Internal separation of the house and associated granny flat to provide for 2 permanent houses and extension of rear garden. Part of the development site is located within the Clonburris Strategic Development Zone.
Internal separation of house and associated granny flat to provide for 2 permanent houses.
The proposed primary school will extend to c3,355sq.m will be 2 storeys in height and will comprise 16 no. classrooms with an additional 2 classroom Special Educational Needs Unit; a General Purpose Hall and all ancillary teacher and pupil amenities and facilities. The proposed development also provides for hard and soft play areas, including 2 no. outdoor ball courts, bicycle parking, staff car parking, vehicle drop off and set down areas. Photovoltaic Panels (PV) are proposed on roofs in addition to EV Charging Points and a packaged Biomass heating plant. The proposed development also provides for all landscaping and boundary treatments and all associated site development works. Access to the site will be via a new junction and access road off Thomas Omer Way. The new access road will run south off Thomas Omer Way and then west into the site. The proposed access road Is in accordance with the Clonburris Strategic Development Zone (SDZ) Planning Scheme and incorporates public lighting, footpaths and cycle tracks. A further pedestrian / cycle only connection to Thomas Omer Way ls also proposed along the western green corridor, west of the proposed school building.
The development consists of the retention and completion of revisions to a section of the northern site boundary comprising the omission of the pedestrian/cycle access (consisting of ramp and stairs) off Thomas Omer Way and the repositioning of the pedestrian access c. 6 m in an easterly direction to co-join with the permitted vehicular access. The amendments do not involve any changes to the position of the permitted vehicular access itself and the access road remains in accordance with the Clonburris Strategic Development Zone (SDZ) Planning Scheme. Permission is also sought for the relocation of bicycle parking areas within the site; revisions to the permitted boundary treatment along a section of the eastern site boundary; the installation of 3 no. flagpoles in the south-eastern part of the site; and revisions to the site compound including repositioning of bin store area and replacement of previously permitted bio-mass heating with new heat pump and gas storage tank.
The development will consist of Extension and refurbishment of existing dwelling to include construction of single-storey extensions to front and rear, alterations to roof to include dormer roof structure to rear of existing roof to create new storage space in attic, new roof light windows to front of roof, alterations to existing internal layout, alterations to front, side and rear elevations and all associated site works. The development is proposed to be completed in phases as follows (1) The rear extension (2) The Dormer Roof Space (3) Alterations and extension to the front of the dwelling.
The development will consist of works located inside the Clonburris SDZ relating to the Stage 2 roads, public parks/open space areas and services infrastructure works (as part of a separate concurrent application) as per the Clonburris SDZ Planning Scheme (2019) to facilitate the future development of the northern part of the overall SDZ comprising: A) The construction of c. 2.3km of a new Link Street Clonburris Northern Link Street (CNLS) and approximately 800m of side streets including ancillary cycle facilities, pedestrian crossings, traffic signals, footpaths, car parking (79 no. spaces) public lighting as well as services infrastructure (including ESB, Comms, gas main, trunk surface water sewer, and watermain) and ancillary works. B) Provision/upgrade of 12 signalised junctions (5 new and 7 upgraded) as follows: Junction 1: R136 & Adamstown Avenue/Thomas Omer Way, Junction 3: R113 & Thomas Omer Way / Ninth Lock Road, Junction 4: CNLS & R136, Junction 6: CNLS, Junction 8: CNLS & R113, Junction 9: CNLS/Neilstown Road & Ninth Lock, Junction 24: CNLS/Neilstown Road & Ninth Lock, Junction 28: R136 & Adamstown Avenue/Thomas Omer Way, Junction 2: CNLS & Thomas Omer Way, Junction 5: CNLS, Junction 7: CNLS, Junction 27: R136 & Adamstown Avenue/Thomas Omer Way along with minor priority-controlled junctions are proposed along the street alignment to provide access to existing development and future development cells within the Clonburris SDZ. C) Approximately 2 km of upgrade of existing streets, including minor priority-controlled junctions are proposed along the street alignment to provide access to existing development and future development cells within the Clonburris SDZ, including pedestrian crossings. D) Provision of 2 main public parks centrally (Na Cluainte Park North) c. 2.78 ha and in the eastern part of the subject lands (c. 0.77 ha) both to include open water attenuation areas. E) Drainage infrastructure works to include surface water attenuation areas, Sustainable Urban Drainage Systems (SUDs) as well as landscaped areas including attenuation ponds and the provision of underground attenuation. Provision of surface water drainage and waste supply trunk infrastructure within the proposed road corridors; wastewater infrastructure including a foul pumping station (known as pumping station no.3) and foul pipe network within proposed road corridors to facilitate drainage connections to future development within the SDZ lands. The easterly section of the development will collect surface water and discharge into an existing outfall situated within Moorfield Walk whereas the western surface water catchment will connect (as part of a separate concurrent application) to an existing surface water outfall on the Griffeen Road (and ultimately to an existing Griffeen River outfall). F) Provision of trunk watermain infrastructure within the CNLS as well as connections to the permitted watermain infrastructure as part of SDZ20A/0021. G) Permission is also sought for all ancillary site development and landscape works associated with the development, including hard and soft landscaping, (tree pits, boundary treatments, road marking, signage, enabling works and temporary construction works, (including site accommodation, site compounds, and temporary construction boundary fencing) as well as temporary project signage (at 6 no. locations) and provision of underground utility connections under the Dublin - Cork Railway line (at 3 no. locations) and Irish water diversions. This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
Demolition of existing 7.15 sq/m ground floor rear extension, change of use of 10.8 sq/m garage to habitable space; construction of an 18 sq/m first floor side extension; construction of a 33.2 sq/m ground floor rear extension; construction of a 2.3 sq/m porch to the front of existing dwelling and conversion of attic space to storage room.
