To change use of part of existing shop / filling station to an off licence together with all associated site development works and services
Of(a) attic conversion with dormer and roof windows (b) domestic garage and boiler house (c) boundaries together with all associated site development works and services as constructed
For development which will consist of the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
For the construction of a dwelling house, garage, a proprietary waste water treatment system and ancillary site works
The development will consist of the construction of a dwelling house with connections to existing services together with ancillary site works
The development will consist of the construction of a dwelling house with connections to existing services together with ancillary site works
The development will consist of the demolition of the existing retail unit and storage areas together with ancillary site works
To reconstruct the existing building to Main St., fit new railings and entrance gateway to the street boundary at footpath level and construct an extension to the rear of the building and all associated site and ancillary works
For development which will consist of a dwelling house with proprietary wastewater treatment system and polishing filter together with ancillary site works
For the construction of a new external stepped access route from the rear of the site to the existing first and second floor dwelling units, associated internal alterations including the removal of the internal stairs between first and second floor, and all associated elevational changes and external works at No.'s 4,5 and 6
To retain 2 No. Dormer windows (replacing original roof lights) to the existing second floor dwelling unit, and elevational alterations to the rear of the existing first floor dwelling unit at No's 4, 5 and 6
For the construction of a dwelling house, garage, entrance, wastewater, treatment system and all ancillary site works
To change the use of the existing ground floor shop unit for use as a credit union along with ancillary site works for a period of five years. The development is located within an Architectural Conservation Area.
To construct an external steel balcony to the first floor at the rear of existing house
To build a new dwelling, install a waste water treatment system & all other associated site and ancillary works
RETAIN changes made to the layout and elevations, including increasing the roof height of the existing dwelling, accessed by means of a shared entrance and driveway from the public road, all with associated site works
To RETAIN the existing Garage on site and PERMISSION to extend the existing dwelling house & all other associated site and ancillary works
For development, the development consists of the construction of a calving unit and associated site works
For development which will consist of the construction of a new two storey dwelling, sewage treatment system, and private well with associated site works
Of the existing timber chalet for short-term letting ancillary to the existing music studio together with ancillary site works
For development which will consist of; a) replacement and change of use of existing derelict sheds to provide 5 No. artist studio spaces b) reconstruction, extension and change of use of existing haybarn and lean-to to provide a main studio space with kitchenette, dining area and w.c. and c) replacement of existing substandard septic tank with a proprietary wastewater treatment system and soil polishing filter together with ancillary site works
For the refurbishment and extension to an existing terrace house and all associated site works
To develop the top floor of the existing apartment building into 2 no. apartments and all associated site and ancillary works
Is sought for an external render to the front (south-west) and rear (north-east) facades of the existing two storey dwelling
Of the existing single storey utility and PERMISSION to complete works
For development which will consist of a domestic garage with home office and studio together with ancillary site works
P22/95 to build a dwelling house and garage, connect to public services and carry out all ancillary site works
For development at this site of Armsteads building (a protected structure), Bogbere Street, Ennistymon, Co. Clare. The development will consist of renovation of the existing protected structure and addition of two storey extension to rear, vehicular gate and associated landscaping and ancillary site works, for use as private dwelling with home office and three B&B guest rooms
For two no. dwelling houses and garages Planning Application previously granted under P09/519) Connect to public services and carry out all ancillary site works
For development at this site of Armsteads building (a protected structure) Bogbere Street, Ennistymon, Co Clare. The development will consist of renovation of the existing protected structure and addition of two storey extension to rear, vehicular gate and asociated landscaping and ancillary site works, for use as private dwelling with home office
To convert existing attic to accommodate new heating system, child's play area and wash area
Of existing rear extension to dwelling
To renovate and extend the existing Dwelling House upgrade the existing septic tank with a new waste water treatment system & all other associated site and ancillary works
For the renovation of an existing cottage and single storey extension to the rear of the cottage and all associated site works
To construct an extension to the side of the existing dwelling house along with all associated site works and ancillary services
To construct a first floor extension on top of the existing single storey extension to the side of the house and RETENTION permission for elevational changes to the dwelling house and the construction of a garden shed along with all associated siteworks
For development at this site of a private dwelling house, polytunnel dome, refurbishment of the existing access lane with widened entrance and all necessaries utilities and services connections. The existing dwelling shall be retained and incorporated in the new dwelling house
The development will consist of the permanent change of use of the existing Family Resource Centre building, from community support facility to Creche and preschool, with RETENTION of the following: changes to fencing to external play area; additional fencing around main entrance; new fire escape door; replacement of door with window; and 3No storage sheds and a Polytunnel
For development which will consist of the demolition of existing single storey garage, construction of new storey and a half one bedroom studio accommodation, new boundary fencing and gates, on site parking, connection to public mains water and sewage and all associated site works
For the following works a) to construct a two-storey side extension and single-storey rear extension to existing house b) a new boiler house c) single storey office/store d) new front boundary wall along with associated site works
To build a new Dwelling house, install a wastewater treatment system & all other associated site and ancillary works
To rebuild, extend and renovate the derelict house on site, install a wastewater treatment system and all other associated site and ancillary works
To construct a new dwelling house with waste water treatment system and all associated site works and services
For the Construction of a new dwelling house with waste water treatment system, and all associated site works and services
For the following works, (A) change the use of the development granted under existing permission P19-333 as a retirement village and presently under construction, to use as residential, (B) change the internal layout, including minor elevational changes to the refurbished convent building as granted, and presently under construction, to provide 13 apartments made up of 1 x 1 bedroom apartment, 10 x 2 bed apartments and 2 x 3 bed apartments and (C) change the site boundaries and layout as granted, all with associated site works
To build a new dwelling house with garage, install a waste treatment system, creating a new entrance to the public road and all associated site and ancillary works
To alter the design of the previously granted permission approved under Planning Reference P21/1199 for a new dwelling house with garage, waste treatment system, new entrance to the public road and all associated site and ancillary works approved under Planning Reference P21/1199
For the construction of a new extension and modifications to existing dwelling house, new waste water treatment system along with all ancillary site works
To build a new dwelling, create a new entrance onto the public road, connect to public services and all associated site and ancillary works. A Natura Impact Statement has been prepared and will be submitted along with the planning application
Of the porch onto the front of the existing dwelling & all other site and ancillary works