Planning permission for the construction of 2 no semi-detached 2 storey dwellings, including all associated site works, landscaping and SUDs drainage details, increasing a section of the side boundary wall to 1.8m in height, new vehicular access exiting onto Cloonmore Drive, Dublin 24, for each dwelling, all at the site to the side of 1 Cloonmore Drive, Dublin 24.
Construction of new front door structure to front elevation; single storey rear extension extending existing kitchen space and widening of the existing front entrance pillars with new solid gates and associated works
Aldi Stores (Ireland) Limited are applying for permission for the construction of a single storey Deposit Return Scheme (DRS) Kiosk (Gross Floor Area: 17 sq.m) including 2 no. signage panel areas for branding on the side elevation of the DRS Kiosk (1.0m x 2.0m), and all associated site development works. The development will result in the removal of 2 no. existing car parking spaces in the car park that serves the existing Aldi store at Belgard Road, Tallaght, Dublin 24 D24 VY77.
Retention to retain single storey independent unit in rear garden, and all associated site works.
Minor alterations to the existing Pastoral Centre to include the formation of a new entrance door and enlarged window on the elevation to Fortunestown Road. The provision of a community café service within the existing main room of the building and all associated works including new skylights to north & south faces of the roof & minor site works.
For the conversion of existing garage structure, new porch extension to the front elevation, new first floor extension over garage, new canopy roof alongside passage, new wall on party line on front elevation, new single storey Granny Flat Structure with new link to original house and all associated works. The Granny Flat space will consist of kitchen/living area, WC and bedroom.
Retention/change of use for existing development and shed/outbuilding; the development was originally built for residential purposes but is currently being used as a childcare facility.
10-year planning permission for Phase 2 development (Unit 4); the construction of 1 industrial/warehousing unit of approximately 14,730sq.m gross floor area (including ancillary offices and operational facilities) and up to approximately 17m in height, with rear service yard; 155 car parking spaces; 72 cycle parking spaces; water services infrastructure and sustainable urban drainage system features; 2 entrances and internal road network, which will connect to Citywest Avenue and the R136 Outer Ring Road via the internal estate road network proposed under Reg. Ref. SD21A/0150; pedestrian/cycle entrance to the south-east at Citywest Avenue; public lighting; landscaping, planting and boundary treatments throughout the development; external sprinkler tank and pumphouse; and all other necessary site and infrastructural works to facilitate the development on a site generally bound to the east by the R136 Outer Ring Road, to the south by Citywest Avenue and to the west and north by undeveloped lands subject to a Phase 1 industrial/warehousing development planning application (Reg. Ref. SD21A/0150) and having been granted planning permission for infrastructural and enabling works under Reg. Refs. SD15A/0391 (extended by SD15A/0391/EP) and SD16A/0400, and with the Phase 1 industrial/warehousing development planning application (Reg. Ref. SD21A/01.50) currently being assessed by South Dublin County Council.
The development seeking retention consists of the construction of a fence on top of the existing block wall along the side and rear boundaries of the property
Attic conversion for storage with dormer window to the rear; garage conversion for additional bedroom; rear single storey extension 'Velux' window to the side.
9 non-illuminated signs to replace existing and 1 new non-illuminated sign.
Construction of proposed first floor Extension above existing garage at gable end of house. Conversion of existing loft area and the construction of a dormer structure with window to rear roof profile also all associated site works.
Construction of single storey extension to the rear of existing dwelling comprising of open plan Kitchen/Dining and Living space.
Erect 837sq.m for 150.3 KWP of photovoltaic panels on the roof, with all associated site works.
Change of use from existing office accommodation (53.67sq.m) to new Sushi Take-Away shop consisting of new service counter with hatch to customer area at front, new internal kitchen, cold store, dry goods store & staff w.c., together with new shopfront signage to front elevation and all associated site works.
Permission sought for the retention of existing store and glasshouse at rear
The installation of 1.6m x 0.87m x 0.5m (hxlxw) pressure reduction installation and 3.25m (h) vent stack with all ancillary services & associated site works.
