Single storey side and rear extension; all associated site works.
10 year permission for roads and drainage infrastructure works as approved under the Clonburris Strategic Development Zone Planning Scheme (2019) to form part of the public roads and drainage networks providing access and services for the future development of the southern half of the overall Strategic Development Zone (SDZ) lands; the roads infrastructure works are for the construction of c. 4.0km of a new road, known as Clonburris Southern Link Street, generally consisting of 7m wide single carriageway, plus on either side of the carriageway landscaped verges, 1.75m wide off-road cycle tracks and 2m wide footpath including public lighting, trees, 288 on-street car parking spaces (including 26 disabled parking spaces), pedestrian crossings, bus stops, a number of vehicular access spurs to facilitate future development of adjoining lands, a total of 8 new junctions (including 3 junctions to facilitate future road developments within the SDZ; 2 junctions with proposed local access roads and 3 new junctions with Hayden's Lane, Lynch's Lane and Ninth Lock Road) and alterations to 4 existing junctions on Newcastle Road (R120), Grange Castle Road (R136), Fonthill Road (R113) and also to the existing access road to Park and Ride facilities at both Kishoge Station and at Fonthill Station; alterations to the existing public roads Newcastle Road (R120), Hayden's Lane Access Road, Hayden's Lane, Lynch's Lane, Grange Castle Road (R136), Fonthill Road (R113) and Ninth Lock Road arising from new junctions with the Clonburris Southern Link Street consisting of reconfiguration of a c.165m long section of Newcastle Road (R120) including road widening and revisions to layout of junction with Hayden's Lane Access Road; incorporation of Hayden's Lane Access Road into proposed Clonburris Southern Link Street; provision of new junction with Hayden's Lane and Clonburris Southern Link Street; incorporation of a c. 26m long section of Lynch's Lane into proposed Southern Link Street and provision of a new junction with Clonburris Southern Link Street; reconfiguration of a c. 260m long section of Grange Castle Road, including road widening and replacement of existing roundabout with signalised junction; reconfiguration of a c. 250m long section of Fonthill Road, including road widening and replacement of existing roundabout with signalised junction; reconfiguration of a c.125m long section on Ninth Lock Road including road widening and provision of a new junction with Clonburris Southern Link Street; construction of 2 local access roads, consisting of c. 110m long road extending north from Clonburris Southern Link Street and providing access to proposed foul pumping station and generally consisting of a 6m wide single carriageway plus on either side of the carriageway 2m wide footpath including public lighting, 2 set-down parking spaces and vehicular access to proposed foul water pumping station; north/south Link Street (c. 240m in length) extending north from southern Link Street to the Kildare-Cork railway line and generally consisting of a 7m wide single carriageway plus on either side of the carriageway 1.3m wide landscaped verge, 1.75m wide off-road cycle lane, 2m wide footpath including public lighting and 2 vehicular access spurs to facilitate future development of adjoining lands; the drainage infrastructure works include 8 attenuation systems (with outfalls to Griffeen River, Kilmahuddrick Stream and existing storm sewers) including 4 ponds, 2 modular underground storage systems and 2 detention basins combined with modular underground storage systems all adjacent to proposed Clonburris Southern Link Street; surface water drainage culverts to existing watercourses; flood water compensation area adjacent to Griffeen River; surface water drainage and water supply trunk infrastructure within proposed road corridors; wastewater infrastructure including a foul pumping station and pipe network within proposed road corridors to facilitate drainage connections to future wastewater drainage infrastructure within the adjoining SDZ lands (including future Irish Water pumping station) and to connect to the existing sewer network in Cappaghmore housing estate; ducting for public electrical services and utilities and the diversion of existing utilities is provided for within the proposed road corridor; Permission is also sought for all ancillary site and development and landscape works associated with the development including hard and soft landscaping, boundary treatments, road markings and signage, enabling works and temporary construction works (including site accommodation, site compounds and temporary boundary fencing); the application is made in accordance with Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Zone Planning Scheme Area as defined by Statutory Instrument No. 604 of 2015; an Environmental Impact Assessment Report accompanies the application.
Construction of a temporary logistics and storage facility within the Clonburris NorthWest Development Area of the Clonburris Strategic Development Zone (SDZ) Planning Scheme 2019. The facility includes the provision of a logistics facility comprising a warehouse (single story pitched roof c.11.356 meters in height) and adjoining unit (single storey pitched roof c. 6.22m in height) with a combined Gross Floor Area of 1,411sq.m; The provision of a single-storey ancillary office and staff facilities to include an office (25sq.m), canteen/ changing area (24.8sq.m), and WC (9sq.m); Vehicular and pedestrian access from the Fonthill Road (R113) to the east, 24 car-parking spaces, 5 HGV setdown parking spaces and turning/loading areas and 18 bicycle parking spaces; All ancillary site development works including attenuation, footpaths, lighting, landscaping boundary treatments and signage; The logistics facility will exist for a temporary period of up to 10 years to facilitate the delivery and storage of building materials throughout the construction phases of the development of the entire Clonburris Strategic Development Zone; The logistics facility will not be open to the general public; This application is being made in accordance with the Clonburris Strategic Development Zone Planning Scheme 2019 and relates to a proposed development within the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015 all on wider lands bounded generally by Thomas Omer Way (L 1059) to the north, the Dublin-Cork railway line to the south, the Fonthill Road (R 113) to the east and undeveloped lands to the west.
