CONSTRUCTION OF STOREY AND A HALF/DORMER DWELLING HOUSE, GARAGE, SECONDARY TREATEMENT SYSTEM AND POLISHING FILTER AND ALL ASSOCIATED SITE WORKS AND SERVICESDecision record indexed
THE DEVELOPMENT OF A TWO-STOREY DWELLING HOUSE, GARAGE, SECONDARY TREATMENT SYSTEM AND POLISHING FILTER AND ALL ASSOCIATED SITE WORKS AND SERVICES.Decision record indexed
(A) 1 NO. NEW TWO STOREY EXTENSION TO THE REAR OF EXISTING DWELLING HOUSE, THE DEVELOPMENT IS TO A PROTECTED STRUCTURE (REF 25-51) (B)DEMOLITION OF EXISTING WALL TO THE SIDE OF EXISTING DWELLING TO CREATE NEW VEHICULAR ENTRANCE, PARKING AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
DEMOLITION OF AN EXISTING HOUSE AND SHEDS, MODIFICATIONS TO THE EXISTING SITE ENTRANCE AND THE CONSTRUCTION OF A NEW DWELLING HOUSE AND GARAGE, INSTALLATION OF SEWERAGE TREATMENT TANK WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKSDecision record indexed
THE DEMOLITION OF EXISTING STRUCTURALLY UNSAFE DWELLING HOUSE AT FRONT OF SITE, TO BE REPLACED WITH 2 NO. PROPOSED 4 BED DWELLING UNITS TO MATCH EXISTING, LOCATED ON SITE OF PREVIOUSLY APPROVED PLANNING PERMISSION REF. 20/563 AND ALL ASSOCIATED SITE WORKS AND SERVICESDecision record indexed
THE CONVERSION OF EXISTING BUILDING INTO 2 SEPERATE 4 BED, THREE STOREY DWELLING HOUSES WITH REPAIRS TO THE ROOF AND REPLACEMENT WINDOWS. CONSTRUCTION OF NEW SITE ENTRANCE AND TWO NO. 3 BED, THREE STOREY SEMI-DETACHED HOUSES AND FOUR NO 3. BED, THREE STOREY TERRACED HOUSES TO THE REAR OF THE SITE, OPEN SPACE AREA, PARKING AND ALL ASSOCIATED SITE WORKS AND SERVICESDecision record indexed
THE CONVERSION OF EXISTING BUILDING INTO 2 SEPERATE 4 BED, THREE STOREY DWELLING HOUSES WITH REPAIRS TO THE ROOF AND REPLACEMENT WINDOWS. CONSTRUCTION OF NEW SITE ENTRANCE AND THREE NO. 3 BED, THREE STOREY SEMI-DETACHED HOUSES AND FOUR NO 3. BED, THREE STOREY TERRACED HOUSES TO THE REAR OF THE SITE AND ALL ASSOCIATED OPEN SPACE, PARKING AND ALL ASSOCIATED SITE WORKS AND SERVICESGrounds not yet categorised
CONSTRUCTION OF A TWO STOREY DWELLING HOUSE, SEPTIC TANK, EFFLUENT TREATMENT SYSTEM AND ALL ANCILLARY SITEWORKS AND SERVICESGrounds not yet categorised
Construct new dwelling house, domestic garage, new site entrance, septic tank treatment system, percolation area and all associated site worksDecision record indexed
CONSTRUCTION OF A DWELLING HOUSE, GARAGE, INSTALLATION OF SEWERAGE TREATMENT TANK WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKSDecision record indexed
(A) REAR SINGLE STOREY HOUSE EXTENSION (B) WINDOW STYLE & SIZES AS INDICATED (C) VELUX WINDOW TO REAR ELEVATION (D) INCREASED HEIGHT OF PORCH TO FRONT ELEVATION (E) DOMESTIC GARAGE CONSTRUCTION TO DATE. PLANNING PERMISSION TO COMPLETE CONSTRUCTION OF DOMESTIC GARAGEDecision record indexed
EXISTING GARAGE OUTBUILDING AND PLANNING PERMISSION FOR PART REMOVAL OF FRONT BOUNDARY WALL FOR NEW FRONT DRIVEWAY WITH ALL ANCILLARY SITE WORKSDecision record indexed
Townland of Clonarrow, or Riverlyons, County Offaly
A) The erection of a temporary 100m high lattice type meteorological mast which will be secured to ground anchors by stay wires and will include instruments for measuring local climate conditions, services, and associated equipment; b) A fixed red aviation light will be fitted near the top of the lattice section of the proposed meteorological mast; c) Bird flight deterrent markers fitted to each stay wire at approximately 10m intervals; and d) All associated ancillary works. The temporary meteorological mast development will remain in position for a period of 5 years after which the mast, instruments, services, equipment, and all associated ancillary works will be removed. The purpose of the meteorological mast is to accurately measure the weather conditions at this siteDecision record indexed
