Bedroom at dormer level and associated works
Detached storage shed no. 1 (388.50m2), detached tool / battery shed no. 2 (38.9m2), 2 no. sprinkler tanks and pump house (13.95m2) located north of building no. 1. Retention sought for detached storage shed no. 3 (224.60m2) located north of building no. 2 and all associated works
As constructed weighbridge office extension, PRR 20/1282 and all associated site works
New three bedroom single storey dwelling new roadside entrance waste treatment system with percolation and soakaway areas & associated site works
Split level two storey dwelling with domestic garage and services with ancillary works
Change of house type and site plan previously granted under Planning Ref 16/904 and also the provision of a double garage
The construction of a bungalow with new entrance and driveway off existing right of way, new effluent treatment system to current EPA standards and all ancillary site works
Detached bungalow with detached garage together with waste water treatment system to current EPA standards, on site bored well, new vehicular entrance onto main road and ancillary works
Amendments to roof design of previously approved house (Planning Ref No. 21/257) and for the inclusion of 2 No. Velux type windows on side elevation over kitchen area
The construction of a dormer to the lean-to roof at the rear of the existing house, the construction of a new extension, including a conservatory type structure to the West of the existing house, the installation of a new wastewater treatment plant, landscaping and site works associated with the proposed development
Of 1) garden room and 2) garden storage building
The installation of circa. 3,492sq.m array of solar photovoltaic (PV) panels on ground mounted frames on an agricultural plot within the existing Shelton Abbey Open Prison, together with ducting, underground electrical cabling, and all associated site works The proposed development is considered to be within the curtilage of a protected structure (RPS No. 40-05) listed under the current Wicklow County Development Plan 2022-2028. The proposed solar array installation will have no impact on the protected structure, located over 330.00 meters away from the proposed site.
Replacement of an existing 12.9m high support pole carrying associated antennae for a 21 metre high free standing communications structure with its associated antennae, communication dish, ground equipment, fencing and all associated site development works. The development will continue to from part of existing 3G and 4G Broadband network
Construction of a garage/store associated with the domestic use of the existing dwelling, together with landscape screening and associated site works
For a new side extension to side of existing dwelling, removal of existing septic tank, install a new wastewater treatment unit, soil polishing filter and associate works
Renovate and reinstate existing abandoned residential dwelling to include reinstatement of roof structure. Permission is sought to make alterations and to erect an extension to existing abandoned dwelling. Permission is sought to install wastewater treatment facilities to current EPA standard and sink a new bored well water supply and and all associated site and ancillary works
Erection of a new single storey steel shed building to side/rear of existing dwelling and all associated site works
Alterations and additions to an existing single storey detached dwelling, comprising the construction of a new single storey utility room extension to the rear, the construction of a new single storey bedroom extension to the front elevation, and the conversion of an existing detached garage area into home office, together with the construction of a new single storey domestic garage to the side of the existing dwelling, including all ancillary site works. Retention permission is also being sought for the conversion of an existing detached single storey garage structure into ancillary games/garden room at the same address
The removal of external potting and utility sheds and for building 1 new replacement single storey steel shed building to side / rear of existing dwelling and all associated site works
For modifications to the dwelling and site granted permission under Reg Ref 20/746. For (1.) A reduction to the overall subject site area.(2) A revised location for the approved dwelling site layout/entrance driveway. (3). A revised location packaged effluent disposal system with mechanical aeration and polishing filter to current EPA standards (4.) A revised location for a proposed groundwater well and all together with required site and development works
Outline Reg Ref 23/444. The development will consist of a dwelling circa 191msq, a domestic garage, packaged effluent disposal system with mechanical aeration and polishing filter to current EPA standards, a groundwater well, together with all required site and development works
Erect a first floor dormer extension with alterations and revisions to the elevations of the existing dwelling along with all associated site development works
1) new two storey rear extension 2) forming 4 new dormer window structures at first floor 3) for changing of main roof covering from concrete tiles to zinc covering 4) all associated site works
New dwelling house & driveway, a packaged effluent disposal system with mechanical aeration and polishing filter to current EPA standards & a groundwater well together with required site and development works