Two storey side extension consisting of ground floor car garage and store with first floor ensuite bedroom.
A two storey side extension (74.83 sq.m) Associated site works
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window, new access stairs and flat roof dormer to the rear.
Change of roof profile from hip end profile to accommodate attic conversation with dormer extension to rear. 1 no. velux roof light to front. All associated site works at No. 8 Griffeen Glen Chase, Lucan, Co. Dublin.
Attic conversion to a non-habitable storage space with hip roof to gable to allow stairs access to attic with roof windows to front of existing house and frosted window to side gable all with ancillary works.
The development will consist of the proposed construction of a single-storey extension with flat roof to side + rear of existing dwelling including internal alterations and provision for wheelchair accessibility to 2 additional bedrooms and accessible bathroom at ground floor. All other associated ancillary site works included in the application.
Construction of a part two storey part single storey extension to the side and a single storey extension to the rear together with associated internal alterations.
Construction of 157 dwellings within the Clonburris South-West Development Area of the Clonburris Strategic Development Zone (SDZ) Planning Scheme 2019 consisting of, 81 houses comprising of 4 two bedroom houses, 65 three bedroom houses and 12 four bedroom houses (all two storey with associated private open space and car parking; 76 apartment units consisting of 26 one bedroom and 50 two bedroom units within Block 1 (4 storeys); Vehicular access will be provided from the permitted street under SDZ21A/0022 and the permitted Clonburris Southern Link Street (SDZ20A/0021) and R113 (Fonthill Road) to the east; All ancillary site development works including footpaths, landscaping boundary treatments, public and private open space areas, car parking (170 spaces) and bicycle parking (170 spaces), single storey ESB sub-stations, bin and bicycle stores and all ancillary site development/construction works all on wider lands bounded generally by the Dublin-Cork railway line to the north, undeveloped lands and Grand Canal to the south and undeveloped lands and the Fonthill Road (R113) to the east, in accordance with the Clonburris Strategic Development Planning Scheme Area, as defined by Statutory Instrument No. 604 of 2015.
Construction of two storey extension to the side of existing dwelling comprising of family room, shower room and utility room at ground floor level and 2no. bedrooms at first floor level. Construction of single storey extension to the rear comprising of open plan kitchen, living and dining space. Relocation of existing entrance door and revised internal layout. New access gate from rear garden on to Fforster Drive.
Extension and refurbishment of existing two storey three bedroom semi-detached dwelling of 103sq.m consisting of: new reconfigured vehicular entrance with electric gate and additional permeable paving with new single storey ground floor front; side and rear extension of 44sq.m with lean-to pitched roof and roof lights; detached single storey home office of 11.5sq.m with new rear garden side access from Liffey Crescent with landscaping to remaining 25sq.m garden area; new internal stairs to converted attic store of 24sq.m with dormer window to gable roof and associated site works.
Extension and refurbishment to existing 2 storey, 3 bedroom semi-detached dwelling of 103sq.m; new reconfigured vehicular entrance with electric gate and additional permeable paving; new internal stairs to converted attic store of 24sq.m with dormer window to gable roof; associated site works.
Single storey extension to front; Two storey extension to side; New pedestrian access to rear from side and all associated site works.
A single storey rear and side extension, minor internal alterations and all associated siteworks
To convert attic space to storage space with dormer window to the north facing roof elevation and 1 rooflight to the front west facing roof elevation and 2 rooflights to the rear elevation.
Change of use of area of single storey detached timber cabin in rear garden, previously wc (3sq.m) & timber cabin (23sq.m) to family flat (26sq.m); construction of single storey shed (5sq.m) & wc (3sq.m) in rear garden.
Change of use from offices to physiotherapy centre and fitness studio.
Construction of a two storey side extension to existing dwelling house (planning exempt single storey rear extension previously constructed); new utility; study; ensuite and bedroom with associated internal alterations.
Change of roof profile from hip end to full gable end profile to accommodate dormer extension to the rear (b) 1 No. velux roof light to front elevation (c) All associated site works.
Construction of a single storey kitchen, living room and utility room extension to side and rear of house with internal alterations to house and all associated site and drainage works.
