Demolition of side garage and building 2 two storey dwelling houses on site, using existing vehicular access to public roadway to serve 1 new dwelling, forming 2 new vehicular access to public roadway to serve other new dwelling and existing dwelling.
Demolition of side garage and building 2 new two storey dwelling houses on site, each new dwelling containing 1 family flat unit, using existing vehicular access to public roadway to serve 1 new dwelling house. Two new vehicular access to public roadway to serve other new dwelling house and existing dwelling house. All associated ancillary site works.
The development will consist of the installation of approximately 658.63 sq.m of Photo-Voltaic Solar Panels onto the existing roof. The solar panels will be used to create green electricity, all of which will be used by building.
Extension of an existing warehouse by approximately 1,685sg.m and the addition of 1 loading dock, extension of existing loading yard and upgrade of 11 parking spaces for E.V charging, 2 spaces to accessible parking spaces, and the addition of 35 covered bicycle parking spaces all on a site of approximately 1.6 hectares in the townland of Fortunestown.
1 no. 6.25m wide x 2.5m high internally illuminated sign to be mounted on existing front (east-facing) elevation of B&Q premises.
Construction of single storey granny flat to the side of existing 2 storey dwelling consisting of bedroom, WC and living area and all associated works.
Construction of additional floor area of 192.43sqm to existing warehouse and office building of 1658.44sqm, alterations to layout of 152.11sqm of existing warehouse and alterations to existing parking layout to accommodate disabled parking. New first floor of 169.75sqm internally in existing warehouse, internal alterations at ground level, 2 storey extension to southern elevation of existing warehouse to accommodate new entrance lobby and all associated site works.
The development consists of a first-floor side extension with tiled hip roof and parapet with roof light, attic conversion with dormer roof and windows to the rear, tiled canopy to the front elevation, two roof lights to the front of the existing roof, internal alterations, and all associated site works.
The development will consist of (a) the removal of the existing fascia signage, (b) the installation of green powder coated aluminium cladding panels overlaid on the existing shopfront, (c) the installation of a new double glazed Crittall framed glazing and entrance door complete with repairs to the shopfront, (d) the installation of new internally illuminated fascia signage, (e) the installation of a new internally illuminated projecting sign and (f) all associated site works.
For the construction of new dormer structure to the rear and conversion of attic space with en-suite and associated works.
The use of an existing shed of c. 5m2 in the rear garden as a dog grooming parlour
Construction of proposed first floor Extension above existing garage at gable end of house. Conversion of existing loft area and the construction of a dormer structure with window to rear roof profile also all associated site works.
Demolition of single storey attached garage to side of dwelling; construction in side garden of end of terrace, two storey three bedroom dwelling with attic conversion with dormer roof to rear; new vehicular entrance and partial dishing of kerb and all associated site works.
2 prefabricated units for use as an office (31.5sq.m) and a canteen (23.3sq.m) located adjacent to the existing permitted Retail Shop (Ref. SD16A/0239) within a 0.0125 hectare application area at the existing quarry.
Front side and rear first floor extension with flat roof over for extended living accommodation; rear ground floor extension with flat roof over for extended kitchen and living room accommodation.
Attic conversion with dormer roof window on rear slope of roof and window in gable wall at attic level.
Extension to side and rear and internal alterations and upgrade of existing group residence with related care facilities for accessible bedrooms and bathrooms and all associated site works
Conversion of existing attic space comprising of modification of existing roof structure, removal of chimney stack, new access stairs and flat roof dormer to the rear.
Installation of site services including the construction of a new gravity foul sewer, foul pumping station and rising main discharging to the public sewer, connection to the public watermain, boundary landscaping and planting treatments including removal of central hedgerow, provision of 'green link' path. Installation of a sub-surface collector drain and infilling of central dry drainage channel. Vehicular and pedestrian/cyclist access points, internal road commencement (details as marked on submitted plans) and all ancillary development works as necessary to facilitate future development at this site.
Change of use of existing open plan 997sq.m shell and core retail unit to the use as a spa/recreational facility to include swimming pool area; relaxation areas; treatment rooms; associated office/administration areas; changing facilities; internal dining/restaurant area; associated kitchen facilities; plant areas; associated ducting/extraction vents with associated elevational changes; connections to all services and site development works; new internal mezzanine floor to provide additional 602sq.m at new first floor level and on-street bicycle parking outside the building for 18 bicycles at the corner of Abberley Square and Abberley Square East.
