Mixed use development will consist of 28 residential units(comprising 1-1 bed units; 16 2-bed units and 11 3-bed units (including terraces and balconies) an office unit (100sq.m), 2 retail units (87sq.m and 154sq.m), ancillary bin stores (16sq.m) and bike storage area (29sq.m) across 4 blocks (Blocks A to D); the breakdown for the individual Blocks is as follows: Block A (3 storeys (1,497sq.m), 7 apartments and 7 duplex apartments; Block B (3 storeys (851sq.m) 4 apartments and 4 duplex apartments; Block C (3 storeys (777sq.m), 6 apartments and 2 retail units and Block D (2 storey (243sq.m), the refurbishment, alteration and extension of the existing 2 storey former public house (including the demolition of a 3sq.m rear lean-to) and its change of use to 1 office unit and 1 apartment with new bin stores and bike store to the rear. The provision of private open space, communal and public open space; surface car parking (30 spaces); all hard and soft landscaping including boundary treatments; SUDS measures including attenuation tanks; PV panels; changes to levels and all other associated site excavation and site development works above and below ground. Vehicular access will be form Pairc Mhuire to the south. The existing perpendicular public parking on the north side of Pairc Mhuire will be replaced with 4 perpendicular car parking spaces on Pairc Mhuire and 2 parallel car parking spaces on the eastern side of Boherboy Road. The site is bounded by Main Street to the north, public open space to the east, Pairc Mhuire to the south and Boherboy Road to the west. it previously accommodated a petrol filling station and a public house (part of which remains on site).
Change of use for the ground floor of the existing two storey Public House Block D (disused/vacant) and the ground floor of the proposed Block C. The application seeks modifications to Block C and Block D of the previously granted permission SDCC Reg. Ref. SD18A/0202. Block C comprised a 3 storey building accommodating 2 no. retail units on the ground floor and 6 no. apartments (5 no. 2 bedroom and 1 no. 1 bedroom) across the first and second floor. Block D comprised refurbishment, alteration and extension of a 2 storey existing Public House building to accommodate 1 no. commercial office unit on ground floor and 1 no. 2 bed apartment on the first floor along with a new bin/bike store at the rear. The modifications seek a change of use from previously granted retail/commercial use to residential use to provide an additional 4 no. 2 bedroom apartment units on the ground floor of Blocks C & D. The proposed works to Block C include a change of external material finishes and replacing the glazing of retail units with windows for the proposed apartment units on the ground floor to accommodate 3 no. 2 bedroom apartments accessed through entrance corridor. The proposed works to Block D include removing the existing doors/windows and replacing them with new doors/windows to match the existing to accommodate 1 no. 2 bedroom apartment on the ground floor of the existing two storey former Public House. All with associated bin store, bicycle store and associated site works.
Single storey 3 bed detached split level dwelling along with ancillary works to include new vehicular entrance, on site wastewater treatment system and percolation area, landscaping and all associated site works.
For demolishing of existing extension to rear & provision of new entrance & porch to front. Construction of one two storey, two bedroom semi-detached townhouse with solar panels 3m x 2m to front elevation with private entrance adjoining existing property
(A) Construction of 1no. two storey, end of terrace 2-bedroom dwelling (76sqm) with new vehicular entrance off road. (B) All associated site development, landscaping and drainage works to facilitate the development; ancillary works for foul water to public drainage system and provision of surface water soakaway to meet BRE Digest 365 standards for the new dwelling.
Permission for demolishing of extension to rear and provision of new entrance and porch to front. Construction of one, two storey, two bedroom semi-detached townhouse with solar panels 3m x 2m to front elevation with private entrance adjoining existing property.
Move entrance & demolish existing extension to rear; construction of 1 two storey, three bedroom dwelling to adjoin existing property.