The development consists of a two-storey extension to the side, a single-storey extension to the rear, a rear dormer roof, and necessary ancillary work to facilitate the development.
Construction of new attic dormer window to the rear of existing roof; conversion of existing attic to habitable space; change existing hipped roof to mini-hipped/gable style roof and all associated site works.
Change of use for existing ground floor single storey side extension only from Doctor's Surgery to residential use. A new front porch, a first floor front, side and rear extension over existing single storey side extension, a new single storey rear extension with roof window and all associated site works.
Alterations to previously granted planning, Ref. SD20B/0488; the alterations are to remove existing side elevation wall at ground floor level; extend the front, side and rear walls by 1 metre at ground & first floor levels; extend roof to match new walls; new windows added to side & rear elevations at ground floor level; new roof window added; relocate windows to front & rear elevations at ground & first floor levels; all associated site works.
Construction of a two storey, detached three bedroom dwelling in the side garden area to include off street parking for two cars using the existing vehicular access driveway; proposed new vehicular access driveway for the existing house; ancillary site works and connections to all services.
Retention of single storey client control room (248.5sq.m) associated with the planned future substation that will be located to the north-east of the permitted data centre development granted under Reg. Ref. SD18A/0134/ABP Ref. ABP-302813-18; the development will form an amendment and modification of the permission granted for a single storey transformer building (125sq.m) under Reg. Ref. SD18A/0134/ABP Ref. ABP-302813-18; no other changes to the permission granted under this decision are proposed under this application on a site within the townland of Aungierstown & Ballybane.
Alterations to the elevations relating to planning number SD18A/0271 and as amended by further information received on the 19th December 2018.
Convert existing side garage from storage space to living space; single storey extension to the rear of dwelling with skylights; change existing hipped roof to an apex roof with gable; new roof to have a skylight to the front elevation and a new dormer window to the rear elevation; convert existing attic space to living space; widen existing entrance to accommodate off-street parking; internal alterations and all associated site development works.
The construction of a 2-storey extension and any associated site works to the south elevation of the existing engineering stores in the administration offices building which comprises of construction of circa 34sq.m area with a maximum height of 9.4m to accommodate two storey units at Grange Castle Business Park, Grange Castle, Dublin 22. The application relates to development which comprises of an activity, which requires an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1922 as amended.
For the continued use for a period of 4 years of the existing 30 metre high, free-standing lattice communications structure carrying associated communication equipment to be shared with third party operators, all within a 2.4m high palisade compound following parent permission SDZ22A/0001. The proposed development is located within the Clonburris Strategic Development Zone.
For the continued use for a period of 3 years of the existing 30 metre high, free-standing lattice communications structure carrying associated communications equipment to be shared with third party operators, all within at 2.4m high palisade compound following parent permission SD23A/0033. The proposed development is located within the Clonburris Strategic development zone
The continued use for a period of 3 years of the existing 30 metre high, free-standing lattice communications structure carrying associated communication equipment to be shared with third party operators, all within a 2.4m high palisade compound following parent permission SD18A/0378. The proposed development is located within the Clonburris Strategic Development Zone.