The development will consist of a single storey rear extension and a single storey front extension to the existing two storey terraced house and will include internal alterations
Change of use of a vacant unit to four one bedroomed apartments.
Alterations to previously approved design (Reg.Ref:SD25A/0001W) comprising modified internal apartment layouts, additional window/door ope to terraces in Apts 1 & 2, fenestration alternations to southern and eastern facades, additional floor area to Apt. 4 to northern elevation, additional of 2 no. AOV's to roof level and all associated site works.
Retention permission for a single-storey, flat roof structure in the private rear garden for use as a small dog grooming business, and all associated works necessary to facilitate the development.
Demolition of all existing 1-3 storey industrial/commercial structures on the site (c. 5,500 sq.m). Construction of a 1-4 storey Transitional Care Facility (c.11,747 sq.m.) providing therapy and treatment space and a pharmacy and general practitioners space at ground floor level and 171 no. bedspaces at 1st to 3rd floor levels. 2 no. internal landscaped areas are provided at ground floor level (c.440 sq.m) and 2 no. outdoor amenity areas are provided at 1st floor level (c.483 sq.m). Provision of a coffee dock area, hairdresser, comms rooms, toilets, staff changing facilities, kitchen area, laundry rooms, lobbies/reception areas, admin areas, storage spaces, staff canteen, LV switch room, mains/ sprinkler tank room/ boiler room, multipurpose rooms, dining rooms, meeting and office rooms, sluice rooms, nurses stations, ancillary refuse storage area, ancillary generator, ancillary ESB substation and switch room associated with the operation of the facility throughout. Provision of Stair/lifts, photovoltaic panels, mechanical plant and green/blue roofs associated with the operation of the facility throughout. Partial provision of the pocket park identified in the Tallaght LAP (c.1,500 sq.m). Provision for the relocation and upgrade of the existing vehicular and pedestrian access point along First Avenue for servicing and staff parking and relocation and upgrade of the existing vehicular and pedestrian site access point along Cookstown Road. Provision of signage on the southern, eastern and northern facades of the proposed building and associated totem signage. All associated site development works above and below ground, services provision, connection to water supply and foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, attenuation/bioretention systems, provision of internal roads and footpaths, tree removal, bicycle storage (60 no. total spaces), staff and visitor car parking (55 no. total spaces) and 3 no. set down/ loading bays.
Demolition of all existing 1-3 storey industrial/commercial structures and small cafe on site totalling c.5,500sq.m in area; construction of a 1-5 storey nursing home/step-down facility (131 bedspaces) over partial basement (total floor area c.6,743sq.m) with central courtyard (c.519sqm); construction of a deck-access apartment development comprising 139 residential units arranged in 2 blocks (Block A - 8 storeys and Block B - 5 to 6 storeys) with a total floor area of c.10,556sq.m excluding deck access (c.1,141sq.m); 2 commercial units comprising a cafe and pharmacy located at ground floor level facing Cookstown Road in residential Block A ( c.292sq.m in area); the residential development consists of 67 one bed/two person units, 12 two bed / three person units and 60 two bed/4 person units with north, south, east and west facing balconies throughout and residents amenity area at ground floor level; central communal open space (c.1,272sq.m); the basement serving the nursing home consists of a sprinkler tank and pump rooms, tank room, plant room and workshop; provision of dining and kitchen areas, siting/family rooms, activity rooms, coffee dock, hair salon, oratory, lobbies/reception areas, ancillary offices and staff areas, stores, toilets, shower/changing facilities, ESB substation, generator, switch room, service yard and waste areas serving the nursing home; provision of an ESB substation, switchboards, waste areas, water tanks and generator serving Blocks A and B; lobbies, stair/lifts, photovoltaic panels and green roofs throughout; partial provision of the pocket park identified in the Tallaght LAP (c.1,165sq.m); new vehicular access from First Avenue and egress onto Cookstown Road via a one-way system through the subject site; entrance signage on the eastern elevation of the proposed nursing home; all associated site development works, services provision, connection to the water supply, foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (307 spaces), car parking (42 spaces), set-down parking spaces including 1 ambulance space serving the nursing home and delivery/loading areas to Cookstown Road and First Avenue.
Construct a single storey flat roofed kitchen extension to the rear of my property and a single storey pitched roofed side extension (granny flat side) and associated site works.