The development will consist of a 4.42 hectare stie currently in use as Greenogue Recycling to include the following; A) Demolition of existing green recycling structures on site including office and storage shed with total area of 2,265m2. B) Construction of 7 no. warehouse units, with maximum height of 15.3 meters, all with ancillary office, staff areas, bin stores etc. Each unit has access to service yard and HGV loading / unloading area. The total floor area of the warehouse development is 16,602.2 m2, made up as follows; i) Unit 1 - gross floor area of 3,851.1 m2. ii) Unit 2 - gross floor area of 3,886.8 m2. iii) Unit 3 - gross floor area of 2,758.3 m2. iv) Unit 4 - gross floor area of 1,685.4 m2. v) Unit 5 - gross floor area of 1,062.2 m2. vi) Unit 6 - gross floor area of 1,679.2 m2. vii) Unit 7 - gross floor area of 1,679.2 m2. C) Access to be provided from existing entrance to the site via Tay Lane. New footpaths / cyclepaths throughout the site including a new footpath / cyclepath connection to the Greenogue Logistics Park to the north of the site. D) 170 no. car parking spaces and 100 no. secure, sheltered bicycle parking spaces to serve the warehouse units. E) All ancillary site development works to include; minor realignment of site entrance, landscaping, internal raods, drainage, utility services, service yards, HGV loading / unloading areas, level access goods doors, dock levellers, site lighting, boundary treatments, signage, storm water drainage network, underground water and foul servicing, green roofs on warehouse units, form part of this application.
The construction of a new one-bedroom single storey timber frame dwelling to the Northwest of the rear garden. ii). Alterations to existing site entrance to facilitate visibility lines. iii). Connection to existing foul sewer. iv). All associated site works and landscaping.
Erection of non-illuminated signage to the front of the building.
Construction of 2 storey kitchen/dining/living/bedroom extension to side; Porch extension to front; Detached garage to side and all associated site works.
Detached two storey house, single storey domestic garage, connection to foul sewer, entrance and all associated site works.
Construction of a single storey shed (144sq.m) to be used as a storage area; Weights and fitness training area.
Demolition of existing single storey dwelling and the construction of 274 units on a 4.62 ha (net) site (density 60 units per hectare). It will comprise of 51 houses, 38 duplex units and 185 apartments. The height of the proposed scheme will range from two storey houses and three storey duplexes to 5 storey and part 8 storey apartment blocks. The proposed residential mix will comprise of: 17 2-bed houses, 27 3-bed houses and 7 4-bed houses, 2 1-bed duplex, 17 2-bed duplex and 19 3-bed duplex units, 62 1-bed apartments, 119 2-bed apartments and 4 3-bed apartments. A 4-classroom crèche of c. 276 sq.m and 2 substations are also included in the proposed development. 276 car parking spaces and 634 bicycle spaces are provided. A planted woodland berm will be developed along the northern boundary with the N7 to provide a sound barrier and amenity open space. There are a number of green spaces located in the centre of the site and on the south east and west of the site with natural play and SUDS elements as well as a large open communal space for the two apartment blocks to the south. Vehicle, pedestrian and cycle access to the site will be from the Mill Road. A new road will be constructed running east west at the southern boundary of the site. The residential element of the site will have two access points off the proposed new road. This new route will extend eastwards to provide cycling and pedestrian connections through neighbouring Citywest lands and to the Saggart LUAS light rail terminus. Secondary access is proposed at the north west of the site from an existing access road connecting to Mill Road. This access is designed as services and emergency only and will be controlled by collapsible bollards.
Construction of two storey extension (55sq.m) with dormer windows to the side of existing dwelling; internal modifications to the existing structure and all associated site works.
Planning permission to upgrade existing vehicular access by setting it back from the public road and creating a splayed entrance with a gate and fence; aswell as retention permission for the laying of a driveway and permeable hardstanding.
