EXTENSION AND RENOVATION OF AN EXISTING PROPERTY (PREVIOUS PLANNING REFERENCE P93/1230, P96/1400 AND P06/263) AND ALL ASSOCIATED SITE WORKSDecision record indexed
The development will consist of the construction of a new dwelling house, garage, on-site wastewater treatment system, and connection to existing services together with all ancillary site development works.Decision record indexed
Demolition of the original dwelling house, the retention of an extension to the original house and the construction of an extension to the dwelling house, the construction of an extension to existing fuel store, the upgrading of the existing septic tank and soakaway to proprietary treatment unit and percolation area and all ancillary worksDecision record indexed
Development consisting of the removal of 2 no. temporary storage containers and the installation of a new single storey storage building to the rear of Community Centre and all associated site and development works.Decision record indexed
Retain existing dwelling house, septic tank treatment system and existing granny flat to the rear as constructed along with all ancillary site works, previous planning ref. no. P06/2664Decision record indexed
CONSTRUCT DWELLING HOUSE, PROPRIETARY EFFLUENT TREATMENT UNIT, PERCOLATION AREA AND DOMESTIC GARAGE ALONG WITH ALL ASSOCIATED SERVICES.Decision record indexed
CONSTRUCT DWELLING HOUSE, PROPRIETARY EFFLUENT TREATMENT UNIT, PERCOLATION AREA AND DOMESTIC GARAGE ALONG WITH ALL ASSOCIATED SERVICESGrounds not yet categorised
Construct an Extension to Existing Dwelling House, New Septic Tank / Sewerage Treatment System and Associated Site Works and ServicesDecision record indexed
CONSTRUCT DWELLINGHOUSE, PROPRIETARY EFFLUENT TREATMENT UNIT, PERCOLATION AREA AND DOMESTIC GARAGE ALONG WITH ALL ASSOCIATED SERVICESDecision record indexed
CONSTRUCT NEW DWELLING HOUSE, DOMESTIC GARAGE, SEWAGE TREATMENT UNIT AND PERCOLATION SYSTEM, TOGETHER WITH ANCILLARY SITE DEVELOPMENT WORKS.Decision record indexed
CONSTRUCTION OF A NEW DWELLING HOUSE, ON-SITE WASTEWATER TREATMENT SYSTEM, AND CONNECTION TO EXISTING SERVICES TOGETHER WITH ALL ANCILLARY SITE DEVELOPMENT WORKS. A NATURA IMPACT STATEMENT (NIS) HAS BEEN SUBMITTEDDecision record indexed
CONSTRUCT A THREE-BAY SLATTED SHED INCORPORATING A CALF CREEP AREA AND CATTLE CRUSH AND A CONCRETE APRON, ALL AS PER DRAWING DOCUMENTS SUBMITTED TOGETHER WITH ALL ANCILLARY SITE WORKS AND SERVICESDecision record indexed
CONSTRUCT A NEW TWO STOREY EXTENSION TO AN EXISTING DWELLING HOUSE, REMOVE EXISTING THATCH ROOF TO EXISTING REAR EXTENSION AND REPLACE WITH A NEW ROOF FINISH AND ALL ANCILLARY WORKSDecision record indexed
Permission for development at Ballinvilla, Castlebar, Co. Mayo. The proposed development will consist of the construction of a dwelling and ancillary storage shed, new vehicular access point, connection to nearby public water supply with proprietary waste water treatment system, percolation area and all associated site works.Grounds not yet categorised
RENOVATE AND EXTEND EXISTING DWELLING HOUSE, RELOCATE EXISTING DOMESTIC SHED, UPGRADE EXISTING SEPTIC TANK AND PERCOLATION BED WITH A PROPRIETARY EFFLUENT TREATMENT SYSTEM AND SOIL POLISHING FILTER TOGETHER WITH ALL ANCILLARY SITE WORKSDecision record indexed
DEMOLITION OF THE EXISTING REAR CONSERVATORY AND THE CONSTRUCTION OF A REAR EXTENSION TO THE EXISTING DWELLINGHOUSE, ALTERATIONS TO THE EXISTING DWELLING AND FENESTRATION TO ALL ELEVATIONS, TOGETHER WITH A NEW EFFLUENT TREATMENT SYSTEM AND PERCOLATION AREA, AND ALL ASSOCIATED SITE WORKSDecision record indexed
REFURBISHMENT AND EXTENSION OF AN EXISTING BUNGALOW WITH AN INCREASE IN THE EAVES AND RIDGE HEIGHTS TO ACCOMMODATE TWO UPSTAIRS BEDROOMS AND A BATHROOM, WITH ROOF WINDOWS TO THE FRONT AND REAR. THE EXISTING FRONT PORCH AND FRONT WINDOWS ARE TO BE RECONFIGURED. DOWNSTAIRS THE INTERNAL LAYOUT IS TO BE RECONFIGURED AND THE FLOOR AREA EXTENDED TO THE REARDecision record indexed
RETENTION OF EXISTING DWELLING HOUSE AND DETACHED GARAGE, AND THE INSTALLATION OF A NEW ONSITE WASTEWATER TREATMENT SYSTEM TO REPLACE THE EXISTING, WITH ALL ANCILLARY WORKSDecision record indexed
CHANGE OF HOUSE DESIGN AND A CHANGE OF DOMESTIC GARAGE DESIGN FROM THAT PREVIOUSLY APPROVED PERMISSION UNDER P15/752 AND P15/7520 ALONG WITH ALL ASSOCIATED SERVICESDecision record indexed
The development shall consist of: The construction of a new prefabricated residential dwelling, along with all ancillary site works and services.Decision record indexed
The development consists of the retention of a converted domestic garage granted under P98/1485 to habitable space, and the retention of the converted attic space over the original domestic garage for domestic use, including the dormer window installationDecision record indexed
Planning application for the construction of a new dwelling house, garage, on-site wastewater treatment system, demolition of existing barn, and connection to existing services together with all ancillary site development worksDecision record indexed
Construct a private dwelling house, proprietary effluent treatment unit, percolation area and domestic garage along with all associated servicesDecision record indexed
Planning application for the construction of a new dwelling house, on-site wastewater treatment system, demolition of existing barns, and connection to existing services together with all ancillary site development worksDecision record indexed
The proposed development which will consist of the following elements: the installation and operation of 1no. battery energy storage system compound containing battery energy storage containers, 1no. electrical substation and compound, connected to the national grid system via c. 50m of underground cable to the ESB Castlebar 38kV substation, electrical transformers and inverter units, underground cabling and ducting, boundary fencing, security entrance gates, CCTV, internal access road, associated ancillary site development, landscaping and reinstatement works. The operational lifespan of the development will be 35 years. The site of the proposed development has a total area of 0.89 hectares.Decision record indexed
Revision to site layout to that granted planning permission under P23/222 for the construction of an all weather playing field including fencing and lighting and all ancillary worksDecision record indexed