Construction of a Volatile Organic Compound (VOC) Abatement system comprising of a thermal oxidiser (TO), associated plant equipment and scrubbers positioned on a bunded concrete plinth with a maximum single stack height of 12m along with two access platforms at 2.5 high and 5.0m high used for maintenance only; The system is set within a 489sq.m (including a bunded area of 213sq.m) concrete compound enclosed by a 2.4m high paladin weldmesh black fence to match the existing utilities perimeter fence; 135sq.m single storey utilities workshop will sit adjacent to the Volatile Organic Compound (VOC) abatement system compound with associated hardstanding area and soakpit; 55m (L) x 3.2m (W) x 5.6m (H) pipe rack extension with the addition of a second tier extension 118.6m (L) X 3.2M (W) 1.2m (H) to the existing pipe rack is required to service the new VOC abatement system compound; a contractor's compound 3,420sq.m comprising single stacked portacabins, workshops, parking for 30 contractors, materials delivery and set down area; the compound will be enclosed by a 2.4m tall paladin weldmesh black fence; modifications to the existing internal access road will include the addition of a new access road and footpath around the VOC abatement system compound and utilities workshop; a permanent pedestrian crossing including associated signage at the existing access road giving access between the contractor's compound and the voe abatement system compound; modifications to the existing site lighting, signage, surface water, foul and process wastewater drainage, hard and soft landscaping including a 3m high planted berm to the north of the contractor's compound; An EIAR (Environmental Impact Assessment Report) will be submitted with the application; this application relates to development which comprises an activity requiring an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1922 as amended.
Conversion of existing attic space comprising of modification of existing roof structure; new gable window; new access stairs; flat dormer roof to the rear.
A new single storey ground floor extension to side & rear of property with flat & pitched roofs and new roof windows, comprising of a bedroom, en-suite, walk-in wardrobe & family room. New roof window to rear of existing roof and all associated site works.
Relocation of the existing Clondalkin RFC grounds at Gordon Park to new lands at Kingswood Farm, Moneenalion Commons Lower Clondalkin and comprising of 4 new rugby playing pitches, including a high quality main competition pitch (with modern directional floodlighting comprising 18m high floodlighting columns either side) and a high quality Junior pitch both laid approximately level, and two back pitches as well as various grassed rugby training areas all laid on existing land cross fall levels; change of use of existing agricultural shed to accommodate new two storey changing facility and storage areas; a new two storey Clubhouse Pavilion with supporting facilities including dressing rooms, physio rooms, coffee dock, committee rooms, members bar and lounge, plantroom and toilets; all associated site development sustainability and infrastructure work including connection to existing public foul sewer, SUDs, sedum roof and PV roof panels; new landscaping throughout the site comprising trees, hedges and wild flower areas; new cycle track and pedestrian access and stairs off the R136, bicycle shelter, children's playground area, electrical car charging stations, vehicle parking and new vehicle entrance off the Old Country Roadway.
New dormer roof to rear.
The development will consist of an attic conversion for storage with a dormer roof to the rear and all ancillary works necessary to facilitate the development.
Alterations to an existing house including a first floor extension to the rear
2 storey extension to side. Rear attic storage with dormer window to rear. Roof window to the front. Garage conversion for extended living.
Retention of rear dormer extension and attic conversion to existing two storey, end of terrace dwelling including: rear dormer extension with a roof light to facilitate stair access to the attic; attic conversion to include storage space and a playroom; 3 roof lights to the rear of existing roof; all associated ancillary site works.
A single storey ground floor extension to side/ rear, including, demolition of part of existing kitchen extension, removal of existing rear sheds, drainage works and a gate to existing side boundary wall, into the existing garden.
Change of use of area of single storey detached timber cabin in rear garden, previously wc (3sq.m) & timber cabin (23sq.m) to family flat (26sq.m); construction of single storey shed (5sq.m) & wc (3sq.m) in rear garden.
Demolition of an existing lean-to shed and construction of a single storey domestic extension to the side and to the rear of house.
Change of roof profile from hip end to full gable end profile to accommodate dormer extension to the rear (b) 1 No. velux roof light to front elevation (c) All associated site works.
Conversion of existing attic space comprising of modification of existing roof structure, new access stairs and flat roof dormer to the rear
A social housing development comprising of 10 one bed units in a three storey apartment building, associated car parking and bicycle parking, bin store, new vehicular access onto Old Nangor Road, new pedestrian access to replace existing vehicular entrance, landscaping, boundary treatments and all associated site and engineering works necessary to facilitate the development.