Demolition of the existing dwelling (252sq.m) and associated domestic garage (49sq.m) and shed (12sq.m) located towards the north-west of the site and the construction of 3 warehouses with ancillary office and staff facilities and associated development as follows: Unit 1 will have a maximum height of 15.75 metres with a gross floor area of 5,619sq.m including a warehouse area (5,041sq.m), ancillary office areas (182sq.m) and staff facilities (396sq.m); Unit 2 will have a maximum height of 16.35 metres with a gross floor area of 6,724sq.m including a warehouse area (6,135sq.m), ancillary office areas (275sq.m) and staff facilities (314sq.m); and Unit 3 will have a maximum height of 18.9 metres with a gross floor area of 10,095sq.m including a warehouse area (9,335sq.m), ancillary office areas (399sq.m) and staff facilities (361sq.m); the development will also include the provision of a new vehicular access to the site from the Aerodrome Roundabout in lieu of the extinguishment of existing multiple access points from the R120 Newcastle to Rathcoole Road; internal roundabout; pedestrian access; 187 ancillary car parking spaces; bicycle parking; HGV yards; level access goods doors; dock levellers; access gates; signage; hard and soft landscaping; lighting; boundary treatments; ESB substations; sprinkler tanks; pump houses and all associated site development works above and below ground.
The following works replacement of existing grass football pitch with a synthetic grass 3G all- weather pitch to a maximum size of 139m x 87m., reprofiling the ground level in order to achieve a more level playing surface encompassing the increase. in levels in parts of the pitch by up to 1 metre. Install perimeter weld mesh fence of varying heights 1.2m-3.0m, relocated ball-stop netting and posts behind goals. All related hard and soft landscape works including extended spectators' area, goal storage area and soft landscaping and all ancillary works.
Alterations to an existing granted planning permission (Reg. Ref. SD20A/0258) for warehousing; alterations relate to Unit 2 only on its 1.316 ha site including change of use of 24sq.m. of warehouse floor area to staff facilities due to addition of single storey staff facilities block in the south-west corner of the warehouse; change of use of 97sq.m of warehouse floor area to ancillary office (38sq.m) & staff facilities (59sq.m) due to extension of the ancillary office block on ground floor; alterations also result in increase in the overall staff facilities area by 7sq.m (from 314sq.m to 321sq.m) and increase in the overall office area by 139sq.m (from 275sq.m to 414sq.m); addition of 232sq.m of charging area (including 6sq.m change of use from warehouse to charging area) as the extension of the rear of warehouse (southern elevation); alterations result in total building area increase by 254sq.m (from 6724sq.m to 6978sq.m); associated elevational revisions; associated site plan & drainage layout adjustments due to the inclusion of the above alterations; all other details remain as per the granted application Reg. Ref SD20A/0258 such as site access, site boundaries, landscaping, external surface finishes, water supply, attenuation tank, drainage & outfalls.
The development will consist of the construction of a single storey timber residential structure on the lands at McDonagh's Lane, Glenaraneen, Brittas, Co Dublin
Retention of construction of a single storey timber residential structure.
The development will consist of the replacement of an existing grass training pitch with a synthetic grass 3G all-weather pitch (maximum size 74m x 34.5m), Installation of perimeter weld-mesh fencing of varying heights (1.2m to 3.0m), installation of ball-stop netting and posts behind goals, flood lighting columns and all associated hard and soft landscaping and ancillary works, including new steps and a pedestrian entrance to St. Mary's National School.
2 above ground firefighting water holding tanks and 2 integrated pumphouses plus ancillary works to serve the 2 industrial development sites currently under construction at Block A & B.
Retention application consists of the following: 1) Provision of fenced turnstile & pedestrian gate to the main building entrance on the front (north-east) elevation; 2) Provision of external ramped access to ancillary Office Block B2 and separate stepped access/egress platform on the side (north-west) elevation; 3) Provision of additional fencing and new barriers to existing HGV access/egress gate plus new pedestrian entrance gate; 4) Provision of gatehouse to HGV gate, 23m2, 3m high; 5) Provision of new paladin fence & second pedestrian gate on the side (north-west) elevation; 6) Provision of car access/egress barriers in and out and directional arrow road markings; 7) Provision of 23no. EV charging for logistics vehicles and 3 no. EV rapid chargers for logistics vehicles; 8) Provision of Sprinkler Tank 10.70m diameter, 9.39m high, effective capacity = 657m3, to rear (south-west) yard; 9) Provision of Pump House 29m2, 3.2m high, adjacent to above referenced sprinkler tank; 10) Provision of 2no. location of new paladin fence and fire tender gates within the site.