The development will consist of a single storey rear extension and a single storey front extension to the existing two storey terraced house and will include internal alterations
The construction of a two storey, mixed use, development consisting of a public house at ground floor level with a gross floor area of 359sqms. The public house includes internal bin storage and other ancillary rooms. The construction of 4 residential apartments (Gross floor area 374sqms) at first floor consisting of 2no. one bed units; 1no. two bed unit; and, 1no. 3 bed unit. All apartments have private space in the form of balconies with a common area at first floor for access to each apartment with access to this common area off the internal entrance lobby; internal, residential, bike storage room and bin storage room at ground floor level. The proposed development includes communal amenity spaces located to the west of the block and at first floor level; parking of 8 spaces including 1 no mobility space, 2 electric vehicle spaces and is accessed via a new vehicle entrance from the Old Belgard Road. New boundary treatments proposed along with a drop off area and wider soft and hard landscaping including a plaza area which ties into the public footpath on the Old Belgard Road; external bike parking areas within these external spaces; and, a connecting footpath to the established local centre to the north. Associated mechanical plant, PV panels at roof level, groundworks, landscaping, drainage including SUDS measures, lighting, engineering and ancillary works necessary to facilitate the development.
Footbridge from car park of university campus to Airton Close.
Demolition of single storey attached garage to side of dwelling; construction in side garden of end of terrace, two storey three bedroom dwelling with attic conversion with dormer roof to rear; new vehicular entrance and partial dishing of kerb and all associated site works.
The proposed development will consist of conversion of existing garage to living space, first-floor side extension above the existing structure, redesigned porch / entrance & ground floor extension to the rear and all associated site works.
Planning permission for attic conversion with dormer to rear roof to accommodate stairs to access attic as non-habitable storage space. Retention permission for single storey shed extension to side of existing house, Retention permission for extended vehicle access all with associated ancillary works
Two13 x 3.07m sign to existing totem and one 50 x 2.18m signage to building facade fronting Airton Road.
Demolition of side garage and building 2 new two storey dwelling houses on site, internal front garden alteration to existing vehicular access to public roadway to serve existing dwelling house. Forming new shared vehicular access to public roadway to serve the proposed 2 new dwelling houses, and all associated ancillary site works at 1 Watermeadow Drive, Old Bawn, Tallaght, Dublin 24, D24 NY7R
Demolition of side garage and building 2 dwelling houses on site (1 semi-detached, 1 detached) internal front garden alteration to existing vehicular access to public roadway to serve existing house. Forming new vehicular access on the eastern boundary to serve the 2 new houses, and all ancillary works.
Demolition of side garage and building 2 two storey dwelling houses on site, using existing vehicular access to public roadway to serve 1 new dwelling, forming 2 new vehicular access to public roadway to serve other new dwelling and existing dwelling.
Demolition of side garage and building 2 new two storey dwelling houses on site, each new dwelling containing 1 family flat unit, using existing vehicular access to public roadway to serve 1 new dwelling house. Two new vehicular access to public roadway to serve other new dwelling house and existing dwelling house. All associated ancillary site works.
Demolition of the existing entrance porch and single storey converted garage to side; construction of a new single storey extension to front, side and rear; rooflight to side; front gate and associated external works.
A bicycle storage unit to accommodate 75 no. bicycles to be located within the TU Dublin Tallaght campus, on an area of existing hardstanding to the east of the Main Campus Building and to the west of the Quad, along with all associated site works and services. The bicycle storage unit will be an enclosed, covered single-storey structure. The gross development floor area of the unit will be 101 sqm.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
Change of use of 2 existing ground floor retail units to a Day Service Centre; new internal partitions to accommodate meeting rooms; open plan learning spaces and toilet and staff facilities; external works comprise replacement of the existing shopfront at ground floor level incorporating new windows, doors, fascia and signage.
Ground floor extension to side and rear to provide kitchen, wc, utility and living room with bay window to front elevation; first floor extension to side to provide single bedroom and en-suite double bedroom and associated site works.
Permission for an original historic mural on the gable wall of John O'Leary's Solicitors
An original historic mural on gable wall facing the Old Bawn Road. The mural has been funded by SDCC Arts Department in their 2022 Scheme.
Internal alterations to the existing office at first floor level and a change of use of the 2 existing ground floor retail units at the rear of the property into a single licensed restaurant premises; comprising of external alterations to the rear elevation including new restaurant and office signage and shop frontage, replacement of all opes, 3 restaurant entrances - 1 at Old Bawn Road and 2 at Courthouse Square; 1 office entry (existing) at Courthouse Square; use of external paved area onto Courthouse Square as restaurant seating, bicycle parking facilities; internal alterations include the removal of existing stairways; removal of existing retail unit dividing wall; removal of existing internal partitions to first floor provision of restaurant customer and staff sanitary facilities and services at first floor level; provision of office sanitary facilities and services at first floor level; following a recently approved planning application for alterations to the Old Bawn Road elevation including a new shopfront and provision of a single office premises at ground floor level, Reg. Ref. SD19A/0013.