Alterations to the previously approved SD24B/0131. A first floor extension to the Front side and rear over the existing Converted Garage. Alterations to the existing hipped roof and the roof be extended over the proposed extension. With conversion of the enlarged Attic and Dormer window to the rear
An attic conversion. Alterations to the existing hipped roof and dormer window to the rear
Social housing development consisting of 10 one bed units in a two to three storey apartment building, associated car parking and bicycle parking, bin store, water pump house, new vehicular access onto Old Nangor Road, new pedestrian access onto Old Nangor Road, landscaping, boundary treatments, public lighting and all associated site and engineering works necessary.
(i) Partial demolition of the existing boundary wall; (ii) provision of a new vehicular entrance accessed off Convent View; (iii) associated driveway works; (iv) construction of a new dividing boundary wall and (v) all ancillary works inclusive of dished kerbing, landscaping boundary treatments, necessary to facilitate the development. Outline Permission is sought for: (i) Construction of 1 detached single storey dwelling, and associated drainage, to the side (north) of existing dwelling at 1 Convent View, Boot Road, Clondalkin, Dublin 22. (D22 YV78).
Demolition of the existing side extension 34sq.m; New side/rear extension to be built (rear extension to be two-storey), total new extension 72sq.m.
Two bedroom, single storey semi-detached house on site adjacent with converted attic for storage room with pitched roof over; shared vehicular access together with all on-site services and utilities; demolition of detached garage.
Change of use of first floor storage area to Creche Classroom
Change from preschool and after school sessional childcare centre to full day preschool and after school childcare centre with opening times from 7:30am to 6:30pm accommodating 32 children; change of use of the indoor play area to classroom and all ancillary works.
Kelland Homes Ltd. seeks permission for development, consisting of elevational changes and alterations to an apartment building (known as Block A) permitted under Ref. SDZ22A/0010. Permission is sought to (I) replace previously approved recessed balconies on the east and west facades with proposed cantilevered balconies and associated elevational and internal amendments, (ii) incorporation of ESB substation & meter room into the ground floor plan of the building and associated internal modifications, (iii) revisions to external materiality, and (iv) all associated site development works, car parking, open spaces & landscaping etc., all on a site measuring c.0.27Ha, located at "Keepers Lock", Clon Burris, Dublin 22, within the Clon Burris Strategic Development Zone (SDZ). This application is being made in accordance with the Clon Burris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clon Burris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
Removal of two existing prefabricated classrooms and construction of a four classroom, two storey extension to the west of the existing school buildings, together with connections to services and all associated site works.
Planning Permission for (1) The construction of 1no. 3 bedroom 5 person detached two storey pitched roof dwelling (no 18A St Johns Road) located within side garden of existing dwelling (no 18) and fronting onto St Johns Road (2) New vehicular entrance of the public road to provide off road parking and (3) Connection to all public services and all necessary ancillary site development works to facilitate this development. Note: Demolition of the existing garage attached to the side of the existing dwelling is as per previous Planning Ref: SD23B/0447 at18.
(1) Demolition of the existing garage attached to the side of the existing dwelling (2) Construction of a two storey pitched roof side extension, and with the two storey extension projecting beyond the rear of the existing dwelling (3) Single storey flat roof rear extension for the width of the existing dwelling (4) Internal alterations at ground and first floor level within the existing dwelling to facilitate the new extension (5) increased width vehicular entrance of the public road to provide additional off road parking and (6) all necessary ancillary site development works to facilitate this development
Planning Permission for (1) Construction of a two storey pitched roof side extension to the existing dwelling (2) Construction of a single storey flat roof rear extension to the existing dwelling and extending for the width of the two storey extension. (3) Works to the existing house (a) Internal alterations at ground and first floor level to facilitate the new extension (b) Alterations to existing ground floor window on the front elevation (4) Increased width vehicular entrance of the public road and (5) All necessary ancillary site development works to facilitate this development
Parking area to the front with dropped kerb for access; new folding wrought iron gates in keeping with the existing.
Construction of a new detached single storey pitched roof shed building within the rear garden off the existing house. Part of the new shed building will be used as a home office. Connections to all services and all necessary ancillary site development works to facilitate this development.
Demolition of existing shed structure. Creation of a new vehicular entrance 3.5M in width. Construction of a single storey extension to the front, side and rear of the existing dwelling including an ancillary family dwelling unit, porch to the main entrance of the existing dwelling and extension to the main dwelling to the rear. All associated site, internal alterations, drainage and landscaping works.