Erect 3 no. company logo advertising signs, smoking shelter, sheltered cycle parking spaces, and compactor canopy at Block B, College Lane, Greenogue Rathcoole Co. Dublin. The application consists of the following: Proposed 3no. non-illuminated signage company logo lettering; total area of 24.78m2 located 13.70m above ground floor level on the front (north-east) and side (north-west) elevation; Proposed smoking shelter located at front north-east elevation, 3.90m2, 2.68m high; Proposed 20no. sheltered cycle parking spaces at front north-east elevation; Proposed compactor canopy, 48m2, located 3.51m above ground floor level on the side north-west elevation.
Subdivision of existing Block B, College lane, Greenogue, Rathcoole, Co. Dublin (existing areas: 23,421sq.m single warehouse and 2,963sq.m ancillary office/staff facilities as granted under application Ref. SD19A/0265 into 2 warehousing units as follows: (1) Unit 81 to contain 15,815sq.m existing warehouse area, 2,905sq.m existing ancillary office/staff facilities area and (2) Unit 82 to contain 7,569sq.m existing warehouse area, 58sq.m existing ancillary staff facilities area, 37sq.m change of use of existing warehouse to ancillary office/staff facilities area at ground floor and 636sq.m additional 2-storey ancillary office/staff facilities on 1st & 2nd floor; the above proposal includes minor elevation adjustments to south & west elevation of Unit 82 to facilitate the additional ancillary office/staff facilities, subdivision of the rear HGV yard by internal fencing, provision of new HGV & car access gate to Unit 82 from the existing estate access road, provision of 36 carpark spaces including 2 disabled spaces and 24 bicycle spaces, pedestrian access & footpath from the new gate to the new ancillary office and associated drainage adjustments, note this planning submission is one of two independent applications for subdivision options to Block B.
Subdivision of existing Block B, College Lane, Greenogue, Rathcoole, Co. Dublin (existing areas: 23,421sq.m single warehouse and 2,963sq.m ancillary office/staff facilities as granted under application Ref. SD19A/0265 into 2 warehousing units as follows: (1) Unit B1 to contain 13,719sq.m existing warehouse area, 2,905sq.m existing ancillary office/staff facilities area; (2) Unit B2 to contain 9,665sq.m existing warehouse area, 58sq.m existing ancillary staff facilities area, 37sq.m change of use of existing warehouse to ancillary office/staff facilities area at ground floor and 636sq.m additional 2-storey ancillary office/staff facilities on 1st & 2nd floor; the above proposal includes minor elevation adjustments to south & west elevation of Unit B2 to facilitate the additional ancillary office/staff facilities, subdivision of the rear HGV yard by internal fencing, provision of new HGV & car access gate to Unit B2 from the existing estate access road, provision of 36 carpark spaces including 2 disabled spaces and 24 bicycle spaces, pedestrian access & footpath from the new gate to the new ancillary office and associated drainage adjustments. (Note: this planning submission is one of two independent applications for subdivision options to Block B).
Construction of 1 two bedroom, single storey detached short let self-catering tourist accommodation Unit A; 2 two bedroom single storey, semi-detached short let self-catering tourist accommodation Unit B; use of the existing two bedroom bungalow as caretaker residential accommodation and all ancillary landscape and site services works.
Replace the existing 16 metre floodlight with a new 20 metre high structure carrying telecommunications equipment and floodlights; ground level equipment cabin and fencing.