TWO STOREY DWELLING, ENTRANCE, GARAGE, WASTEWATER TREATMENT SYSTEM WITH RAISED BED POLISHING FILTER AND ALL ASSOCIATED SITE WORKSDecision record indexed
Construct new single storey dwelling house, proprietary waste water treatment system and soil polishing filter, new entrance, ancillary site services and all associated site worksDecision record indexed
The development will consist of the retention of a single-storey extension to the rear of the existing dwelling, including all associated site works and servicesDecision record indexed
EXISTING DAINGEAN WASTEWATER TREATMENT PLANT AT ST. MARY'S ROAD, TOWNPARKS DAINGEAN, CO. OFFALY
THE UPGRADE OF THE EXISTING DAINGEAN WASTEWATER TREATMENT PLANT AND WILL CONSIST OF THE FOLLOWING: THE CONSTRUCTION OF A NEW STORM WATER HOLDING TANK COMPLETE WITH INTERNAL CLEANING SYSTEM, INTERNAL STORM RETURN PUMPS, ACCESS STAIRS AND PLATFORM; CONSTRUCTION OF NEW SLUDGE DRYING REED BEDS COMPLETE WITH SLUDGE FEED PIPEWORK, FILTRATE RETURN PIPEWORK AND A FILTRATE RETURN PUMPING STATION; CONSTRUCTION OF NEW FINAL EFFLUENT WASH WATER PUMPING STATION; INSTALLATION OF A NEW MANUAL BYPASS CHANNEL AND GRIT CLASSIFIER ONTO THE EXISTING INLET SCREEN, INSTALLATION OF A GRP KIOSK TO HOUSE ELECTRICAL CONTROL PANEL; AND ALL ANCILLARY SITE WORKSDecision record indexed
Main Street & Gaol Lane, Townsparks, Daingean Co. Offaly
Of renovation and alterations of existing derelict dwelling at Main Street, and 4no: 2bedroom single storey semi-detached dwellings to rear of the site accessed via Gaol lane, to include carparking, boundary treatments, ancillary services and all associated site worksDecision record indexed
ERECTION OF A NEW SINGLE STOREY FAMILY RESIDENCE WITH CONNECTION TO A NEW SEPTIC TANK AND PERCOLATION AREA; THE CONVERSION OF AN EXISTING DWELLING INTO A DOMESTIC GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
(A) 1 NO. NEW STOREY AND HALF TYPE DWELLING, (B) 1 NO.NEW DOMESTIC GARAGE (C) INSTALLATION OF A NEW WASTE WATER TREATMENT SYSTEM (D) VEHICULAR ENTRANCE (E) NEW LANDSCAPING AND ALL ASSOCIATED SITE DEVELOPMENT WORKSDecision record indexed
Townlands of Ballyteige Little Ballyteige Big and Colehill Tullamore, County, Offaly
An amendment to a previously consented development (RED III) (Planning Reference 2198 by Offaly County Council) comprising of; (i) removal of the 38kV substation and infrastructure within the most northern field (Field 1), (ii) internal access track reduced from c.3.4km to c. 3.2km,relocated and tweaked to include turning areas, (iii) replacement of string inverters instead of combined central inverters and MV transformers, the central MV transformers remain, and increase from 11No. to 12 No., however there will be a reduction in their associated hardstanding areas and the number of string inverters is 128, (iv) table layout updated (reduced), (v) PV angle tilt reduced from 10º and 40º to 10º and 30º, (vi) separation area between infrastructure and OHL towers increased, (vii) an additional badger sett buffer added (viii) temporary construction compound has been relocated from Field 1 to Field 4, (ix) alter Condition No. 10 to increase the boundary fencing from 1.8m-2m high to 2.4m high and reduce in the perimeter fence length, (x) CCTV number increase from 81 to 118 and their locations have been amended, (xi) adjustment of the development period from 5 years to 10 years, and (xii) alter Condition No. 11 to change the operational lifetime from 35 years to 40 years. The planning application area comprises of 60.53hectares and comprises of a Solar PV development (i.e. a relevant solar energy development as per the Renewable Energy Directive III). This planning application is accompanied by a Natura Impact Statement (NIS). This development is covered by the provision of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall applyDecision record indexed