Proposed new dwelling, upgrade to existing entrance, bored well, effluent disposal systems to EPA Cop 2009 standards and all associated site works
Dwelling,garage, upgrade to existing entrance, bored well, effluent disposal systems to current EPA standards and all associated site works
Proposed waste water treatment system to EPA standards, and associated works
Sunroom to the side of existing dwelling and PERMISSION to remove the entire pitched roof and demolish 111 sqm of the existing dwelling, erect a 272 sqm two storey extension to the first floor and sides of the retained 77 sqm structure with alterations and revisions to the elevations and internal layout along with an additional 32 sqm garage / store linking to the existing garage and all associated site development works
For proposed change of use from industrial/warehouse to plastics recycling facility and associated works
Rear/side extension to existing main cottage. Permission for new extension to the rear of main cottage, which will create a link connection, to existing outhouse buildings, conversion of existing outhouse building to home office/workshop and conversion of existing outhouse building to self-contained apartment/granny flat, with double bathroom extension to the rear-south elevation, one for the studio, one for self-contained apartment/granny flat. Associated site works and some internal alterations
Stable building /storage shed and associated works
Construction of an extension to side and rear of existing garage, creation of a granny flat in part of extension to garage and part of existing garage, creation of boiler room in part of rear extension to garage, removal of 2 containers, new outdoor patio area, new covered canopy area to rear of dwelling, converting rear window in existing dwelling to door and associate works
Demolition of the existing rear extension and replacement with a new extension to the side and rear of the existing cottage and for decommissioning the existing septic tank and installation of a new effluent treatment system to current EPA standards and all ancillary site works
(1) Two storey extension to rear of existing house. (2) New porch & rooflight to front elevation. (3) New high-level windows at first floor level to south elevation of existing house. (4) Alterations to existing window openings to front & rear elevations. (5) New septic tank & percolation area in new location
For a new dwelling with attached garage, new entrance, wastewater treatment unit and soil polishing filter, new well and associate works
Construction of a slatted cattle house/store, cattle handling facilities, farm roadway and farmyard entrance, together with associated concrete yards and site works
Erect a dwelling and garage with services along with all associated site development works
A 36m² garage to the lower ground level of the north east elevation & Permission to erect a 16m² extension to the south east elevation and a 42m² extension to the north east elevation with alterations and revisions to the elevations and internal layout of the existing dwelling along with all associated site development works
1. Demolition of existing ind building units totalling (C.2784.4m2) comprising of a c.7.1m high Overall Main Building (c.2460m2), a c.4.2m high Sub-station (c. 107.3m2), a c.3.6m high Guardhouse (c.106.2m2), a c.3.6m high East-Building (c.39.1m2), c.5m high Water Tank (c.56.8m2) &c.2.6m high Pump House Building (c.15.1m2), assoc works. 2. Dev of 3 no. Data Centre Buildings, ancillary offices & plant comprising of: Data Centre Building A, - a single storey Data Centre Building, with mezzanine 1st floor level offices (GFA c.10,564m2, building height c.13,658m & structures c.15,137m), made up of 2 no. Data Halls & loading areas with assoc 2 no. Dock Levellers & including 10 no. c.14m high flues, & adjacent 1 no. Standby Power Generation Compounds, consisting of 10 no. HV Diesel Generators &belly tanks (GFA c.530 m2), 1 no. storage fuel tank (GFA c.15m2). Data Centre Building B – a single storey data centre building with mezzanine 1st floor level offices (GFA c.18,508m2, building height c.13,658m &structures c.15,137m), made up of 4 no. Data Halls &loading areas with associated 2 no. Dock Levellers &including 20 no. c.14m high flues, &adjacent 2 no. Standby Power Generation Compounds, consisting of 20 no. HV diesel Generators &belly tanks (GFA c.1,060 m2), 2 no. storage fuel tanks (GFA c.30m2). Data Centre Building C – a single storey data centre building with mezzanine 1st floor level offices (GFA c.18,508m2, building height c.13,658m & structures c.15,137m), made up of 4 no. Data Halls & loading areas with associated 2 no. Dock Levellers &including 20 no. c.14m high flues, &adjacent 2 no. Standby Power Generation Compounds, consisting of 20 no. HV Diesel Generators & belly tanks (GFA c.1,060 m2), 2 no. storage fuel tanks (GFA c.30m2). 3. Upgrading of existing 110 kV Substation to comprise of Compound (c. 8539m2) consisting of 11 kV GIS Switch Room (GFA c.708m2), &4 no. External Transformers (GFA c.550m2), a grid connection, security fence & all assoc works & services. 4. Dev of 1 no. Fire Hydrant Pump Hse (GFA c.129m2) with Sprinkler Tank (c.49m2), 1 no. single storey Security Guard Hse (GFA c.48m2) &2 no. vehicular accesses, internal access rds & 224 no. surface car parking spaces. 5. An upgraded attenuation basin, a proposed ww treatment plant &polishing filter. 6. All assoc site services, with c.2.7m high palisade fence, landscaping, boundary & all assoc site development works above & below ground. An EIAR has been prepared in respect of the proposed dev