Construction of single storey extension to the side of existing dwelling comprising of office, WC, utility and bedroom.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
Conversion of attic space to storage space in existing 2 storey semi-detached house. Erection of dormer window to the rear elevation, 3 roof lights to front elevation. Gable Dutch hip to be replaced with standard A roof design. Internally a new-stairs to the 2nd floor and the alteration of 1st floor to accommodate new floor plan layout with minor alteration to fenestration and all ancillary site works. Maintain connection to existing county council soil and surface water.
Single storey side extension and a single storey rear extension with internal modifications and all associated site works.
Single storey pitched roof extension to rear with 5 'Velux' rooflights and new stainless steel flue; new pitched roof porch extension to entrance hall; new bay window at ground floor level to front with matching windows on bedroom over; new flat roofed brick finished external store to front and adjoining rear boundary wall of no. 10 & 12 Grifeen Glen Wood and associated site works.
Conversion of existing attic space comprising of modification of existing roof structure, raising of existing gable c/w window and 'Dutch' hip and new access stairs.
Planning permission for attic conversion with dormer to rear roof to accommodate stairs to allow conversion of attic as non-habitable storage space with roof window to rear roof all with associated ancillary works
Construction of a 30.6 sq./m single storey extension to the side of existing dwelling.
12m guyed telecommunications pole, together with antennas, dishes and associated telecommunications equipment.
GROUND FLOOR EXTENSION AT THE FRONT AND SIDE OF THE EXISTING HOUSE, AND EXISTING GARAGE REFURBISHMENT TO ACCOMMODATE FAMILY FLAT, WITH MAIN ENTRANCE ALTERATION AND ALL ASSOCIATED SITE WORKS.
Conversion of attic space to new bedroom; works include alteration of front facade of dwelling and all associated site development works.
Alterations and construction of two storey extension to an existing two storey dwelling including all associated site works.
Construct dormer window to the front and rear of the existing property serving games room/domestic storage; conversion from hipped roof gable to straight roof gable and associated site works.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs and flat roof dormer to the rear
Install a new LPG Safety Installation in a caged enclosure 1.8m x 1.2m x 1.2m (LxWxH) servicing the existing LPG storage installation with all ancillary services and associated site works situated within the Clonburris SDZ (Strategic Development Zone) area.
A single storey ground floor extension to side/ rear, including, demolition of part of existing kitchen extension, removal of existing rear sheds, drainage works and a gate to existing side boundary wall, into the existing garden.
Construction of a dormer window in the main roof to the rear of the property as well as the construction of a porch to the front of the property.
Retention for pitched roof structure over side passageway.
An attic conversion with dormer window to rear and associated site works.
Construct a single storey side and rear extension (total extension area = 77.4) with internal modifications and all associated site works. Permission is also sought to demolish part of the existing house that juts out (lean-too) (5.1sq m) to the rear of the existing dwelling
Two storey side extension and a single storey rear extension (total extension area = 115.4sq.m) with internal modifications and all associated site works. Permission is also sought to demolish part of the existing house that juts out (lean-too) (5.1sq.m) to the rear of the existing dwelling.
Single storey porch extension to side of house and all associated site and drainage works.
Planning permission for a 3 bedroom detached house, demolition of existing garage, extension to rear of existing house and all associated site development works.
Construction of ground floor family flat extension to the side of existing two storey end of terrace dwelling.
Retention planning permission for single storey extension to side
Alterations to the attic storage space to include two dormer roofs to the rear, Velux roof lights to the front, internal modifications and all associated site works
Conversion of attic to non-habitable storage space to include 3 'Velux' windows to rear roof elevation; change of existing hip roof type to gable type; 1 new window in new gable wall section.
The proposed development consists of the construction of 233 no. dwellings which are comprised of: 78 no. 2 & 3 bed, 2 storey, detached, semi-detached and terraced houses, 56 no. 2 & 3 bed duplex units in 8 no. 3 storey buildings and 99 no. 1, 2 & 3 bed apartments in 2 no. 3-5 and 4-6 storey buildings. Access to the development will be from two new vehicular accesses from the Ninth Lock Road to the east and via the permitted road network i.e. the Clonburris Northern Link Street, (under Ref. SDZ24A/0033W) which provides access from the Ninth Lock Road to the east and the R113, Fonthill Road to the west. The proposed development will connect into the permitted infrastructural works as approved under the Clonburris Strategic Development Zone Planning Scheme (2019) and permitted under Ref. SDZ24A/0033W. The proposed development also provides for all associated site development works and infrastructure to facilitate the development (above and below ground), public & communal open spaces, hard & soft landscaping and boundary treatments, surface car parking (192 no. spaces), bicycle parking (351 no. spaces), bin & bicycle storage, public lighting, plant (M&E) etc.