Demolition of all existing 1-3 storey industrial / commercial structures and small café on site totalling c.5,500sqm in area; - Construction of a deck-access apartment development comprising 123 residential units arranged in 2 no. blocks (Block A 5 to 7 storeys and Block B 5 to 6 storeys) with a total floor area of c.9,806sqm including the proposed bike shelter (c.93sqm) and excluding deck access (c.901sqm); -Commercial floor space located at ground floor level facing Cookstown Road in Residential Block A (c.421sq.m); - The residential development consists of 58 no. 1 bed/2 person units, 12 no. 2 bed/3 person units and 53 no. 2 bed/4 person units with north, south, east and west facing balconies throughout and residents amenity area at ground floor level; -Central communal open space (c.1,303sq.m); -Provision of an ESB substation, switchboards, waste areas, water tanks and generator serving Blocks A and B; -Lobbies, stair/lifts, photovoltaic panels and green roofs throughout; -Partial provision of the pocket park identified in the Tallaght LAP (c.1,286sq.m); -New vehicular access from First Avenue and egress onto Cookstown Road via a one way system through the subject site; -All associated site development works, services provision, connection to the water supply, foul and surface water networks on First Avenue and Cookstown Road including partial diversion of the foul line to the north east of the site at First Avenue, temporary foul pump station. attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, pedestrian facilities/public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (302 no. total spaces) comprising 276 no. spaces (serving proposed mixed use development) and 26 no. spaces (serving concurrent transitional care facility application), car parking (32 no. total spaces) comprising 15 no. spaces (serving proposed mixed use development) and 17 no. spaces (serving concurrent transitional care facility application), 2 no loading bays (one each on First Avenue and Cookstown Road), 2 no. setdown/loading areas to the internal road and 1 no. ambulance setdown space serving the adjacent concurrent proposed Transitional Care Facility. The concurrent application has been made to South Dublin County Council regarding a 131 bed Transitional Care Facility on the western portion of the site (SDCC Ref SD22A/0361 refers) currently under appeal to An Bord Pleanála (ABP Ref 317394).
Demolition of all existing 1-3 storey industrial/commercial structures and small cafe on site totalling c.5,500sq.m in area; Construction of a 1-5 storey Transitional Care Facility (step-up/step-down) providing 131 bedspaces over partial basement (total floor area c.6,743sq.m) with central courtyard ( c.519sq.m ); The basement consists of a sprinkler tank and pump rooms, water tank room, plant room and workshop; Provision of dining and kitchen areas, siting/family rooms, activity rooms, coffee dock, hair salon, oratory, lobbies/reception areas, ancillary offices and staff areas, stores, toilets, shower/changing facilities, ESB substation, generator, switchroom, service yard and waste areas serving the facility; Lobbies, stair/lifts, photovoltaic panels and green roofs throughout; Partial provision of the pocket park identified in the Tallaght LAP (c.1,286sqm); New vehicular access from First Avenue and egress onto Cookstown Road via a one-way system through the subject site; Entrance signage on the eastern elevation of the proposed facility; All associated site development works, services provision, connection to the water supply, foul and surface water networks on First A venue and Cookstown Road including partial diversion of the foul line to the north east of the site at First A venue, temporary foul pump station, attenuation/bioretention systems, vehicular and pedestrian access including internal road and footpaths, interim pedestrian facilities/public realm upgrade works, landscape and boundary treatment works, tree removal, bicycle storage (76 total spaces), car parking (32 total spaces), set-down parking spaces, 1 ambulance set-down space serving the facility and delivery/loading areas to First A venue.
For the conversion of existing garage structure, new single storey front extension with porch, new single storey rear extension, new first floor extension over garage, new dormer attic structure, internal ground and first floor modifications and all associated works. Works also include gate to existing vehicular access and new vehicular access and associated dishing of kerbing
Attic conversion incorporating dormer extension to rear and 3 'Velux' rooflights to the front; two storey extension to side; all associated site works.
Construct a two bedroom single storey detached dwelling house, area 68.3sq.m with a new vehicular entrance area and associated site works.
Retention Permission for ground floor front and rear extensions with pitched roof.