Dwelling, wastewater treatment system to EPA standards, entrance incorporating revision to existing entrance and associated works
Erect a dwelling and garage with services along with all associated site development works
1. demolition of existing sub-standard rear and side extensions comprising of approx. 59sqm, resulting in the existing dwelling having a gross floor area of 88sqm; 2. construction of a new 308sqm single storey extension consisting of a living block, a 4-bed bedroom block and an entrance and link element; 3. construction of a 68sqm basement; 4. renovation of and internal alterations to existing dwelling; 5. construction of a new wastewater treatment system; 6. Creation of pond water feature to front of existing dwelling; 7. new 20sqm service structure to house plant and equipment to facilitate renewable technologies; 8. new vehicular entrance; 9. all associated site works
The proposed development occupies part of the site of (and will supersede) a previously permitted data centre development under Reg. Ref. 20/1285. The proposed development, for which a ten-year permission is sought, consists of the following: Demolition of the existing structures on site (industrial structures and outbuildings) and site clearance works; construction of 3 no. three storey information and communication technology (ICT) facility buildings, each with a gross floor area (GFA) of c. 16,206 sq.m (c. 48,618sq.m GFA in total), and with a parapet height of c. 19.5 metres; each of the 3 no. ICT buildings will accommodate ICT equipment rooms, mechanical equipment rooms, staff welfare facilities, ancillary office space, security rooms, storage, and loading bays; a customer compound, a power trunk building, a transformer compound and a water tank compound area are provided to the north of the ICT facility buildings; the development includes the extension of the existing road and serving the existing industrial park to access the subject site, with gated access points to the proposed ICT facility development to be provided off this roadway; construction of internal road network and circulation areas, footpaths, provision of 124 no. car parking spaces and motorcycle and cycle parking spaces; landscaping and planting, boundary treatments, lighting, security fencing, and all associated site works including underground foul and storm water drainage network, attenuation and percolation areas, and utility cable (including connections to the substation permitted under ABP Ref. 310090-21, resulting in the partial culverting of an existing drainage ditch), on an application site area measuring c. 9.69 hectares. An Environmental Impact Assessment Report (EIAR) has been prepared and will be submitted to the Planning Authority with the planning application
New agricultural entrance
Construct a stable building consisting of 3 No. stables and tack room and all associated site works
The proposed development seeks permission to amend the development permitted under WCC Reg. Ref.: 23/72 and will consist of the following: • Reconfiguration of the internal layout of the 3-no. permitted ICT facility buildings to include ICT equipment rooms, mechanical rooms, switch rooms, electrical equipment rooms, office accommodation, storage and staff facilities at ground and first floor levels; • Amendments to the southern façade on all ICT facility buildings to include alterations to fenestration, extension of permitted louvered façade treatment, and associated alterations; • An increase of c.113 sq.m to the permitted external generator compound of each ICT facility building at ground floor to accommodate additional plant and equipment; • Amendments to plant and equipment layout at roof level and the provision of 1 no. additional roof-mounted emergency landlord generator on each ICT facility building; • Amendments to the permitted water services compound to provide for 1 no. sprinkler tank, 1 no. hydrant tank, 2 no. hydrant water tanks, 2 no. water storage tanks, 6 no. single storey pump rooms (with a gross floor area (GFA) of c. 52 sq.m each) and 1 no. single storey pump room of with a GFA of c. 46 sq.m; • Revisions to permitted site access arrangements including the omission of a permitted security hut and the provision of a revised sally port entrance system with a single storey gatehouse (c. 43 sq.m) and associated revised internal road network; • Relocation of permitted car parking spaces and the provision of 26 no. additional car parking spaces (149 no. spaces in total), Electric Vehicle (EV) car parking and ducting; • The proposed development also includes alterations to the permitted landscaping and planting, fuel filling areas, boundary treatments, security fencing, lighting, SuDS and drainage, and all associated and ancillary site development works. The operation of the development will require an EPA Industrial Emissions Directive (IE) Licence.
Construction of a new domestic garage
Extensions to dwelling, to decommission existing septic tank, and for proposed treatment system in accordance with EPA 2021
Change of use (removal of planning condition no. 3 of planning ref. no. 04/113) from restricted use as a dwelling to use by all classes of persons
The upgrade of existing effluent disposal system to current EPA standards together with a bored well and all ancillary site works