Permission to change the use of Unit 3 of Block 2, from retail to a medical practice as well as permission for associated signage area and all associated works to complete the development.
Change the use of Unit 1 of Block 3 to a veterinary clinic as well as permission for signage areas. Retention of a new entrance door on Block 3; sub-division of Unit 1, Block 2, in to two units (1a and 1b) and the change of use to a barber (Unit 1a) and takeaway (Unit 1b); new signage zones; all associated works to complete the development.
Installation of site services including the construction of a new gravity foul sewer, foul pumping station and rising main discharging to the public sewer, connection to the public watermain, boundary landscaping and planting treatments including removal of central hedgerow, provision of 'green link' path. Installation of a sub-surface collector drain and infilling of central dry drainage channel. Vehicular and pedestrian/cyclist access points, internal road commencement (details as marked on submitted plans) and all ancillary development works as necessary to facilitate future development at this site.
Retention for single storey building to rear garden for home office / playroom use and all associated site works.
Change the use of Unit 3 of Block 3 from retail to office space (155sq.m gross floor area excluding shared lobby of 34sq.m); signage zones related to the office use; all associated works to complete the development; signage zones located on the fascias of the ground floor retail Unit 2 and two internally illuminated, projecting pharmacy 'cross' signs, for a pharmacy which will be operating from the ground floor retail unit (Unit 2) of Block 3; all associated works to complete the development.
Two storey, end terrace house with new entrance; car parking in front garden and associated works.
Change of use from a Bookmakers (from last used) to a community -based Resource Centre/Wellness Centre to be operated by Dublin Vineyard CLG. Internal alterations and modifications, including removal of internal walls and part levelling of floors to assist with achieving universal access. New hardwood sign fitted to the existing signage frame. Replacement of the two external doors to the street with new painted hardwood doors.
Change of use of existing bookmakers to a café; opening hours Mon - Fri 8:00am - 12:00am, Sat - Sun 12:00pm - 12:00am including raising the height of the front entrance door.
For the construction of new dormer structure to the rear and conversion of attic space with en-suite and associated works.
Planning permission for conversion of attic to non-habitable storage space with partial Extension of ridgeline to accommodate a contemporary dormer to rear roof. Single Storey extension to rear of existing house, single storey porch extension and extended bay extension to front of existing house all with ancillary works
Planning Permission for the Demolition of existing Garden Shed and proposed creation of new work from home office/ home gym and garden toom to the rear of existing dwelling
Demolition of the existing single-storey c. 2,605sq.m. Junior School building; demolition of the existing single-storey c. 211sq.m. Junior School ancillary structures; construction of a new part three/part two-storey c. 4,998sq.m - Junior School building, located to the west of the existing Senior School building. The new school will accommodate 27 classrooms, a 3-class base Special Education Needs facility and all ancillary accommodation (the Senior School does not form part of planning application); 2 single-storey temporary accommodation units, c. 400sq.m, located to the south of the site, to facilitate the construction of the new school building; renewable energy design measures, PV Panels and/or heat pumps located at roof level; new school signage comprising wall-mounted lettering on the front elevation of the new building; external hard play area and 2 Multi-Use Games Areas; all located to the south of the site; redevelopment of the existing staff car parking and set-down facilities within the school site comprising: provision of 40 Junior school staff car parking spaces and 6 car set-down spaces, resurfacing of 22 existing Senior school car parking spaces, 106 bicycle parking spaces, new access road, new footpaths, landscaping and all ancillary site works; boundary treatment comprising of repair works to the existing low-level blockwork wall and new metal railings to an overall height of 2.4m along Fortunestown Road; replacement of the existing palisade fencing with new 2.4m high railings along Kiltalown Park Rd to the south; replacement of the existing pedestrian and vehicular entrance gates; works in the public road outside the school site: including 5 set-down spaces along Fortunestown Road, and services connection required to facilitate the development.
The development consists of a first-floor side extension with tiled hip roof and parapet with roof light, attic conversion with dormer roof and windows to the rear, tiled canopy to the front elevation, two roof lights to the front of the existing roof, internal alterations, and all associated site works.
Development on a site of c. 0.008 ha located West of the SSR Building of the TU Dublin Tallaght Campus. The development shall consist of the construction of a M&E plant area (28m2) comprising an enclosed pump house and external water tank with 2.4m high screen fencing surround.