a new monopole carrying antennae, dishes and associated equipment with ground works, including foundation (overall height of 20m, excluding lightning finial).
Kelland Homes Ltd. seeks permission for development, consisting of amendments to street design, and in compliance with condition no. 16(e) attached to planning permission Ref. SDZ22A/0010. The proposed development consists of the creation of an intimate local street/home zone and includes for all associated site development works, car parking, landscaping and public lighting etc., all on a site measuring c.0.15Ha, located at "Keepers Lock", Clonburris, Dublin 22, within the Clonburris Strategic Development Zone (SDZ). This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
Retention of existing self-service laundromat facility.
Car wash & car wash plant room with water recycling system; re-location of the main ID sign and all associated structures, drainage and site development works.
The development will consist of an attic conversion for storage with a dormer roof to the rear and all ancillary works necessary to facilitate the development.
Change of use from offices at first floor level to residential one bedroom apartment; reconfiguration of an existing layout to accommodate new apartment and a new private open space with 1.8m high timber screen on existing flat roof at first floor level and a new window and terrace door to the rear and side and all associated site development works.
Attic Conversion with front roof lights, attic yoga/storage spaceand rear dormer window bedroom extension including all associated ancillary works
Removal of existing front boundary wall and replace with new selected stone boundary wall with new extended front vehicular access opening and widen existing front driveway.
Two bedroom, single storey semi-detached house on site adjacent with converted attic for storage room with pitched roof over; shared vehicular access together with all on-site services and utilities; demolition of detached garage.
Retention permission for the removal of existing scrub plantation and for the plantation and for the placing of clean broken stone at ground level, for the creation of an overflow carparking area for work vehicles and buses and for the erection of a green mesh fence and galvanised palisade fence to the roadside (Boot Road) boundary. Full planning permission is being sought for the restoration of the existing stone wall that is adjacent to the boot road including proposed trees and all associated site works to the east of existing Green Isle Hotel, Boot Road, Clondalkin 22
Retention for Click and Collect signage in the existing Tesco car park; construction of a sheltered canopy (c. 35sq.m) in the existing car park for the purpose of providing 2 dedicated Click and Collect spaces for the existing Tesco store and all associated site development works.
The proposed development will consist of the following: 1. A new truck wash facility to the rear of the existing site. 2. A new truck refuelling station to the front of the site and 3. All of the above works along with all ancillary and associated site works necessary to complete this development.
Change of use of first floor storage area to Creche Classroom
Change from preschool and after school sessional childcare centre to full day preschool and after school childcare centre with opening times from 7:30am to 6:30pm accommodating 32 children; change of use of the indoor play area to classroom and all ancillary works.
Further alterations to an existing granted planning application (previously granted permissions Reg. Ref. S018A/0314 (ABP-304148-19); SD19A/0408; S020A/0187); alterations consist of site plan alterations; revised site boundary to suit new arrangement of additional land used as concrete yard and HGV parking; omission of an existing roundabout and provision of a road junction with an access/egress to the proposed development and to the existing business park; provision of a new boundary fence type A to the southern and eastern site boundary; associated drainage adjustments; all other details will remain as per the aforementioned granted planning applications.
The development consists of the retention of a single story pavilion structure (floor area 203 sq.m) and will consist of two proposed acoustic lobbies (floor area 11.6 sq.m) at the rear of the existing premises. The use of the pavilion structure is ancillary to the existing bar and restaurant use on the site. Permanent permission is being sought for the pavilion structure.