Source EV Ireland Ltd. intends to apply for permission for development of an Electric Vehicle (EV) Charging Station at Belgard Retail Park, Belgard Road, Tallaght, Dublin 24, a site of ca. 0.035ha. The development will consist of 5 no. EV charging stations, each serving 2 no. vehicle charging bays, a total of 10 no. charging points. The charging bays will be located in the existing car park replacing 12 no. standard parking bays with 10 no. EV charging bays. The proposed development will utilise an existing, ancillary storage building to house an Medium Voltage (MV) switch room linked to an adjacent ESB substation to service the proposed development, the charging bays will utilise existing established access & egress and includes all other associated above and below ground ancillary works.
A new two storey end of terrace dwelling house with concrete tiled roof and external finishes to match existing: new driveway and vehicular access: new dished section footpath for vehicular access and associated site works.
First floor extension at front and side of dwelling over an existing single storey kitchen and study at side; new velux window in existing rear roof plane; all associated site works.
Planning permission sought for a new two storey end of terraced dwelling to the side of the existing two storey dwelling with concrete roof tiled & external finishes to match existing; new driveway with new vehicular access with dished footpath & associate site works.
Two bedroom, double storey house.
Application for planning permission for a development at this site at Inis Thira, Oldman, Tallaght, Co. Dublin. The application is for a new 4-bedroom two-storey detached dwelling on an existing vacant site, along with all associated site development, facilitating works.
Provision of a ground floor extension only to the front of the property and all associated site works.
Conversion of attic to habitable room; provision of dormer extension to rear roof; 2 rooflights to front roof and all associated site works.
New storage and maintenance shed (780sq.m); An extension to the existing laboratory (281 sq.m); A new enclosed HVO generator with transformer and fuel storage tank (internally bunded) on a concrete plinth (156sq.m), all within a 0.3 hectare application area at the existing quarry.
Alterations and extensions to our dwelling, to include a 19sqm GF extension to the front, side and rear elevations. Also for side pedestrian access together with all ancillary and associated site works.
Three storey apartment building containing six apartments with external terraces/private gardens (3 x two bed & 3 x three bed duplex) & one end of terrace two storey house (two bed), landscaping of site and play area, footpath, bin stores, eight car parking spaces, eighteen bicycle parking spaces and all associated site works.
Change of use from office to medical/dentist use with revisions to front elevation.
Extension of an existing telecommunications lattice tower (providing new overall height of 31.5 metres) carrying existing antennas, dishes and associated equipment and additional new antennas, dishes and associated equipment together with new ground equipment cabinets, new fencing and all associated site development works.
Retention of single storey extension with all associated site works.
The development will consist of: I. 384 residential units with a cumulative gross floor area of 33,190.15 sq.m comprising: a) 122. houses, consisting of 28 two-bed units, 83 three-bed units and 11 four-bed units, ranging in height from 2-3 storeys. b) 84 duplex units, consisting of 48 one-bedroom units and 36 three-bedroom units, ranging in height from 2-3 storeys. c) 178 apartments consisting of 43 one bedroom units and 135 two-bedroom units, ranging in height from 5-7 storeys. II. tenant amenity floorspace with a gross floor area of 139 sq.m. III. 1.49 ha of public open space including a public plaza and 0.15 ha of communal amenity space; IV. the provision of a childcare facility with a gross floor area of 239 sq.m and associated play area; V. the provision of 361 car parking spaces, including 10 disabled parking spaces and 16 reserved for visitor parking and 3 reserved for creche staff. VI. the provision of 734 bicycle parking spaces, including 472 residents bicycle parking spaces and 262 visitor cycle spaces. VII. vehicular access is proposed via 3 access points including the existing Kingswood roundabout on Citywest Avenue to the north, The Walk to the west and from the park and ride access road at the eastern end of the site. Dedicated pedestrian/cyclist links are proposed throughout the site. VIII. ESB substation, 3 x ESB kiosks, rooftop solar photovoltaics, landscaping and all ancillary site and development works.
Conversion of attic space to non-habitable space with dormer window to side & 'Velux' rooflights to rear of existing dwelling and associated site works.
Change of use, and associated internal works, of part of the existing building (167 sq.m. approx.) from warehouse to part workshop/light industrial (89 sq.m. approx.) and part water sampling hub (78 sq.m. approx.) to facilitate the overall use of the building as an Uisce Éireann Operations Centre; the provision of a window and security shutter on the north eastern façade of the building; the provision of a wash bay and 4 No. materials bunkers in external yard area; 2 No. replacement vehicular gates; a new pedestrian gate; Uisce Éireann signage on front (southwest) elevation; external air handling unit on northwestern side of building; and associated site development and drainage works.