BALLYTEIGE LITTLE BALLYTEIGE BIG AND COLEHILL, TULLAMORE, CO. OFFALY
A PERIOD OF 5 YEARS TO CONSTRUCT AND COMPLETE A SOLAR PV ENERGY DEVELOPMENT WITH A TOTAL SITE AREA OF 60.53 HECTARES, TO INCLUDE A SINGLE STOREY ELECTRICAL SUBSTATION BUILDING, INVERTER SUBSTATIONS, MODULES, SOLAR PV GROUND MOUNTED ON SUPPORT STRUCTURES, A TEMPORARY CONSTRUCTION COMPOUND, INTERNAL ACCESS TRACKS, SECURITY FENCING, ELECTRICAL CABLING AND DUCTING, CCTV AND OTHER ANCILLARY INFRASTRUCTURE, DRAINAGE, ADDITIONAL LANDSCAPING AND HABITAT ENHANCEMENT AS REQUIRED AND ASSOCIATED SITE DEVELOPMENT WORKS RELATING TO THE ACCESS OF THE SITE. THE SOLAR FARM WILL BE OPERATIONAL FOR 35-YEARSDecision record indexed
THE CONSTRUCTION OF A 2-STOREY DWELLING HOUSE, GARAGE, INSTALLATION OF SEWERAGE TREATMENT TANK WITH PERCOLATION AREA AND ALL ASSOCIATED SITE WORKSDecision record indexed
PROPOSED SINGLE STOREY TYPE DWELLING, NEW VEHICULAR ENTRANCE, WITH CONNECTION TO THE EXISTING PUBLIC SEWER AND ALL ASSOCIATED SITE WORKSDecision record indexed
EXISTING 30M HIGH LATTICE TELECOMMUNICATIONS SUPPORT STRUCTURE TOGETHER WITH ANTENNAS, DISHES AND ASSOCIATED TELECOMMUNICATIONS EQUIPMENT AND ACCESS TRACK EXTENSIONDecision record indexed
THE DEMOLITION OF A SINGLE STOREY LEAN-TO EXTENSION TO THE REAR OF THE EXISTING TWO STOREY DWELLING, THE DEMOLITION OF TWO FARM BUILDINGS, ONE TO THE REAR AND TO THE SIDE OF THE EXISTING DWELLING, THE REFURBISHMENT OF THE EXISTING DWELLING TO INCLUDE THE RAISING OF THE ROOF, REMOVAL OF ONE NO. CHIMNEY STACK, THE INSERTION OF NEW FIRST FLOOR WINDOWS, A SINGLE STOREY EXTENSION TO THE REAR OF THE EXISTING DWELLING, THE PROVISION OF A NEW WASTEWATER TREATMENT SYSTEM AND POLISHING FILTER AND ASSOCIATED SITE WORKSDecision record indexed
CONVERSION OF EXISTING MILKING PARLOUR, DAIRY, LOOSE HOUSE AREA AND SILAGE PIT INTO A ROBOTIC MILKING AREA, DAIRY, MACHINE ROOM, FARM OFFICE, EASYFEED CUBICLES WITH UNDERGROUND SLATTED SLURRY STORAGE AND LOOSE HOUSE AREA, EXTENSION TO DRY STORE, LIVESTOCK SHED EXTENSION, SILAGE PIT, CONCRETE YARDS AND ANCILLARY WORKS. THE PROPOSED DEVELOPMENT IS WITHIN THE CURTILAGE OF A PROTECTED STRUCTUREDecision record indexed
Revised site boundaries, revised location of the house and Septic tank on site, PREVIOUS GRANTED UNDER PLANNING PERMISSION REF. NO. 24/60281 AND ALL ASSOCIATED SITE WORKS’Decision record indexed
The development will consists of PROPOSED SINGLE STOREY TYPE DWELLING, NEW VEHICULAR ENTRANCE, SEPTIC TANK SEWAGE TREATMENT SYSTEM, PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS.Decision record indexed
The development will consist of; THE CONSTRUCTION OF A DWELLING HOUSE, DETACHED GARAGE, ONSITE WASTEWATER TREATMENT SYSTEM, NEW ENTRANCE AND ALL ASSOCIATED SITE WORKS.Decision record indexed
CONSTRUCTION OF A PROPOSED TWO-STOREY DWELLING, DOMESTIC GARAGE, A PROPOSED SEPTIC TANK AND PERCOLATION AREA AND ALL ASSOCIATED SITEWORKS, INCLUDING A PROPOSED SITE ENTRANCEDecision record indexed
(A) CONSTRUCTION OF A NEW SINGLE STOREY EXTENSION TO THE REAR OF THE EXISTING SCHOOL BUILDING CONSISTING OF 4 NO. CLASSROOMS, CIRCULATION, AND ANCILLARY AREAS, (B) CONSTRUCTION OF A NEW SINGLE STOREY EXTENSION TO THE FRONT / EAST SIDE OF THE EXISTING SCHOOL BUILDING, A SPECIAL EDUCATIONAL NEEDS AREA CONSISTING OF 1 NO. CLASSROOM, 1 NO. OFFICE, 1 NO. TOILET, 1 NO. MULTISENSORY ROOM, CIRCULATION AND ANCILLARY AREAS, (C) ALTERATIONS AND REFURBISHMENT TO THE EXISTING SCHOOL AND ALL ANCILLARY SITE WORKS. PROVISIONS FOR NEW SENSORY GARDEN TO THE FRONT, AND HARD/SOFT PLAY AREA TO THE REAR. DEMOLITION OF THE DISUSED WATER TANK AND TOWER, PREFABRICATED BUILDING AND REMOVAL OF THE EXISTING OIL TANK TO SIDE/ REAR OF SCHOOL, (D) CONSTRUCTION OF PROPOSED CAR PARKING AREA AND LPG TANKDecision record indexed