Alteration to previously granted planning permission (Reg. SD19A/0407, SD21A/0200 & SD22A/0092) for development at Site C (2.7ha site).
Amendments principally comprising of an overall increase in the commercial floor area by 15,479sq.m from the permitted 13,959sq.m to 29,438sq.m; the permitted scheme has 3 internal ancillary office floor levels, and the proposed alterations provide 2 mezzanine levels in the warehouse area (i.e a total of 5 internal floor levels); the permitted maximum height of the development at 23.7 metres will remain unchanged; the additional 15,479sq.m development proposed will comprise an increase in the warehouse floor area from 12,369sq.m to 13,353sq.m, staff facilities from 548sq.m to 2,582sq.m and ancillary office area from 1,042sq.m to 2,437sq.m; in addition to the provision of a 2 storey mezzanine warehouse area (9,703sq.m), integrated plant room (434sq.m) and plant area on 2 floors (929sq.m); construction of a 2 storey car-parking area (4,057sq.m and 7.8m height) to accommodate an increase from the previously permitted 119 ancillary car parking spaces to 190 car parking spaces; 13 designated van parking spaces (no dedicated van spaces previously proposed); 72 permitted cycle parking spaces; reconfiguration of the HGV yard and an increase in the number of HGV dock levellers from 12 to 14 and the provision of 16 van loading level entry doors; the provision of an additional egress on the eastern boundary to facilitate vans exiting the site; sprinkler tank and associated underground pumps; repositioned ESB substation (15sq.m and 3m height); bin storage (42sq.m and 2.9m height); amended lighting layout; signage; modifications to hard and soft landscaping and boundary treatments; and associated site development works above and below ground.
Modifications to a permitted warehouse development (as granted under SD19A/0407, as amended by SD21A/0200); The amendments principally comprise an overall increase in the commercial floor area of the warehouse by 2,334sq.m from the permitted 27,683sq.m to 30,017sq.m; The modifications proposed include: an increase in plant/machinery areas from 1,363sq.m to 3,933sq.m (principally through the provision of an additional mezzanine level within the warehouse area to accommodate plant/machinery); a reduction in the permitted mezzanine level 2 from 9,703sq.m to 9,349sq.m (principally through the provision of opes in the mezzanine floor to accommodate machinery associated with an advanced picking system); an increase in warehouse floor area from 14,225sq.m to 14,282 sq.m; an increase in staff facilities from 1,616sq.m to 1,659sq.m; and an increase in ancillary office area from 776sq.m to 794sq.m; The development will also include: the provision of security hut (14.7sq.m) close to the southern site boundary; the relocation of the building's main entrance stair core at the western elevation; elevational changes including the repositioning of 2 level entry doors and 1 dock leveller and the associated canopy, repositioning of fire escape doors, removal of 2 M&E rooms; internal modifications including the insertion of a warehouse toilet block at ground floor level, repositioning of stair cores; the provision of a pedestrian gate adjacent to the bin store; reduction in bin area from previously approved 45sq.m to 38sq.m; provision of compactor in place of 1 van parking space along the south-east boundary resulting in the reduction of van parking spaces from 12 to 11 in a modified arrangement; relocation of van egress gate further south; modifications to the position of the van loading entry doors and associated canopy; modifications to hard and soft landscaping and boundary treatments including the provision of a paladin fence separating the car parking area and the HGV circulation area and removal of 2 green walls; and all associated site works above and below ground.
Provision of a warehouse unit with ancillary three storey office and staff facilities and associated development; the building will have a maximum height of 23.7m with a gross floor area of 13,959sq.m including a warehouse area (12,369sq.m); staff facilities (548sq.m) and ancillary office area (1,042sq.m); provision of one new vehicular access/egress point at the northern corner of the subject site and one HGV access/egress point at the southern corner of the subject site which connects onto the internal access road for two adjacent permitted warehouses (Reg. Ref. SD18A/0265) and permitted waste metal facility (Reg. Ref. SD19A/0065) which links to the Greenogue Roundabout on the R120; 119 ancillary car parking spaces; bicycle parking; HGV yard with 12 loading bays; level access goods doors; dock levellers; hard and soft landscaping; ESB substation (9sq.m); boundary treatments and associated site development works above and below ground.
Reduction of the warehouse office/staff facilities block at south-east corner of the building, decreasing the overall staff facilities floor area by 290sq.m (from 396sq.m to 106sq.m) and overall office floor area by 60sq.m (from 182sq.m to 122sq.m). Change of use of 177sq.m staff facilities floor area to the warehouse floor area at the ground floor (warehouse floor area was 5041sq.m to 5218sq.m). Associated elevational revisions. All other details remain as per granted application Reg. Ref SD20A/0258 such as site access, site boundaries, landscaping, external surface finishes, water supply, attenuation tank, drainage and outfalls. The alterations relate to Unit 1 only on its 1.32ha site.
The development will consist of: The installation of Solar PV Panels to be mounted on the rooftop of an existing warehouse building and all associated ancillary infrastructure. PV Panels will not extend above parapet line.
Alterations to existing granted planning, Ref. SD19A/0065, for a proposed Waste Metal Transfer Facility including Waste Electric & Electronic Equipment (WEEE). The subject alterations for which planning permission is sought for are as follows: (1) Reconfiguration of the floor plan areas as follows: (A) Provision of 535sq.m additional floor area due to introduction of areas as follows - (A.1) Extended display area at ground floor of ancillary office, addition of 46sq.m floor area, (A.2) Extended open plan office at first floor of ancillary office, addition of 20sq.m floor area, (A.3) Single storey ancillary storage facility to the front north-east elevation totalling 166sq.m with overall height 7m, (A.4) Mezzanine area to the south eastern side of Light Industrial Unit, totalling 303sq.m. Alterations listed above result in total building area Increase from 4391sq.m to 4926sq.m as shown at the revised table of gross Internal floor areas & uses. (B) Change of use of 64sq.m of light industrial unit floor area to staff facilities due to the introduction of: (B.1) Enclosed stairs from Light Industrial Unit to ancillary office/staff facilities (overall 31sq.m), (B.2) single storey cleaners store and storage at ground floor to the north-eastern comer of light industrial unit (overall 33sq.m). (C) Change of use of 100sq.m of workshop charging area & staff facilities to workshop area & single storey office/staff facilities. (D) Introduction of full height dividing wall at light industrial unit. 2. Elevations alterations as per list above plus additional alterations as follows: (a) Provision of full height cladding (ground floor to roof) to light industrial unit and ancillary Workshop. (b) Introduction of 11m wide x 6m high open to light industrial unit side (north-western) elevation, (c) Rearrangement of all fire exit & level access doors to light industrial unit & ancillary workshop including omission and addition of the same, (d) Introduction of integrated modular louvre system to light industrial unit rear (southwestern) & side (north-western) elevation, (e) Introduction of canopies to the ancillary office main entrance and above 11m wide open & dock levellers to light industrial unit side (north-western) elevation. (3) Site plan alterations as follows: (a) Rearrangement of car parking spaces due to provision of office extended display area to the front (north-eastern) elevation, (b) Provision of new finish floor level to office/staff facilities and Workshop and associated site levels adjustments, (c) Provision of a new boundary fence type (paladin fence) throughout the development, (d) Provision of additional weighbridge - overall 2 proposed and rearrangement of brush wash and steam wash between workshop and site's north-western boundary, (e) Provision of building protection bollards to workshop side elevations (south-east and northwest), (f) Associated drainage adjustments due to the inclusion of the alterations above plus reduction of surface water and foul sewer outfall route as per as built access road and services which serve built developments to the east of the site. All other details such as landscaping, lighting, external surface finishes, Environmental Impact Assessment Report (EIAR), Flood Risk Assessment etc. will remain as per the granted application ref. SD19A/0065.
Demolition of the existing prefabricated extension structure and dilapidated extension and the construction of a new single storey 87sqm extension to the existing cottage with new pitched and flat roofs, raising of the existing cottage roof and walls, internal alterations, associated site works, services and landscape.
Provision of signage on the north, south and west elevations; Provision of a storage yard, access road, mesh fence and walls to the west of Unit G; Additional door to access storage yard on the west elevation and all associated landscaping and ancillary works to facilitate the development.
Demolish existing garage and connecting wall to house to modify the existing house; block window and change existing windows to large sliding door opening and form new dormer windows and ridge roof light to roof on south east elevation; demolish chimneys; form new entrance canopy and decorative piers from new dormer windows and dormer roof extension and change windows and door ope to north west elevation; raise first floor gable window head heights; new door and ground floor window to north east gable and re-roof entire house with new selected roof tile as well as change all elevation finishes to brick cladding on new external insulation; carry out internal alterations including increase first floor bedroom space into existing attic.
Single storey dwelling and detached garage with bored well and packaged waste water treatment system & polishing filter to EPA Code of Practice 2009, accessed from existing right of way.
Change of use from aparthotel to restaurant, together with external signage and all associated site works.
Removal of existing modular dwelling and construction of 2 bedroom bungalow, with associated vehicular access, wastewater treatment system with percolation area.
Removal of existing modular dwelling and construction of 3 bedroom dormer bungalow, with associated vehicular access, wastewater treatment system with percolation area.
Retention for a single storey dwelling with a vehicular access; Permission for the installation of an Oakstown Treatment Plant with sand polishing filter and all associated site works.
New detached bungalow type dwelling house, (B) New vehicular recessed entrance off L7377 Mount Seskin Road, (C) New onsite domestic wastewater treatment system, (D) Landscaping and all associated site development works on lands at Intersection of Meagan's Lane and L7377 Mount Seskin Road, Crooksling, Saggart, Co. Dublin.
Retention of existing 15m high telecommunications support structure carrying antennas and dishes; associated equipment container; security fence.
Construction of a domestic garage to the rear of the existing dwelling
Construction of a Self-Storage building with ancillary facilities and associated development. The Self-Storage building will have a maximum height of 9.745 metres with a Gross Floor Area of 1,796 sq m including storage area (1,698 sq m) and ancillary facilities (98 sq m). The development will also include: a vehicular entrance/exit to the site via Tay Lane; 6 No. ancillary car parking spaces (including 1 No. accessible parking space); loading bays; external fire escape stairs; an external canopy; boundary treatments; hard and soft landscaping; lighting; and all associated site and development works above and below ground.
Planning Permission for Alterations to amend the previous granted permission (Reg Ref SD23A/0178) for a Self-Storage Facility revised to provide an open hard surfaced yard to be used for the parking of vehicles and trailers and external storage of non-hazardous goods with all associated works and Ancillary WC Facility at Tay Lane, Greenogue, Rathcoole, Co. Dublin. The subject alterations for which Planning Permission is sought are as follows: 1. Permitted Self-Storage Facility omitted to provide an open hard surfaced yard 2,468m2 to be used for the parking of vehicles and trailers and external storage of non-hazardous goods; 2. Provide a single storey Ancillary WC Facility, 27m2, 4.2m high, to the North-East boundary of the site. 3. Omission of 6 no. car parking spaces to the side (north-western) elevation; 4. Adjusted HGV site entrance set back to accommodate a recessed HGV Access/egress; 5. Provision of 9m wide HGV sliding gate; 6. Associated landscape adjustment due to the inclusion of the alterations above; 7. Associated drainage adjustments due to the inclusion of the alterations above.
Amend previously permitted application Ref. SD21A/0230 consisting of the installation of two external water tanks and associated concrete slabs, guardrails and access ladders, to the north-east of Units F & G (currently under construction) and all associated landscaping, infrastructure and site development works to facilitate the development.